Loading...
HomeMy WebLinkAboutWORK ORDER - BID - 5954 DIRT HAUL OFF FRONT RANGE VILLAGEEXI-11 IT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN p TI3E CITY OF FORT COLLINS J and Connell Resources DATED: April 15, 2008 Work Order Number. 9-740700-08 Project Title: Harmony/Ziegler Front Range Village Project Commencement Date: April15,2008 Completion Date: May 15, 2008 Maximum Fee: (time and reimbursable direct costs): not to exceed 90,000.00 Project Description: Dirt haul off Front Range Village. Scope of Services: Haul excess material/dirt fromFront Range Village to the Flatiron pit off Strauss Cabin and Horsetooth. Per Quote dated 4/9/08, bid #2071031. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including tine attached forms), the Services Agreement shall control. Service Pro ' r By, D e: April 15, 2008 Approved By: Purchasing Agent over $30,000 The attached forms consisting of three (3) pages are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given. City of Fort Collins Date: ApH115, 2(Y08 Connell Resources, Inc. 7785 Highland Meadows Pkwy, #100 Fort Collins, CO 80528 ■ Phone: (970) 223-3151 Fax: (970) 223-3191 Estimator: Jennifer Acton QUOTATION Date: 4/9/2008 Submitted To: City Of Fort Collins - Engineering Bid Title Dirt Haul Off Front Range Village April 08 Address: 281 North College Avenue Bid Number: 2071031 Fort Collins, CO 80522 Project Location: Contact: Craig Farver Project City, State: , Phone: 970-221-6605 Fax: 970-221-6378 Engineer/Architect: We offer for your consideration the following Quotation which, if accepted, shall constitute a contract between us. Item Description Unit Unit Price D. Earthwork Export Excess Material CY $3.50 Knock Down W/ Blade HR $161.00 Notes:. Pricing Is based upon request per City of Fort Collins to have Connell load and haul excess material from Front Range Village to the Flatiron pit off Strauss Cabin and Horsetooth, Connell will have a blade knock down the material. Approx. 3000 CY. .The following are excluded fi om this proposal: Construction layout and engineering; Drainage facility certification; Performance and Payment bonds; Warrantee period in excess of one year; Street cleaning for work performed by others; Permits: including but not limited to, city building, development construction, construction dewatering, wastewater discharge, storm water discharge (NPDES), air quality, etc.; Fees, including but not limited to, for developement, inspection, utility connection, meters, etc,; Dewatering; Maintenance of erosion control devices for others; quality control or acceptance testing; prairie dog removal, relocation, or extermination; landscaping, seeding, or revegetation. . Pavement Drainage less than 1.5% designed or obtainable fall will not be guaranteed. . All work is contingent on the availability of construction water, access to the work, negotiation of acceptable contract terms, a mutually agreeable schedule, and verifcation of financing. . Please provide a minimum of 2 weeks advanced notification of work requests to allow for scheduling the work. No work will be completed without a signed Contract Agreement. Work is anticipated April l0th-18th. Dependent on weather. Dirt Haul Off Front Range Village April 08 Page 1 of 2