HomeMy WebLinkAboutCHANGE ORDER - BID - 5929 CSU TRANSIT CENTER (5)Apr.13. 2006 3:58PM coover-clark
No.3444 P. 2
CHANGE ORDER NO. 06
PROJECT TITLE: CSU TRANSIT CENTER
CONTRACTOR: MARK YOUNG CONSTRUCTION
PROJECT NUMBER: 5929
DESCRIPTION: CHANGES TO THE CONTRACTOR'S AGREEMENT
In preparing change orders show in order as separate numbered paragraphs the following:
1. Reason for change: adjustments and add back.
2. Description of change: COR No. 25, 26, 29, 30, 31 and 34 See Attachments.
3. Change in contract cost: $6,471.00
4, Change in contract time:
(Attach additional sheets as required)
ORIGINAL CONTRACT COST.........................................................................$4,318,404.00
TOTAL APPROVED CHANGE ORDERS..................................................................40,483.00
TOTAL PENDING CHANGE ORDERS.................................................I........................00.00
TOTAL THIS CHANGE ORDER...............................................................................6,471.00
ADJUSTED CONTRACT COST.........................................................................$4,365,358.00
TOTAL % OF THIS CHANGE ORDER ......................... Lass than 1%
TOTAL C.O. % OF ORIGINAL CONTRACT ....................Less than 2%
ADJUSTED CONTRACT COST...........................................................$4,365,358100
ACCEPTED BY
ACCEPTED BY
ACCEPTED BY
APPROVED BY:
APPROVED BY:
PURCHASING AGENT OVER $30,000
Z�6
DAT
4-14 vG
DATE
4- 8-00
DATE
DATE
cc: Project File, Contractor, Purchasing, Engineer
No. 3 17 9 P. I
aat;s
SUPPLEMENTAL
INSNSTRt/CT10NS
AreMleen Pbnxsrr Lmubcepa /Ao*" (A31) 012
Wb shone 81hft. SUM 208 Dena. co 802M
Phwa 303-783C010 Fes: 303-78X006D
Weh11WNeWeyf/ilf(k WT
OWNER [ X1
ARCHITECT [ XJ
CONSULTANT [ J
CONTRACTOR (X)
FIELD ( J
OTHER [ 1
PROJECT: CSU 6 Fort Collins Transit Center ARCHITECT'S SUPPLEMENTAL
Colorado State University INSTRUCTION NO: 12
OWNER: Fort Collins & CSU
TO: Mark Young Construction
(Comtmetor) 4150 Jason Street
Denver, CO 80211
CONTRACT FOR: Transit Center
CONTRACT DATED.
DATE OF ISSUANCE:
2/152006
ARCHITECT: Coover-Clark & Associates, P.C.
455 Sherman Street, Ste 205
Denver, CO 80203
ARCHITECT'S PROJECT NO. 0320
The Work *halt be carried out in accordance with the following supplemental instructions issued in e0cordence
with the Contract Documents without change in Contract Sum or Contract Time, Proceeding with the Work in
accordance with these Instructions indicates your acknowledgement that there will be no change in the
Contract Sum or Contract Time.
1, Rolocate mechanical relief fan to new roof, see M1.3, MIA and E2.3 attached.
2. Remove grille on south lobby wall and relocate to clerestory opening, see SK-IS attached.
3. Rwmove all roof drains servicing drainage above elevator shaft including internal leaders.
Storm water will run down north face on sloped structure.
Attachments:
Architectural sketch SK-15
Mechanical drawings M1.2 and M1.3
Electrical drawing E2.3
ISSUED BY: Jay Lamicq, Associate
ASI#12.xis Page 1
101
n n
inwAw
ilwl'AI'•�AIAIA�w1
' A
•
w w A p A
.i:!at¢:.!•'.•.!nyyC.ii(</i'.'i
r.i
AI A�AIAI
A w A A A
i..mow
wIAIAI A�AIA A
w w A A A �IA
i
AI A�A�.121
IAIw�A�A
A A A w w
rwr
A A
rw,
A A
AIA`AIAIAIAIAIh(Af
/li.r.�I:!/i��'/i:
�.y
A A
�.•i�.,
A
A /1
w r^
A•
wI1�A►�'
:!':•%f/�'
iMA
i.
A A
i.
A A I� A
Oil IA
wIAIA�AIAI
A�A�
i.::•iY :�/
I
A A A A
4v ter:•
IJ I. '!I'llil.'�/III•://Ir/.�i.//%.f
1
! Mf
1�
1
N
I
1
•
1
TE
Scrum IIZ w r-0•
7
I ffGVJr,q LaAfR AVAU 6
PAN? 70 �.*4MNAUH PA11OfnW
PMVC
!Il
�
N
� '
O
YCOWa... Sb SOKtUI[
......
1. ARNIM.�►
COWRAoosrAuvwu®taw
14fil 9
1204'.
1.
XM
Tpi
rA
Fat, Mrnr ............. . ... .. ...... n''
CMDRADOSTATE
M
k.
......
..
...........
-------------
s4
--------------
.Samos
--- -------
---- ------- I
-------------
- -------------
..........
MOM,
(XM)VMAMAItU 4 AS$rA'%7U
cc
j
DONRAY 1416 E. Eisenhower
Loveland, CO 80937
GLASS (970) 667-9288
COMPANY lelo 4 FAX (970) 667 95163
PROJECT: CSU 7APoiq a5/ 7—
TO; /%%io2� yo 4146 6nS T
ATTN: 44 e c74
Your Use
v and C
VIA:
UUWAY GLASS Co
DATE! .9 - 2
REF: AS Z' / Z
PAGE 01/01
TRANSMITTAL
� %63
NUMBER OF PAGES (includes cover):
Signcd:
ae Submitted
REvnbmil
Submit
Retumed
Retumed
eO 3e 'V Z %SB. 00
��-r JVJJLJ(J( FRONT RANGE ROOFING PAGE 02
SYSTEMS
Tam
JOB NAME: CSU TM
DESCRIPTION: ASI # 12
LABOR: MAMNOt1R6 RATE TOTAL
o.o -
1 w,- 31.0 S 22.W f 897.50
)pymerw 31.0 S 10.50 i 004.50
0.0 $ s -
faromon 6.0 s (22.W) s (180.00)
*M""M 8.0 $ (10.80) s Ose.00)
0.0 s $ -
0.0 s s - LABOR TOTAL
0.0 -- $__ f $ W.00
INSULATION
100
SF
S
ZZ
f 225.00
pslaWck dnk
2
tk
$
153.00
$ Woo
ON*** 20 to
i
d
$
47.70
s 47.78
pw *w 30 or tr to
2
d
s
85.62
s 171.21
pe-1021 pbWe
1
GAL
$
Z.77
$ 29.77
V" akm h m
3
d
S
71.99
S 215.97
ant strip
80
N
s
0.25
$ 20.00
0
s
s -
m@6% d Aashlnps
2
d
S
(40•50)
s (07.00)
ModSsdbm
2
d
s
(1e.5D)
$ (33.00)
=%WP
so
If
S
(0.25)
s (17-50)
olow covet
1
pal
s
(15.25)
s (15,25)
0
s
0
s
-
S
MATERIAL TOTAL
o
_s
s__ _
$ W8.01
EQUIPMENT:
LINT
LNITCOW
TOTAL
_
CRANE
0
HOURS
S
120A0
s
0
S
-
$
EQUIPMENT TOTAL
0
i
s
S Sc
awmTr
%w
LMIIT cow _
TOTAL
o
s
-
s
0
$
s -
SUB$ TOTAL
o
s
$
M
QUAN TY
LM
L"T
ow
TOTAL
U i MISfi. I V IlAL
o s s s
DIRECT COST $ 1,824.01
TOTAL MAN HOURS 78.00 20%
LABOR BURDEN
$
193.20
0.W%
TAX ON MATERIALS
$
-
5%
MARK-UP ON SUBS
$
-
150A
MARKUP ON FRRS WORK
S
297.34
SUB -TOTAL
S
2,$14.65
Horizon Sheet Metal,
Inc.
126 Hemlock Street, Fort Collins, CO 80524,Phone: (970) 482-7333, FAX: (970) 482-7545
CHANGE ORDER REQUEST
Date: 3/1 /2006
To: Mark Young Construction, Inc.
4150 Jason Street
Denver, CO 80211
Attn: Max
Issue:
Number 00007
Project: CSU/Fort Collins Transit Center
Ref:ASI #12
Plumbing: No Chan a $0.00
Sheet Metal Shop labor; 9 hours $65.00 per hour— $585.00
Sheet Metal Field labor; 34x hours $65.00 er hour— $2,210.00 Materials: $1,297.00
tqulpment: $0.00
Profit and O/H for
Profit and O/H for Sheet metal work Q10%=409.00
--------------
Note: Roof stands will be
Cost and $4,
Schedule NA
Impact
501.00
See attached breakdown
Copy to: File
to support ductwork. Roofing work by others.
Signed:
Horizon Sheet Meta{, Inc.
126 Hemlock Street. Fort Collins, CO 80624,Phone: (970) 482-7333, FAX: (970) 482-7545
CHANGE ORDER REQUEST
Number 00008
Date: 3/112006
To: Mark Young Construction, Inc. Project: CSU/Fort Collins Transit Center
4150 Jason Street
Denver, CO 80211
Attn: Max
Issue: Ref:ASl #12 Deduct
Plumbing: $672.46
Sheet Metal Shop labor; 13 hours @ $65.00 per hour-- $845.00
Sheet Metal Field labor; 21x hours ft $65.00 Der hour-- $1.365.06
Materials: $ 504.00
Equipment: $0,00
Profit and O/H for plumbing @ 5%=$34.00
Profit and O/H for Sheet metal work 0 10%=$271.00
See Attached Breakdown
Cost and <$3,691.00>
Schedule NA
Impact
Copy to: File Signed:
Please review the attached regarding ASI #12.
This is for the relocation of Mechanical Relief Fans 1 and 2 and the deletion of
drains at the elevator roof:
Phillips
Deduct: (1) 3" Roof Drain at Elevator $268.98
(1) 3" Overflow drain at Elevator $403.48
Add: N/A
Horizon Sheet Metal
Deduct:
(2) 90 degree elbows — 32" $308.00
(2) 24" x 48" roof penetrations $390.00
(2) 24" x 48" 90s down thru roof $544.00
(2) 24" x 48" 90s over to radius louver$244.00
(2) transitions from 24" x 48" duct to radius louver $300.00
Approximately 6' of straight 32" duct $178.00
Approximately 14' of 24" x 48" duct $ 420.00
Roof duct supports $330.00
Add: (2) 4'-6" x 3'-6" rectangular louvers $441.00
(2) 45 degree 32" elbows $197.00
(2) 32" to 48" transitions $594.00
Approximately 44' of straight 32" duct $1,105.00
Approximately 10' of 24" x 48" duct $528.00
(1)24 t, x 48" 90 degree elbow $347.00
Roof duct supports $880.00
Not premium freight allowed.
Markups not included in breakdowns. See original COR's
Note: The original louvers are not returnable. No credit allowed in equations.
Respectfully,
Frank Toni
MARK YOUNG
CONSTRUCTION
INCORPORATED
Via Facsimile 303-783-0060
April 13, 2006
Coover-Clark & Associates
455 Sherman Street, Suite 205
Denver, CO 80203
Project Tale: City of Fort Collins & Colorado State University Transit Center Phase 11
Project No. 05477
Subject: Barrel Roof Re -Design #2
RE: Change Order Request Number: COR No: 25
Gentlemen:
Pursuant to the above subject matter, please find enclosed our cost summary, qualifications, and back-up for the
barrel roof re -design, which includes ASI#11 and a portion of ASI#8. The total cost to perform the above
referenced work is $9,704.00.
Please note the following during review of this change order request:
1. ASI#8 — Item #5 detailing the XXS pipe columns w/ a 3 hour wet spray fire proofing and column wraps were
included into this COR. The column wraps were excluded per the direction of Cass Beitler and an alternate
material will need to be detailed for pricing. The subcontractor quote for $14,914 is attached for reference
if the specified wraps are required. All other items from ASI#8 were assumed to be void or have been
included into other COR's. A copy of ASI#8 is attached for review.
2. Fireproofing for this change order request includes only the two beams detailed in SKA 4. All credits for the
remaining fireproofing in the barrel roof have been included into the backup of this COR.
3. The EPDM roof system associated with this change will have a manufacturer's warranty of 10 years and
workmanship warranty of 2 years.
4. ASI#8 — Per SK-9 the 1-1/2" of perlite material was not included into this COR because it was not required
to achieve the R=30 rating. If it is required add $3,483.00.
If you should have any questions and/or concerns, please contact me at your earliest convenience at (303)
710-1421
Sincerely,
Max Millen
CONSTRUCTION
INCORPORATED
Via Facsimile 303-783-0060
April 6, 2006
Coover-Clark & Associates
455 Sherman Street, Suite 205
Denver, CO 80203
Project Title: City of Fort Collins & Colorado State University Transit Center Phase 11
Project No. 05477
Subject: Change Light Fixtures @ Exterior Stairs Per RFI#33
RE: Change Order Request Number: COR No: 30
Gentlemen:
Pursuant to the above subject matter, please find enclosed our cost summary, qualifications, and back-up to
change the light fixtures at the exterior stairs. The total cost to perform the above referenced work is $1,159.00.
Please note the following during review of this change order request:
1. RFI#33 — There was a discrepancy on the red -lined submittals in regards to which light fixture was to be
used at the exterior stairs. An RFI was required to clarify which fixtures would be required in that area.
If you should have any questions and/or concerns, please contact me at your earliest convenience at
(303) 710-1421
Si are'
ax Mill n
Project Engineer
cc:
05477-F-1.2
Steve White 970-221-6534
Cass Beitler 970-491-7572
Owner response, please sign as appropriate:
Approved, Proceed as Submitted
Rejected, Do Not Proceed, Provide Comments
Other, Do Not Proceed, Provide Comments
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase 11
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODESI ACTIVITY DESCRIPTION
Change Light Fixtures @ Ext. Stairs Per RFI#33
MYC LABOR TOTAL
MYC MATERIAL TOTAL
MYC EQUIPMENT TOTAL
FAYROLL TAXES & INSURANCE @ 20%OF LABOR
GENERAL CLEANUP: N/A
DELIVERY: N/A
DRAWINGS & SPECS: BY ARCHITECT
Change Light Fixtures @ Ext. Stairs Per RFI#33
AMOUNT
$0
iEl
TOTALS
$0
$0
$0
$0
$0
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
FCOESTCOD:ES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
Wayne's Electric
Deduct Original Type AA and AAE Light Fixtures
($3,565)
Add for New Type AA and AAE Light Fixtures
$4,641
SUBCONTRACTTOTAL
$1,076
$1,076
SUBTOTAL
$1,076
MYC FEE a 5.0%
$54
SUBTOTAL SUBCONTRACTOR WORK
$1,130
SUBTOTAL (DIRECT COSTS)
$1,130
BUILDERS RISK INSURANCE @ 1.0%
$11
LIABILITY INSURANCE @ 0.75%
$8
MYC BOND:.86 %
$10
SUBCONTRACTOR BOND: NIA
$0
PERMIT FEES: NIA
$0
SALES TAX: NIA
$0
CONTRACTOR CONTINGENCY @ 0%
$0
PROPOSED CHANGE TOTAL
$1,159
mu u.c•4o rn wriYNt. b tLEGNIC INC FAX N0, 3036540877 P, 03
CHANGE ORDER
WAYNE'S ELECTRIC 114C.
130 SOUTH MAIN STREET
BRIGHTON COLO. 80801
PHONE: 659-7481
FAX: 654-0971
CHANGE TO: MYC
ATTENTION: MAX
JOB LOCATION: CSU
DATE: 4/5/2006 CHANG : ORDER NUMBER:
WE HEREBY AGREE TO MAKE THE CHANGEiS) SPECIFED BELOW
JRFI $33
New M and ME light fixtures 84 641.40
Old M and ME light rodures ($3.565.00)
Total change order $1,076.40
NOTE: THIS CHANGE ORDER BECOMES PART OF AND IN CONFORMAP CE WITH THE CONTRACT:
WE AGREE TO MAKE THE CHANGFIS) SPECIFIED ABOVE AT THIS PRI :E: $1 076.40
DATE: A ri15 2008 ,/,���,G},_ ?yi'+�•.-'�
AUTHORIZED SIGNATURE(CONTRACTOR):
ACCEPTED:
DATE OF ACCEPTANCE:
SIGNATURE OWNER):
ma uv cuuv inu uc.yo rrl NHYNtb ELECTRIC INC FAX N0, 3036540877 P, 04
Jab Name: CSU RFI 13
Job Numby: 325
Jab Path: CAPropram FloolAceu iid OataUobdMn%326.ES8
Job Type:
Yid Due Data., 03/312006 05:41AM
Esdmaew:
Telephone:
Fox.
Email:
Job address:
Nun". RFI e33 CHARGE
CSU TRANSIT
FT COLLINS, CO
CDerd address:
S kdn_Tot. LFmp Tot. Total II Fu0 Rate Coda Typs
Quoted Motod$ _
Alarm Cost Adpntment % Total
Vendor Cods e
t
I UGHTING FIXTURES
ON 4,036.00 4.036.00
L... .
�Totek _...._.�
_
.... 4_036.00 4.038.00
_
__..._ _...
- Flllal Prtablp
Value (S)
Pot (Sri)
Atorm
C_ ode
— -
Quoted Material
Material Total - -
4,038.00
4,036.OD
15.000
15.000
—
Total Cost
4 036.00
_
Quoted Material Overhead
Total OverMad
1 605.401
Quoted Material Markup
Total Markup
605.40
4,641.40
Selling Price
F'naI
,,,,% vv �vvv rrry VC-4v rll WHIN1.0 CLCIiIKIU INS MX NO, 3036540877 P. 05
Job Name: CSU RF113 C
Job Numbar. 326
Job Path: C:1Pro0ram Files%Accu lid DataWo0deta1326.ES6
Job Type:
Bid Due Date•. 0361/2006 08:44AM
Eat(malor:
Tone:
Fax:
Emu:
Job address:
Number. RFI #v CREDIT
CSU TRANSIT
FT COLONS, CO
Client address:
Irdn Tot.1 Fmo T, t. Tatar Full Rate Code Type
Quoted Metertals-
Alarm j
Cost
jAdjustment %
Total
Vendor _ _
Code Type
1
JUGHTINGFIXTURES—
3,100.00
-
Fin_al Priakt0
ValuTW66.000
(TO)
Alarm
:ode
_
Quoted Material
Material Total
Total Cost
Quoted Material OverheadTotal
OveMeadQuoted
Material Markup
15.0001
1_
Total Markup
- 1S.IDD
Sewn Price
_4b6.00
3,666.00
_
f ryPhal
Price
� 3,565.00
teraolLFORATED
LETTER OF TRANSMITTAL
RFW:
33
DATE:
2/22/2006
TO:
Coover-Clark & Associates, P.0
PROJECT M
05477
455 Sherman Street, Suite 205
PROJECT:
CSU Transit Center
Denver, CO 80203
Fort Collins, CO
ATTENTION:
Jay Lamicq
Fax:
303-783-0060
PAGES:
SUBJECT:
Liaht Fixtures 0 Exterior Stairs
REFERENCE: E0.1 and E1.2
INFORMATION REQUESTED:
Per the electrical schedule on E0.1, the base bid drawings show a H drel fixture to
be used at the exterior stairs. Addendum #1 states to change that fixture to
a Lithonia fixture, which is what was submitted on by Wa ne's Electric. In the
rejected light fixture submittal the "red -lined" notes state to use a Hydrel fixture
once again. The H drel fixture is a recessed fixture and the Lithonia is surface mounted.
Presently, the foundation wall has been poured making it very difficult to recess the H drei
fixtures.
Please advise which fixture needs to be used and if the recessed fixture must be mounted,
Please advise.
SIGNED BY: Aaron Phillips DATE: 3/2412006
IMPACT: DATE RESPONSE REQUESTED BY: 212T/2006
WILL DELAY SCHEDULE IF CHECKED: CPM ACTMTY No.
POTENTIAL COST IMPACT IF CHECKED:
RESPONSE: The exterior stair fixture must meet ADA (less than 6" deep) and provide emergency lighting.
Provide the following: (Refer to attached cutsheet)
Type AA (typ of 5 at stair) - Pace Illumination fAEML-1620-PLT32-120-TAL
Type AAE (typ of 4 at stair) - Pace Illumination SAEMI-4620-121-T32-120-TAL-REMOTE EM BALLAST
Coordinate remotos ballast with fighting supplier (The Lighting Agency). Locate remote ballast
on opposite side of wall from fixture In Mechanical Room 52C. Remote ballast must be located
teas than 10`-W from fixture.
SIGNED BY: DATE:
cc out: 05477-F-3.3
cc in: 05477-F-3.3
m
ORDERING CODE GUIDE
DIMENSIONS
ROBusTO
"Muralume"
Die-cast aluminum housing
dear glass lens
Electronic HPF ballast
. Specular optics
. Powder coat finish
Wal mount upldown
Ram
C--�....
�T2
120 7AL = Tezlurec Alumk�um
PLT32
277 TBK.7i;rttaed Black
PLT42
3e7 T13 F1.wad smze
20MH
Textured While
SOMH
400
0
0
0
0
17.5o
F c'r� Is76.8[i sJ tv:r,', parcii;umhiation.r.orn
Via Facsimile 303-783-0060
March 29, 2006
Goover-Clark & Associates
456 Sherman Street, Suite'205
Denver, CO, 80203
Project Title, City of Fort Collins & Colorado State Universitj Transit Canter Phase II
Project No: 05477
Subject: Add Closer to Opening#102
RE: Change Order Request Number: COR o: 29
Gentlemen:
Pursuant to the above subject matter; please find enclosed our cost summary, qualifications, and back-up for the
additional closer required per the fire code at opening #102. The total cost to perform the above referenced work
is Vo4.00.
Please note the following during review of this change order request:
I. CO Dootvvays Note #11 —The red -lines as marked by the architect on the submittals and returned
approved as noted state that the closer was not necessary at opening #102. Since the opening is to be
fire -rated, a closer will be required_
if you shouldhave any questions and/or concerns, please contact me at your earliest convenience at
(303) 710-1421
Sincerely,
( M fen
Project Engineer
RR
05477-F-1.2
Steve White 970-221=6534
Cass tenter 970-491.7572
Owner response; please sign as appropriate:
Approved, Proceed as Submitted
Rejected, Do Not Proceed, Provide Comments
Other, Do Not Proceed, Provide Comments
No Text
Project Engineer
cc:
05477-F-1.2
Steve White 970-221-6534
Cass Beitler 970-491-7572
owner response, please sign as appropriate:
Approved, Proceed as Submitted
Rejected, Do Not Proceed, Provide Comments
other, Do Not Proceed, Provide Comments
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fart Collins and CSU Transit Center Phase 11
PROJECT NUMBER, #0$477
CHANGE.ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
CNAN,GE RDER REQUEST# 29
Add Closer to Opening 0102
MARK YOUNG CONSTRUCTION LABOR:
MYC LABOR TOTAL
$0
$0
MYC MATERIAL
MYC MATERIAL TOTAL
$0
so
4VIYC MO.
MYC EQUIPMENT TOTAL
s0
$0
SUBTOTAL
so
SMALL TOOLS & SUPPLIES @ 5% OF LABOR
so
PAYROLL TAXES & INSURANCE @ 20 % OF LABOR
$0
GENERAL CLEANUP, NIA,
$p
DEUVERY: NIA
$0
DRAWINGS &'SPECS; BY ARCHITECT
so
SUBTOTAL,,
E0''
WtYC OVERHEAD & FEE 1fi.0%
30.
SUBTOTAL MYC WORK
$0
SUBCONTRACTS
Add Closer to Opening N102
Colorado Doorways Inc.
Opening #lW Door Closer due to Fire Rating
$t89
Date: Submitted By. Laura Potter
Max Millen
From: Jay Lamicq UaylamiCq(MWover-da*,comj
Sent: Wednesday, March 22,2006 11:07 AM
To: Max Mullen
Subjects RE: Scanned image
Max-
rf they say its required by come then ve need to abide.
Jay
,Tay R. Lamicq, Assoc. AIA
Associate Designer
Coover-Clark & Associates, Inc
455 Sherman Street, suite #205
Denver, Colorado 80203
(303) 783-0040 ext. 16
(303) 783-0050 fax
Email; jaylami.cq@coover-rlark.com <malltorjaylamicq@coover-clark,cemv
Web. vwv.coover-clark.com <http,//Kvv.coover-clark.com/?
"The sander believes that this E-mail and any attachments were free of any virus, vozm,
Trojan horse, and/or malicious code when sent. This message and its attachments could have
been .infected during transmission. By reading the message and opening any attachments, the
recipient accepts full responsibility for taking protective and remedial action about
viruses and other defects. The sender's employer is not liable fox any loss or damage
arising in any vary from this message or its attachments.,*
Original message --
From: Max Millen(mail ta:mmfllan@markyoungconstruct.ion.coml
Sent: Monday, March 20, 2006 7:04 AM
To. Jay Lamicq
Subject: FW: Scanned image
Jay,
I ,just received this question from CO Doorways about the closer in opening #102. See
below. Fs this closer required or not?
Max Millen
Mark Young Construction, rnc.
Ce22: 303-710-1421
Fax: 970-482-3061
mmi2len@markyOUWdonstruct on.com
-----OrigiCnal Message-- --
From, Uura,Patter coal
Cont: klortday> march 20, 2006 7t52 AM
To: JOW MIt ilia
Subject: W. Scanned image
Opeaalnq # 102 - since this door is Fire rated It requires a closer on the active leaf.
Z've attached our 4uestion at sutolttals time but ve tailed to **J*tion it actually
requires a closer. please verily 'Chat,Is okay.
FYZ - the Z custom frames are shipping 3-27 from rFes and then tre,2a need a week to
weld them. Volivery to the Site,should be Arouimd AprIl $66.
Laura a. Potter
project 44op4gar
Colorado ZN6'*' v' ys Zpc'.
303-3 2-OiSO (c {zecktj
343-25�1-al l3 (ira�1
--�0!r3glrta2 etessage-----
l'' om«txloeadaar. ciao dmailto: adwi{aQcodoor. cool
dent: Atc7rtdayr march 20, 2oo6 7.4a am
To: Laura Potter
Subject; OdiuOted imago
L14'Vi CK : sharp c4piear
ZOCATJCON: 6*;,xtdrAcom
Fly jroj fQr::Pzw kmw(G4)
125.6'OLtt�'l'ON: 300s1,�i x .3QQdp
Attached filer is scanned image In Pzw foxmAt.
This file car, be rears by Adobe Acrobat ASdex.
The reader can be downloaded tram'the tolloaing mm:
bttp:l/vwx.adobe.coal
2
Cpcolo ''ad0 Page 2 of 2
00O AYS W
3333 East 52"' Avenue • Deriver, CO 80216.2322 . Phone (303) 291-0900 . Fax (303) 291-0113
Job Name: GSU Transit Canter Phase It Job #: 05436DSO
9. The door schedule calls for a lever lockset at opening 036. This hardware Is not
appropriate for a double egress; pair. One leaf of this pair swings into the store and
one leaf swings out. If this opening had remained non -rated we would recommend
� ` 4push/hour ulls for day operationand flushbofts tHowever,d a deadbolt for security.
fire was to opening in addendum # 1, which would limit our
options to vertical rod exit devices. Please review this opening and advise any
changes to the swing andlor hardware. This opening cannot be fire rated as
specified.
10.Opening 117 is 45 minute fire rated per addendum # 1 but the specified hardware
k\0)'A'� does not qualify for a fire rating. Please review and advise if a closer should be
` added to this opening. Fuse" C*e7vipE q e e aa4rp , F�p_ aF !f
11. A similar condition occurs at opening 102. Even though this opening Is a pair, it is
��c� for a mechanical room, which should allow a closer at the active leaf only. Please
,ioXi review and advise if a closer should be added to this opening.
CONSTRUCTION
INCORPORATED
Via Facsimile 303-783-0060
April6, 2006
Coover-Clark & Associates
455 Sherman Street, Suite 205
Denver, CO 80203
Project Title: City of Fort Collins & Colorado State University Transit Center Phase II
Project No. 05477
Subject: Telecommunication Changes
RE: Change Order Request Number: COR No: 31
Gentlemen:
Pursuant to the above subject matter, please find enclosed our cost summary, qualifications, and back-up to
implement all of the telecommunication changes. The total cost to perform the above referenced work is
($-2,291.00).
Please note the following during review of this change order request:
1. The telecommunication changes were submitted to Wayne's Electric per revised drawings from meetings
conducted by CSU.
If you should have any questions and/or concerns, please contact me at your earliest convenience at
(303) 710-1421
Sincerely,
G, >
Max Millen
Project Engineer
cc:
05477-F-1.2
Steve White 970-221-6534
Cass Beitler 970-491-7572
Owner response, please sign as appropriate:
Approved, Proceed as Submitted
Rejected, Do Not Proceed, Provide Comments
Other, Do Not Proceed, Provide Comments
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase 11
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
CHANGE ORDER REQUEST# 31
Telecommunication Changes
MARK YOUNG CONSTRUCTION LABOR:
MYC LABOR TOTAL
$0
$0
MYC MATERIAL
MYC MATERIAL TOTAL
$0
$0
MYC EQUIP.
MYC EQUIPMENT TOTAL
$0
$0
SUBTOTAL
$0
SMALL TOOLS & SUPPLIES @ 5% OF LABOR
$0
PAYROLL TAXES & INSURANCE @ 20% OF LABOR
$0
GENERAL CLEANUP: N/A
$0
DELIVERY: NIA
$0
DRAWINGS & SPECS: BY ARCHITECT
$0
SUBTOTAL
$0
MYC OVERHEAD & FEE 15.0%
$0
SUBTOTAL MYC WORK
$0
SUBCONTRACTS
Telecommunication Changes
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
Wayne's Electric
Delete Floor Boxes and Wall Boxes
($4,017)
Added Power Poles and Underground Piping
$1,891
SUBCONTRACT TOTAL
($2,126)
($2,126)
SUBTOTAL
($2,126)
MYC FEE a 5.0%
($106)
SUBTOTAL SUBCONTRACTOR WORK
($2,232)
SUBTOTAL (DIRECT COSTS)
($2,232)
BUILDERS RISK INSURANCE @ 1.0%
($22)
LIABILITY INSURANCE @ 0.75%
($17)
MYC BOND:.86 %
($20)
SUBCONTRACTOR BOND: NIA
$0
PERMIT FEES: N/A
$0
SALES TAX: NIA
$0
CONTRACTOR CONTINGENCY @ 0%
$0
PROPOSED CHANGE TOTAL
($2,291)
ni n-uu—Cuuo inu uc clo rn wHYNt6 tLEGIVO INC FAX N0, 3036540877 P, 06
CHANGE ORDER
WAYNE'S ELECTRIC INC.
130 SOUTH MAIN STREET
BRIGHTON COLO, 80(i01
PHONE: 859.7401
FAX: 054-0877
CHANGE TO: MYC
ATTENTION; MAX
JOB LOCATION: CSu
DATE: 4/3/2008 CHAN(;E ORDER NUMBER:
WE HEREBY AGREE TO MAKE THE CHANGE(S) SPECIFIED BELOW
Communication changes
Deleted floor boxes and wall boxes
(34,016.96)
Power changes s even
Added power poles and underground piping
$1,091.40
Total change order credit
($2,125.56)
NOTE: THIS CHANGE ORDER B COMES PART OF AND IN CONFORMM CE
WITH THE CONTRACT:
WE AGREE TO MAKE THE CHANGEISI SPECIFIED ABOVE AT THIS PRI ;E:
,4112,125.56
DATE 15, 2005
AUTHORIZED SIGNATUREICONTRACTOR :
ACCEPTED:
DATE OF ACCEPTANCE:
SIGNATURE
nrn-UU-6000 InU U64t) rn wl1YNE6 ELECTRIC INC FAX NO. 3036540877 P, 07
Job Name: CSU COM CREDIT
Job Number. 332
Job Path: CVropram FBesWca A Da1elJobdata1332.ES6
Job Type.
Bld Due Data: 04I0412006 01117AM
Estimator:
Telephone;
Fax:
Email:
Job address:
Number: CSU COM CREDIT
CSU TRANSIT
FT COLLINS. CO
Client address:
Daruription—
Qty
5l10/2004
6110120_04
1
3/4" EMT CONDUIT
_Data
210
2
314" EMT DC SS CONN
42
3
4" SO 1 G PLSTR RING 5/6" RISE
_ ^ - 21
1 /19/2005
4
FLOOR BOX 2G CAST
_ _ - 1
12/5/2001
6
FLOOR BOX DUPLEX REC, PLATE
9
12/5=01
6
FLOOR BOX COMM PLATE
9
12/5Q001
7
I POKE THRU SERVICE FTG
a
21
12/5/2001
e
110 WS TELEPHONE PLATE
412112004
S
-lTotals---
MSF MTL STUD SNAP -ON BOX SUPP
21
WSaW4
Price
__ 115661
67.31 1
_ 254.86 1
0.001
0.001
0.00 1
0.00 I
210.00 i
68.55 1
J
Desaipoon
Qty
Total Hours
7.30
4.20
Mat Cond. Lab. Cond.
1
3M" EMT CONDUIT
210
Normal Normal
2
3/4" EMT DC SS CONN
42
Normal Normal
3
44 $Q 10 PLSTR RING SIB" RISE
2 t
1
0.53
Normal Normal
4
FLOOR BOX 20 CAST
FLOOR BOX DUPLEX REC PLATE_
FLOOR BOX COMM PLATE --
-P,—O* ..._..... _....,.--.._._ .._._.. _
POKE THRU SERVK:E FTG
10013 TELEPHONE PLATE
1.00
Quoted Normal
5
6
T
e
9
2.25
Quoted Normal
9
2.26
Quoted Normal
a
T4.00
.......r_�
Quoted Normal
21
0.63
Normal Normal
9
MSF MTL STUD SNAP -ON BOX SUPPC
21
1.05
Normal Normal
Totals 43.30
Manufacwrer Name jCwtaloqNumbeL Price Code
CONDUIT RIG1D-EMT
CONDUIT & CBL FTG
Description
3/4" EMT CONDUIT
EMT DC SS CONN
Qry
Reference
Supplier Nam !
Suppllar Code
1
210
42
3
4
5
8
7
4" SO 1 G PLSTR RING 518" RISE
FLOOR BOX 2G CAST
FLOOR BOX DUPLEX REC PLATE
FLOOR BO_X COMM PLATE
POKE 7NRU SERVICE FTG
21
t
9
6
8
1G SIS TELEPHONE PLATE
21
9
MSF MTL STUD SNAP -ON BOX SUPP
21
_
- -�—
...__
Totals _ _
do % Fmg S Brdn Tot~ Fmg Tot. Total Ful Rate
43320 40.00
866.00 40.00
433.20 40.00
1.732.40 _I0.00
Wberljps^ - -- Code _ Type
1 fOREMAN
2 JOURNEYMAN
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase 11
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
CHANGE ORDER REQUEST# 25
Barrel Roof Re -Design #2
MARK YOUNG CONSTRUCTION LABOR:
Remove Internal Gutter - 28 MH's @ $30.69
($859)
MYC LABOR TOTAL
($859)
($859)
MYC MATERIAL
Plywood - 14 Sheets @ $25.00/EA
($350)
Blocking Materials - 45OLF
($273)
MYC MATERIAL TOTAL
($623)
($623)
MYC EQUIP.
MYC EQUIPMENT TOTAL
$0
$0
SUBTOTAL
($1,482)
SMALL TOOLS & SUPPLIES @ 5% OF LABOR
($43)
PAYROLL TAXES & INSURANCE @ 20°% OF LABOR
($172)
GENERAL CLEANUP: N/A
$0
DELIVERY: N/A
$0
DRAWINGS & SPECS: BY ARCHITECT
$0
SUBTOTAL
$1,697)
MYC OVERHEAD LELE1 15.0°%
($255)
SUBTOTAL MYC WORK
SUBCONTRACTS
Barrel Roof Re -Design #2
Best Steel
Add 4" Diameter Nom. HSS XXS Heavy Duty Tube Steel (8EA)
$2,563
in lieu of 4.5" Diameter Nom. HSS Tube Steel (8EA)
Vulcraft Decking Change to Type 3N
($1,800)
Roof Check Inc.
1-1/2" of Perlite (Mineral & Fiber Board Per ASI#8) Not Included
N/A
msi vv rvvv inu ve.,m rri WHYNtb ELEUTKIG INC FAX NO, 3036540877 P, 08
-f. LeborType Code Type
1APPRENTICE --1
TT
Quoted Materials I Alarm
Floor box Hubbell 8PDX46M3 OR
Flow box Hubbell fb423341 OM
Towle
is t Acd0justmeMM % ['*to I Vendor --60do Type
11377.00 1,377.00
11,438.00 1,468.00
Final Pricing
Value (3)
Pot
Alarm
Code
Daubw Material (lbitenslon)
Quoted Matedal
302.61
Material Total
1,760.61
Dked Labor
Database— Material Overhead
Quoted Material Overhead
Labor Overhand
Total Overhand
Database Materal Markup
45.39
16.000.
I
Quoted Material Markup
218.70
15-0001
Labor Markup
259.86
16.000
Total Markup
523.95
15.000
seem Price
4,016.90
Final Price
4.016.06
rirR-Uo-dun IhU ue;0 VM MMS ELECTRIC INC FAX NO, 3036540877 P. 09
Job Nam: CSU COM
Job N0136er: 310
Jo:r Path: CM1Ptogram F'ftsftou :id DatelJobdatM310£S6
Job Typo:
Bid Qua Dab: 03/032006 01:1 OPM
Estbtrobr;
Tekphone:
Fax:
Emil:
Job address:
Ntanber. COM PIPES
CSU TRANSIT
FT COLLINS, CO
Clientaddraaa:
Description
[Xy
Data
Price
U
I At:
MM,Adj_
Nei Price
Labor
U
Total Mag6)
1
1" EMT CONDUIT
60
62212005
19736
C
35.00
000
122.04
6.72
C
73.22
2
_~
1" EMT DC SS CONN
121%lerLo06
1T2.96C
2000
OAO
0.00
0.00
$4.37
328,64
18,00C
11.60
3
_4
1" GRC COUPLING
1" GRC 90 DEG ELBOW _
61
0
11/g2008
469AS
C
30.00
- 0,000
_ 19.72
1,669.51
C
30.00
1,182,88
_ 45.00
C
70.90
5
1• STEEL LOCKNUT
6
210
1_f182006
g21142005
44,27
171'49
C7
C
20.00
35V0
40_0
0.00
_ 35.42
111.47
7.50
6.80
C
C
2.13
234.09
6
1" PVC
!7
1• PVC TERM ADAPTER
411234M5
60.87C
3550
_
630-
$2.67
10.000
3.15
8
1' PVC COUPLING
12
11/23/2005
S1.75
C
35.00
0.00
33.64
0.00
C
4.04
9
1' PVC 90 DEG ELBOW
� 0
11rt3/2005
171.00
C
35.00
50.00
0.00
_ 115.05
0.00
C
0.00
22.63
10
_.___.
41Q 1M' SO BOX 1" KO
_
6
2I82006 _.."
_ 75h39
C
0,00
377.20
3450
C
Totals ..
..
(r
_1�._._
..441.74
Description
Oty
Total Hotaa
Met. Cand
La . Cand.
Manufacturer Name
Catalog Number
_
Price Code
1
2
- _
1" EMT CONDUIT
1" EMT OC SS CONN
60
4.03
Normal
formal
_
CONDUIT RIGID EMT
CONDUIT 6 CBL FTGS
98001D02003
98
98007013513
12
2.16
Normal
formal
3
4
1" GRC COUPLING
1" GRC 90 DEG ELBOW
6
6
0.00
2.70
Normal
Normal
Normal
f o Labor
formal
formal
CONDUIT FTGS RIGID
98002000133
CONDUIT FTGS RIGID
98002000163
5
_
1" LOCKNUT
6
0.46
CONDUIT A CBL FTGq
9800ID12003
6
7
_STEEL
1" PVC
210
B
13.861
V 1.08
Normal
Norma
formal
lormal
CONDUIT d FTGS PV
CONDUIT 6 FTGS PVC
98000006003
98000006203
1" PVC TERM ADAPTER
8
1" PVC COUPLING
12
0
0.00
0.00
Normal
Normal
I o Labor
lama
CONDUIT 6 FTGS PVC
CONDUIT 6 FTGS PV
98006006/03
9
1" PVC oo DEG ELBOW
DONSOCS043
III
4x011V' SO 80X 1" KO
6
2.07
Normal
Vormal
RACO
233
05016990233
_
Osaellption
Oty
60
Reference
Supplier Name ;uppksr Code
1
1" EMT CONDUIT
_
2
3
1" EMT DC SS CONN -
12
8
- ^
1" GRC COUPLING
4
Jim GRC 90 DEG ELBOW �-
0
-
5
1" STEEL LOCKNi1T
6
-
6
10 PVC _
210
7
6
10 PVC TERM ADAPTER
1' PVC COUPLING
6
12
9
10
1" PVC 90 DEG ELBOW
0
410 118• SO BOX 1"KO
8
,rdn 46 Fmg S Hrdn at:
Frng Tot, Total Full Rua
260,60 40.00
442.00 40.00
260.00 40.00
-�_ 9t13.60 40;00
nra-uo-eum JHU Ud;41 Fn WHYNE6 ELLUTHIG INC FAX NO. 3036540877 P. 10
Labor Two -
Code Type
FOREMAN
2 JOURNEYMAN
'S 2'%P.RENTIC�
wmm_ief�ls Alarm
Quale Ula-- Cost Adjtt6ent % Code Type
. __T
poles Off 239.36
_T_ 2J9.361.7 :339.76
Final Ki-civ—
value
001(
Alarm Code
Detaban-lixterial (E*mW*n)
441.74
Quoted Material
Material ToW
Dired Labor
Labor_1
239.36
^ 891.10
Taal Cost
"Database
Quoted Ma"I Overhead
Labor Overhead
TOW Overhead
Database Material Markup
$6.26
1 KC&
Quoted Ma"IMorkup
35 .90
1 6.0mi
Labor m!RE
144.54
15.000
15.1*0
i;im-i-_Markup
245.70
SeMng Price
1.691.40
Iftw Price
1,991.40
CONSTRUCTION
INCORPORATED
Via Facsimile 303-783-0060
April 7, 2006
Coover-Clark & Associates
455 Sherman Street, Suite 205
Denver, CO 80203
Project Title: City of Fort Collins & Colorado State University Transit Center Phase 11
Project No. 05477
Subject: Bagel Shop Credits
RE: Change Order Request Number: COR No: 33
Gentlemen:
Pursuant to the above subject matter, please find enclosed our cost summary, qualifications, and back-up to
delete the items as specified on the shop drawings in the bagel shop. The total preliminary cost to perform the
above referenced work is ($-5,779.00).
Please note the following during review of this change order request:
1. The cost associated with this COR is only for work deleted in the bagel shop area. None of the other red -
lined notes on the returned submittals have been reviewed for inclusion into this COR.
If you should have any questions and/or concerns, please contact me at your earliest convenience at
(303) 710-1421
Sincerely,
Max Millen
Project Engineer
r97�4
05477-F-1.2
Steve White 970-221-6534
Cass Beitler 970-491-7572
Owner response, please sign as appropriate:
Approved, Proceed as Submitted
Rejected, Do Not Proceed, Provide Comments
Other, Do Not Proceed, Provide Comments
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase 11
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
CHANGE ORDER REQUEST# 33
Bagel Shop Credits
MARK YOUNG CONSTRUCTION LABOR:
MYC LABOR TOTAL
$0
$0
MYC MATERIAL
MYC MATERIAL TOTAL
$0
$0
MYC EQUIP.
MYC EQUIPMENT TOTAL
$0
$0
SUBTOTAL
$0
SMALL TOOLS & SUPPLIES @ 5% OF LABOR
$0
PAYROLL TAXES & INSURANCE @ 20% OF LABOR
$0
GENERAL CLEANUP: N/A
$0
DELIVERY: N/A
$0
DRAWINGS & SPECS: BY ARCHITECT
$0
SUBTOTAL
$0
MYC OVERHEAD & FEE @ 16.0%
$0
SUBTOTAL MYC WORK
$0
SUBCONTRACTS
Bagel Shop Credits
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase 11
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
True North Woodcraft
Delete Bagel Shop Counters
($4,193)
Change from Corian to P-Lam @ Movable Condiment Cabinet
($1,170)
SUBCONTRACT TOTAL
($5,363)
($5,363)
SUBTOTAL
($5,363)
MYC FEE @ 5.0%
($268)
SUBTOTAL SUBCONTRACTOR WORK
($5,631)
SUBTOTAL (DIRECT COSTS)
($5,631)
BUILDERS RISK INSURANCE @ 1.0%
($56)
LIABILITY INSURANCE @ 0.75%
($42)
MYC BOND:.86 %
($49)
SUBCONTRACTOR BOND: N/A
$0
PERMIT FEES: N/A
$0
SALES TAX: N/A
$0
CONTRACTOR CONTINGENCY @ 0%
$0
PROPOSED CHANGE TOTAL
($5,779)
TRUE NORTH
WOODCRAFT,LLC
2332 4th AVE
GREELEY, COLORADO 80631
PHONE: 970-3534800
FAX 970-3534814
FOR YOUR INFORMATION (FYI) MEMO
DATE: 3/24/06 FYI #: 4
To: Mark Young Construction
Attn: Dennis Wolfe / Max Millen
Phone: 970484-1468
Fax: 970-224-0392
From: Bob Cumming
Project: CSU Transit Center
Subject:COR #2
I have not completed the red -line review. Dustin requested the impact to scope of these two items.
Submitted for your information & approval;
I. Delete Bagel Counter S-4,193.00*
• *Assumes 15% restocking charge for material
• *Includes refacing existing casework
2. Change Solid Surface to P-lam @ movable condiment cabinets. S-1170.00**
• **Assumes 15% restocking charge for material
• **Assumes standard types of P-lam
TOTAL COR #2 S -5J63 00
Please call with any questions.
Thanks
Bob
1-d 418b ESE OG6 l 1 i4ejopoom ylaoN enj1 e4.a:wn en in .jdu
Via Facsimile 303-783-0060
April 11, 2006
Coovero-Clark & Associates
455 Sherman Street, Suite 205
Deriver, CO 80203
Project Title? City of Fort Collins & Colorado State University Transit Center Phase it
Project No_ 05477
Subject: Fire Alarm Relocation @ Bagel Shop
RE: Change Order Request Number: CAR No 34
Gentlemen.
Pursuant to the above subject matter, please find enclosed our cost summary, qualifications, and hack -up to
relocate the fire detection system in the beget shop The total cost to perform the above referenced work is
$707'.00.
Please note the following during review of this change order request;
1. When the steel beams were being erectedin the bagel shop for the new stairway, the fire detection system
was found to be in conflict with a structural beam. Also, the electrical conduits were all poured Into the
concrete and not surface mounted, making it difficult to relocate.
If you should have any questions and/or concerns, please contact me at your earliest convenience at
(303) 710-1421
Sincerely,
Max Millen
Project Engineer
GC
05477-F-1.2
Steve White 970-221-6534
Cass Beitter 970-491-7572
Owner response, please sign as appropriate:
Approved, Proceed as Submitted
Rejected, Do Not Proceed, Provide Comments
Either, Do Not Proceed, Provide Comments
MARK YOUNG CONSTRUCTION, INC.
PROJECTNAME: City oi' FdrtCollins'sin,4tSU'i`**# Conte` Phase tt
PROJECT NUMBER; *6$477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTMIY'DESCIiII fQN
AMOUNT
TOTALS
apne's`woc c .
Move Fire [ration System h $640
$656
To Not Contlt With Stti�t 01 40�' ;
StlD�0 �T At»
$656
!iB QTAL
SUBTOTA TOl • , O
Stlitis4Cx_ C, .STS
-
;s4
e i4 � S1J r�
l.lt.#Y lNSlt;1Cr t1.74',
$5
Ct„E6
$5
StJSGD
IT'RACf0',,, SON0.1 NIA
$0
PERIIAYTfEES,
NIA
$0
SALE ^ YIA
1
$
cQNToa CQ4T'!N' C3EN 0t4
$Q
Mmm
PROPOSED CHA,NUE TaTAl.
$70
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit center Phase N
PROJECT NUMBER, #06477
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: 805477
�w e.�'lffc^. Ld IuuAl2V
Vr1M1VVG %0F%W
t\t_%Wwa +q
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
Add two (2) layers of 2.51, ISO insulation over 1-1/2" pedite
$6,629
- R-30 Insulation rating achieved
Add EPDM Roof System Below Clay Tiles - (10 Year Warranty)
$17,226
Deduct for Clay Tiles to be Summer Rose - Single Color
($2,053)
Front Range Roofing Systems
Deduct for Sheet Metal Gutter
($3,065)
Deduct for Prefinished Downspouts
Inc.
Deduct Ice & Water Guard Lining @ Gutter
Inc.
Craftsman Decorating
Deduct intumescent paint per Spec. Section 09967
($3,000)
Add for Painting Exposed Structural Steel and Deck
$2,818
Add Paint for Gypsum Board @ Beam Enclosures
Inc.
Herblan Insulation
Deduct for Aft. Spray Fireproofing and Intumescent Material
($20,000)
Add Wet Spray Applied Fire Resistive Material @ Columns (7EA)
$8,624
Add to Spray Cementitious Material Over the Following Areas:
$1,827
- Beam W10x22 per Detail 3/A5.2 (24LF)
- (Low) Beam per Detail 6/A5.4 (48LF)
Midwest Drywall
Add to Enclose Beams per Detail SK-14
$1,096
Don Ray Glass Co.
18 GA, Anodized Column Wraps (7 EA) Not Included
WA
- Concealed Fasteners to Match Window System
- Front Range Roofing quote = $16,820.
SUBCONTRACT TOTAL
$10,865
$10.665
SUBTOTAL
$10,865
MYC FEE 6 5.0%
$543
SUBTOTAL SUBCONTRACTOR WORK
$11,408
SUBTOTAL DIRECT COSTS
$9,456
BUILDERS RISK INSURANCE @ 1.0%
$95
LIABILITY INSURANCE @ 0.75%
$71
MYC BOND:.86 %
$83
SUBCONTRACTOR BOND: NIA
$0
PERMIT FEES: NIA
$0
SALES TAX: NIA
$0
CONTRACTOR CONTINGENCY a 0%
$0
PROPOSED CHANGE TOTAL
$9,704
tim-rt-eem tUt uy,b1 Ail NAYNES ELECTRIC IK FAX NO. 3036540677
P. 02
APR-11-2006 TUE 09:51 AM WAYNES ELECTRIC INC FAX NO. 3036640877 F. 03
Fob Name: CSi t BAGEL z
Lela lfumbw: 341
lob P011r C;iPfoptam FWV4m b d OwWoWMI341.5S6
tab type:
Sid Crre onto: 04/t1a006 0,34AX
faC�Qhonit:
%e+c:
imaa:
tobaddress:
4umber: REVM9 FA 0t BAGEL SHOP
.Su TRANSIT
T COUR.", CO
;tiw* address:
ETaseAptlon
Oty
Oate
Puce
U
r iam
Mai: Adi
Net Pike _
Labor �^
) ,WtCONDUR
46 Mt
IiiTT!,
3N'Ex
40
StI0R0d4
t 4S.e6
C
610
0.00
115.65
3.62
314` r a1t ss Coww
x
4
s1to12oO4/S3
e4
C
odo
d.od
isa 64.oa3
7 s7
3r4' EMT STL SS CPLG
51t0(2004
IBB.XI
C
0 00
0,00
10-21
0 Go
4
31e"EW "STEEL WRAP
5
51t0ayw
30.70.0
000
COO
30,794
cia
— l67Mi
. 6 00
o i 1.541
S
g1dTHE1N _.
t7641612005
22506M
M
3400
' U0
000
_
0.00
tS9.
O.Oo
26.10
M O.oO
E
i116.2P AWtai05C (FIA) CABLE
45
12WO01
r. O DO
7
B24REG WIREGONN
4
tM612605
14.65C
]49 33
'~ 146.49,C
'2010
040
tt.724:
600C
' 0,
C '..00
6
4st Ill` SO sox COMB tUS
t
/
1l1>i120¢
ti16/20d5
Z;
,SO
0.00
144.67
" 23,00
ft
4' SO BLANK COVER
0.00
0 00`.
74 2S,
210
C 0.74
t6
g B tOs IlePL43ANCHOR(3116)
7
tIM 04
4AS
C
20.00
0001
372;
6'00
.1
C ! 0.26
11-
gift 374'PrH$E.1F-lAPSCREW
2411d12004
5,06C
20,00
0�4.6
_ zoo
606
t2
8100 PMSELFTAPSCREW
6402012GC4
SAOC'
20--po
066
4%4j
0231
2S8G
Totela
E 20.33;
�_
jGy Reterenae tNami aup 1VerCode
CONDUCT` �—`1! 40
3TL= COON 2
Sh SSCPt6 4
4...
3(4'. WT I•H SFEEL STRAP'
S
'178"
45
5
at'MitN.
6
*IS=2PAWM-10SC FIA)CABLE
7
82•IREU "RECONN.
4
4
4s1 Irt 30 809 COMB K0
i SO et: tt4K COVER
3 `
tQ
gO.10s 7t0"P1ASANCHOR t311'61
7
t1
#loft 3WPIHSELF=TAP SCREW
2
t2
10si' PIKSELF+TAP SCREW
Tomh
VR- t 160f TUE 09 52 AM WA"IO ELECIOCANO FAX NO 3,030640877 P. 04
T-..
4tat•1
"�Q,.Op
aroa 6 ai►lC
oanpl.;,��
�.,d
,�,--z-aft
Fr�j«_,�,�r r F�la.�e
840aa _ sana
i
`KxJRNEYMRN
E.p4
`1N1, .
- 8A4,� lO,dO
ram.. ..w
t2co
�Cd OC _
._ 1lO;oD 40
—JIF
r� Cads
RSIOAIIN
N�+YNate.
CONSTRUCTION
INCORPORATED
Via Facsimile 303-783-0060
March 24, 2006
Coover-Clark & Associates
455 Sherman Street, Suite 205
Denver, CO 80203
Project Title: City of Fort Collins & Colorado State University Transit Center Phase 11
Project No. 05477
.Subject: Relocation of Mechanical Relief Fans 1 & 2, Removal of Roof Drains at Elevator
RE: Change Order Request Number: COR No: 26
Gentlemen:
Pursuant to the above subject matter, please find enclosed our cost summary, qualifications, and back-up for the
relocation of mechanical relief fans 1 & 2 and associated ductwork and the removal of the roof drains at the
elevator roof per ASI #12. The inclusion of this change in scope will result in a net add of $2,767.
Please note the following during review of this change order request:
1. The added cost to Horizon Sheet Metal's contract is due to the addition of ductwork and ductwork
supports and increased labor costs associated with the installation of these items. Further, the specialty
grille for the south side of the barrel has been ordered and is a custom fabricated item that is not
returnable.
2. In order to meet warranty requirements for the EPDM roof, the ductwork supports must receive additional
tapered insulation, flashing, and cant strips and on all sides for proper drainage.
3. A deduct has been included from Don Ray Glass for the removal of glazing at the new grille location.
4. The ceiling in Room 228 was assumed to be unaffected by the ductwork passing above.
As roofing activities are currently scheduled for April 13, 2006, MYC requests approval of this change order
request no later than Thursday, April 6, 2006,
If you should have any questions and/or concerns, please contact me at your earliest convenience at
(303)718-0563
Sincer ly, !'
Aaron Phillips
Project Engineer
cc:
05477-F•1.2
Steve White 970-221-6534
Cass Beitler 970-491-7572
Owner response, please sign as appropriate:
Approved, Proceed as Submitted
Rejected, Do Not Proceed, Provide Comments
Other, Do Not Proceed, Provide Comments
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase 11
PROJECT NUMBER: #05477
C4IQNCE InRDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
CHANGE ORDER REQUEST# 26
Relocate Mechanical Relief Fans, Remove Elevator Roof
Drains
MARK YOUNG CONSTRUCTION LABOR:
Deduct: Sawcut, Demo, Remove Concrete for Roof Penetrations
(8 mh @ $30.691mh)
($246)
MYC LABOR TOTAL
($246)
($246)
MYC MATERIAL
I
MYC MATERIAL TOTAL
$0
$0
MYC EQUIP.
MYC EQUIPMENT TOTAL
$0
$0
SUBTOTAL
($246)
SMALL TOOLS & SUPPLIES @ 5% OF LABOR
($12)
PAYROLL TAXES & INSURANCE @ 2D% OF LABOR
($49)
GENERAL CLEANUP: NIA
$0
DELIVERY: NIA
$0
DRAWINGS & SPECS: BY ARCHITECT
$0
SUBTOTAL
($307)
MYC OVERHEAD & FEEg 15.0%
($46)
SUBTOTAL MYC WORK
($353)
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES ACTIVITY DESCRIPTION I AMOUNT TTOTALS
CHANGE ORDER REQUEST# 26
Relocate Mechanical Relief Fans, Remove Elevator Roof
Drains
DON RAY GLASS COMPANY
Delete Glass at Frame II (See attached)
($220)
FRONT RANGE ROOFING
Insulation, EPDM, Flashings for Mechanical Relief Fans, Roof Duct
Supports (See attached)
$2,315
HORIZON SHEET METAL
Deduct Labor, Materials, Markup (See attached)
Add Labor, Materials, Markup (See attached)
($3,692)
$4, 50101
AL
45
INSURANCE @ 0.75% , V
$27
(LIABILITY
MYC BOND:.86 %
$20
SUBCONTRACTOR BOND: NIA
$24
PERMIT FEES: N/A
$0
SALES TAX: N/A
$0
CONTRACTOR CONTINGENCY @ 00
$0
PROPOSED CHANGE TOTAL
$0
$2,767