HomeMy WebLinkAboutCHANGE ORDER - BID - 5929 CSU TRANSIT CENTER (7)SECTION 00950
CHANGE ORDER NO. 08
PROJECT TITLE: City of Fort Collins and CSU Transit Center, Bid No. 5629
CONTRACTOR: Mark Young Construction, Inc.
PROJECT NUMBER: 30518250
DESCRIPTION: Add additional work.
In preparing change orders show in order as separate numbered paragraphs the following:
1. Reason for change: Additional Work see Attachments
2. Description of change: See Attached COR NO. W, 36, 40, 41, 42, 44, 45,6)47 and 48
3. Change in contract cost: $29,363.00
4. Change in contract time: No change in time in this Change Order
(Attach additional sheets as required)
ORIGINAL CONTRACT COST ................................................
$4,318,404.00
TOTAL APPROVED CHANGE ORDERS........................................54,224.00
TOTAL PENDING CHANGE ORDERS... ................... ..........................
00.00
TOTAL THIS CHANGE ORDER.....................................................29,363.00
TOTAL. % OF THIS CHANGE ORDER Less than 1%
TOTAL C.O. % OF ORIGINAL CONTRACT 1.8%
ADJUSTED CONTRACT COST...............................................$4,401,991.00
(Assuming all change orders approved)
r
ACCEPTED BY:
Young Construction Inc.,
REVIEWED BY:
REVIEWED BY:
REVIEWED BY: (�ZS �
Cass Beitler,//Project Manage
APPROVED BY:CUI
Marlys Sittner,
cc: City Clerk Project File
Contractor Purchasing
Engineer
Representative
1 Z
Dat
6 AA I_
Date
Date
6-12-06
Date
-/-2-Ofo
Date
05-02-2006 03:2TPM FROM-EDON CORP
2156720014 T-638 P 002/002 F-569
May 2, 2006
Mark Young Construction
700 Medrurn
Fort Collins, CO 80524
Attention: Max
RE: CSU Transit Authority
FRP Column Covers
EDON Quote #15409.B
Dear Max:
SOON COFIP
1160 EASTON ROAD
HORSHAM. PA 10044
(215) 672.6050
We are pleased to submit our 2nd revised proposal to manufacture the fiberglass components
for the above referenced project. This proposal is based upon your telephone conversation
on 04/27 & 05/02/05, using EDON standard column cover molds/profiles, to the quantities
and revised heights as requested. Please note that all field dimensions are the responsibility
of the contractor,
EDON proposes to fabricate the FRP (Fiberglass Reinforced Polyester) components using
class "A" material to meet local fire codes and will have a gel -coat finish with a nominal 1/13" +
thickness. Our cost breakdown is as follows:
CITY ITEM & DESCRIPTION
6 FRP EC-101A 9" Dia. X 12'-6" High (unassembled in halves)
Straight Shaft Column Covers
COST TO PRODUCE ABOVE ITEMS F. O. B. JOBSITE...$5,350.00'
'State and local taxes are not collected.
NOTE: The cost of this proposal, as submitted above, is valid for 30 days.
TERMS:
50% Deposit with a purchase order
Balance; cashier's check, due upon delivery
Estimator
ASA/aa
QAA15409.6
FIBERGLASS COMPOSITES . DESIGN • DEVELOPMENT • PRODUCTION • FAX: (215) 672.9014
www.edon.corn email: edon®edon.com
:hie, ural Fiberglass Column Covers Page 2
L;, EDON Corporation
mar 9: `1
Architectural Fiberglass
J
� 1160 Easton Rd. Horsham, PA 19044
Phone: 215-672-8050
Fax: 215-672-9014
Email: int'o@edon.com
Fiberglass Column Covers Page 2
STRAIGHT SHAFT COLUMN COVERS
(May be varied to any height requested)
Click on the Model number to view product details
Model EC-101 EC-101A EC-101B:EC-101C EC-101D EC-101E EC-101F EC-101G EC-101H EC-101J EC-101K EC-101L':EC-1
No.
Diameter. 8" 9" 10' 12' 14" 16" 16 21" 24" 30" 36' 48' 71
Heigh 10' 10, 10, 10, 10, 12' 12'._ 10'_... 20 :.._ 15 10 12'.6 li
Model No. EC-101N EC-101P EC-1010 EC-101R EC-101S EC-101T EC-101U EC-101V.' EC-101W EC-101X ECEC102,EC
Diameter 15' 20" 2540' 42 52'(6) 62 (D) 84'(E) 27' 11" 18 (A) 2E
Height 10 10, 10, 9' 6- 12' 10, 10 10 10' ! 7 11' 10' 3" '.. T
A = 18" Square CaprBase B = 3 Piece column cover with reveals D = 4 Piece column cover with reveals E= 8 Piece column cove
reveals
`i
FLUTED PILASTERS
Click on the Model number to view product details
Model No. EPEP114
EP120
EP121
EP122
EP=126
EP_131
Width 16"
18"..._
2'71/4'
18"
7".._.
113.
Height 13
9' 9"
1619,
12' 7"
8110,
8110,
Stvle Scamozzi
Tuscan
Tuscan
Scamozzi
Tuscan
Doric
+3
'I
FLUTED COLUMN COVERS
Click on the Model number to view product details
Model
EC-132
EC-140
EC-141
EC-145
No.
Diameter
14'
B.
16"
22"
Height
9' 4 1/2'
10'
8'
23'
Style
Tuscan
Tuscan
Doric
,Entasis'
_
Entasis
Straight
Tapered
EC-151
EC-152
EC-153
EC-160
18'
14"
14"
18"
16' 4
9' 9"
16' 11"
1/4'
12' 6"
Tuscan
Doric
Entasis
Corinthian
Tuscan
Entasis
1 of 2 4/19/2006 10:48 AM
Er,,ol
C'Er c-
" - '-v't.KT
LD I A.M'D' Ekf3
EDON fiberglass
http:\\www.adon.com
EC-101
81
A
9�
101-01
W
124
D
14"
101-0"
E
16,
10'-04
F
180
101-0"
G
21
10'-0"
H
24"
15-01
300
K
L
480
M
7W
N
15,
p
20"
R
40-
T
52*
u
v
847
w
27*
x
10'-00' --
T-W
MEIGHT5 MAY DE VARIED
COLUMN JOINT OP71ON5
wr
i4
STANIDAW LAP JOW
BUTT JOINT
SUGGESTED BLOCKING
I A
REVEAL
JCMKT
w
EC-1 01 STRAIGHT SHAFT COLUMN COVERS
don Corp. 1160 Eorptan Rd., Horsham, PA 19044 - Phone: 215-1371-8080 - Fav 215172-9014 - Email: ado4edonxorn
1 of 2
4/19/2006 10:45 AM
MARK YOUNG
Via Facsimile 303-783-0060
May 16, 2006
Coover-Clark & Associates
455 Sherman Street, Suite 205
Denver, CO 80203
Project Title: City of Fort Collins & Colorado State University Transit Center Phase II
Project No. 05477
Subject: Replace Interior Precast w/ Birch Trim
RE: Change Order Request Number: COR No: 40
Gentlemen:
Pursuant to the above subject matter, please find enclosed our cost summary, qualifications, and back-up to install
birch trim in lieu of the interior precast. The total cost to perform the above referenced work is $-(892.00).
Please note the following during review of this change order request:
1. All interior precast for this project has been eliminated per this COR and has been replaced by 4 7/8" x 1
'/2' Birch Trim.
If you should have any questions and/or concerns, please contact me at your earliest convenience at
(303)710-1421
in erely,
J/ M
Project Engineer
cc:
05477-F-1.2
Steve White 970-221-6534
Cass Beitler 970-491-7572
Owner response, please sign as appropriate:
Approved, Proceed as Submitted
Rejected, Do Not Proceed, Provide Comments
Other, Do Not Proceed, Provide Comments
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
CHANGE ORDER REQUEST#40
Replace Interior Precast w/ Birch Trim
MARK YOUNG CONSTRUCTION LABOR:
Install Birch Trim - (120 MH's)
$3,683
MYC LABOR TOTAL
$3,683
$3,683
MYC MATERIAL
600 LF of Birch Trim -Sanded 3 Sides, Rounded Exterior Corners
$3,600
- Dimensions - 1 1/2"x4 7/8"
MYC MATERIAL TOTAL
$3,600
$3,600
MYC EQUIP.
Scissor Lift- (4 Days)
$280
MYC EQUIPMENT TOTAL
$280
$280
SUBTOTAL
$7,563
SMALL TOOLS & SUPPLIES @ 5% OF LABOR
$184
PAYROLL TAXES & INSURANCE @ 20% OF LABOR
$737
GENERAL CLEANUP: N/A
$0
DELIVERY: N/A
$0
DRAWINGS & SPECS: BY ARCHITECT
$0
SUBTOTAL
$8,484
MYC OVERHEAD & FEE @ 15.0%
273
$1,273
SUBTOTAL MYC WORK
$9
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase 11
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
SUBCONTRACTS
Replace Interior Precast w/ Birch Trim
Big Horn Masonry
Delete Installation of Interior Precast
($5,520)
Fort Collins Precast
Delete Material for Interior Precast
($5,287)
Craftsman Decorating
Stain Interior Birch Trim (6001-F)
$687
SUBCONTRACTTOTAL
($10,120)
($10,120)
SUBTOTAL
($10,120)
MYC FEE @ 6.0%
($506)
SUBTOTAL SUBCONTRACTOR WORK
($10,626)
SUBTOTAL
(DIRECT COSTS)
($869)
BUILDERS RISK INSURANCE @ 1.0%
($9)
LIABILITY INSURANCE @ 0.75%
($7)
MYC BOND:.86 %
($8)
SUBCONTRACTOR BOND: N/A
$0
PERMIT FEES: N/A
$0
SALES TAX: NIA
$0
CONTRACTOR CONTINGENCY @ 0%
$0
PROPOSED CHANGE TOTAL
($892)
Ae-Duos at X4 pwa,
FORT COLLINS PRE -CAST, INC.
308 South Summit View Drive, Fort Collins, CO 80524
970484-2112 office 970494-8232 fax
May 10, 2006
Mark Young Construction, Inc.
Attn: Mike
155 North College Avenue
Fort Collins, CO 80524
Project: CSU Transit Center (MYC Job #5477)
Mike.
In response to correspondence dated April 13, 2006, regarding the deletion of ALL interior
precast and the deletion of 56 lineal feet of lintel, we are issuing you a full credit of $5,287.00.
If you have any questions or concerns, please feel free to give me a call.
Sincerely
Elaine Lauffer
Fort Collins Pre -Cast, Inc.
E'd ZEZB-b8b-0G6 KW3 13rH3SHI dH Wdb0:21 9002 01 FeW
nay U4 06 11:04a Big Horn Masonrulnc. S702213527 p,1
BIG HORN MASONRY, INC.
6521 E. CO. RD. 44
FORT COLLINS, CO 80524
(303) 221-5330
May 4, 2006
Attn: Aaron
Mark Young Construction, Inc.
115 N. College Ave.
Fort Collins, CO 80524
RE: Change Order
CSU Transit Center
Fax: 482-3061
Delete all labor for placing interior precast.
Total of Deduction: $5,520.00
Please call if you have any questions.
Sincerely,
Randy Carey
May 10 06 10:55a p,3
Page No Pages
Proposal
r
I
CRAFTSMAN DECORATING, INC.
403 16th Street
GREELEY, COLORADO 80631
(970) 356-0895
FAX (970) 356-1808
PROPOSAL Sus?x" ED TO
,PHONE GATE
Mark Youn Construction
Ma 10, 2006
STREET
JOB NAVE
155 N. College Ave., Suite 220 CSU Transit._ Center
CITY. STATE and ZIP CODE
JOB LCCAT ION
Fort Collins CO 80524
Fort -Collins, CO
ARCHITECT
DATE OF PLANS JOS PHONE
I
I
We hereby submit specifications and estimates for
RFI # 44
Stain and finish 600 lin.ft.
of Birch base.
Materials:
$ 129.00
Labor:
$ 468.00
$ 597.00
Overhead & Profit @ 15%:
90.00
Total:
I
$ 687.00
Ur PPopOSP hereby to furnish material and labor — complete in accordance with above specifications, for the sum of:
I to be made as follows: -- dollars (S }.
All material Is guaranteed to be as specified. Alf work !o be completed In a workmanlike
manner accadirg to standard practices. Any alteration or deviation •rem above specifications Authorized
Involving exit$ costs will be exerted only upon written orders and will become an extra signa'ure _
charge over and above the estimate. Aft agreements contingent upon strikes, accidents
or delays beyond out control. Owner to carry firetornado and other necessary msumme Note'. This proposal may ba
Cu, workers are fully covered by workman's Compensation LaurancevuOhdrawrt by us it not accepted within
Acre Jtunre of Proposal — The above paces, specifications
and conditions are satisfactory and are hereby accepted. You are authorized Signature
to do the work as specified. Payment will be made as outlined above.
ale of Acceptance: Signature
days
�l
MARK YOUNG CONSTRUCTION, INC. Dlv
155 North College Avenue, Suite 22D • Fort Collins, Colorado 80524 - (970) 484-I648
TELEPHONE BID
FIRM MA,W SON 1S L-t4 mika DATE 5-1 ZZD�,2
ADDRESS CONTACT /<C X& Y
JOB C.SL4 - TRAMciT c EAir 7c PHONE 9j7a'567-7$yo
ITEM QUOTED JOB NO. Q 5 417 F
RECEIVED
O,N41,� ' I
YOUNG
CONSTRUCTION
INCORPORATED
Via Facsimile 303-783-0060
May 11, 2006
Coover-Clark & Associates
455 Sherman Street, Suite 205
Denver, CO 80203
Project Title: City of Fort Collins & Colorado State University Transit Center Phase II
Project No. 05477
Subject: Fiberglass and Drywall Column Wraps
RE: Change Order Request Number: COR No: 36
Gentlemen:
Pursuant to the above subject matter, please find enclosed our cost summary, qualifications, and back-up to add
column wraps as required. The total cost to perform the above referenced work is $10,805.00.
Please note the following during review of this change order request:
1. Due to many conversations with the owners, it was decided in the weekly owners meetings that column
wraps would be needed for the HSS 4.5" diameter tube steel columns. Along the north storefronts, there
are.only 6 columns that could be wrapped, with the fiberglass covers due to other obstructions. The
column covers had to be custom fabricated to fit a 12'-0" ceiling height. Shipping is 6-8 weeks upon
approval of shop drawings.
2. At column lines L & 5.2 and C & 2.2, stud framed drywall enclosures are required due to their relative
sizes.
3. Installation of the fiberglass wraps will be on a time and material basis. The 65 man-hours to install the
fiberglass column wraps include the miscellaneous materials required for proper installation.
If you should have any questions and/or concerns, please contact me at your earliest convenience at
(303)710-1421
Sincerely)
Men
Project Engineer
cc:
05477-F-1.2
Steve White 970-221-6534
Cass Beitler 970-491-7572
MARK YOUNG
CONSTRUCTION
INCORPORATED
Via Facsimile 303-783-0060
May 9, 2006
Coover-Clark & Associates
455 Sherman Street, Suite 205
Denver, CO 80203
Project Title: City of Fort Collins & Colorado State University Transit Center Phase II
Project No. 05477
Subject: TV Pocket Framing
RE: Change Order Request Number: COR No: 41
Gentlemen:
Pursuant to the above subject matter, please find enclosed our cost summary, qualifications, and back-up to add
the TV pockets per the owners details. The total cost to perform the above referenced work is $1,293.00.
Please note the following during review of this change order request:
1. See the attached details provided by CSU (Cass Beitler) for new framing locations and details for pricing.
2. Wayne's Electric stated they would provide the work to move the power to the pockets at no cost to the
owner.
If you should have any questions and/or concerns, please contact me at your earliest convenience at
(303)710-1421
Sincerely,
%
Ma' L G
ax Millen
Project Engineer
cc:
05477-F-1.2
Steve White 970-221-6534
Cass Beitler 970-491-7572
Owner response, please sign as appropriate:
Approved, Proceed as Submitted
Rejected, Do Not Proceed, Provide Comments
Other, Do Not Proceed, Provide Comments
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #05477
rwAmrw nRnER RF0UFST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
CHANGE ORDER REQUEST#41
TV Pocket Framing
MARK YOUNG CONSTRUCTION LABOR:
Install Plywood Backing @ 2 Pockets - (2 MH's)
$61
MYC LABOR TOTAL
$61
$61
MYC MATERIAL
3/4" Plywood Backing - 2 Shts
$48
MYC MATERIAL TOTAL
$48
$48
MYC EQUIP.
MYC EQUIPMENT TOTAL
$0
$0
SUBTOTAL
$109
SMALL TOOLS & SUPPLIES @ 5% OF LABOR
$3
PAYROLL TAXES & INSURANCE @ 20% OF LABOR
$12
GENERAL CLEANUP: N/A
$0
DELIVERY: N/A
$0
DRAWINGS & SPECS: BY ARCHITECT
$0
SUBTOTAL
$124
MYC OVERHEAD & FEE @ 15.0%
$19
SUBTOTAL MYC WORK
$143
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #06477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
SUBCONTRACTS
TV Pocket Framing
Midwest Drywall
Add to Frame in the Two (2) Display Screen Pockets
$1,063
Wayne's Electric
Add to Run Electrical to the New Pocket Locations
No Cost
SUBCONTRACTTOTAL
$1,063
$1,063
SUBTOTAL
$1,063
MYC FEE @ 5.0%
$53
SUBTOTAL SUBCONTRACTOR WORK
$1,116
SUBTOTAL (DIRECT COSTS)
$1,260
BUILDERS RISK INSURANCE @ 1.0%
$13
LIABILITY INSURANCE @ 0.75%
$9
MYC BOND:.86 %
$11
SUBCONTRACTOR BOND: N/A
$0
PERMIT FEES: NIA
$0
SALES TAX: N/A
$0
CONTRACTOR CONTINGENCY @ 0%
$0
PROPOSED CHANGE TOTAL
$1,293
CSU Transit Center
1. PCO Title: TV pocket framing
3. Change Order Requested By
5. Owner and/or Architect -Engineer Change Order Request Number
6. Material
7. Equipment
2. Number TV pocket framing
4. Date 5/2/2006
8. Material and Equipment Sub -Total
9. Sales Tax @ 0,00%
10.
Labor 18.00 Manhours @ $30.69 / Hour
11.
Labor Insurance & Taxes
42,00%
12.
Estimation/Planning
0 Manhours @ $1.00 / Hour
13.
Tool Replacement
2.00% of Labor
14.
Overtime Inefficiency
0.00% of Labor
15. Labor Sub -Total
16,
Equipment Rental
x Scissor Lift
0.00 Hours @ 2.52 / Hour
x Lull
0.00 Hours @ 25.13 / Hour
x Trash
0.00 Hours @ 15.00 / Hour
x Hoisting
0.00 Hours @ 100.00 / Hour
17, Equipment Rental Sub -Total
18.
Indirect Costs for this Change Order:
19. CHANGE ORDER SUB -TOTAL COSTS
20. Overhead
30, This Proposal May Be Withdrawn By us
If Not Accepted Within 30 Days
31. Time Extension Required of 0 Days
32. Submitted By Keith Ewing
33. Approved By
pockets
22. Margin
24. (Credits)
$124.80
$124.80
$0.00
$552.42
$232.02
$0.00
$11.05
$0.00
$795.48
$0.00
$0.00
$0.00
$0.00
$0.00
$920.28
10.00%
$92.03
21. Sub -Total
$1,012.31
5.00%
$50.62
23. Sub -Total
$1,062.93
$0.00
25. sub -Total
1,062.93
26. Special Insurance $0.00
27. Bond Premium 0.0%
70 TOTAI PRICE OF CHANGE
28. TOTAL PRICE OF CHANGE $1,063.00
29. Cost if this change Order is not accepted
$0.00
C5` 31?-flZ-3r10
TV pocket framing Page 1 of 2
0
CSU Transit Center
Back Up Data
Description
.
d
e
Quantity
Unit of
..
framing material
-••
��®
• 1f1
f 1f
•f
_--
f 1./
f ••
1 1•
_--
f 11f
f If
1 If
_--
/ 11•
• /•
f 11
®®®
• fff
• 1•
f ••
_--
f •1f
• If
• •/
---
f fff
• ff
1 f{
_--
f //f
1 ft
1 1•
_--
•/ 11
f/ f
1 1 1
_--
1 !•1
• 11
1 11
---
1/ 1 1
••!
1 1 1
_--
• fff
1 1f
• 1•
_--
1• 1 1
1 1!
1 1 1
_--
f f1•
_ f /f
f f/
124.80 18.00
TV pocket framing
Page 2 of 2
�"L
�
yq
y L _.si p res*+N� d..h�:4.yi((wFf �y��iHb.Y +&^92'3RY' tiS& ie#sm�n+W LY'P*F
s �r�C v�T is '� �%� �;mt:'' Y�'`�E: � 4 ggSv �"}T'a�'", e � 4iM:°' �T3'� �"�n5 Hsi AL3.2 �> i f`$_'•�"" a
� � �; r���'c ry'E.� ✓ d d� .Fw,�� v.�iz� x^e� ns�r ^u �:aac ,�`N.. 1. -,.I' �.+t j�'�
t3.iE uzs rv9>'s<P
u 1
k
9Rr
a s ,g
:
IN i
:� tY, }s.✓ s .5 e �v �'��" f 4 3 t p'' r E, z Sy�'a n �.a� � f �.4.,�� ,� .r f (EF..
���`�.� f ' ��� n � � ��� t ''�L t� � i€t .+" w' �a��.'i`r�a' i.9�y� `�ss {� � ' ` , „ • ,;9
� �a� 3 �'. ! 9 1 r. • Y 'Nt
H
Y
+
- 41n—
its,
a
SJ
Pill,
No Text
No Text
1 E 1
Owner response, please sign as appropriate:
Approved, Proceed as Submitted
Rejected, Do Not Proceed, Provide Comments
Other, Do Not Proceed, Provide Comments
F
is
ns
§ +
M
t
P
i
«M1
RH
y
1ii
t
b
Pan- s
v
F
�F
i� i
Via Facsimile 303-783-0060
May 24, 2006
Coover-Clark & Associates
455 Sherman Street, Suite 205
Denver, CO 80203
Project Title:
Project No.
Subject:
RE:
City of Fort Collins & Colorado State University Transit Center Phase II
05477
Change for Type BB&DD Light Fixtures
Change Order Request Number: COR No: 42
Gentlemen:
Pursuant to the above subject matter, please find enclosed our cost summary, qualifications, and back-up to
change the type BB & DD light fixtures. The total cost to perform the above referenced work is $2,749.00.
Please note the following during review of this change order request:
1. Due to the LEED credits required on this project, type BB and DD light fixtures were required to be
changed from the "red -lined" submittals and Coover-Clarks attached email.
If you should have any questions and/or concerns, please contact me at your earliest convenience at
(303) 710-1421
Sincerely,
Max Millen
Project Engineer
cc:
05477-F-1.2
Steve White 970-221-6534
Cass Beitler 970-491-7572
Owner response, please sign as appropriate:
Approved, Proceed as Submitted
Rejected, Do Not Proceed, Provide Comments
Other, Do Not Proceed, Provide Comments
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
CHANGE ORDER REQUEST#42
Change For Type BB&DD Light Fixtures
MARK YOUNG CONSTRUCTION LABOR:
MYC LABOR TOTAL
$0
$0
MYC MATERIAL
MYC MATERIAL TOTAL
$0
$0
MYC EQUIP.
MYC EQUIPMENT TOTAL
$0
$0
SUBTOTAL
$0
SMALL TOOLS & SUPPLIES @ 5% OF LABOR
$0
PAYROLL TAXES & INSURANCE @ 20% OF LABOR
$0
GENERAL CLEANUP: N/A
$0
DELIVERY: N/A
$0
DRAWINGS & SPECS: BY ARCHITECT
$0
SUBTOTAL
$0
MYC OVERHEAD & FEE @ 15.0%
$0
SUBTOTAL MYC WORK
$0
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
SUBCONTRACTS
Change For Type BB&DD Light Fixtures
Wayne's Electric
Deduct Original Lights
($6,210)
Add for New Type BB & DD Light Fixtures
$8,761
SUBCONTRACT TOTAL
$2,551
$2,551
SUBTOTAL
$2,551
MYC FEE @ 5.0%
$128
SUBTOTAL SUBCONTRACTOR WORK
$2,679
SUBTOTAL (DIRECT COSTS)
$2,679
BUILDERS RISK INSURANCE @ 1.0%
$27
LIABILITY INSURANCE @ 0.75%
$20
MYC BOND:.86 %
$23
SUBCONTRACTOR BOND: NIA
$0
PERMIT FEES: N/A
$0
SALES TAX: N/A
$0
CONTRACTOR CONTINGENCY @ 0%
$0
PROPOSED CHANGE TOTAL
$2,749
MAY-24-2006 WED 08:41 AM WAYNES ELECTRIC INC FAX NO, 3036540877 P. 01
Ref, Ne:G oaowaw
heaerFroa N S (IIST6M`prlMlnq urvin ieOOa 427 Art"- ne. awwawpn. NN OW I •ww.neoc.fan _ . _ _ .._ ... .... `
DATE
Wayne's Electric, Inc.
130 Soutl+ IIAsn Strwt a i�ieea. ca+eraad 80601-167S 303459-7481
INVOICE #
DAILY INVOICE I.__ , _,.._....r.
)ESCRIPTION OF WORK: 7t� �O
22
QUANTITY I DESCRIPTION OF MATERIALS USED
e
s
PENDING INVOICE: Y N,
COMPLETION DATE:
SIGNATURE:
MAY-23-2006 TUE 04:19 PM WAYNES ELECTRIC INC FAX NO, 3036540877
05/23/2086 15:29 3039963633 WESC' SALES
P. 01
PAGE 01/01
Quotation
ThA "o"an "me&" N Dow a ago wwa
the extra a" a p"* sort waptanea to to titer or
effort people tnle oar no tear rms. ,tia eTw ww
C' Y Ihae be flm Iw a PeAae ntarawe (tit aM emn
rn Aet ret.n.. *,Aim au wl"r% onant
IIt aarwraft ea ftow at Wa tm wen a
etr�aoa a PWOW& Diver 1"ahar er aM~ nMenatt
aauaR of aaarttaet a,ar et sa ki.N t tom
an ga .A on the kmf aM Cad afana M
ar e.r! rear taaueen.
To; Waynes Electric
Attn: Alan
Fay;
ype 88
1 IAdder for New Type BB & OD fixtures
NOTE FULL FREIGHT ALLOWED .
NOTE THIS PRICE DOES NOT INCLUDE AN it
MOUNTING OR HANGING NAROWAF c
NOTE THIS PRICE DOES NOT INCLUDE AN'(
SPARE LAMPS,LENSES OR BALLAS—S
F.O.B. Point of Bhipmerd. The prltes started in this offer shell, uA* a re-
newed, av omatIcally expire fifteen (15) days from the date of this a lar.
WESCO
Dee: Aprll 10, 2006
Project Name Csu Transit -BB & DID Cheniles
or Number:
WESCO Distribution, Inc.
Per: Chad Hale
303-995-3613
Page I of 2
Aaron Phillips
From: Jay Lamicq oaylamicq@coover-clark.coml
Sent: Tuesday, April 04, 2006 10:15 AM
To: Aaron Phillips
Subject: RE: Light Fixture Type BB at Exterior Columns
Attachments: #48-sub-Electrical submittals REVISED 040306.doc
Aaron -
I am aware of this change, but it was the only way we are able to achieve LEED points for this and feel
comfortable that there would be no water penetration at the tops of the columns. The housing for this fixture is 7
with a flange on top of 7.5', which should fit snug into the precast. My elec. engineer also switched fixture DO as
well to achieve LEED credits.
Please forward this along to your sub and let me know if you have any further questions.
Jay
Jay R. Lamicq, Assoc. AIA
Associate Designer
Coover-Clark & Associates, Inc
455 Sherman Street, Suite #205
Denver, Colorado 80203
(303) 783-0040 ext.16
(303) 783-0060 fax
Email: I vllaamicaftoover-clark.com
Web: www.coover-dark.com
"The sender believes that this E-mail and any attachments were free of any virus, worm, Trojan horse, and/or malicious code when sent. This message and its
attachments could have been Infected during transmission. By reading the message and opening any attachments, the recipient accepts full responsibility for
taking protective and remedial action about viruses and other defects. The sender's employer is not liable for any loss or damage arising in any way from this
message or its attachments."
-----Original Message -----
From: Aaron Phillips[mailto:aphillips@markyoungconstruction.com]
Sent: Tuesday, April 04, 2006 9:54 AM
To: Jay Lamlcq
Subject: Light Fixture Type BB at Exterior Columns
Jay,
Upon review of both the Precast Concrete and the Specialty Light Fixtures, I see you have marked the diameter
of the fixture opening to be 7-1/4". The APPROVED light fixture type BB for these columns is 12" in diameter.
Are the precast and specialty light fixture openings to be fabricated as marked at 7-1/4", with a 12" fixture? Is the
light fixture diameter to change?
If the fixture is to change, please realize that this was an approved item that has been ordered and there will likely
be a cost impact if changed at this point.
Please advise as to what will be provided at these exterior columns.
Respectfully,
Aaron Phillips
Project Engineer
Mark Young Construction, Inc.
155 N. College Ave., Suite 220
5/2/2006
b
dE
ENGINEERING, INC.
reaJmLip tFm ai Pagnwnng
SUBMITTAL TRANSMITTAL
Marc E. Espinosa
David B. Robinson, P.E.
Richard D. Matthias, A.E.
TO: JayLamiCq DATE: FEBRUARY 8, 2006 - REVISED APRIL 3, 2006
Coover-Clark & Associates, P.C. REFERENCE: CSU Transit Center Phase II
455 Sherman Street, Suite 205 BCER PROJECT N: 29604002
Denver, CO 80203
303-783-0040
To Whom It May Concern:
We are sending via: ❑ MAIL ® COURIER
The following items: ❑ PRINTS ® SUBMITTALS
❑ DELIVERED BY HAND
❑ AS-BUILTS
❑ FEDERAL EXPRESS
❑ SPECIFICATIONS
E
�
a
v
v
x
E
e
Y
a
°o
Y
E
a i
E a
Date Iu
Date Out
Tag #
Submittals!
Section
& Para.
Manufacturer &
Model if
O1/17/06
02/08/06
Grounding & Bonding
16170
X
-Appleton
`►i/17/06
02/08/06
Wire & Cables
16123
X
Various
1/17/06
02/08/06
Wirin Devices
16141
X
Pass & Seymour
o1/17/06
02/08/06
Panelboards
16470
X
Square D
01/17/06
02/08/06
Fuses
16477
X
Cooper Bussmann
01/17/06
02/08/06
Enclosed Switches
16441
X
Square D
01/17/06
02/08/06
Fixture Type AI (C-Store)
X
Lithonia
01/17/06
02/08/06
Fixture Type At
X
Focal Point
01/17/06
02/08/06
Fixture Type A I E
X
Focal Point
01/17/06
02/08/06
Fixture Type AID
X
Focal Point
01/17/06
1 02/08/06
Fixture Type A2
X
Focal Point
01/17/06
02/08/06
Fixture Type A2E
X
Focal Point
01/17/06
02/08/06
Fixture Type A2D
X
Focal Point
01/17/06
02/08/06
Fixture Type BID
X
Focal Point
01/17/06
02/08/06
Fixture Type B2
X
Focal Point
01/17/06
02/08/06
Fixture Type B2E
X
Focal Point
01/17/06
02/08/06
Fixture Type C
X
Lithonia
01/17/06
02/08/06
Fixture Type CE
X
Lithonia
01/17/06
02/08/06
Fixture Type D
X
Translite Sonoma
01/17/06
02/08/06
Fixture Type F
X
Gotham
01/17/06
02/08/06
Fixture Type FE
X
Gotham
01/17/06
02/08/06
Fixture Type G
X
Lithonia
0 17/06
02/08/06
Fixture Type GE
X
Lithonia
0 /17/06
02/08/06
1
Fixture Type GI
X
Lithonia
01/17/06
02/08/06
1 Fixture Type G2
X
Lithonia
C:\DOCUMENTS AND SETrINGS\APHTL-M\LOCAI.SEMI-4GS\TESIPORARY INTERNET FILLS\OLKIO\#48.SUB-ELGCTRICAL
SUBMITTALS REVISED W306 (4.DOC
5420 WARD ROAD, SUITE 200, ARVADA, COLORADO 80002-1838 • TELEPHONE: 303-422-7400 • FAX: 303-422-7900
B
�
v
z
v
z
a
z
v
z
o
�
Y h
2 a
Date In
Date Out
Submittals & Tag #
Section
& Para,
Manufacturer &
Model #
01/17/06
02/08/06
Fixture Type G2E
X
Lithonia
01/17/06
02/08/06
Fixture Type H
X
Lithonia
01/17/06
02/08/06
Fixture Ty e J
X
Insight
01/17/06
02/08/06
Fixture Type K
X
Insight
01/17/06
02/08/06
Fixture Type L
X
Gotham
01/17/06
02/08/06
Fixture Type LE
X
Gotham
01/17/06
02/08/06
Fixture Type M
X
B-K Lighting
01/17/06
02/08/06
Fixture Type NI
X
Gotham
01/17/06
02/08/06
Fixture Type NIE
X
Gotham
01/17/06
02/08/06
Fixture Type N2
X
Gotham
01/17/06
02/08/06
Fixture Type N2E
X
Gotham
01/17/06
02/08/06
Fixture Type PE
X
Focal Point
01/17/06
02/08/06.
Fixture Type R
X
Lithonia
01/17/06
02/08/06
Fixture Type RE
X
Lithonia
01/I7/06
02/08/06
Fixture Type SE
X
Lithonia
-01/17/06
02/08/06
Fixture Type T
X
Gotham
01/17/06
02/08/06
Fixture Type AA
X
Lithonia
01/17/06
02/08/06
Fixture Type AAE
X
Lithonia
01/ 77/06
02/08/06
Fixture Type BB
X
H drel
01/17/06
02/08/06
Fixture Type CC
X
Winona
1/17/06
02/08/06
Fixture Type DD
X
H drel
W/17/06
02/08/06
Fixture Type FF
X
B-K Lighting
01/17/06
02/08/06
Fixture Type EM
X
Lithonia
01/17/06
02/08106
Fixture Type XI
X
Lithonia
01/17/06
02/08/06
Fixture Type X2
X
Lithonia
These are transmitted as indicated below:
7 COPIES TRANSMITTED
❑ CHECKED AS NOTED (See submittals)
® CHECKED AS NOTED (See comments below)
SUBMITTAL REVIEW COMMENTS:
1. GROUNDING & BONDING: PROVIDE IRREVERSIBLE TYPE CONNECTIONS PER
SPECIFICATION.
2. BUILDING WIRES & CABLES: METAL -CLAD CABLE (AC OR MC) NOT PERMITTED PER
CSU BUILDING CONSTRUCTION STANDARDS MANUAL. PROVIDE BUILDING WIRE PER
SPECIFICATION.
,DOCUN93'MAND SETMGS\APMLLIPS\LOCALSGITINGS\TEMPORARYINTERNE'I'F1LEs\OI.K10\#4&SUB-ELECIR[CALSUBM TALSREVISED
040306 (2).DOC
5420 WARD ROAD, SURE 200, ARVADA, COLORADO 80002-1838 • TELEPHONE: 303-422-7400 • FAX: 303-422-7900
WIRING DEVICES: ALL DEVICES SHALL BE OF THE SAME MANUFACTURER (HUBBELL
OR PASS & SEYMORE). PROVIDE DEVICES AS SPECIFIED AND AS SHOWN ON DRAWINGS:
')OCUMWM AND SE rMGS\APHIIJ-IPS\I.00AL SETTINGS\TEMMPARY NTE:RNET PILES\OLKIO\#48.SI B-EI.EC nUCAC. SUBMTTALS REVISED
06 (n.DOC
5420 WARD ROAD, SUrrE 200, ARVADA, COLORADO 80002-1838 • TELEPHow 303-422-7400 • FAX: 303-422-7900
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
CHANGE ORDER REQUEST# 36
Column Wraps
MARK YOUNG CONSTRUCTION LABOR:
Install Rubber Base @ Fiberglass Columns - (2 MH's)
$61
T&M- Not to Exceed Install Columns - (65 MH's)
$1,995
MYC LABOR TOTAL
$2,056
$2,056
MYC MATERIAL
Fiberglass Column Wraps - Straight Shaft Column Covers
$5,350
6 Ea- 9" Diameter x 12'-6" High
Rubber Base Fiberglass Column Wraps
$40
MYC MATERIAL TOTAL
$5,390
$5,390
MYC EQUIP.
MYC EQUIPMENT TOTAL
$0
$0
SUBTOTAL
$7,446
SMALL TOOLS & SUPPLIES @ 5% OF LABOR
$103
PAYROLL TAXES & INSURANCE @ 20% OF LABOR
$411
GENERAL CLEANUP: NIA
$0
DELIVERY: N/A
$0
DRAWINGS & SPECS: BY ARCHITECT
$p
SUBTOTAL
$7,960
MYC OVERHEAD & FEE @ 15.0%
$1,194
SUBTOTAL MYC WORK
S-9-1-54-71
PAGE
SUBMITTAL REVIEW COMMENTS (CONTINUED):
WALL SWITCHES — HEAVY DUTY (SUITABLE FOR HIGH ABUSE AREAS); RECEPTACLES —
HEAVY DUTY (SUITABLE FOR HIGH ABUSE AREAS); CORRIDOR RECEPTACLES —
HOSPITAL GRADE; WALL PLATE — STAINLESS STEEL; WEATHERPROOF COVER PLATES —
GASKETED CAST IRON WITH HINGED GASKETED DEVICE COVER.
4. PANELBOARDS: "L2A" — (2) 20/3 INSTEAD OF (2) 35/3.
5. FIXTURE TYPE Al (C-STORE): AT C-STORE ONLY (LITHONIA).
6. FIXTURE TYPE G: WHERE IS THIS FIXTURE USED?
7. FIXTURE TYPE GE: WHERE IS THIS FIXTURE USED?
8. FIXTURE TYPE H: PROVIDE LOW VOLTAGE TRACK HEAD SPECIFIED.
9. FIXTURE TYPE J: PROVIDE FIXTURE TS673 WITH SINGLE LAMP SYMMETRIC
DISTRIBUTION REFLECTOR. ADJUSTABLE SAWTOOTH SHIELD OPTION NOT REQUIRED.
10. FIXTURE TYPE AA: PROVIDE HYDREL FIXTURE "HP3". REFER TO RESPONSE TO
C-WEST REVIEW COMMENTS.
11. FIXTURE TYPE AAE: EMERGENCY BATTERY PACK UNIT "EM2". REFER TO RESPONSE
TO C-WEST REVIEW COMMENTS.
12. FIXTURE TYPE Xl: PROVIDE MATTE BLACK, BRUSHED ALUMINUM FACE HOUSING
COLOR.
13. FIXTURE TYPE X2: PROVIDE MATTE BLACK, BRUSHED ALUMINUM FACE HOUSING
COLOR.
REVISED APRIL 3, 2006
1. FIXTURE TYPE BB: REVISE SPECIFICATION - BK LIGHTING #S-0O2-PAR2035-TR-58-
NAT-120
2. FIXTURE TYPE DD: REVISE SPECIFICATION — HYDREL #7000-50M-120-FL-KM-BD-WH
Signed:
Layne Webber
-)OCUNW2M AND SETTINGS\APHILLIPS\LOCAL SETTINGS\T ENfPORARY INTERNE[' FILES\OLK IO\#48-SUB-F1.ECIRICAL SUBMITTALS REVISED
-" (2).DOC
5420 WARD ROAD, SUITE 200, ARVADA, COLORADO 80002-1838. TELEPHONE: 303-422-7400 9 FAX: 303422-7900
Mark Young Construction, Inc. 5/10/2006
Project: CSU Transit Center
Job #05477
Summary Page
COR #44 - Revised Flooring Option
Description Cost
Demo Interior Concrete Floor $2,089
Replace Demoed Concrete with Standard Grey $1,885
Total $3,974
Please note the following during review of this change order:
1) All costs associated with the carpet have been excluded from this COR per CSU. The carpet
will be priced at a later date.
2) Floor preparations, transition strips, plywood protection, etc. will be priced with COW 2 upon final selections.
3) This submission excludes additional _ceramic tile at the bathrooms.
4) The pricing for pouring concrete into the area removed around the stairs is based on a slab that will match the
existing slab elevation. All additional costs to elevate the slab if required will be included into COR#12.
5) The stained concrete credit will be included into COR#12.
6) This COR is being separated ftom COR#12 to ensure that the project keeps moving towards its desired
completion date.
0
No Text
f-� .v_ I IUU4 UPTq_ H�YYC wDRK1 _ t'!
ITEM I I FT- _ _ _ _.._ y� _—
U • 1 1 was DESCRYTNIM _ 10 MS T �.,._ Ory �Iyy , it CpEW ' � 7E i PROD._ EQUIP._S I t i 9UBTOT�I DIAL YAT -- � r - -
-----. 1 jYNNR3 INOUR , �-UIP AMN;. -� UT gNNT _SUB. �TOT�I YNR
- - _ Yi _ 37TSF �r _] 15000 f7B' fp,Dpi --_� ANNT U8+ -AMOUNT C08T it G08T--
FUTWO_RK .-
FINEGRADEATSOGwTERIOq - �- /- i�' -i --_
f PLACEANDFWISH S.OG jSTANDARDGREY) I- 375 SF rj'� 5020 _ - Solis.� _ - - I- - }.,. - f 1 35, 50� f23 5088 - _ _
1�.- L _tI _ _ _ -
_YATERIAUEGUIPYENT_ L. �-i-__ 'r' _.I 7•_._ _...F - .. __ -_
L m� fM f1a1 m.oul �
'OG CONCRETE 7500jSTANDARO GfiE 6' THICK / - I -- i - '- _,_ _- _ i -_ iJ291 $1271 fA79
_._ _ 1.. - SO _ - t
sow SoT ° yD�
_ r�ox wgsTE OH coNCRETE Y1.®-- a cv YAn 4 t1 _ ' 9 os T` M
+- -- } �- D 8 CV MAn ` - -_ �- +_ _ r _- i ' O.__ SBO_OD f6A0 3000� f0 r 610 00 S7B./5
1 , _*REINFORCING STEEL _ f 375�M 1 f MAn I _J '� � - -- -.- __
SAWCUT CONTROL I2'OC --- I _ -- '-- -
i
80LF f SUB a� _-- 111 ._ ._ _ -
00
.SK10.STEERTOHAULCONCRETE -- -_ _ 1 --- yr --
- _-. iDY: EOVIP .� K7 r ___ ';•'__ f 87 h� S� Ste{-' ��I ... � � ' 0�011 ffy_al
__ ..
SUBTOTAL ._ . r ( -_} 1-_..
5725 S23
$50 16
26 1
NO6 f15] 5710
f1251 $23. $406 $157 f]10� 5875 1
_ .._. .._.. -l. CHECK
I 2E
HEC 625i
+-r_-__. r _ �OVERHERD t, FEE 15x1. 243 ]9 _
r '
1 _ 196905
_ BUBi�TgL
1601
LF
!4
1
-. ___Tebl7a0 melR.gbc. Ganafb r
1 ... _ ..... -. .. 1
1 OF
MARK YOUNG
CONSTRUCTION
INCORPORATED
Via Facsimile 303-783-0060
May 16, 2006
Coover-Clark & Associates
455 Sherman Street, Suite 205
Denver, CO 80203
Project Title: City of Fort Collins & Colorado State University Transit Center Phase II
Project No. 05477
Subject: Colorado Hardscapes to Sawcut the Tree Limbs
RE: Change Order Request Number: COR No: 45
Gentlemen:
Pursuant to the above subject matter, please find enclosed our cost summary, qualifications, and back-up to
sawcut the tree limbs into the stained concrete. The total cost to perform the above referenced work is $6,250.00.
Please note the following during review of this change order request:
1. The sawcutting of the tree will be performed by Colorado Hardscapes but the artist must provide all
layouts as required prior to their work.
If you should have any questions and/or concerns, please contact me at your earliest convenience at
(303) 710-1421
$i erelerely,
Max Millen
Project Engineer
cc:
05477-F-1.2
Steve White 970-221-6534
Cass Beitler 970-491-7572
Owner response, please sign as appropriate:
Approved, Proceed as Submitted
Rejected, Do Not Proceed, Provide Comments
Other, Do Not Proceed, Provide Comments
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
CHANGE ORDER REQUEST#45
Sawcutting the Tree Shadow
MARK YOUNG CONSTRUCTION LABOR:
MYC LABOR TOTAL
$0
$0
MYC MATERIAL
MYC MATERIAL TOTAL
$0
$0
MYC EQUIP.
MYC EQUIPMENT TOTAL
$0
$0
SUBTOTAL
$0
SMALL TOOLS & SUPPLIES @ 5% OF LABOR
$0
PAYROLL TAXES & INSURANCE @ 20% OF LABOR
$0
GENERAL CLEANUP: NIA
$0
DELIVERY: NIA
$0
DRAWINGS & SPECS: BY ARCHITECT
$0
SUBTOTAL
$0
MYC OVERHEAD & FEE @ 15.016
$0
SUBTOTAL MYC WORK
$0
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase If
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
SUBCONTRACTS
Sawcutting the Tree Shadow
Colorado Hardscapes
Sawcut the Tree Limbs into the Stained Concrete Floor
$5,800
SUBCONTRACT TOTAL
$5,800
$5,800
SUBTOTAL
$5,800
MYC FEE @ 5.0%
_ $290
SUBTOTAL SUBCONTRACTOR WORK
$6,090
SUBTOTAL (DIRECT COSTS)
$6,090
BUILDERS RISK INSURANCE @ 1.0%
$61
LIABILITY INSURANCE @ 0.75%
$46
MYC BOND:.86 %
$53
SUBCONTRACTOR BOND: NIA
$0
PERMIT FEES: NIA
$0
SALES TAX: NIA
$0
CONTRACTOR CONTINGENCY @ 0%
$0
PROPOSED CHANGE TOTAL
$6,250
MAY-16-2006 TUE 09:46 AM COLORADO HARDSCAPES
FAX NO, 0 P. 01
8085 E. Harvard Ave.
Denver, CO 80231
303-750-8200
Fax: 303-750-8886
1-800-447-1888
FAX TRANSMITTAL
To: Max Millen
From: John Buteyn
Company: Mark Young Constuction Date: 511 S-rc,-o6
— - _ --- — Fax Number: 970-482-3061 # of pages: 1
Subject: Trees - cut and stain - CSU Transit Center
Comments:
Max:
To add the cutting and staining of the tree "shadows" please add $5800 to
our price. This should result in a new total of $34,310.00.
This assumes the artist will provide the layout for the tree shapes. We will
be happy to work with him on that.
Contact me with any questions.
John
303-472-2174
If you do not receive the number of pages indicated, please contact
us at one of the phone numbers listed
Via Facsimile 303-783-0060
May 25, 2006
Coover-Clark & Associates
455 Sherman Street, Suite 205
Denver, CO 80203
Project Title: City of Fort Collins & Colorado State University Transit Center Phase II
Project No. 05477
Subject: Acid Etching Pre -Cast Concrete
RE: Change Order Request Number: COR No: 46
Gentlemen:
Pursuant to the above subject matter, please find enclosed our cost summary, for the acid etching of the pre -cast
concrete. The total cost to perform the above referenced work is $2,593.00
Please note the following during review of this change order request:
1) MYC's fee was eliminated from this COR.
2) See the attached email describing why the changes were required.
If you should have any questions and/or concerns, please contact me at your earliest convenience at
(303)710-1421
Sincerely,
Max Millen
Project Engineer
cc:
05477-F-1.2
Steve White 970-221-6534
Cass Beitler 970-491-7572
Owner response, please sign as appropriate:
Approved, Proceed as Submitted
Rejected, Do Not Proceed, Provide Comments
Other, Do Not Proceed, Provide Comments
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase 11
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
CHANGE ORDER REQUEST#46
Acid Etch Precast
MARK YOUNG CONSTRUCTION LABOR:
MYC LABOR TOTAL
$0
$0
MYC MATERIAL
MYC MATERIAL TOTAL
$0
$0
MYC EQUIP.
MYC EQUIPMENT TOTAL
$0
$0
SUBTOTAL
$0
SMALL TOOLS & SUPPLIES @ 5% OF LABOR
$0
PAYROLL TAXES & INSURANCE @ 20% OF LABOR
$0
GENERAL CLEANUP: NIA
$0
DELIVERY: NIA
$0
DRAWINGS & SPECS: BY ARCHITECT
$0
SUBTOTAL
$0
MYC OVERHEAD & FEE @ 15.0%
$0
SUBTOTAL MYC WORK
$0
, MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
SUBCONTRACTS
Column Wraps
Craftsman Decorating
Paint Fiberglass Column Wraps
$501
Paint Stud Framed Column Covers
Inc.
Midwest Drywall
Wrap Columns at Grid Lines L&5.2 and C&2.2
$808
SUBCONTRACTTOTAL
$1,309
$1,309
SUBTOTAL
$1,309
MYC FEE @ 5.0%
$65
SUBTOTAL SUBCONTRACTOR WORK
$1,374
SUBTOTAL (DIRECT
COSTS)
$10,529
BUILDERS RISK INSURANCE @ 1.0%
$105
LIABILITY INSURANCE @ 0.75%
MYC BOND:.86 %
$79
$92
SUBCONTRACTOR BOND: N/A
$0
PER FEES:_ N/A
$0
SALES TAX: N/A
$0
CONTRACTOR CONTINGENCY @ 0%
$0
PROPOSED CHANGE TOTAL
$10,805
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #06477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
SUBCONTRACTS
Acid Etch Precast
Fort Collins Pre -Cast, Inc.
Acid etching precast concrete
$2,527
SUBCONTRACT TOTAL
$2,527
$2,527
SUBTOTAL
$2,527
MYC FEE @ 5.0%
_ $0
SUBTOTAL SUBCONTRACTOR WORK
$2,527
SUBTOTAL (DIRECT COSTS)
$2,527
BUILDERS RISK INSURANCE @ 1.00l0
$25
LIABILITY INSURANCE @ 0.76%
$19
NYC BOND:.86 %
$22
SUBCONTRACTOR BOND: NIA
$0
PERMIT FEES: NIA
$0
SALES TAX: NIA
$0
CONTRACTOR CONTINGENCY @ 0%
$0
PROPOSED CHANGE TOTAL
$2,593
Page I of I
Max Millen
From:
Max Millen
Sent:
Wednesday, May 24, 2006 10:36 AM
To:
'Cass Beitler'
Subject: Acid Etching Precast
Cass,
Through the submittal process, MYC's subcontractor produced precast samples to "match the existing"
per the project specifications. For the fabrication of these samples, Fort Collins Precast provided an
Initial sample that was too gray in color. Coover-Clark and Associates directed MYC to have the sample
be re -fabricated with more white cement to match the precast on the North side of the Lory Student
Center. This sample was provided and approved on 2121106 by CCA. Later, MYC was told that the precast
needed to match the precast on the East side of the Lory Student Center, containing a yellow color and
acid etching. This is where the Change Order for the acid etching was bom.
Max Millen
Mark Young Construction, Inc.
Cell: 303-710-1421
Fax: 970-482-3061
mmillen markyoungconsruction.com
5/25/2006
FORT COLLINS PRE -CAST, INC.
308 South Summit View Drive, Fort Collins, Co 80524
9704"2112 0fike 970 94-8232 fax
May 10, 2006
Mark Young Construction, Inc,
Attni Mille
155 North College Avenue
Fort Collins, Co 90524
Project: CSU Transit Center (MYC Job #5477)
Mike.
We are requesting a change order in the amou
numerous nt of 52527.00 to cover the costs involved in the
of acid washinghing,. m9 of color changes, including the day that we began pouring, and the addition
1f you have any questions or concerns, please feel free to give the a call
Sincerely,
��.�lDQ6i�
Elaine Lauffer
Fort Collins Pre_Cast, Inc.
z•d aeze-bet.-ocs
Via Facsimile 303-783-0060
May 24, 2006
Coover-Clark & Associates
455 Sherman Street, Suite 205
Denver, CO 80203
Project Title: City of Fort Collins & Colorado State University Transit Center Phase II
Project No. 05477
Subject: HVAC/Ceiling Ht. Conflicts
RE: Change Order Request Number: COR No: 47
Gentlemen:
Pursuant to the above subject matter, please find enclosed our cost summary for the HVAC/ceiling height conflicts
at the transit desk. The total cost to perform the above referenced work is $894.00.
Please note the following during review of this change order request:
1) RFI#47 - Due to the ceiling height conflicts over the transit counter desk with the structural steel beam and
fireproofing along grid line 4, the original 12" diameter duct would not fit. A new line of ductwork was required to fit
into the soffit above the transit desk.
If you should have any questions and/or concerns, please contact me at your earliest convenience at
(303) 710-1421
cerely,
Max Millen
Project Engineer
cc:
05477-F-1.2
Steve White 970-221-6534
Cass Beitler 970-491-7572
Owner response, please sign as appropriate:
Approved, Proceed as Submitted
Rejected, Do Not Proceed, Provide Comments
Other, Do Not Proceed, Provide Comments
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #06477
`14AMr%r- AR11FR RIP-niIPAT SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
CHANGE ORDER REQUEST#47
HVAC/Ceiling Height Conflicts (RFI#47)
MARK YOUNG CONSTRUCTION LABOR:
MYC LABOR TOTAL
$0
$0
MYC MATERIAL
MYC MATERIAL TOTAL
$0
$0
MYC EQUIP.
MYC EQUIPMENT TOTAL
$0
$0
SUBTOTAL
$p
SMALL TOOLS & SUPPLIES @ 5% OF LABOR
$p
PAYROLL TAXES & INSURANCE @ 20% OF LABOR
$p
GENERAL CLEANUP: N/A
$p
DELIVERY: N/A
$p
DRAWINGS & SPECS: BY ARCHITECT
$p
SUBTOTAL
$p
MYC OVERHEAD & FEE @ 15.0%
$p
SUBTOTAL MYC WORK
$p
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Coffins and CSU Transit Center Phase 11
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
SUBCONTRACTS
HVAC/Ceiling Height Conflicts (RFI#47)
Horizong Sheet Metal
Re -size the ductwork above and to the north of the transit counter.
$830
SUBCONTRACT TOTAL
$830
$830
SUBTOTAL
$830
MYC FEE @ 5.0%
$42
SUBTOTAL SUBCONTRACTOR WORK
$872
SUBTOTAL (DIRECT COSTS)
$872
BUILDERS RISK INSURANCE @ 1.0%
$9
LIABILITY INSURANCE @ 0.75%
$7
MYC BOND:.86 %
$8
SUBCONTRACTOR BOND: N/A
$0
PERMIT FEES: N/A
$0
SALES TAX: N/A
$0
CONTRACTOR CONTINGENCY @ 0%
$0
PROPOSED CHANGE TOTAL
$894
Horizon Sheet Metal, Inc.
126 Hemlock Street, Fort Collins, CO 80524,Phone: (970) 482-7333, FAX: (970) 482-7545
CHANGE ORDER REQUEST
Number 00010
Date: 5/10/2006
To: Mark Young Construction, Inc. Project: CSU/Fort Collins Transit Center
4150 Jason Street
Denver, CO 80211_
Attn: Max
Issue: Ref:RFI#47 - AV4L4 CCiL146 uT_ Ln1fL1e-rS
Plumbing: $0.00
Sheet Metal Shop labor; 5 hours @ $65.00 per hour= $325.00
Sheet Metal Field labor; 8 hours @ $65,00 per hour= $520.00
Materials: <$ 90.00>
Equipment: $0.00
Profit and O/H for plumbing @ 5%=$0.00
Profit and O/H for Sheet metal work @ 10%=$75.00
Cost and $830.00
Schedule NA
Impact
Copy to: File
Signed:
05rJ} -F!Z'Soz
Page I of 1
Aaron Phillips
From: Jay Lamlcq gaylamicq c@coover-clark.comj
Sent: Wednesday, April 26, 2006 8:45 AM
To: Aaron Phillips
Subject: RE: RFI #47 Response
Aaron -
This would prove to be acceptable by CCA. As stated,
ductwork. please hold this ceiling to be as tight as possible with the
Thanksl
Jay
Jay R- Lsmicq, Assoc. AIA
Associate Designer
Coover-Clark & Associates, Inc
455 Sherman S"et,.Suite #205
Denver, Colorado 80203
(303) 783-0040 ext. 16
(303) 783-OM fax
Email: i�vlamiceft per Wark M
Web: Wffl762Wver-etark.eom
E-mail
a�chmain�t could
h that this nfWa and any attachments wero free of anY virus worm, Trojan horse, and/or malicious code when sent. This message and its
have �a iactiond during tranamiaalon. ey reading the message and opening any attachment, the recipient accepts full responsibility for
messtoldnage
or Its s and remedial aglo^about viruses and other detects, The sender's employer Is not liable for any loss or damage arising in an
meaeape or sa attaehments."
-----Original Message--___ g y way from this
From: Aaron Phillips(malito:aphtllips@markyoungconstruction,com)
Sent: Friday, April 21, 2006 7:32 AM
To: Jay Lamicq
Cc: COSS Belder, Max Millen
Subject: RFI #47 Response
Jay,
We need a revised response for RFI #47 because the ceiling height shown behind the Info/Transfort Desk on the
associated AS[ #13R.2 (8' 8-1/2") is too high to accommodate the 8" x 20" duct running into the area under the
beam on 4 line. (The elevation to bottom of fireproofed beam is 9' 2".
this area as tight as possible to the 8" x 20" duct to provide the highest possible finished ceiling hei h
advise if this is acceptable, ) We recommend holding the grid ceiling in
Respectfully,
Aaron Phillips
Project Engineer
Mark YounConstruction Inc.
155 . College Ave.; Su to 220
Fort Collins, CO 80524
303-718-0563 - Mobile
970-482-3061- Jobsite Fax
4/26/2006
g t. Please
L.0 _ _ rev,
LETTER OF TRANSMITTAL
RFM: 47
TO: Coover--Clerk & ASsocietes, P,C PROJECT!:
455 Sherman Street, Suite 205 PROJECT:
Denver, CO 80203
ATTWOMON: _ Jey Lemicg
WAM DATE RESPONSE REQUESTED BY, vwre M10n0Q— 8 ----
WILL DELAY SCHEDULE IF CHECKED: 41=00*
P0I W"L COST IMPACT IF CHECKED: CPM AcnvlN NO
m� ..-_ --asp
cc out 05477-F-3.3 — ••••te
cc In:
W2y x68
Kieror t. g.. sus a
9f1°`� , V�VQ GK�
C-0 FGAJ4E t4T
%Neek{
9ve.T
��t'C' AStiJc
SiGle-E�! f5►�� r f��t
CSU Transit Center
1. PCO Title: added columns 2. Number added columns
3. Change Order Requested By 4. Date 5!9/2006
5. Owner and/or Architect -Engineer Change Order Request Number
6. Material $80.08
7. Equipment
8. Material and Equipment Sub -Total $80.08
9. Sales Tax @ 0.00% $0.00
10.
Labor 14.00 Manhours @ $30.69 / Hour
$429.66
11.
Labor Insurance & Taxes
42.00%
$180.46
12.
Estimation/Planning
0 Manhours @ $1.00 / Hour
$0.00
13.
Tool Replacement
2.00% of Labor
$8.59
14.
Overtime Inefficiency
0.00% of Labor
$0.00
15. Labor Sub -Total
$618.71
16.
Equipment Rental
x Scissor Lift
0.00 Hours @ 2.52 / Hour
$0.00
x Lull
0.00 Hours @ 25.13 / Hour
$0.00
x Trash
0.00 Hours @ 15.00 / Hour
$0.00
x Hoisting
0.00 Hours @ 100.00 / Hour
$0.00
17. Equipment Rental Sub -Total
$0.00
18.
Indirect Costs for this Change Order:
19. CHANGE ORDER SUB -TOTAL COSTS
$698.79
20. Overhead
10.00%
$69.88
21. sub -Total
$768.67
22. Margin
5.00%
$38.43
23. Sub -Total
$807.10
24. (Credits)
$0.00
25. Sub -Total
807.10
30.
This Proposal May Be Withdrawn
By us 26. Special Insurance
$0.00
If Not Accepted Within
30 Days 27. Bond Premium
28 TOTAL DCV`C OF
0.0%
CWAAI/�C
$0.00
28. TOTAL PRICE OF CHANGE
9074.0
$808.00
31. Time Extension Required of 0 Days
32. Submitted By Keith Ewing
33. Approved By
Narrative: 2 column covers per Max Millen
29. Cost if this change Order is not accepted
added column wraps
$0.00
DPM-Fit-SIo
Page 1 of 2
0 Plan North
0 .5 1 2
SCALE. 1/8 0 = 1 '-0"
J013 NAME: CITY OF FORT COLLINS & COLORADO STATE
UMVERSITY TRANSIT CENTER PHASE 11
SHEET TITLE: LOWER LEVEL
x =emu s HVAC PLAN
DRAWN BY: MGK ISSUE: REV. NO.. N/A
IMH= 03. �D Sort 200 "0"` CHECKED BY: MGK DATE: 04ENI/A
■, _SMW4 tmw, 0 Gc30M0QZ-1J00 mPROJ. NO.: 29W4002 REF. DRAWING: M
i
i
%t to *ff�
e-M, 4[F•tTs . GOGtrF�
3fi�/ate
hs-T ! 3R. 2
Co,A-T (Avevs
•Z)C tju,%&4Fta- Of-
ilaot f9GI'Wo . Ps.m:c
t-r-e D.G. e^c* �tr�rr�L-
%AAI tamp-
�'rltra��ta•Ss .
"Mtowf -C"df - ai rr„IG
y1% AWE �t6L�
�.,,Ec�ftoJ 'Tit�+J '�►rsS�oJ�-'� SDc�Ft'C',
Via Facsimile 303-783-0060
May 30, 2006
Coover-Clark & Associates
455 Sherman Street, Suite 205
Denver, CO 80203
Project Title: City of Fort Collins & Colorado State University Transit Center Phase II
Project No. 05477
Subject: Additional Windows to be Re -sized
RE: Change Order Request Number: COR No: 48
Gentlemen:
Pursuant to the above subject matter, please find enclosed our cost summary to re -size interior window sizes
The total cost to perform the above referenced work is $1,697.00.
Please note the following during review of this change order request:
There were twelve (12) more frames that needed to be cut down so that the window mullions, heads and sills
would properly. The window types were Y, Z, P and O.
If you should have any questions and/or concerns, please contact me at your earliest convenience at
(303)710-1421
Sincerely,
Project Engineer
cc:
05477-F-1.2
Steve White 970-221-6534
Cass Beitler 970491-7572
Owner response, please sign as appropriate:
Approved, Proceed as Submitted
Rejected, Do Not Proceed, Provide Comments
Other, Do Not Proceed, Provide Comments
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #05477
cHnNrlF oRDFR REOLIEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
CHANGE ORDER REQUEST#48
Additional Window Frames to be Re -Sized
MARK YOUNG CONSTRUCTION LABOR:
MYC LABOR TOTAL
$0
$0
MYC MATERIAL
MYC MATERIAL TOTAL
$0
$0
MYC EQUIP.
MYC EQUIPMENT TOTAL
$0
$0
SUBTOTAL
$0
SMALL TOOLS & SUPPLIES @ 5% OF LABOR
$0
PAYROLL TAXES & INSURANCE @ 20% OF LABOR
$0
GENERAL CLEANUP: NIA
$0
DELIVERY: NIA
$0
DRAWINGS & SPECS: BY ARCHITECT
$0
SUBTOTAL
$0
MYC OVERHEAD & FEE @ 15.0%
$0
SUBTOTAL MYC WORK
$0
I.
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
SUBCONTRACTS
Additional Window Frames to be Re -Sized
Colorado Doorways
Re -size window types Y, Z. P and Q to match in size
$1,575
SUBCONTRACTTOTAL
$1,575
$1,575
SUBTOTAL
$1,575
MYC FEE @ 5.0%
$79_
SUBTOTAL SUBCONTRACTOR WORK
$1,654
SUBTOTAL (DIRECT COSTS)
$1,654
BUILDERS RISK INSURANCE @ 1.0%
$17
LIABILITY INSURANCE @ 0.75%
$12
MYC BOND:.86 %
$14
SUBCONTRACTOR BOND: NIA
$0
PERMIT FEES: NIA
$0
SALES TAX: NIA
$0
CONTRACTOR CONTINGENCY @ 0%
$0
PROPOSED CHANGE TOTAL
$1,697
Change Orderi�
colorado 11Q0 Yi111f
DOORWAYSInc.
3333 East 52nd Avenue • Denver, CO 80216-2322 (303) 291-0900 FAX (303) 291-0113 www.codoor.com
Confirming Change Order # 06
To: Mark Young Construction
c/o CSU Transit Center
Ft. Collins, CO
Attn: David Guide
Fax#: 303-477-9085
Date. May 30, 2006
Customer Job#:
05477
CDI Job#:
05436DSO
Change Order#:
06
Re:
re -work
Page 1 of 1
DESCRIPTION OF CHANGE OR MODIFICATION
P.E. 121328
Re -work 12 window frames to specified dimensions, per Max's e-mail
SubTotal $1,576.00
Tax Rate: 0.00% $0.00
Labor / Freight: $0.00
Change Order Total $1,575.00
NOTE: PER YOUR INSTRUCTIONS, THE ABOVE CHANGES HAVE BEEN IMPLEMENTED.
If your accounting department requires field authorization numbers or purchase order numbers to approve payment,
that number must accompany the signed change order.
I _101 skel �( o 14 :?_1 ia!Lel 1 Le1 wel Z l;:
APPLY TO THIS
PLEASE RETURN ONE SIGNED COPY TO COLORADO DOORWAYS, INC. THANK YOU.
Equal Employment Opportunity Clause
(Incorporated by Reference)
The Equal Employment Opportunity Clause required under Executive Order 11246, the affirmative action commitment for disabled veterans and veterans of the
Vietnam Era, set forth in 41 CFR 60-250.4. the affirmative action clause for disabled workers, set forth in CFR 60-741.4, and the related regulations of the Secretary
of Labor, 41 CFR Chapter 60, are incorporated by reference In this change order. By accepting this change order, customer certifies that It complies with the
authorities cited above and does not maintain segregated bollities or permit Its employees to perform services at locations where segregated facilities are maintained,
as required by 41 CFR 60-1.8
Accepted By:
Date: Submitted By: Laura Potter
CSU Transit Center
Back Up Data
Description-
labor
00®
....
...
...
80.08 14.00
added column wraps Page 2 of 2
May 08 06 11:31a
p.4
Vrnnngnl Page No. of Pages
CRAFTSMAN DECORATING, INC.
403 16th Street
GREELEY, COLORADO 80631
(970) 356-0895
fAX (970) 356-1808
PROPOSAL SUBMITTED TO
PHONE
DATE
Mark Young Construction, Inc.
May 5, 2006
STREET
JOB NAME
155 N. College Avenue, Suite 220
C5U Transit Center
CITY. STATE and ZIP CODE
JOB LOCAIION
Ft. Collins, CO 80542
rt. Collins, CO
ARCHITECT
DATE OF PLANS
I JOa PHONE
i
We hereby submit specifications and estimates IOT:
I�
Colu>sm Request _
�I
Prime and two -coat paint. _ coltvnns :
A).... 6 columns __.9"
B) 2 columns -.drywall.._wrapped .-_R...r.high __
Material. $
' 96.00
Labor:
340.00
$
436.00
Overhead -and profit @ 157
65.00
Total $
501.00
I
Ia-----
It FrUP35t hereby to furnish material and labor — complete in accordance with above specifications, for the sum of:
dollars ($ ).
Payment to be made as ioaows-
i
as specified Any a. All work to be completed Ina workmanlike
AN material Is guaranteed tord Authorized 1t"�!`/'�'�—
manner according b atendard practices. Any alteration or tleviation from above specifications
pr
Sinaturel
LjTJ(- :♦WA`
Involving extra costs will be executed only upon written orders, and will become an extra 9
charge over and above the estimate. All agreements contingent upon strikes. accidents
or delays beyond our control Owner to carry lire, tornado and other necessary insurance. Note: This proposal
may be
Out workers are fully covered by Wo kman's Compensation Insurance. withdrawn by us it not accepted within days.
Arreptatirr of Proposal— The above prices. soecifications
and conditions are satisfactory and are hereby accepted You are authorized Signature
to do the work as specified. Payment will be made as outlined above.
of Acceptance. Signature
05-02-2006 03:27PM FROM-EDDN CORP 2156Tt0014 T-036 P 001/002 F-560
1160 Easton Road
Norsham, PA 19044 Edon Corporation
http: / /www.edon.com
Phone:215-672-8050
Fax:215-672-9014
To:
Max
From: Adam Axel
Company:
Mark Young Construction
Time:;
Fax:
970-482-3061
Date: May 2, 2006
Phone:
303-710-1421
Pages: 02
Re:
CSU Transit.
CC: FILE
❑ Urgent O'Xor Review 0 Please Comment ❑ Please Reply V,6s Requested
*Comments. Max,
Here's the FRP Column Cover price quotation you had requested.
Estimated manufacturing lead -lime, upon EDON's receipt of a purchase order with deposit and
approved shop drawings, is at 6 — 8 weeks.
Please note that a hard copy of this proposal will follow in the mail.