Loading...
HomeMy WebLinkAbout111331 ABRAHAMSON ENGINEERING - PURCHASE ORDER - 8850815Date: 02/11 /08 City of Fort Collins Page Number: 1 City of Fort Collins Purchase Order Number: 8850815 venvery vate: uu-r-u O Buyer: HUME,JAMES Purchase Order number must appear on invoices, packing lists, labels, bills of lading, and all correspondence. Note: Line Qty/Units Description Extended Price 1 1 lot 3,900.00 Provide engineering services to compare energy saving alternatives and prepare a RTU replacement plan for the Mulberry Pool, per your proposal Job No. P07-08 of Feb. 6, 2008, NTE 2 1 lot 2,200.00 Perform an engineering study to determine the best alternative for replacement of the pool boiler, per proposal Job No. P01-08. NTE 3 1 lot 3,600.00 Provde design services study to determine the best alternative for replacement of the pool boiler, per proposal Job No. P01-08. NTE A F Total $9,700.00 I ALA, City of Fort C(rny Director of Purchasing and Risk Management City of Fort Collins This order is Octoalid over $2000 unless signed by James B. O'Neill II, CPPO, FNIGP Accounting Department City of Fort Collins Purchasing, PO Box 580, Fort Collins, CO 80522-0580 PO Box 580 Fort Collins, CO 80522.0580