HomeMy WebLinkAboutCHANGE ORDER - BID - 5929 CSU TRANSIT CENTER (4)g�lv'�ar: 3: 200.61E '5:2. "'V-70 2� ?y_er-lark CITY of FORT COLLINS' Ns• 3265
atvofrmtc
CHANGE ORDER NO. 0'3
PROJECT TITLE: CSU TRANSIT CENTER
CONTRACTOR: MARK YOUNG CONSTRUCTION
PROJECT NUMBER' 5929
DESCRIPTION: CHANGES TO THE CONTRACTOR'S AGREEMENT
In preparing change orders show in order as separate numbered paragraphs the following:
1. Reason for change: adjustments and add back
2. Description of change: COR No. 13, 16, 19, 24, 27 and 28 See Attachments.
3. Change in contract cost: $8,644.00
4. Change In contract times.
fbftacb_ it fps its as required)
ORIGIN-,- CONTRACT COST,.................................. ....... ...............................
54,318,46400
TOTAL APPROVED CH WM5 ORDERS ............ ....................... ..... .......... ...................
31,839
TOTAL PENDING CHANGE ORDERS..................................................................I.....00-00 TOT;- THIS CFfAncE ORDER...................................................................... 4q
APPROVED BY:
PURCHASING AGENT OVER $30,000 DATE
Project File, Contrac tDr, Purchasing, Englneer
ca
ADJUSTED CONTRACT COST ......................................................... .................
4,,6EW .
TOTAL 96 OF THIS CHANGE ORDER ......................... Lass Than 1 %
TOTAL C.O.'Sf! OF ORIGINAL. CONTRACT.- .................Lelathan 1 %
1iII.rl7STE0 CONTRACT COST ................................... ....................... 54,35Es,6E7.00
(As>aumiaa a!I diarrQA orders approved)
REVIEWED
MARK YOUNG
CONSTRUCTION
INCORPORATED
Via Facsimile 303-783-0060
February 27, 2006
Coover-Clark & Associates
455 Sherman Street, Suite 205
Denver, CO 80203
Project Title: City of Fort Collins & Colorado State University Transit Center Phase II
Project No. 05477
Subject: Payroll & Taxes Percentage Change
RE Change Order Request Number COR No: 24
Gentlemen
Pursuant to the above subject matter, please Find enclosed our cost summary, qualifications, and back-up to
change the payroll and taxes percentage from 38% to 20%. The total cost to perform the above referenced work
is ($407.00).
Please note the following during review of this change order request
1. COR#3- This change omitted Manhole #6 at the top of the exterior stairs. The credit from COR#3's
payroll and taxes went from $-93.00 to $-48.00. Total change in contract amount equals $45.00.
2. COR#8- This change included the work associated with relocating the electrical panel feed outside of
Restroom #50. The add for payroll and taxes went from $140.00 to $74.00. Total change in contract
value equals $-69.00.
3. COR#14- This change included the work associated with building the parapet wall along grid line 34N.
The add for payroll and taxes went from $583.00 to $307.00. Total change in contract value equals
$-276.00.
4. COW 8- This change includes the work associated with placing the additional roof drain piping from the
existing building to the Northeast comer of the existing building. The add for payroll and taxes went from
$225.00 to $118.00. Total change in contract value equals $-107.00.
If you should have any questions and/or concerns, please contact me at your earliest convenience at
(303) 710-1421
Sincerely,
Max Millen
Project Engineer
MARK YOUNG
CONSTRUCTION
INCORPORAT€D
Via Facsimile 303-783-0060
February 27, 2006
Coover-Clark & Associates
455 Sherman Street, Suite 205
Denver, CO 80203
Project Title: City of fort Collins & Colorado State University Transit Center Phase II
Project No. 05477
Subject: Remove 4" DIP Fire Line @ NE Comer of Site
REChange Order Request Number COR No. 27
Gentlemen:
Pursuant to the above subject matter, please find enclosed our cost summary, qualifications, and back-up for the
removal of the 4' ductile iron pipe shown on the base bid drawings. The total cost to perform the above
referenced work is ($-4,337.00).
Please note the following during review of this change order request:
1. RFI#27 — Coover-Clark & Associates stated to remove the 4" DIP fire line from the project scope of work.
If you should have any questions and/or concerns, please contact me at your earliest convenience at
(303) 710-1421
Sincerely, �
Max Millen
Project Engineer
ER
05477-F-1.2
Steve White 970-221-6534
Cass Beitler 970-491-7572
Owner response, please sign as appropriate:
Approved, Proceed as Submitted
Rejected, Do Not Proceed, Provide Comments
Other, Do Not Proceed, Provide Comments
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase If
PROJECT NUMBER: 006477
rl4AMr.E nROER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
CHANGE ORDER REQUEST* 27
Remove 4" DIP Fins Line @ NE Comer of Site
MARK YOUNG CONSTRUCTION LABOR:
Laborer - (8MH)
($223)
Operator - (8MH)
($370)
MYC LABOR TOTAL
($593)
($593)
MYC MATERIAL
Credit 4" DIP for Fire Line (95LF)
($1.025)
Tee Connection - 6"xe"x4" (I EA)
($64)
Gate Valve - 6" (1EA)
($382)
Bedding Materials for Backfili - (15TN)
($158)
MYC MATERIAL TOTAL
($1,629)
($1429
MYC EQUIP.
Bobcat - (1 DAY)
($87)
Excavator - (1DAY)
($320)
Trucking - (1 MH)
($75)
MYC EQUIPMENT TOTAL
$482)
($482)
SUBTOTAL
($2,704)
SMALL TOOLS & SUPPLIES @ 5% OF LABOR
($30)
PAYROLL TAXES 6 INSURANCE @ 20% OF LABOR
($119)
GENERAL CLEANUP: NIA
$0
DELIVERY: NIA
$0
DRAWINGS & SPECS: BY ARCHITECT
$0
SUBTOTAL
($2,853)
MYC OVERHEAD & FEE @ 16.0%
($428
SUBTOTAL MYC WORK
(S3.281)
SUBCONTRACTS
Remove 4" DIP Fire Lim @ HE Comer of Site
LaFarge West. Inc.
Ashpalt Patch
($900)
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of fort Collins and CSU Transit Center Phase li
PROJECT NUMBER: SM77
GFIANQF ARnFR RFOUF_'ST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
i
SUBCONTRACT TOTAL
($900)
($900)
SUBTOTAL
($900)
MYC FEE 6.0%
($45)
SUBTOTAL SUBCONTRACTOR NlORK
($945)
SUBTOTAL DIRECT COSTS)
($4.226)
BUILDERS RISK INSURANCE 0 1.0%
LIABILITY INSURANCE @ 0.75%
MYC BOND:.86 %
SUBCONTRACTOR BOND: NIA
PERMIT FEES: NIA
SALES TAX: NIA
CONTRACTOR CONTINGENCY a 0%
($42)
($32)
($37)
$o
$tt
SO
1 $0
PROPOSED CHANGE TOTAL
(54,337)
CC:
05477-F-1.2
Steve White 970-221-6534
Cass Beitler 970-491-7572
Owner response, please sign as appropriate:
Approved, Proceed as Submitted
Rejected, Do Not Proceed. Provide Comments
Other, Do Not Proceed, Provide Comments
MARK YOUNG
CONSTRUCTION
INCORPORATED
Via Facsimile 303-783-0060
March 1, 2006
Coover-Clark & Associates
455 Sherman Street, Suite 205
Denver, CO 80203
Project Title: City of Fort Collins & Colorado State University Transit Center Phase 11
Project No. 05477
Subject: Interior Balcony Railing
RE: Change Order Request Number: COR No: 28
Gentlemen:
Pursuant to the above subject matter, please find enclosed our cost summary, qualifications, and back-up for the
upgrade to blue-green tinted glass for the interior balcony railing. The total price change for this upgrade is a net
add of $560.00.
Please note the following during review of this change order request:
1. The balcony glass was changed from the original design with blue-green arched panels to clear,
rectangular panels per SCVE Item I. Please see the attached pricing from Don Ray Glass Company.
2. The blue-green glass must be provided by Viracon and has a lead time of 16-20 weeks. Due to the
qualities of this particular glass, it can not be provided locally.
Please review the attached information and respond with your approval, rejection, or suggestions. If you should
have any questions and/or concerns, please contact me at your earliest convenience at (303) 718-0563.
Sin erely,
Aar n Phillips
Project Engineer
cc:
05477-F-1.2
Steve White 970-221-6534
Cass Beitler 970-491-7572
Owner response, please sign as appropriate:
Approved, Proceed as Submitted
Rejected, Do Not Proceed, Provide Comments
Other, Do Not Proceed, Provide Comments
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase li
PROJECT NUMBER: #06477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
CHANGE ORDER REQUEST# 28
3/8" Glass at Interior Balcony
MARK YOUNG CONSTRUCTION LABOR:
MYC LABOR TOTAL
$0
$0
MYC MATERIAL
MYC MATERIAL TOTAL
$0
$0
MYC EQUIP.
MYC EQUIPMENT TOTAL
$0
$0
SUBTOTAL
$0
SMALL TOOLS & SUPPLIES @ 5% OF LABOR
$0
PAYROLL TAXES & INSURANCE @ 20% OF LABOR
$0
GENERAL CLEANUP: N/A
$0
DELIVERY: N/A
$0
DRAWINGS & SPECS: BY ARCHITECT
1 $0
SUBTOTAL
$0
MYC OVERHEAD & FEE @ 15.0%
$0
SUBTOTAL MYC WORK
$0
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase 11
PROJECT NUMBER: #06477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
SUBCONTRACTS
3/8" Glass at Interior Balcony
DON RAY GLASS COMPANY
Deduct 3/8" clear glass rectangular panels at interior balcony
($4,880)
railing
Upgrade to Viracon 3/8" blue-green rectangular panels at
$5,400
interior balcony railing
SUBCONTRACT TOTAL
$520
$520
SUBTOTAL
$520
MYC FEE @ 6.0%
$26
SUBTOTAL SUBCONTRACTOR WORK
$546
SUBTOTAL (DIRECT COSTS)
$546
BUILDERS RISK INSURANCE @ 1.0%
$5
LIABILITY INSURANCE @ 0.75%
$4
MYC BOND:.86 %
$5
SUBCONTRACTOR BOND: NIA
$0
PERMIT FEES: NIA
$0
SALES TAX: NIA
$0
CONTRACTOR CONTINGENCY @ 0%
$0
PROPOSED CHANGE TOTAL
$560
MHKK YUUNG CONSTRUCTION 3034779085
92/14/2006 09:D5 9706679516 DONRAV GLASS CD
1
PAGE 01/01
r ,
ftD. S�
tAr� ii
ATTN : / Mak ► ne
1416 E. Slsenhower
Loveland, CO BOW
(970) 667-9269
Me" (303) 440-0163
FAX (970) 667-9916
JOB NO./FILE
._
JOBSITE Copy
DAV D G. I E
DATE: Z/Z I /01r
RANSMITTAL
RED:
NUMBER Or, PAGES (includes cover):
WE ARE SENDINC-: I
SUBMITTED FOR:
ACTION TAKEN:
Sh&p D,l*"v JLJ
Appmuel
Approve l d SulmtiRM
ra 4ew JLJYour
Use
A •*VCll as Noictl
cbmtec o
AN Requodai
RespbPoit
Phone /lhkp_jUReview
Md Cemmnw:
ID Submit
Sptppbt
BENT V
0 RolomeQ
eei6tadntr
frot
❑ Rehvned forCmneetlou.
other:
Mail
- 61.100 vrs. 41te6
Signed:
fiA3rkY01MCon09*1 W
MARK YOUNG
IYI
CONSTRUCTION
INCORPORATED
Via Facsimile 303-783-0060
February 13, 2006
Coover-Clark & Associates
455 Sherman Street, Suite 205
Denver, CO 80203
Project Title: City of Fort Collins & Colorado State University Transit Center Phase II
Project No. 05477
Subject: Added Isolation Valve in Mechanical Hallway HWR Line
RE: Change Order Request Number: COR No: 13
Gentlemen:
Pursuant to the above subject matter, please find enclosed our cost summary, qualifications, and back-up to
provide and install the added isolation valve in the hot water return line of the mechanical hallway. This additional
valve was required to be added in order for the mechanical system to be drained properly to demo the OAP building
and was discussed during multiple Owner/Architect Meetings on Friday at 9am. The total cost to perform the above
referenced work is $1060.00.
If you should have any questions and/or concerns, please contact me at your earliest convenience at (303)
710-1421
Sincerely,
Max Millen
Project Engineer
cc:
05477-F-1.2
Steve White 970-221-6534
Cass Beitler 970-491-7572
Owner response, please sign as appropriate:
Approved, Proceed as Submitted
Rejected, Do Not Proceed, Provide Comments
Other, Do Not Proceed, Provide Comments
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
CHANGE ORDER REQUEST# 13
Added Isolation Valve
MARK YOUNG CONSTRUCTION LABOR: $20/hr
MYC LABOR TOTAL
$0
$0
MYC MATERIAL
MYC MATERIAL TOTAL
$0
$0
MYC EQUIP.
MYC EQUIPMENT TOTAL
$0
$0
SUBTOTAL
$0
SMALL TOOLS & SUPPLIES @ 5% OF LABOR
$0
PAYROLL TAXES & INSURANCE @ 38% OF LABOR
$0
GENERAL CLEANUP: N/A
$0
DELIVERY: N/A
$0
DRAWINGS & SPECS: BY ARCHITECT
$0
SUBTOTAL
$0
MYC OVERHEAD & FEE @ 15.0%
$0
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #06477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
SUBTOTAL MYC WORK
$0
SUBCONTRACTS
Added Isolation Valve
Horizon Sheet Metal
Added cost for isolation valve on hot water return line
$984
Includes: Draining and rerouting as required
SUBCONTRACT TOTAL
$984
$984
SUBTOTAL
$984-
MYC FEE @ 5.0%
$49
SUBTOTAL SUBCONTRACTOR WORK
$1,033
SUBTOTAL (DIRECT COSTS)
$1,033
BUILDERS RISK INSURANCE @ 1.0%
$10
LIABILITY INSURANCE @ 0.75%
$8
MYC BOND:.86 %
$9
SUBCONTRACTOR BOND: N/A
$0
PERMIT FEES: N/A
$0
SALES TAX: N/A
$0
CONTRACTOR CONTINGENCY @ 0%
$0
PROPOSED CHANGE TOTAL
$1,060
MARK YOUNG
CONSTRUCTION
INCORPORATED
Via Facsimile 303-783-0060
February 2, 2006
Coover-Clark & Associates
455 Sherman Street, Suite 205
Denver, CO 80203
Project Title: City of Fort Collins & Colorado State University Transit Center Phase 11
Project No. 05477
Subject: Re -implement SCVE Item J — Concrete Deck Topping
RE: Change Order Request Number: COR No: 16
Gentlemen:
Pursuant to the above subject matter the concrete topping, reinforcement and related materials and labor that was
eliminated per SCVE Item J (Dated 9/28/05) will need to be added back into the contract documents. The re -
implementation of this change order request is due to the structural concrete being required at the Upper Level
Decks. The total cost to perform the above referenced work is $9661.00.
If you should have any questions and/or concerns, please contact me at your earliest convenience at (303)
710-1421
Sincerely,
Max Millen
Project Engineer
cc:
05477-F-1.2
Steve White 970-221-6534
Cass Beitler 970-491-7572
Owner response, please sign as appropriate:
Approved, Proceed as Submitted
Rejected, Do Not Proceed, Provide Comments
Other, Do Not Proceed, Provide Comments
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase 11
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
CHANGE ORDER REQUEST# 16
Added Concrete Topping Upper Level Deck
MARK YOUNG CONSTRUCTION LABOR:
Form, Place, Finish Concrete (4111 SF)
$2,261
MYC LABOR TOTAL
$2,261
$2,261
MYC MATERIAL
Standard Grey Concrete (3500psi)
$4,200
- 4111SF at 3-1/2" concrete on 2" deck (50CY)
- Includes Waste
MYC MATERIAL TOTAL
$4,200
$4,200
MYC EQUIP.
Pump Truck (1 Day)
$753
MYC EQUIPMENT TOTAL
$753
$753
MYC OVERHEAD & FEE 15.0%
$7,214
SMALL TOOLS & SUPPLIES @ 5% OF LABOR
$113
PAYROLL TAXES & INSURANCE @ 38% OF LABOR
$859
GENERAL CLEANUP: NIA
$0
DELIVERY: NIA
$0
DRAWINGS & SPECS: BY ARCHITECT
$0
SUBTOTAL
$8,186
MYC OVERHEAD & FEE @ 15.0%
$1,228
SUBTOTAL MYC WORK
$9,414
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase 11
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
SUBCONTRACTS
SUBCONTRACT TOTAL
$0
$0
SUBTOTAL
$p
MYC FEE @ 5.0%
$0
SUBTOTAL SUBCONTRACTOR WORK
$p
SUBTOTAL (DIRECT COSTS)
$9,414
BUILDERS RISK INSURANCE @ 1.0%
$94
LIABILITY INSURANCE @ 0.75%
$71
MYC BOND:.86 %
$82
SUBCONTRACTOR BOND: NIA
$p
PERMIT FEES: N/A
$p
SALES TAX: NIA
$p
CONTRACTOR CONTINGENCY @ 0%
$0
PROPOSED CHANGE TOTAL
-
$9,661
MARK YOUNG
CONSTRUCTION
INCORPORATED
Via Facsimile 303-783-0060
February 3, 2006
Coover-Clark & Associates
455 Sherman Street, Suite 205
Denver, CO 80203
Project Title: City of Fort Collins & Colorado State University Transit Center Phase II
Project No. 05477
Subject: Door Hardware Red -Lines per Submittal Response
RE: Change Order Request Number: COR No: 19
Gentlemen:
Pursuant to the above subject matter, please find enclosed our cost summary, qualifications, and back-up to make
the changes to the door hardware per the mark-ups on the door hardware schedule. The total cost to perform the
above referenced work is $2,107.00.
Please note the following during review of this change order request:
1. Colorado Doorways Submittal Clarifications: Many of the changes associated are due to the Red -Lined
notes on the attached submittal clarification sheet and on the CSU Design Review Comments page.
2. Colorado Doorways CO#2 Cover Page: States to leave the lock sets as Lever Trim, not Knobs,
3. RFi#19: The double doors located at opening #36 are to have Corbin Exit Devices ED6200 panic bars
and mullion bars per CCA response.
If you should have any questions and/or concerns, please contact me at your earliest convenience at
(303) 710-1421
Sincerely,
Max Millen
Project Engineer
cc:
05477-F-1.2
Steve White 970-221-6534
Cass Beitler 970-491-7572
MARK YOUNG CONSTRUCTIONS INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
Add two (2) layers of 2.5" ISO insulation over 1-1/2" perlite
$6,629
- R-30 Insulation rating achieved
Add EPDM Roof System Below Clay Tiles - (10 Year Warranty)
$17,226
Deduct for Clay Tiles to be Summer Rose - Single Color
($2,053)
Front Range Roofing Systems
Deduct for Sheet Metal Gutter
($3,065)
Deduct for Prefinished Downspouts
Inc.
Deduct Ice & Water Guard Lining @ Gutter
Inc.
Craftsman Decorating
Deduct intumescent paint per Spec. Section 09967
($3,000)
Add for Painting Exposed Structural Steel and Deck
$2,818
Add Paint for Gypsum Board @ Beam Enclosures
Inc.
Herblan insulation
Deduct for Alt. Spray Fireproofing and Intumescent Material
($20,000)
Add Wet Spray Applied Fire Resistive Material @ Columns (7EA)
$8,624
Add to Spray Cementitious Material Over the Following Areas:
$1,827
- Beam W10x22 per Detail 3/A5.2 (241-F)
- (Low) Beam per Detail 6/A5.4 (48LF)
Midwest Drywall
Add to Enclose Beams per Detail SK-14
$1,096
Don Ray Glass Co.
18 GA, Anodized Column Wraps (7 EA) Not Included
N/A
- Concealed Fasteners to Match Window System
- Front Range Roofing quote = $16,820.
SUBCONTRACT TOTAL
$10,865
$10,865
SUBTOTAL
$10,865
MYC FEE P, 5.00k
$543
SUBTOTAL SUBCONTRACTOR WORK
$11,408
SUBTOTAL (DIRECT COSTS)
$9,456
BUILDERS RISK INSURANCE @ 11.0"/u
$95
LIABILITY INSURANCE @ 0.7511
$71
MYC BOND:.86 %
$83
SUBCONTRACTOR BOND: NIA
$0
PERMIT FEES: N/A
$0
SALES TAX: NIA
$0
CONTRACTOR CONTINGENCY @ 0%
$p
PROPOSED CHANGE TOTAL
$9,704