Loading...
HomeMy WebLinkAbout132158 CTL/THOMPSON INC - CONTRACT - RFP - P1107 GEOTECHNICAL TESTING SERVICEPROFESSIONAL SERVICES AGREEMENT WORK ORDER TYPE THIS AGREEMENT made and entered into the day and year set forth below by and between THE CITY OF FORT COLLINS COLORADO a Municipal Corporation hereinafter referred to as the City and CTL Thompson Inc hereinafter referred to as Professional WITNESSETH In consideration of the mutual covenants and obligations herein expressed it is agreed by and between the parties hereto as follows 1 Scope of Services The Professional agrees to provide services in accordance with any protect Work Orders for P1107 Geotechnical Testing Services issued by the City A blank sample of a work order is attached hereto as Exhibit A consisting of Three (3) pages and is incorporated herein by this reference The City reserves the right to independently bid any protect rather than issuing a Work Order to the Professional for the same pursuant to this Agreement 2 Time of Commencement and Completion of Services The services to be performed pursuant to this Agreement shall be initiated as specified on each Work Order Time is of the essence Any extensions of any time limit must be agreed upon in writing by the parties hereto 3 Contract Period This Agreement shall commence April 9 2008 and shall continue in full force and effect until April 1 2009 unless sooner terminated as herein provided In addition at the option of the City the Agreement may be extended for additional one year periods not to exceed Four (4) additional one year periods Pricing changes shall be negotiated by and agreed to by both parties and The Denver Boulder Greeley CPIU published by the Colorado State Planning and Budget Office will be used as a guide Written notice of renewal 1 sldwopsa rev 06/07 The normal construction hours for the City of Fort Collins are from 7 00 am to 6 00 pm Monday thru Saturday The cost of performing tests during the normal work hours should be included in the unit price for each test If there will be an overtime charge for work outside of these hours that charge must be addressed in your proposal The City will give the consultant 24 hours notice for weekend testing The following is a list of time allowed for some of the more frequently used testing services Please address in your proposal how and when standby time is charged by your firm Time allowed for field test without standby time being charged Concrete Physical Property Tests 1 Hour per test Nuclear Asphalt Densities 15 Minutes per test Nuclear Soils Densities 15 Minutes per test Asphalt Content Sample 30 Minutes per test All field technicians shall meet the Larimer County Urban Area Street Standards for certification All personnel shall be qualified to perform the assigned tasks or they shall be replaced with qualified personnel at the request of the City TERMS AND CONDITIONS The payment for services as described under the Scope of Services shall be based on unit prices and reimbursement rates for completed services The Consultant shall include in their proposal a detailed list of unit costs and reimbursement rates for the services requested The Professional Services Agreement shall commence April 1 2008 and continue in full force and effect for one year In addition at the option of the City the Agreement may be extended for additional one year periods not to exceed four (4) additional one year periods Renewals and pricing changes shall be negotiated by and agreed to by both parties The Denver Boulder Greeley CPIU published by the Colorado State Planning and Budget Office will be used as a guide The Contract may and will be used by other City Departments This is a work order contract and prior to work being performed a work order must be generated and signed by the Consultant and the City Representative Use of Subcontractors The Consultant shall indicate in their proposal any work intended to be performed by subcontractors or persons outside of the firm The Consultant shall name the subcontractors if known at the time the proposal is submitted If the names of subcontractors are not presented in the proposal the City reserves the right of approval or refection 2 SCOPE OF SERVICES The RFP indicates that in addition to the Annual Street Maintenance Program Minor Bridge Maintenance Program Pedestrian Access Program and Parks and Utilities Protects the City has the following street projects which may require geotechnical services over the next two years • North College Improvement Protect • Hersetooth Road and Ziegler Road roundabout • West Harmony Road Improvements • Ziegler Road Drake to Horsetooth We understand the Engineering Constructor Inspectors may need geotechmcai services and or inspection services to help them resolve problems with private developments Some of the services required for the protects planned are pavement designs asphalt extraction and gradation sampling aggregate at the asphalt plant and borrow sources and running a gradation and physical property and strength tests on concrete and soils tests such as proctors and nuclear field density tests We understand the testing frequencies will be as specified in the Latimer County Urban Area Street Standards FIRM CAPABILITIES CTI- Thompson Inc is a full service geotechnrcal structural materials and environmental engineering consulting firm Our corporate offices are located in Denver Colorado with branch offices In Fort Collins Colorado Springs Pueblo and Glenwood Springs Colorado We also have offices in Texas We have over 270 trained employees company wide and operate the most complete sods concrete and asphalt testing aboratories in the Rocky Mountain Region The Denver and Fort Collins offices have completed more than 40 000 protects in the past 35 years for federal state and municipal government entities as well as private >ector clients Our Fort Collins operations include 33 engineers geologists technicians and support staff We participate in the AASHTO Materials Reference Laboratory (AMRL) the Cement and Concrete Reference Laboratory ICCRL) and the CDOT round robin proficiency sample programs to maintain a high level of performance and consistency Our laboratory has completed the AASHTO Accreditation Program We take great pride in training and educating all of our employees including technicians and engineering staff The technicians and engineers that wrll be assigned to City protects have certifications consistent with the requirements of the Latimer County Urban Area Street Standards Most of our technicians have also completed the necessary training and obtained the required certifications to cover state or CDOT funded protects for the city Most of our technicians have also completed the necessary training and obtained the required (srhfications to cover state or CDOT funded projects for the City Certifying agencies for engineering technicians include ACI CDOT CAPA NICET and WAOTC Our specific team their relevant experience Ind qualifications are described in more detail below in ASSIGNED PERSONNEL CITY OP FORT (OI 1 INS C rLl r PROPObA(. WI PC 01, 0015 EXHIBIT B FEESCHEDULE BID SCHEDULE ITEM DESCRIPTION NO Unit PRICE SOILS 101 Atterberg Limits Classification Liquid Limit Plastic Limit Plasticity Index Ea Test $ 60 1132 Hveem Stabilometer R" Value Ea $ 20 103 Proctor Standard Ea $ 80 104 Proctor Modified Ea $ 90 105 Proctor One Point Check Ea $ 30 106 PH Determination Ea $ 2 S 107 Nuclear Field Density Test 3 or More Tests Per Trip Ea Test $ 20 108 Nuclear Field Density Test Less Then 3 Tests Per Trip Ea Test $ 20 109 Sieve Analysis (Pius #4 Material) Ea Test $ 35 110 Sieve Analysis (Plus #4 Material) (Minus #4 Material) Ea Test $ 35 111 Sieve Analysis - (#4 to minus 200 Material) Ea Test $ 35 1 12 Organic Content for Top Sal Ea Test $ 30 1 13 Hydrometer Analysis Ea Test CONCRETE Concrete Cylinders (Including sampling in Field Slump Unit 201 Weight Yield Air Content Temperature Casting Cunng Testing and Reporting) Set of 4 $ 1 60 202 Additional Cylinder Per Cylinder $ 9 203 Compression Test (Cap Cure and Break FOB Lab) Ea Test $ 10 204 Concrete Beams (Including Sampling Set of 3 $ 160 205 Additional Beam Per Beam $ 35 206 Sand Equivalent (CP 30) Ea Test $ 75 ASPHALT 301 Sieve Analysis (Plus #4 Material) Ea Test $ _ 302 Sieve Analysis (Minus #4 Material) Ea Test $ 303 Specific Gravity and Absorption (Plus #4 Material) Ea Test _ $ n 5 304 Specific Gravity and Absorption(Minus #4 Material) Ea Test $ 35 305 L A Abrasion Test Ea Test $ 80 306 Fractured Face Determination Ea Test $ 80 307 Flat and Elongated Particles Ea Test $ --97- 308 Specific Gravity Maximum Theoretical for Air Voids (Rice) Ea Test $ 85 309 Lotlman (TSR) Test Ea Test $ 325 310 Mix Design Bulk Unit Weight and Hveem Stability Verification Ea Test $ 210 311 Sand Equivalent Ea Test $ 75 312 Determination of Bitumen Content by Extraction Gradation Analysis Ea Sample of Extracted Aggregate (To be sampled by Consultant) $ 160 313 Determination of Bitumen Content by Extraction (To be Sampled Ea Sample by Consultant) $ RO 314 Determination of Bitumen Content by Nuclear Gauge (To be Sampled by Consultant) Ea Sample $ 80 315 Calibrate Nuclear Gauge(For a New Asphalt Mix) Calibration Ea $ 300 316 Nuclear Field Density Tests (3 or More Tests per Trip) Ea Test S 20 317 Nuclear Field Density Tests (Less Than 3 Tests per Trip) Ea Test $ 20 318 Asphalt Plant Inspection Per Hour $ 100 319 Core Field Samples Per Hour $ 50 Per Inch $ 10 HOURLY RATES 401 Principal Engineer and/or Geologist Per Hour $ 10D 402 Geotechrncal Engineer/ Department Manager Per Hour $ 75 403 Senior Field Technician Per Hour $ 55 _ 404 Field Technician Per Hour $ ; NOTE All prices shall include labor mileage, testing, sampling, reviewing typing and report writing as needed for each service The above listed items indicate the most frequently used tests Please submit any ot7 her testing seances (include pricing) that your provides Signed �Company ✓i /�i � �i LG Printed_ t G Company ItfiL, �i�1GYk1�5GV1, ty1C Address 351 Ll` � c5-�-e-4 , blo Phone _17t ZC6 gyi5 Fax VC 2z)& Email O �@ �N �tq L l t� I E{tbiw A Cbkt Check One J _ Individual Doing Business in Company Name _ Partnership 1� Corporation APPENDIX A Revised 2/26/2008 FEE SCHEDULE 2007 200E Item # Description Unit Price Unit Price SOILS 101 Atterberg Limits Classification Liquid Limit Plastic Limit Plasticity Index Ea Test $58 82 Ea Test $6000 102 Hveem Stabilometer R Value Ea Test $32085 Ea Test $32000 103 Proctor Standard Ea Test $8021 Ea Test $8000 104 Proctor Modified Ea Test $90 91 Ea Test $90 00 105 Proctor One Point Check Ea Test $32 09 Ea Test $30 00 106 PH Determination Ea Test $3209 Ea Test $2500 107 Nuclear Field Density Test (3 or More Tests Per Trip) Ea Test $16 04 Ea Test $20 00 108 Nuclear Feld Density Test Less Then 3 Tests Par Trip Ea Test $21 39 Ea Test $20 00 109 Sieve Analysis (Plus #4 Material) Ea Test $37 43 Ea Test $35 00 110 Sieve Analysis (#4 to minus 200 Material) $32 09 $35 00 111 Organic Content for Top Soil Ea Test $32 09 Ea Test $30 00 112 Hydrometer Analysis Ea Test $64 17 Ea Test $60 00 CONCRETE 201 Concrete Cylinders (Including sampling in Field Slump Unit Weight, Yield Air Content Temperature Casting Curing Testing and Reporting) Set of 4 $149 73 Set of 4 $16000 202 Additional Cylinder Per Cylinder $9 63 Per Cylinder $9 00 203 Compression Test (Cap Cure and Break FOB Lab) Ea Test $12 83 Ea Test $10 00 204 Concrete Beams (Including Sampling) Set of 3 $176 41 Set of 3 $160 00 205 Additional Beam Per Beam $34 22 Per Beam $35 00 206 Sand Equivalent (CP 30) Ca Test $85 56 Ea Test $75 00 ASPHALT 301 Sieve Analysis (Plus #4 Material) Ea Test $37 43 Ea Test $35 00 302 Sieve Analysis (Minus #4 Material) Ea Test $32 09 Ea Test $35 00 303 Specific Gravity and Absorption (Plus 94 Material) Ea Test $37 43 Ea Test $35 00 304 Specific Gravity and Absorption (Minus#4 Material) Ea Test $3743 Ea Test $3500 305 L A Abrasion Test Ea Test S101 60 Ea Test S80 00 306 Fractured Face Determination Ea Test $122 99 Ea Test $80 00 307 Flat and Elongated Particles Ea Test $122 99 Ea Test $80 00 303 Maximum Theoretical Specific Gravity, forAir Voids (Rice) Ea Test $85 56 Ea Teel $8500 309 LoOman(TSR) Test Ea Test $36363 Ea Test $32500 310 Mix Design Bulk Unit Weight and Hveem Stability Verification Ea Test $21390 Ea Test $210 00 311 Sand Equivalent Ea Test $85 56 Ea Test $75 00 1 of 9 APPENDIX A Revised 2r26(2008 FEE SCHEDULE 2007 2008 Item# Description Unit Price Unit Price ASPHALT (Continued) Determination of Bitumen Content by Extraction Gradation Analysis of Extracted Aggregate (To be sampled by 312 Consultant) Ea Sample $16043 Ea Sample $16000 Determination of Bitumen Content by Extraction (To be 313 Sampled by Consultant) Ea Sample $85 86 Ea Sample $8000 Determination of Bitumen Content by Nuclear Gauge (To 314 be Sampled by Consultant) Ea Sample $85 56 Ea Sample $8000 Ea Ea 315 Calibrate Nuclear Gauge(For a New Asphalt Mix) Calibration $320 85 Calibration $300 00 316 Nuclear Field Density Tests (3 or More Tests per Trip) Ea Test $16 04 Ea Test $20 00 317 Nuclear Field Density Tests (Less Than 3 Tests per Trip) Ea Test $21 39 Ea Test $20 00 318 Asphalt Plant Inspection Per Hour $53 48 Per Hour $100 00 319 Core Field Samples Per Hour $37 43 Per Hour $50 00 Perinch Per Inch $1000 HOURLY RATES 401 Principal Engineer andlor Geologist Per Hour $10695 Per Hour $10000 402 Geotechnical Engineed Department Manager Per Hour $74 87 Per Hour $75 00 403 Senior Field Technician Per Hour $58 82 Per Hour $55 00 404 Field Technician Per Hour $48 13 Per Hour $50 00 FIELD INVESTIGATION SERVICES 501 Doling and Sampling with a 4 inch Auger Per Hour $133 69 Per Hour $135 00 502 Drilling and Sampling with Hollow Auger Per Hour $16043 Per Hour $18000 503 Drilling and Sampling with Track Mounted Rig Add Per Hour $48 13 Per Hour $40 00 504 Drilling and Sampling with Rotary Onil Add Per Hour $48 13 Per Hour $40 00 505 Shelby Tube Sample Ea Test $1283 Es Test $1000 Drilling Rig Mobilization 506 Fort Collins Area Hourly Rate Hourly Rate 50T Outlying Areas Per Mlle $2 03 Per Mile $2 00 508 Auto or Pickup Mileage (Out Of Town Mobilization) Per Mile $0 53 Per Mile $0 50 509 Labor Out Of Town Living Expenses Travel Costs Equipment Rental CQNSTRUCTION OBSERVATION AND TESTING SERVICES 601 Onlled Pier Installation Per Hour $5668 Per Hour $50 00 602 On Site Concrete Curing Service Quote on Quote on Request Request 603 Maturity Meter Curing Method Quote on Quote on Request Request 2 of APPENDIX A Revised 2126i2008 FEE SCHEDULE 2007 2008 Item # Description Unit Price Unit Price CONSTRUCT12N OBSERVATION AND TESTING SERVICES (CON T) In Situ Concrete Pullout Tests 604 Insert Installation & Pull Test Per Hour $83 42 Per Hour $80 00 605 Inserts Ea Test $26 74 Ea Test $25 00 606 Floor Flatness (F F and F L anchor 10 Foot Straightedge) Per Hour $83 42 Per Hour $80 00 607 Reinforcement Placement Observation Per Hour $5668 Per Hour $5500 608 Masonry Special Inspection Per Hour $5668 Per Hour $5500 609 Weld& Bolt inspection Per Hour $5668 Per Hour $5500 Post Tension 610 Strand Observation Per Hour $5668 Per Hour $5600 611 Elongation Measurements Per Hour $5668 Per Hour $5500 612 Sprayed on Fireproofing includes when required Thickness Measurements Density Per Sample Bond Per Test Per Hour $66 68 Per Hour $5500 613 Report Review r Supervision for Construction Observation and Testing Services Per Report $42 78 Per Report $40 00 SPECUU.ISED TESTING AND SERVICES Geophysical Services Pier Integrity Profiles by Reflection or Retraction Resistivity Surveys Dynamic Soil Properties Specialized Testing Equipment Charges (Portable Drill Rig Pressuremeter Resistivity Photoronrzation Device Field Permeability Down Hole Moisture I Density Benkelman Beam Testing 701 Benkelman Beam and Operator Per Hour $117 55 Per Hour $120 00 702 Truck 18 kip axle load Per Hour $160 43 Per Hour $160 00 703 Transverse Profilogreph Testing Per Hour $9626 Per Hour $10000 704 NDT Equipment (Pulse Velocity Windsor Probe Test System Pachometer Half Cell) Per Hour $26 74 Per Hour $30 DO LABORATORY SERVICES 801 Natural Moisture and Density Ea Test $5 35 Ea Test $5 00 802 Specific Gravity Ea Test $37 43 Fa Test $35 00 303 Unconfined Compression Ea Test $3209 Ea Test $35 00 804 Unconfined Compression with Stress! Strain Curve Ea Test $42 78 Ea Test $45 00 805 One Dimensional Swell Test Ea Test $37 43 Ea Test $35 00 One Dimensional Swell Test with Load Back for Swell Bob Pressure Ea Test $4813 Ea Test S4000 807 Soil Suction per point Ea Test $42 78 Ea Test S40 00 One -Dimensional Time Consolidation Test 808 Set up and Initial Load Ea Test $139 04 Ea Test $135 00 3 of APPENDIX A FEE SCHEDULE Item# Description Unit LABORATORY SERVICES (CON Tt 809 Additional Increments Ea Test Tnaxal or Direct Shear Tests per point 810 Unconsolidated Undramed Ea Test 811 Consolldated•Undrained Ea Test 812 Consolidaled-Undrained with Pore Pressure Ea Test 813 Relative Density (ASTM D 4253 and D 4254) Ea Test 814 California Beanng Ratio (3 Points) Ea Test Permeability 815 Flemble Membrane (Tnaxial Cell) Ea Test 816 Remolded Sample (Falling or Constant Head) Ea Test 817 Back Pressure Odeometer Ea Test 818 Water Soluble Sulfates Ea Test 819 pH Ea Test Resistivity per Specimen (Natural Moisture and Saturated) 820 Ea Test Rock Testing 821 Specific Gravity Two -Cycle Slake Durability 822 per point Unconfined Compression per point 823 Peak Load Only With Stress I Strain Curve 824 Static E and Passions Ratio 825 Trlaxial Compression NX per point With Stress I Strain Curve 826 Static E and Poissons Ratio LIQUID ASPHALT LABORATORY TESTING 901 Viscosity at 140E F 902 Viscosity at 275E F 903 Penetration 904 Specific Gravity 905 Softening Point 906 Flash Point 907 Ductility ® 77E F 908 Ductility Q 39 4E F 909 Solubility 910 Dynamic Rheometer 911 Polymer Compatibikty 912 Direct Tension Test 913 Urang I Compaction Temperatures 914 Bending Beam Test 915 Thin Film Oven Aging (Including Viscosities) 916 Aging of Asphalt Cement 917 Polymer/ AC Blending Ea Test Ea Test Ea Test Ea Test Ea Test Ea Test Ea Test Ea Test Ea Test Ea Test Ea Test Ea Test Ea Test Ea Test Ea Test Ea Test Ea Test Ea Test Ea Test Ea Test Ea Test Ea Test Quote on Request Revised 2/26/2008 2007 2008 Price Unit Price $3743 Ea Test $3500 $10695 Ea Test $too 00 $35294 Ea Test $35000 $37433 Ea Test $36000 $15508 Ea Test $15000 $38502 Ea Test $35000 $385 02 Ea Test $23529 Ea Test $23529 Ea Test $3743 Ea Test $32 09 Ea Test $8021 Ea Test $3743 Ea Test $85 55 Ea Test $9626 Fa Test $16043 Ea Test $11765 Ea Test $23529 Ea Test $90 91 Ea Test $90 91 Ea Test $6417 Ea Test $6417 Ea Test $90 91 Ea Test $6417 Ea Test $9091 Ea Test $14438 Ea Test $10160 Ea Test $588 23 Ea Test $962 56 Ea Test $454 54 Ea Test $267 38 Ea Test S427 80 Ea Test $23529 Ea Test $23529 Ea Test Quote on Request $35000 $225 00 $225 00 $40 00 S30 00 S80 00 $35 00 $80 00 $90 00 $150 00 $110 00 $225 00 $85 00 $85 00 $60 00 $60 00 $90 00 $60 00 $85 00 S130 00 $ 0000 S550 00 $950 00 $450 00 $250 00 $400 00 $225 00 $225 00 4 of APPENDIX A FEE SCHEDULE Item 0 Description LIQUID ASPHALT LABORATORY TESTING (CON T) 918 Specimen Preparation and Miscellaneous Testing EMULSION TESTING 100i Residue and Oil Distillate Test on Residue 1002 Penetration 1003 Ductility Q 77E F 1004 Solubility 1005 Coating Ability and Water Resistance 1006 Storage Stability 1007 Slave Test 1008 Vialet Testing (per Time or Temperature) 1009 Debonding Testing 1010 Seal Coat Design ASPHALTIC CONCRETE TESTING 1101 SHRP or AAMS Mix Design 1102 Hveem Mix Design 1103 Marshall Mix Design 1104 Immersion Compression 1105 Loffman (Tensile Strength Ratio) AASHTO 1106 Lohman Jerald Strength Ratio) Cyclic 1107 Gyratory Refusal 1108 Indirect Tensile Creep 1709 Indeed Tensile Strength 1110 Stripping Test 1111 Swell Test 1112 Theoretical Maximum Density 1113 Marshall Properties (Including Theoretical Maximum Density) 1114 Hveem Properties (Including Theoretical Maximum Density) 1115 Extraction and Gradation 1116 Resilient Modulus 1117 Nuclear Asphalt content Gage Calibration 1118 Asphalt by Nuclear Gage I or ignition Oven 1119 Core Density 1120 Core l Lift Thickness 1121 Sample Preparation Miscellaneous Testing Revised 2/2612008 2001 2008 Unit Price Unit Pnce Ea Test $5348 Ea Test $5000 Ea Test $235 29 Ea Test $225 00 Ea Test $64 17 Ea Test $60 00 Ea Test $90 91 Ea Test $90 00 Ea Test $10160 Ea Test $10000 Ea Test $12299 Ea Test $11000 Ea Test $12299 Ea Test $11000 Ea Test $64 17 Ea Test $60 00 Ea Test $23529 Ea Test $22500 Ea Test $29946 Ea Test $28000 Ea Test $125341 Ea Test $120D 00 Quote on Quote on Request Request Ea Test $1 28341 Ea Test $120000 Ea Test $126341 Ea Test $120000 Ea Test $320 85 Ea Test $300 00 Ea Test $363 63 Ea Test $350 00 Ca Test $1 28341 Ea Test $120000 Ea Test $16043 Ea Test $15000 Ca Test $16043 Ea Test $15000 Ea Test $16043 Ea Test $15000 Ca Test $7487 Ea Test $7000 Ea Test $7487 Ea Test $7000 Ea Test $8566 Ea Test $8D 00 Ea Test $21390 Ea Test $20000 Ea Test $213 90 Ea Test $200 00 Ea Test $16043 Ea Test $15000 Quote on Quote on Request Request Ea Test $320 85 Ea Test $300 00 Ea Test $85 56 Ea Test $80 00 Ea Test $26 74 Ea Test $25 00 Ea Test $26 74 Ea Test $25 DO Ea Test $5348 Ea Test $5000 5of9 APPENDIX A Revised 2/26j2996 FEE SCHEDULE 2007 2008 Item At Description Unit Price Unit Price AGGREGATE LABORATORY SERVICES Fine Coarse Fine Coarse 1201 Scratch Hardness $5348 $5000 1202 Gradation Analysis (per Fraction) $31 15 $3743 $3500 $3500 1203 Passing No 200 Sieve $25 96 $26 74 $25 00 $25 00 1204 Organic Impurities 34153 $4000 S4000 1205 Lightweight Panicles $8099 $8342 $8000 $8000 1206 Clay Lumps and Friable Particles $70 61 $72 73 $70 DO $70 00 f 207 Pop out of Lightweight Aggregates $213 90 $200 00 1208 5 Cycle Sodium Soundness $186 90 $192 51 $18000 $18000 1209 5 Cycle Magnesium Soundness $18690 $19251 $18000 $18000 1210 12 Cycle Sodium I Magnesium Soundness S238 82 $245 90 $200 00 $200 00 1211 Potential Reactivity (Chemical Method) $259 59 $267 38 $250 00 $250 00 1212 Potential Reactivity (Mortar Bar Method ASTM C227 C 1260 & C 1293) $493 22 $508 02 $450 00 $450 00 1213 Unit Weight $3634 $3743 $3500 $3500 1214 Specific Gravely and Absorption $36 34 $3743 $3500 $35 00 1215 Staining Test (Lightweight Aggregates $85 56 $8000 1216 Flat and Elongated Places $122 99 $12000 Los Angeles Abrasion 1217 Small Sized Aggregate $10150 $10000 1218 Moisture Content $1869 $1925 $1500 $1500 1219 Fractured Face Determination $285 55 $122 99 $250 00 $8000 1220 Sand Equivalent $8307 $7000 1221 Freeze Thaw $249 21 $294 12 $225 00 $225 00 1222 Mill Abrasion $16043 r $1 0 00 1223 Petrographic Examination Quote on Quote on Request Request 1224 Crushing Per Hour $62 03 Per Hour $55 00 1225 Blending Sampling and Misc Testing Per Hour $72 73 Per Hour $56 00 1226 Gradation Analysis of Large Pit Run Samples (Larger than 1 inch) Per Hour $7487 Per Hour $5500 1227 Compressive Strength of Test Cylinders (including Held or Untested Cylinders) Per Cylinder $9 63 Per Cylinder $9 00 CONCRETE LABORATORY SERVICES 1301 Compressive Strength of Test Cylinders Cast by Others Per Cylinder $1925 Per Cylinder $2000 1302 Preparation and Testing of Cores Per Hour Per Hour $55 00 1303 Density I Compressive Strength! Thickness Ea Test $42 78 Ea Test $40 00 1304 Flexural Strength Test of Beams (Including Held or Untested Beams) Ea Test $3743 Ea Test $3000 1305 Splitting Tensile Test of Cylinders Ea Test $3743 Ea Test $3000 Modulus of Elasticity Tests 1306 Frame Method (2 Cylinders) Per Set Ea Test $320 85 Ea Test $300 00 1307 Length Change of Hardened Cement Mortar and Concrete Per Set Ea Test $267 38 Ea Test $250 00 G of shall be provided to the Service Provider and mailed no later than ninety (90) days prior to contract end 4 Early Termination by City/Notice Notwithstanding the time periods contained herein the City may terminate this Agreement at any time without cause by providing written notice of termination to the Professional Such notice shall be delivered at least fifteen (15) days prior to the termination date contained in said notice unless otherwise agreed in writing by the parties All notices provided under this agreement shall be effective when mailed postage prepaid and sent to the following address Professional City With Copy to CTL Thompson Inc City of Fort Collins Purchasing City of Fort Collins Engineering 351 Linden Street Suite 140 PO Box 580 281 North College Avenue Fort Collins CO 80521 Fort Collins CO 80522 Fort Collins CO 80521 Attn Eric Bernhardt Attn John Stephen Attn Rick Richter In the event of any such early termination by the City the Professional shall be paid for services rendered prior to the date of termination subject only to the satisfactory performance of the Professional s obligations under this Agreement Such payment shall be the Professional s sole right and remedy for such termination 5 Design Proiect Insurance and Insurance Responsibility The Professional shall be i esponsible for the professional quality technical accuracy timely completion and the cooidination of all services rendered by the Professional including but not limited to designs plans reports specifications and drawings and shall without additional compensation promptly remedy and correct any errors omissions or other deficiencies The Professional shall indemnify save and hold harmless the City its officers and employees in accordance with Colorado law from all damages whatsoever claimed by third parties against the City and for the City s costs and reasonable attorney s fees arising directly or indirectly out of the Professional s negligent performance of any of the services furnished under this Agreement The Professional 2 stdwopsa rev 06/07 APPENDIX A Revised 2126r2008 FEE SCHEDULE 2007 2008 Item # Description Unit Price Unit Price CONCRETE LABORATORY SERVICES ICONTI Laboratory Trial Mix Batches 1308 3 Point Curve Compressive Strength (Includes Engineering and Aggregate Testing for Gradation Specific Gravity & Absorption) Ea Test $2 C32 07 Ea Test S2 000 00 1309 3 Point Curve Flexural Strength (includes Engineering and Aggregate Testing for Gradation Specific Gravity & Absorption) Ea Test $213002 Ea Test $210000 1310 Single Mir Compressive Strength (Includes Additional Mixes) Ea Test $37433 Ea Test $35000 1311 Single Mix Flexural Strength Ea Test $427 80 Ea Test $40000 1312 Mix With Lighhvelght Aggregate (Additional Charge per mix (Aggregate Tests not Included)) Ea Test $53 48 Ea Test $50 00 1313 Roller Compacted Concrete laboratory Trial Mix Quote on Quote on Request Request 1314 Chloride Content Ea Test Ea Test $60 00 1315 Petrographic Examination Quote on Quote on Request Request 1316 Laboratory Coring Per Hour $62 03 Per Hour 55500 1317 Concrete Freeze r Thaw Per Set Ea Test $695 18 $680 00 1318 Admixture Qualification Quote on Quote on Request Request CEMENT AND FLY ASH SERVICES Cement 1401 Sulfate Expansion (ASTM C 452) Ea Test $588 23 Ea Test $550 00 1402 Compressive Strength Tests (6 Cubes I Mix) Ea Test $187 16 Ea Test $175 00 1403 Additional Cubes Ea Test $2139 Ea Test $2000 1404 Time of Setting (Gilmore or Vlcat) Ea Test $149 73 Ea Test $140 00 1405 Density Ea Test $74 87 Ea Test $70 00 1406 Fineness by Blaine or No 325 Sieve (Air Permeability) Ea Test $85 56 Es Test $80 00 1407 Early Stiffening (Paste Method) Ea Test $69 52 Ea Test $60 00 1408 Chemical Analysis Ea Test $245 99 Ea Test $240 00 1409 Autoclave Expansion Ea Test $18182 Ea Test $17500 1410 Air Content Ea Test $11765 Ea Test $12000 1411 Tensile Briquets Ea Test $352 94 Ea Test $30000 1412 Cement Content of Hardened Concrete Ea Test $614 97 Ea Test $600 00 1413 ASTM C 150 Standard Properties Ea Test $641 71 Ea Test 5650 00 Fly Ash 1414 Lass on Ignition Moisture Ea Test $80 21 Ea Test $80 00 1416 Fineness No 325 Sieve Ea Test $09 52 Ea Test $60 00 1416 Density Ea Test $74 87 Ea Test $70 00 1417 Chemical Analysis Ea Test $19251 Ea Test $18000 1418 Strength Activity(wdh Cement) Ea Test $18716 Ea Test $18000 1419 Drying Shrinkage (Mortar Bar Method) Per Set Ea Test $18716 Ea Test $18000 1420 Autoclave Expansion Per Set Ea Test $187 16 Ea Test $18000 1421 Alkali Reactivity (Pyrex Glass) Ea Test $459 69 Ea Test $450 00 7of9 APPENDIX A FEE SCHEDULE Item p Description CEMENT AND FLY ASH SERVICES ICONT) Fly Ash (con 1) 1422 Available Alkalies 1423 ASTM C 518 Standard Properaes MASONRY LABORATORY SERVICES Block 1601 Compressive Strength Tests 1502 O Block Test Series 1503 British Shrinkage (3 Samples) 1504 Dimensional Analysis 1505 Fire Rating by ILL 518 1506 Absorption Analysis 1507 Block Freeze I Thaw 100 Cycle 1508 Block Freeze i Thaw 200 Cycle Brick 1509 Compressive Strength Tests 1510 Coefficient of Saturation Absorption Analysis 1511 Initial Rate of Absorption Per Set 1512 Dimensional Analysis 1513 Modulus of Rupture (Flexural Strength) 1514 Brick Freeze I Thaw 50 cycle ASTM C 67 Mortar and Grout 1515 Mortar Mix (6 Cubes Per Mix) 1516 Water Retentivity Test 1517 Compressive Strength Tests and Preparation of Field Sampled Mortar (6 Cubes) 1518 Compressive Strength Tests and Preparation of Grout Cored from Block Masonry Prisms (84nch Width) 1519 Hollow Prisms Brick 1520 Hollow Prisms Block 2 Course Maximum 1521 Hollow Prisms Block Over 2 Courses 1522 Grout Filled Prisms Brick 1523 Grout Filled Prisms Block 2 Course Maximum 1524 Grout Filled Prisms Block Over 2 Courses 1525 Clay Tile Flexural Strength 1526 Clay Tile Absorption Analysis Masonry Prisms (10 inch or 124nch Width) Add to Above Prices 1527 Hollow Prisms 1528 Grout Filled Prisms 1529 Laboratory Sawing of Specimens Revised 2126/2008 2007 2008 Unit Price Unit Price Ea Test $13904 Ea Test $15000 Ea Test $534 76 Ea Test $525 00 Ea Test $3743 Ed Test $3500 Ea Test $267 38 Ea Test $250 00 Ea Test $32085 Ea Test $30000 Ea Test 34278 Ea Test $4000 Ea Test $18716 Ea Test $17500 Ea Test 54278 Ea Test $4000 Ea Test $50213 Ea Test $80000 Ea Test $117646 Ea Test $12D000 Ea Test $3743 Ea Test $3500 Ea Test $42 78 Ea Test $4000 Ea Test $7487 Ea Test $7500 Ea Test $3743 Ea Test $3500 Fa Test $4278 Ea Test $4000 Ea Test $44019 Ea Test $42500 Ea Test $18716 Ea Test $17500 Ea Test $8021 Ea Test $8000 Ea Test $13369 Ea Test $13000 Ea Test $3743 Ea Test $4000 Ea Test $64 17 Ea Test $65 00 Ea Test $6417 Ea Test $6500 Ea Test $9091 Ea Test $9000 Ea Test $9091 Ea Test $9000 Ea Test $74 87 Ea Test $75 00 Ea Test $10160 Ea Test 510000 Quote on Quote on Request Request Quote on Quote on Request Request Ea Test $26 74 $30 00 Ea Test $5348 $6000 Per Hour $69 51 Per Hour $55 00 8 of APPENDIX A Revised 21262006 FEE SCHEDULE 2007 2008 Item # Description Unit Price Unit Price STEEL LABORATORY SERVICES 1601 Ultimate Tensile Strength Ea Test $9626 Ea Test $90 00 1602 Percent Elongation Ea Test $1070 Ea Test $1000 1603 Yield Strength Ea Test $1070 Ea Test $1000 1604 Reduction of Area Ea Test $1070 Ea Test $1000 1605 Hollow or Circular Samples Ea Test $1070 Ea Test $1000 1606 Tensile Strength of Post Tension Strands Per Test Ea Test $96 26 Ea Test $90 00 shall maintain commercial general liability insurance in the amount of $1 000 000 00 combined single limits 6 Compensation In consideration of services to be performed pursuant to this Agreement the City agrees to pay Professional on a time and reimbursable direct cost basis designated in Exhibit B consisting of Eleven (11) page(s) attached hereto and incorporated herein by this reference At the election of the City each Work Order may contain a maximum fee which shall be negotiated by the parties hereto for each such Work Order Monthly partial payments based upon the Professionals billings and itemized statements are permissible The amounts of all such partial payments shall be based upon the Professionals City -verified progress in completing the services to be performed pursuant to the Work Order and upon approval of the Professionals direct reimbursable expenses Final payment shall be made following acceptance of the work by the City Upon final payment all designs plans reports specifications drawings and other services rendered by the Professional shall become the sole property of the City 7 City Representative The City will designate prior to commencement of work its protect representative who shall make within the scope of his or her authority all necessary and proper decisions with reference to the protect All requests for contract interpretations change orde rs and other clarification or instruction shall be directed to the City Representative 8 Proiect Drawings Upon conclusion of the protect and before final payment the Professional shall provide the City with reproducible drawings of the protect containing accurate information on the protect as constructed Drawings shall be of archival prepared on stable mylar base material using a non -fading process to provide for long storage and high quality reproduction CD disc of the as built drawings shall also be submitted to the owner in and AutoCAD version no older then the established city standard 3 stdwopsa rev 06/07 9 Monthly Report Commencing thirty (30) days after Notice to Proceed is given on any Work Order and every thirty days thereafter Professional is required to provide the City Representative with a written report of the status of the work with respect to the Work Order Woik Schedule and other material information Failure to provide any required monthly report may at the option of the City suspend the processing of any partial payment request 101 Independent Contractor The services to be performed by Professional are those of an independent contractor and not of an employee of the City of Fort Collins The City shall not be responsible for withholding any portion of Professional's compensation hereunder for the payment of FICA Workers Compensation other taxes or benefits or for any other purpose 11 Personal Services It is understood that the City enters into this Agreement based on the special abilities of the Professional and that this Agreement shall be considered as an agreement for personal services Accordingly the Professional shall neither assign any responsibilities nor delegate any duties arising under this Agreement without the prior written consent of the City 12 Acceptance Not Waiver The Citys approval of drawings designs plans specifications reports and incidental work or materials furnished hereunder shall not in anyway relieve the Professional of responsibility for the quality or technical accuracy of the work The City s approval or acceptance of or payment for any of the services shall not be construed to operate as a waiver of any rights or benefits provided to the City under this Agreement 13 Default Each and every term and condition hereof shall be deemed to be a material element of this Agreement In the event either party should fail or refuse to perform according to the terms of this agreement such party may be declared in default 14 Remedies In the event a party has been declared in default such defaulting party shall be allowed a period of ten (10) days within which to cure said default In the event the default remains uncorrected the party declaring default may elect to (a) terminate the 4 stdworsa rev 06/07 Agreement and seek damages (b) treat the Agreement as continuing and require specific performance or (c) avail himself of any other remedy at law or equity If the non defaulting party commences legal or equitable actions against the defaulting party the defaulting party shall be liable to the non defaulting party for the non defaulting party s reasonable attorney fees and costs incurred because of the default 15 Binding Effect This writing together with the exhibits hereto constitutes the entire agreement between the parties and shall be binding upon said parties their officers employees agents and assigns and shall inure to the benefit of the respective survivors heirs perc,onal representatives successors and assigns of said parties 16 Law/Severabdity The laws of the State of Colorado shall govern the construction interpretation execution and enforcement of this Agreement In the event any provision of this Agreement shall be held invalid or unenforceable by any court of competent jurisdiction such holding shall not invalidate or render unenforceable any other provision of this Agreement 17 Prohibition Against Emoloving Illegal Aliens This paragraph shall apply to all Contractors whose performance of work under this Agreement does not involve the delivery of a spec ific end product other than reports that are merely incidental to the performance of said work Pursuant to Section 8-17 5-101 C R S et seq Contractor represents and agrees that a As of the date of this Agreement 1 Contractor does not knowingly employ or contract with an illegal alien and 2 Contractor has participated or attempted to participate in the basic pilot employment verification program created in Public Law 208 104th Congress as amended and expanded in Public Law 156 108th Congress as amended administered by the United States Department of Homeland Security (the Basic 5 stdwor sa rev 06/07 Pilot Program ) in order to confirm the employment eligibility of all newly hired employees b Contractor shall not knowingly employ or contract with an illegal alien to perform work under this Agreement or knowingly enter into a contract with a subcontractor that knowingly employs or contracts with an illegal alien to perform work under this Agreement c Contractor shall continue to apply to participate in the Basic Pilot Program and shall in writing verify same every three (3) calendar months thereafter until Contractor is accepted or the public contract for services has been completed whichever is earlier The requirements of this section shall not be required or effective if the Basic Pilot Program is discontinued d Contractor is prohibited from using Basic Pilot Program procedures to undertake pre -employment screening of job applicants while this Agreement is being performed e If Contractor obtains actual knowledge that a subcontractor performing work under this Agreement knowingly employs or contracts with an illegal alien Contractor shall 1 Notify such subcontractor and the City within three days that Contractor has actual knowledge that the subcontractor is employing or contracting with an illegal alien and 2 Terminate the subcontract with the subcontractor if within three days of receiving the notice required pursuant to this section the subcontractor does not cease employing or contracting with the illegal alien except that Contractor shall not terminate the contract with the subcontractor if during such three days the subcontractor provides information to establish that the subcontractor has not knowingly employed or contracted with an illegal alien stdwopsa rev 06/07 Contractor shall comply with any reasonable request by the Colorado Department of Labor and Employment (the Department ) made in the course of an investigation that the Department undertakes or is undertaking pursuant to the authority established in Subsection 8-17 5 102 (5) C R S If Contractor violates any provision of this Agreement pertaining to the duties imposed by Subsection 8 17 5 102 C R S the City may terminate this Agreement If this Agreement is so terminated Contractor shall be liable for actual and consequential damages to the City arising out of Contractors violation of Subsection 8-17 5 102 CRS The City will notify the Office of the Secretary of State if Contractor violates this provision of this Agreement and the City terminates the Agreement for such breach THE CITY OF FORT COLLINS COLORADO By Z J es B O Neill II CPPO FNIGP erector of Yurchasing & Risk Management Date CTL Thompson Inc / By R,cG ✓ i Title _ U• C �2. �t�e5i p2u"� CORPORATE PRESIDENT OR VICE PRESIDENT Date 14( 7 I Oe- ATTESy, //e/ter G (Corporate Seal) Corporate. ecretary Adwor sa rev 06/07 EXHIBIT A WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND DATED Work Order Number Purchase Order Number Project Title Commencement Date Completion Date Maximum Fee (time and reimbursable direct costs) Project Description Scope of Services Acceptance Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control Professional RTA Date User The attached forms consisting of (_) pages are hereby accepted and incorporated herein by this reference and Notice to Proceed is hereby given City of Fort Collins James B O Neill II CPPO FNIGP Director of Purchasing and Risk Management (over $30 000 00) Date stdwopsa rev 06 07 SCOPE OF SERVICES Engineering has the following street projects which may require geotechnical services over the next two years North College Improvement Project Horsetooth Road and Ziegler Road roundabout West Harmony Road Improvements Ziegler Road Drake to Horsetooth and Minor Bridge Maintenance Program In addition the Engineering Construction Inspectors may need geotechnical services and or inspection services to help them resolve problems with private developments Engineering also manages the annual street maintenance program The 2008 and 2009 programs will involve over 8 million dollars of street work each year The following is a brief description of the services estimated we will need in the Engineering Department The City spent approximately $135 000 in 2007 for services The 2007 Street Maintenance project included a total of over 70 000 tons of asphalt placed and over 20 000 lineal feet of concrete curb gutter and walk constructed We expect similar quantities in the 2008 project The testing frequency will be as specified in the Larimer County Urban Area Street Standards Some of the tests required for the Street Maintenance Project are asphalt extraction and gradation sampling aggregate at the asphalt plant and running a gradation and physical property and strength tests on concrete There will be construction projects on The Horsetooth Road and Ziegler Road roundabout We<,t Harmony Road Improvements North College Avenue Improvements Some of the services required for these projects are Pavement Designs asphalt extraction and gradation sampling aggregate at the asphalt plant and burrow sources and running a gradation and physical property and strength tests on concrete and soils tests such as proctors and nuclear field density tests The testing frequency will also be comparable to that of the Larimer County Urban Area Street Standards The City of Fort Collins Utilities will also be using this contract for construction projects as well as in-house work Other City Departments will also use this contract These projects will require a variety of tests The purpose of the nuclear asphalt content test is to provide us with a rapid turnaround of asphalt contents throughout the construction season We would expect a gauge to be available throughout the construction season We anticipate the need for approximately 100 nuclear asphalt content tests during the 2008 construction season Due to the anticipated change in oil and aggregate throughout the project a price for a mix calibration for the asphalt content gauge is included in this contract The above mentioned tests will be required on short notice (four to six hours) for Concrete and Asphalt tests and (Two to four hours) for sods tests and often response time may be within one to two hours A field copy of the physical property concrete tests will need to be left on site with the City representative at the time of the test A prompt verbal (phone) notice on all noncompliance tests will be required immediately after tests are completed All tests will be followed up with electronic and a hard copy of test results including a comparison to the spec ifications for that particular project indicating any test results that are out of specification As directed by the Project Manager and on continues projects out of specification tests shall be tracked until a passing test is achieved and documented as an actable retest The hard copies shall be submitted within 48 hours We expect all costs such as mileage labor equipment typing reviewing and report writing to be included in all prices submitted 1