Loading...
HomeMy WebLinkAboutCORRESPONDENCE - GENERAL CORRESPONDENCE - 8850815�Serving Colorado, Wyoming and Nebraska Since 1981 Feb. 6, 2008 Mr. Ron Kechter, Project Manager City of Fort Collins Facilities Division 117 N. Mason St. Ft. Collins, CO 80522-0580 Re: Mulberry Pool Rooftop HVAC Replacement, Our Job No. P07-08 Ron: Abralrarnson Engineering, Inc. 3101 Kintzley Court, Unit D LaPorte, Colorado 80535 Phone 970-221-2569 Fax 970-221-2671 mail@abraliamsoneng.com We are happy to do an economic comparison of energy saving alternatives, and a RTU replacement plan for the pool area only at the Mulberry Pool. We will compare first costs and energy savings of 1) a glycol run-around loop with coils in the exhaust duct and a coil in the new RTU, to transfer heat from the exhaust air to the cold incoming outside air to 2) a heat recovery wheel in the new RTU, also to transfer heat from the exhaust to the incoming outside air. This second option will require extending the exhaust duct through the pool area up under the roof to the new RTU, and may require a new exhaust fan. Our thought is to size one new rooftop unit with the preferred heat recovery system for winter use, with the second unit without heat recovery to run in summer in addition to the first unit, for humidity control and ventilation. We will run block heat loss and humidity control calculations, simple payback calculations for the heat recovery options, size all new equipment required, provide a piping schematic (for the glycol loop if that option is selected) along with pump selection and sizing of piping, etc. We are looking at Engineered Air rooftop equipment installed on the existing roof curbs. We anticipate two sheets of plans, including specification notes, equipment schedules, roof plan, details, sections, etc. Controls to be compatible with the City JCI. EMS system. We will do this work on an hourly basis not to exceed $3900.00 at the following rates (design only) Principal/P.E.: $100.00 Professional Engineer (P.E.): $85.00 Engineer (E.I.T./BS): $75.00 Engineer I/Designer: $48.00 Office: $48.00 HVAC • Plumbing • Energy Audits/Conservation 1 Feb. 6, 2008 Construction phase work will be done hourly as requested by the City, including bid phase coordination, shop drawing checks, construction coordination and changes, job site observations, etc. Please call with any questions, and sign and date if the above is satisfactory. Sincerely, Roger D. Abrahamson, P.E. Signed: RDA:kjk P07-0811001.doe Client: Date: HVAC • Plumbing • Energy Audits/Conservation' 2 Serving Colorado, Wyoming and Nebraska Since 1981 Feb. 6, 2008 Abrahamson Engineering, Inc. 3101 Kintzley Court, Unit D LaPorte, Colorado 80535 Phone 970-221-2569 Fax 970-221-2671 mail@abrahamsoneng, coin Mr. Ron Kechter, Project Manager City of Fort Collins Facilities Division 117 N. Mason St. Ft. Collins, CO 80522-0580 Re: Mulberry Pool Boiler Replacement Study & Design, Job No. P01-08 Ron: We are happy to do an engineering study to help you make the best economic and maintenance decision regarding the replacement of the swimming pool boiler at the Mulberry Pool. We will provide you with a short study report in letter format to include the following 1. Compare first costs and efficiency and energy costs for new high efficiency boilers compared to standard efficiency boilers, with simple payback. 2. Compare options as above, to replace the (2) existing domestic water heaters. One option would be a side -arm heater in a conventional boiler. A second option would be to use a plate -fin heat exchanger, using one of the proposed high efficiency pool boilers as the heat source. We will do this study at our standard hourly rates below, not to exceed $2200.00. Our hourly rates are as follows: Principal/P.E.: $100.00 Professional Engineer (P.E.): $85.00 Engineer (E.I.T./BS): $75.00 Engineer I/Designer: $48.00 Office: $48.00 Upon completion of the study and decision from the City of Ft. Collins regarding the recommended equipment and options, we will prepare plans for the boiler and domestic water heater replacement. We will select and schedule the new equipment, show revised piping to connect the new equipment to existing piping, provide for new flues, combustion air, gas piping, etc. We will also provide a piping/pumping schematic, and provide specification notes on the plans. We will also provide specifications for controls compatible with the City EMS system (Johnson Controls Inc.). HVAC • Plumbing • Energy Audits/Conservation Fcb.6,2008 Design will be done at our hourly rates above, not to exceed $3600.00, design only. Construction phase work will be done hourly as requested by the City, including bid phase, shop drawing checks, job site observations, etc. Please call with any questions, Sincerely, Roger D. Abrahamson, P.E. Signed: RDA:kjk PO L08P00 ] Aoc Client: Date: HVAC • Plumbing • Energy Audits/Conservation 2