Loading...
HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 8852112 BOBCAT RIDGE CALVING SHED RESTORATION PROJECT BCR0308CS:., ::: EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND WRIGHT-BALLARD CONSTRUCTION, INC. 6821 AARON DRIVE FORT COLLLINS, COLORADO 80524 DATED: MARCH 14, 2008 Work Order Number: BCR030SCS Purchase Order Number: Project Title: BOBCAT RIDGE CALVING SHED RESTORATION PROJECT Commencement Date: ASAP Completion Date: April 30, 2008 Maximum Fee: (time and reimbursable direct costs): I9 I d' Project Description: Bobcat Ridge Calving Shed Restoration Project Scope of Services: Support remainder of roof, remove old broken/dislodged cinder block approximately 64 feet, remove/excavate dirt pushing wall in, drill holes in footer for %" rebar at 4'0" O.C., lay new cinder block and grout in rebar, remove temporary supports, clean up job site, install backer rod and caulk in cracks in concrete pan on West side of building, caulking to be Sika-Flex or Sonolastic NP-1. Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. Professional: By: Date: WOPSA 05/01 The attached forms consisting of 1 (, pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. City of Fort Collins By: Date: By: Director of Purchasing and Risk Management (over $30,000.00) Date: WRIGI3T-BALLARD CONSTRUCTION, INC. 6821 Aaron Drive Fort Collins, CO 80524 rill City of Fort Collins Parks Department PO Box 580 Fort Collins, CO 80522-0580 ESTIMATE DATE 2/28/2008 PROJECT NO. 08018 JOB SITE Bobcat Ridge DESCRIPTION TOTAL Support remainder of roof 9,838.00 Remove old broken/dislodged cinder block approximately 64 feet Remove/excavate dirt pushing wall in Drill holes in tooter for 1/2" rebar at 4'0" O.C. Lay new cinder block and grout in rebar Remove temporary supports Clean up job site Install backer rod and caulk in cracks in concrete pan on West side of building Caulking to be Sika-Flex or Sonolastic NP-1 170'60_7q _7F,020(o. Ua -7cP3 3cc 7ou i All material is guorsmteed to be as specitied, and the above work to be pertbrmed in TOTAL. $9,838.00 accordance with the drawings and specifications submitted for above work and completed in a substantial workmanlike manner. Any alteration or deviation 'rem above specifications involving extra costs, will be executed only upon written orders, and will become an extra charge over and above the estimate. Al I agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary insurance upon above work. Workman's -- Compensation and Public Liability Insurance on above work to be taken out by WRIGHT-BALLARD CONSTRUCTION, NC. Customer/Data 33,Alv