HomeMy WebLinkAboutCHANGE ORDER - BID - 5929 CSU TRANSIT CENTER (6)SECTION 00950
CHANGE ORDER NO. 07
PROJECT TITLE: City of Fort Collins and CSU Transit Center, Bid No. 5629
CONTRACTOR: Mark Young Construction, Inc.
PROJECT NUMBER: 30518250
DESCRIPTION: Add additional administration language to the Construction Documents.
In preparing change orders show in order as separate numbered paragraphs the following:
1. Reason for change: Additional Work
2. Description of change: See Attached COR NO, 37, 38 and 39
3. Change in contract cost: $7,270.00
4. Change in contract time: No change in time in this Change Order
(Attach additional sheets as required)
ORIGINAL CONTRACT COST ................... ....... ......................
$4,318,404.00
TOTAL APPROVED CHANGE ORDERS ................ ........................
46,954.00
TOTAL PENDING CHANGE ORDERS.................................................00.00
TOTAL THIS CHANGE ORDER ....... ...............................................
7,270.00
TOTAL % OF THIS CHANGE ORDER Less than 1%
TOTAL C.O. % OF ORIGINAL CONTRACT 1.5%
ADJUSTED CONTRACT COST...............................................$4,372,628.00
ACCEPTED BY:
REVIEWED BY:
REVIEWED BY:
REVIEWED BY:
APPROVED BY:
Inc., Contractor's Representative
White,
Date
Date
sus/a�
Date
Cass Beitler, Project Manager Date
f2 ' J&4S :) (�� S-t(--ofo
Marlys Sittner, , Transfort Date
cc: City Clerk Project File
Contractor Purchasing
Engineer
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #05477
.. r.. .@fie ^I Iww■ww nv
Lrr7H14"C VRNGR
RGMlV Vv I vw vvr .� .
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
COST CODES
CHANGE ORDER REQUEST# 38
Barrel Roof Gutter Fix (RFI#39)
MARK YOUNG CONSTRUCTION LABOR:
MYC LABOR TOTAL
$0
$0
MYC MATERIAL
MYC MATERIAL TOTAL
$0
$0
MYC EQUIP.
MYC EQUIPMENT TOTAL
$0
$0
SUBTOTAL
$0
SMALL TOOLS & SUPPLIES @ 5% OF LABOR
$0
PAYROLL TAXES & INSURANCE @ 20% OF LABOR
$0
GENERAL CLEANUP: NIA
$0
DELIVERY: NIA
$0
DRAWINGS & SPECS: BY ARCHITECT
$0
SUBTOTAL
I $0
MYC OVERHEAD & FEE @ 15.0%
$0
SUBTOTAL MYC WORK
$0
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #05477
Vr1MN%3L
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
COST CODES
SUBCONTRACTS
Barrel Roof Gutter Fix (RFI#39)
Best Steel
Delete Barrel Roof Gutter System
$3,343
- Add Additional Supports as Detailed
SUBCONTRACT TOTAL
$3,343
$3,343
SUBTOTAL
$3,343
MYC FEE a 5.0%
$167
SUBTOTAL SUBCONTRACTOR WORK
$3,510
SUBTOTAL (DIRECT COSTS)
$3,510
BUILDERS RISK INSURANCE @ 1.0%
$35
LIABILITY INSURANCE @ 0.75%
$26
MYC BOND:.86 %
$31
SUBCONTRACTOR BOND: N/A
$0
PERMIT FEES: N/A
$0
SALES TAX: NIA
$0
CONTRACTOR CONTINGENCY @ 0%
$0
PROPOSED CHANGE TOTAL
$3,602
;ADDITIONAL WORK AUTHORIZATION CHANGE ORDER
CAWE ORDER #
DATE
CUSTOMER NAME '
STREET
CITY r
STATE /ZIP
' Original Job Information:
JOB NAME i LOCATION
JOB/CONTRACT# DATE J
We hereby submit the following specifically described additional work / �' `� '• A
✓ d7 ✓ui,C..+ wWN-C'/I"-o j�'"'. ., �• f:i�C 'Y e:i:y,6`i
` �y✓V ,.fj t �' !'� r r ,vSr'r'rr `,4'"-•-
jV
l7 fir! ::f l!'f!% ..I• /�r •tJ ! fLr f•,i fPir(" C'� '+`F , .
/ r.,+}•.'r °. yr..�du J e' �� 1 / e.f %. js %', i % f� i �.i`. l / d✓ !� '^""' %,'�•
+'r - ' i '•fir
01,
'1
}° Y ' cri•/�� eJ x 'i '?
Additional charge for above described work is: $ Dollars
With payments to be made as follows.;
'All charges are due in full upon billing.
Alf charges are in addition to original contract amount.
Additional work to be performed under same conditions as specified in original contract unless otherwise stipulated.
We propose hereby to furnish labor ; complete in accordance with these specifications at above stated price.
Respectfully Submitted
The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as
specified. Payments will be made as outlined above.
Date of Acceptance • ' Signature
'
A►1lF1TTTCl1'\TAT t�1[1RTC A►T TT-TCIRT7ATT(1N
Max Millen
From:
Steve White [swhite@fcg0v.00MJ
Sent:
Thursday, April 13, 2006 11:11 AM
To:
cbeitler@users.fm.colostate.edu
Cc:
Subject:
Max Millen
Re: [Fwd: FW: 0224a / CSU Transit Center Phll - Revised RFI#39- Barrel Gutter Fix]
YES....I Agree.
Steve White
>>> Cass Beitler <cbeitler@users.fm.colostate.edu> 04111106 02:49PM
Steve,
Attached is a sketch from the structural engineer showing the changes to the east end
barrel roof to fill in the space for the deleted roof gutter. The detail for the vest end
roof is similar. The additional work included on the east side is the furnish and install
of a 3x3 angle and a 1/211x6" metal plate on six beams (at 2 ends = 12 total changes).
MYCIs steel erector subcontractor LS price to perform this work is $5,700, approximately 5
days for 2 men. I believe this work can be completed for under $3000, approximately 2
days for 2 men. We received
a credit for deletion of the gutter in the amount of $5,017.
I suggest we authorize this change on a time and material basis, not to
exceed $5700. MYC and the steel erector has agreed to this approach.
Therefore, CSU authorizes MYC to proceed with the change to furnish and
-
install structural steel to fill in the deleted roof gutter on a time and material basis,
not to exceed $5,700.
I would like your authorization.
Thanks,
Cass
-------- Original Message --------
Subject: FW: 0224a / CSU Transit Center PhII - Revised RFI#39 -
Barrel
Gutter Fix
Date: Tue, 11 Apr 2006 14:07:16 -0600
From: Max Millen<mmillen@markyoungconstruction.com>
To: Cass Beitler <cbeitler@users.fm.colostate.edu>
Max Millen
Mark Young Construction, Inc.
Cell: 303-710-1421
1
Fax: 970-482-3061
nwillen@markyoungconstruction.com
<mailto:mmillen@markyoungconstruction.com>
------------------------------------------------------------------------
From: Erich M. Bretz (mai2to:ebretz@samiro.com1
Sent: Monday, April 10, 2006 9:45 AM
To: Joe Rapp: Max Millen; Shawna Kratsch
Subject: 0224a / CSU Transit Center PhIi - Revised RFI#39 - Barrel
Gutter Fix
Max -
Attached is our response to RFI #39 (revised). Please call if you have
any questions.
Erich M. Bretz
Structural Design Engineer
S. A. MIRO, INC.
4582 S. Ulster St. Pkwy., Ste. 1501
Denver, Colorado 80237-2639
Ph 303-741-3737 / Fax 303-694-3134
Direct 720-407-1035 / Fax 720-407-1635
ebretz@samiro.com vwv.samiro.com
From: Joe Rapp
Sent: Friday, April 07, 2006 1:40 PM
To: Erich M. Bretz
Subject: 0224 / CSU Transit Center PhI2 - Revised RFI#39 - Barrel
Gutter Fix
Call Shawna if you need the history...
Joseph G. Rapp, P.E.
Associate Principal
S. A. MIRO, INC.
4582 S. Ulster St. Pkwy., Ste. 1501
2
Denver, Colorado 80237-2639
Ph 303-741-3737 / Fax 303-694-3134
Direct 720-407-1015 / Fax 720-407-1615
jrapp@samiro.com www.samiro.com
From: Max Millen(mailto:mmillen@markyoungconstruction.com]
Sent: Friday, April 07, 2006 1:41 PM
To: Shawn& Kratsch; Joe Rapp
Subject: CSU- Barrel Gutter Fix
Shawna,
Attached is another proposed fix for the gutter system at the east side
of the barrel. The original fix per RFI#39 on the east side of the
barrel was too labor intensive, hence the cost ended up being way too
high for our owners to approve it. is this fix acceptable? Zf not,
can
you provide another detail as to how we can find some cost savings to
correct this issue? Please contact me via email or at the cell #
below. Thank you,
Max Millen
Mark Young Construction, Inc.
Ceti: 303-710-1421
Fax: 970-482-3061
mmillen@markyoungconstruction.com
<mailto, mmiilen@markyoungconstruction.com>
3
Page 1 of 2
Max Millen
From: Erich M. Bretz (ebretz@samiro.com]
Sent: Monday, April 10, 2006 9:45 AM
To: Joe Rapp; Max Millen; Shawna Kratsch
Subject: 0224a ! CSU Transit Center Phil - Revised RFI#39 - Barrel Gutter Fix
Attachments: 04138 - RFI39 revised.pdf
Max -
Attached is our response to RFI #39 (revised). Please call if you have any questions.
Erich M. Bretz
Structural Design Engineer
S. A. MIRO, INC.
4582 S. Ulster St. Pkwy., Ste. 1501
Denver, Colorado 80237-2639
Ph 303.741-3737 / Fax 303-694-3134
Direct 720.407-10351 Fax 720-407.1635
ebretz@ssmiro.com www.samiro.eom
From: 3oe Rapp
Sent: Friday, April 07, 2006 1:40 PM
To: Erich M. Bretz
Subject: 0224 / CSU Transit Center PhII - Revised RFI#39 - Barrel Gutter Fix
Call Shawna if you need the history...
Joseph G. Rapp, P.E.
Associate Principal
S. A. TMRO, INC.
4582 S. Ulster St. Pkwy., Ste. 1501
Denver, Colorado 80237-2639
Ph 303-741-37371 Fax 303.694-3134
Direct 720.407-1015 / Fax 720.407-1615
IrappOsamiro.com www.samlro.com
4/10/2006
Page 2 of 2
From: Max Millen [mailto:mmillen@markyoungconstruction.com]
Sent: Friday, April 07, 2006 1:41 PM
To: Shawna Kratsch; Joe Rapp
Subject: CSU- Barrel Gutter Fix
Shawna,
Attached Is another proposed fix for the gutter. system at the east side of the barrel. The original fix per
RFN39 on the east side of the barrel was too labor Intensive, hence the cost ended up being way too high
for our owners to approve It. Is this fix acceptable? If not, can you provide another detail as to how we
can find some cost savings to correct this Issue? Please contact me via email or at the cell # below.
Thank you,
Maur N11Aan
Mark Young Construction, Inc.
Cell: 303-710-1421
Fax: 970-482-3061
minillen@—markyounuonstructign.com
4/10/2006
•
0
9.Raw
ntle CS U�q N
Sir L�7V C E� Pti Date /o
z v 5t ram, By 'r— 2
3
n �s� 0 r
dy C K
Nv1d 3a
9H1 eV1S
Job No. cq (38
Sheet of
S. A MIRO. INC. Consulting Engineer, 4582 So. Ulster Street Parkway Suite 1501 Denver, CO 80237 (303) 741-3737 Fax (303) 694-3134
WARITOUNG
IYI
coNsr:oc,Kolr
LETTER OF TRANSMITTAL
REQUEST FOR INFORMATION
RFIA:
TO:
ATTENTION:
Fax:
39 DATE: 3/14/2006
Coover-Clark & Associates, P.0 PROJECT a: 05477
455 Sherman Street, Suite 205 PROJECT: CSU Transit Center
Denver, CO 80203 Fort Collins, Co
Jay Lamicq
303-783-0060 PAGES: t
SUBJECT:
Barrel Roof Steel @ Internal Gutter System
REFERENCE: J/S3.2
INFORMATION REQUESTED:
The rolled structural steel for the barrel roof was designed and fabricated per J/S3.2
so that the intemal gutters stem could be installed. With the barrel roof re -design
eliminating that gutter system and COR#25 being verbally approved on 3110106,
a fix needs to take place to Infill those beam ends.
Please advise how that void should be corrected.
SUGGESTED SOLUTION:
REASON:
SIGNED BY:
Max Milian DATE: 3/14/2008
IMPACT:
DATE RESPONSE REQUESTED BY: 3119/2006
WILL DELAY SCHEDULE IF CHECKED: CPM ACTIVITY NO.
POTENTIAL COST IMPACT IF CHECKED:
RESPONSE:
E 4
LA
1 (M. E. Am T C)
c e6. L
SIGNED BY•
,,�. _ DATE:
�_ cc out: 05477-F-3.3 cc in: 05477-F-3.3
YOUNG
CONSTRUCTION
INCORPORATED
Via Facsimile 303-783-0060
April 27, 2006
Coover-Clark & Associates
455 Sherman Street, Suite 205
Denver, CO 80203
Project Title: City of Fort Collins & Colorado State University Transit Center Phase II
Project No. 05477
Subject: Removal/Reinforcement of Interior Pilaster
RE: Change Order Request Number: COR No: 37
Gentlemen:
Pursuant to the above subject matter, please find enclosed our cost summary, qualifications, and back-up to shore
the existing spandrel, patch with concrete and reinforce with carbon fiber reinforced polymer. The total cost to
perform the above referenced work is $3,474.00.
Please note the following during review of this change order request:
1. The demolition and removal of the existing pilaster has been included in the base bid demo costs. The
rebar to infill the square hole in the spandrel beam will also be no cost to the owner.
2. An email response, which is attached, confirmed that all parties would like the pilaster to be removed.
If you should have any questions and/or concerns, please contact me at your earliest convenience at
(303) 710-1421
Sincerely
M x Millen
Project Engineer
cc:
05477-F-1.2
Steve White 970-221-6534
Cass Beitler 970-491-7572
Owner response, please sign as appropriate:
Approved, Proceed as Submitted
Rejected, Do Not Proceed, Provide Comments
Other, Do Not Proceed, Provide Comments
0
Title [,` mot' �-R ✓�S Date 3/ 1�� Job No Qc(1-Zd
Sheet of
o
-
s<
3�
J�
T
o�
c
t t-,z
g
x
_1
10
531oN Mild :38
'SS3N)OIHI WIS
c
,3
S WW� �
S ^
r� WW pq= 1 N20 tJ ZOg
rid �•f°��G �73yCj �oZQ
�J3
S. A. MIRO, INC. Consulting Engineers 4582 So. Ulster Street Parkway Suite 1501 Denver, CO 80237 (303) 741-3737 Fax (303) 694-3134'
•
J
Title (` cJ l ti TiZ t�v�S rt Date Job No. 691 Y3
Q 4' :r- # I" BY SLIC. Sheet of
e.
f
Sr
0
4 3aw!a UM
� `o 0
W� W �mY
a �
�1e-A
0
_J
W
IL
CY
co
CO
Q
n
J1 �
T N=N
b i 2 n ,.i b 1.0
/ n
i°n t
tr` d S31ON NVId :3d 1\
V LL t� 'S53NN�IH1 9VIS �^
ro 4,
�a
K r� tq -1
•• •'••+. • .... A• R'J tin I Iletur �.gf A t Carkwav SuiTA tsnl nanvAr M pn7S7 (3f111741-3737 Fax (303) 694-3134
CONSTRUCTION
INCORPORATED
Via Facsimile 303-783-0060
April 27, 2006
Coover-Clark & Associates
455 Sherman Street, Suite 205
Denver, CO 80203
Project Title: City of Fort Collins & Colorado State University Transit Center Phase II
Project No. 05477
Subject: Opening #036 Sidelight Change
RE: Change Order Request Number: COR No: 39
Gentlemen:
Pursuant to the above subject matter, please find enclosed our cost summary, qualifications, and back-up to fix
the sidelights around door opening #036. The total cost to perform the above referenced work is $194.00.
Please note the following during review of this change order request:
1. This issue was encountered in the field and Cass Beitler approved the change to proceed and to keep the
project moving forward per a field meeting on 4/17106.
If you should have any questions and/or concerns, please contact me at your earliest convenience at
(303)710-1421
cerely,
ax iltfillen
Project Engineer
cc:
05477-F-1.2
Steve White 970-221-6534
Cass Beitler 970-491-7572
Owner response, please sign as appropriate:
Approved, Proceed as Submitted
Rejected, Do Not Proceed, Provide Comments
Other, Do Not Proceed, Provide Comments
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase 11
PROJECT NUMBER: #06477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
CHANGE ORDER REQUEST# 39
Opening #036 Sidelite Length Change
MARK YOUNG CONSTRUCTION LABOR:
MYC LABOR TOTAL
$0
$0
MYC MATERIAL
MYC MATERIAL TOTAL
$0
$0
MYC EQUIP.
MYC EQUIPMENT TOTAL
$0
$0
SUBTOTAL
$0
SMALL TOOLS & SUPPLIES @ 5% OF LABOR
$0
PAYROLL TAXES & INSURANCE @ 20% OF LABOR
$0
GENERAL CLEANUP: N/A
$0
DELIVERY: N/A
$0
DRAWINGS & SPECS: BY ARCHITECT
1 $0
SUBTOTAL
$0
MYC OVERHEAD & FEE @ 15.0%
$0
SUBTOTAL MYC WORK
$0
. MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
SUBCONTRACTS
Opening #036 Sidelite Length Change
Colorado Doorways
Adjust Sidelite Lengths to Fit Opening
$180
SUBCONTRACT TOTAL
$180
$180
SUBTOTAL
$180
MYC FEE @ 5.0%
$9
SUBTOTAL SUBCONTRACTOR WORK
$189
SUBTOTAL (DIRECT COSTS)
$189
BUILDERS RISK INSURANCE @ 1.0%
$2
LIABILITY INSURANCE @ 0.75%
$1
MYC BOND:.86 %
$2
SUBCONTRACTOR BOND: NIA
$0
PERMIT FEES: NIA
$0
SALES TAX: NIA
$0
CONTRACTOR CONTINGENCY @ 0%
$0
PROPOSED CHANGE TOTAL
$194
1
�C.. nge Order
PColorado DOORWAY
DOORWAYS-Inc.
3333 East 52nd Avenue • Denver, CO 80216-2322 (303) 291-0900 FAX (303) 291-0113 www.codoor.com
Confirming Change Order # 05
To: Mark Young Construction
Go CSU Transit Center
Ft. Collins, CO
Attn: David Guida
:ax#: 303-477-9085
Date: April 20, 2006
Customer Job#: 05477
CDI Job#: 05436DSQ
Change Order#: 05
Re: # 036
Page 1 of 1
DESCRIPTION OF CHANGE OR MODIFICATION
P.E. 120347
Per Max, the windows for opening # 036 are too long in width.
PLEASE SUPPLY THE EXACT DIMENSIONS AND D WE'LL CUT DOWN IN OUR SHOP.
Lk
SubTotal $180.00
Tax Rate: 0.00% $0.00
Labor / Freight: $0.00
Change Order Total $180.00
NOTE: PER YOUR INSTRUCTIONS, THE ABOVE CHANGES HAVE BEEN IMPLEMENTED.
If your accounting department requires field authorization numbers or purchase order numbers to approve payment,
that number must accompany the signed change order.
ALL I tKMS ANU GtNCKAL CONUITION5 FROM THE ORIGINAL CONTRACT APPLY TO THIS CHANGE ORDER
PLEASE RETURN ONE SIGNED COPY TO COLORADO DOORWAYS, INC. THANK YOU.
Equal Employment Opportunity Clause
(incorporated by Reference)
The Equal Employment opportunity Clause required under Executive Order 11248, the alfirmative action commitment for disabled veterans and veterans of the
Vietnam Era, act forth in 41 CFR 60-250.4. the affirmative action clause for disabled workers, set forth in CPR 80-741.4, and the related regulations of the Secretary
of Labor, 41 CFR Chapter 60, are Incorporated by reference In this change order. By accepting this change order, customer certifies that It complies with the
authorities cited above and does not maintain segregated facilities or permit Its employees to perform services at locations where segregated facilities are maintained,
as required by 41 CFR 60-1.8
Accepted By:
Date: Submitted By: Laura Potter
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #06477
wr�I ILTL+T QI IIIIIIAAOV
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
CHANGE ORDER REQUEST# 37
Removal/Reinforcement of Interior Pilaster
MARK YOUNG CONSTRUCTION LABOR:
Shoring and Placing Concrete/Rebar/Etc. - 24 MH's
$737
MYC LABOR TOTAL
$737
$737
MYC MATERIAL
6 Ea #4 Rebar (No Cost)
4000 psi Concrete (ICY)
N/A
$130
MYC MATERIAL TOTAL
$130
$130
MYC EQUIP.
Shoring and Pipe Jacks
$250
MYC EQUIPMENT TOTAL
$250
$250
SUBTOTAL
$1,117
SMALL TOOLS & SUPPLIES @ 5% OF LABOR
$37
PAYROLL TAXES & INSURANCE @ 20% OF LABOR
$147
GENERAL CLEANUP: N/A
$0
DELIVERY: N/A
$0
DRAWINGS & SPECS: BY ARCHITECT
1 $0
SUBTOTAL
$1,301
MYC OVERHEAD & FEE @ 15.0%
$195
SUBTOTAL MYC WORK
$1,496
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #05477
nuwu^±C nonCD OCPII ICCT CI IMMORV
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
COST CODES
SUBCONTRACTS
Removal/Reinforcement of Interior Pilaster
Restoration Specialists, Inc.
Furnish and Install Carbon Fiber Reinforced Polymer
$1,800
SUBCONTRACTTOTAL
$1,800
$1,800
SUBTOTAL
$1,800
MYC FEE @ 5.0%
$90
SUBTOTAL SUBCONTRACTOR WORK
$1,890
SUBTOTAL (DIRECT COSTS)
$3,386
BUILDERS RISK INSURANCE @ 1.0%
$34
LIABILITY INSURANCE @ 0.75%
$25
MYC BOND:.86 %
$30
SUBCONTRACTOR BOND: NIA
$0
PERMIT FEES: N/A
$0
SALES TAX: NIA
$0
CONTRACTOR CONTINGENCY @ 0%
$0
PROPOSED CHANGE TOTAL
$3,474
Restoration Specialists, Inc. Protect: CSU Transit
PO Box 29 Bid Data: 4119106
Broomfield, CO BOW Bid To: Mark Young
Phone: (303) 4604WO Attention: Mike or Aaron _
Fax: (�) 4694517 RSI Job*. Fjn C:c QA
sio west.rtet q'70'' aa v - 03 Y.l
*All Bids Per Plans and Specifications, Delivered and Installed, Labor and Material UNLESS otherwise noted.
Fumish and Install 10 pce of Mbrace 160 to the existing $ 1,800.00
bearn as shown. We Include surface prop and Installation
of the carbon fiber along with fire rated coating. We
exclude any shoring or concrete Infill.
I.
p �OT[E
APR ; a 2006
YOUNG CONSTRUCTION, INC.
PLEASE COMPLETE AND RETURN TO RSI: i
Change Order Approved By: Date:
Work to be: (please check one) Contract C.O.
Invoiced Separately
Tax Included: State Tax Excluded: State Bono: _ Included
Local Local I Excluded
xu )�.'a- C. j A•-
NP14.4- a-r-'W.
opw►� wc�
�1Ei2RL NoIL■C:
t • SttC94 T e egg" AA ccNcj!es
BE!'9W( PR10R�Dc-U�tt11Y
CcI.UNW /u3at,t_
e-�tuov� H g g,�t aae
*cfppv=cAmeom teem-
eEuAftm,a,m Abet MA*-
b,U LA-*cPOW
a-*4 cesAaEt�, : 4P3
t Nta EA. S Its
of: 'Ntt I
oter4
AW C IIPO Ow" M13tpcCY CFRP
PMKB of ewmjorq ccKc-om
BRM ps U-SM06PEn Nt`(p
Arr oP csfm
sice eF ccNc.am
tes"W, NV Tt b
CF &p Tp Tpp ap
eta. cows t
S'LA6
lviessage
Page I of 2
Max Millen
From: Jay Lamicq Uaylamicq@coover-clark.com)
Sent: Monday, April 03, 2006 9:27 AM
To: Cass Beitler; Steve White
Cc: Max Millen; Shawna Kratsch
Subject: RE: 0213io / CSU- Interior Concrete Columns
Steve -
We would like to remove this unforeseen condition in the lobby side per your approval, This work will require an
additional $500 for structural design calculations on top of the labor for removal and patching of this beam by the
contractor.
As soon as we receive your comments, we can proceed with how to resolve this issue in a timely manner, thanks.
Jay
Jay R. Lamicq, Assoc. AIA
Associate Designer
Coover-Clark & Associates, Inc
455 Sherman Street, Suite #205
Denver, Colorado 80203
(303) 783-0040 ext. 16
(303) 783-0060 fax
Email: jaylamigg0coover-clark.com
Web: vmw .0 v1�t lwk.cprn
"The sender believes that this E-mail and any attachments were free of any virus, worm. Trojan horse, and/or malicious code when sent. This message and its
attachments could have been infected during transmission. By reading the message and opening any attachments, the recipient accepts full responsibility for
taking protective and remedial action about viruses and other defects. The sender's employer is not liable for any loss or damage arising in any way from this
message or its attachments."
-----Original Message -----
From: Shawna Kratsch (mailto:SKratsch@samiro.com]
Sent: Wednesday, March 22, 2006 8:14 AM
To: Max Millen
Cc: Jay Lamicq
Subject: 0213io / CSU- Interior Concrete Columns
Max,
The existing concrete column on the west side (west of Grid E, near Grid 34N) is n t to be removed.
The existing concrete column on the east side will be removed but not before some reinforcing is installed. We
are waiting for confirmation from Coover-Clark as to how to proceed. As soon as we have that confirmation, I will
send the field fix to you ASAP.
Please call if you have any questions and/or concerns.
Thanks.
Shawna L. Kratsch, P.E.
Project Engineer
4/27/2006
rviessage
Page 2 of 2
S. A. MIRO, INC.
4582 S. Ulster St. Pkwy., Ste. 1501
Denver, Colorado 80237
Ph 303-741 -3737 1 Fax 303-694-3134
slk@samiro.com www.samiro.com
-----Original Message -----
From: Max Millen [mailto:mmillen@markyoungconstruction.com]
Sent: Tuesday, March 21, 2006 3:21 PM
To: Shawna Kratsch
Subject: 0213i / CSU- Interior Concrete Columns
Shawna,
Have we figured out a fix for the interior concrete columns that were shown to be removed?
Maur Millen
Mark Young Construction, Inc.
Cell: 303-710-1421
Fax: 970-482-3061
mmillen@maLkyouniaconstruction.com
Confidential information may be contained in this message
and may be legally privileged. Personal views or opinions
expressed in this email message are those of the author only.
If you are not the addressee indicated in this message (or
responsible for delivery of the message to such person), you
may not copy or deliver this message to anyone. In such case,
you should destroy this message and notify the sender
immediately. If you believe this message was delivered to you
in error, even if addressed to you (e.g. due to a computer virus),
do not open any attachments or copy or deliver this message to
anyone, prior to contacting the sender for verification. We take
reasonable precautions to ensure that our email messages are
virus free. However, we accept no responsibility for any virus
transmitted by us and we recommend that you subject any
incoming email to your own virus checking procedures.
Thank you
4/27/2006
Via Facsimile 303-783-0060
April 27, 2006
Coover-Clark & Associates
455 Sherman Street, Suite 205
Denver, CO 80203
Project Title: City of Fort Collins & Colorado State University Transit Center Phase II
Project No. 05477
Subject: Barrel Roof Gutter Fix
RE: Change Order Request Number: COR No: 38
Gentlemen:
Pursuant to the above subject matter, please find enclosed our cost summary, qualifications, and back-up to fix
the barrel roof internal gutter system. The total cost to perform the above referenced work is $3,602.00.
Please note the following during review of this change order request:
1. Per RFI#39 — The original response was changed to make the fix more cost effective on the east side of
the barrel roof. See the attached email.
2. An email submitted by CSU and approved by Steve White was the basis for Best Steel to proceed on a
time and material basis. See the attached email.
If you should have any questions and/or concerns, please contact me at your earliest convenience at
(303) 710-1421
Sincerely,
max Millen
Project Engineer
cc:
05477-F-1.2
Steve White 970-221-6534
Cass Beitler 970-491-7572
Owner response, please sign as appropriate:
Approved, Proceed as Submitted
Rejected, Do Not Proceed, Provide Comments
Other, Do Not Proceed, Provide Comments