HomeMy WebLinkAboutCHANGE ORDER - BID - 5929 CSU TRANSIT CENTER (3)Cite of For, Collins
CHANGE ORDER NO. 04
PROJECT TITLE: CSU TRANSIT CENTER
CONTRACTOR: MARK YOUNG CONSTRUCTION
PROJECT NUMBER: 5929
DESCRIPTION: CHANGES TO THE CONTRACTOR'S AGREEMENT
In preparing change orders show in order as separate numbered paragraphs the following:
1. Reason for change: A/E Errors in the Plans.
2. Description of change: COR No. 14, 15, 17, 18, 20, 21, 22 and 23 See Attachments.
3. Change in contract cost: $24,030.00
4. Change in contract time:
(Attach additional sheets as required)
ORIGINAL CONTRACT COST ..................................................... ....................
$4,318,404.00
TOTAL APPROVED CHANGE ORDERS....................................................................7809.00
TOTAL PENDING CHANGE ORDERS..........................................................................00.00
TOTAL THIS CHANGE ORDER..............................................................................24.030D0
ADJUSTED CONTRACT COST..........................................................................4,350,243.00
TOTAL % OF THIS CHANGE ORDER ......................... Less than 1 %
TOTAL C.O. % OF ORIGINAL CONTRACT ....................Less than 1%
ADJUSTED CONTRACT COST...........................................................$4,350,243,00
REVIEWED BY:
ACCEPTED BY:
ACCEPTED BY:
ACCEPTED BY:
2
CITY, STEVE WHITE, PROJECT MANAGER
APPROVED BY: MaLL(jj JlLtrn�
TRANSFORT, MARLYS SITTNER
APPROVED BY:
PURCHASING AGENT OVER $30,006
cc: Project File, Contractor, Purchasing, Engineer
%6
ATE
1ja a�
DATE
Z-t 0 -Ca to
ATE
DATE
2 -17_ 0(o
DATE
DATE
MARK YOUNG
IYI
CONSTRUCTION
INCORPORATED
Via Facsimile 303-783-0060
February 3, 2006
Coover-Clark & Associates
455 Sherman Street, Suite 205
Denver, CO 80203
Project Title: City of Fort Collins & Colorado State University Transit Center Phase II
Project No. 05477
Subject: RFI#12 — MEP & Fire Protection Obstructions at New Interior Stairs
RE: Change Order Request Number: COR No: 17
Gentlemen:
Pursuant to the above subject matter, please find enclosed our cost summary, qualifications, and back-up to re-
route the mechanical, electrical, plumbing and fire protection lines per RFI#12. The total cost to perform the above
referenced work is $2,687.00.
Please note the following during review of this change order request:
BCER Response: The costs associated with this work are all due to obstructions with the structural steel
required for the installation of the new stairs over the bagel shop.
Detail MX-3 per BCER: This detail outlines re-routing of ductwork only. The electrical, plumbing and fire
sprinkler piping was field verified to have conflicts in relation to the new stair structural steel layouts.
3. Plumbing pricing is based on moving one (1) domestic hot water pipe, one (1) domestic cold water pipe and
a mixing vane above the bagel shop.
If you should have any questions and/or concerns, please contact me at your earliest convenience at (303)
710-1421
Sincerely,
Max Millen
Project Engineer
cc:
05477-F-1.2 j
Steve White 970-221-6534
Cass Beitler 970-491-7572 b
Owner response, please sign as appropriate:
Approved, Proceed as Submitted
Rejected, Do Not Proceed, Provide Comments
Other, Do Not Proceed, Provide Comments
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
CHANGE ORDER REQUEST# 17
Per RFI#12 (MEP Obstructions)
MARK YOUNG CONSTRUCTION LABOR:
MYC LABOR TOTAL
$0
$0
MYC MATERIAL
MYC MATERIAL TOTAL
$0
$0
MYC EQUIP.
MYC EQUIPMENT TOTAL
$0
$0
MYC OVERHEAD & FEE a 15.0%
$0
SMALL TOOLS & SUPPLIES @ 5% OF LABOR
$0
PAYROLL TAXES & INSURANCE @ 38% OF LABOR
$0
GENERAL CLEANUP: N/A
$0
DELIVERY: NIA
$0
DRAWINGS & SPECS: BY ARCHITECT
$0
SUBTOTAL
$0
MYC OVERHEAD & FEE @ 15.0%
$0
SUBTOTAL MYC WORK
$0
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
SUBCONTRACTS
Per RFI#12 - MEP Obstructions @ Bagel Shop
Wayne's Electric
Relocate Lighting and Branch Piping (See Attached)
$582
Horizon Sheet Metal, Inc.
Modify Ductwork per Details
$277
Plumbing (See Phillips Plumb.)
$1,115
Freedom Fire Protection
Re-route Fire Sprinkler Around the New Stairs
$519
SUBCONTRACT TOTAL
$2,493
$2,493
SUBTOTAL
$2,493
MYC FEE @ 5.0%
$125
SUBTOTAL SUBCONTRACTOR WORK
$2,618
SUBTOTAL (DIRECT COSTS)
$2,618
BUILDERS RISK INSURANCE @ 1.0%
$26
LIABILITY INSURANCE @ 0.75%
$20
MYC BOND:.86 %
$23
SUBCONTRACTOR BOND: N/A
$0
PERMIT FEES: N/A
$0
SALES TAX: N/A
$0
CONTRACTOR CONTINGENCY @ 0%
$0
PROPOSED CHANGE TOTAL
$2,687
MARK YOUNG
IYI
CONSTRUCTION
INCORPORATED
Via Facsimile 303-783-0060
February 3, 2006
Coover-Clark & Associates
455 Sherman Street, Suite 205
Denver, CO 80203
Project Title: City of Fort Collins & Colorado State University Transit Center Phase II
Project No. 05477
Subject: Additional Storm Sewer for Unknown Roof Drain Pipe
RE: Change Order Request Number: COR No: 18
Gentlemen:
Pursuant to the above subject matter, please find enclosed our cost summary, qualifications, and back-up to tie the
unknown storm drain into the 18" RCP storm line at the Northeast corner of the addition. The total cost to perform
the above referenced work is $3,869.00.
Please note the following during review of this change order request:
1) The existing 8" storm drain line per drawing P1.0 does not exit the building as shown on the drawings. The
pipe is actually routed out of the North side of the existing building, not the East side.
2) The storm line was connected to the 18" RCP line that runs North -South under the exterior stairs near the
northeast corner of the new addition.
3) Drawing C6.0: The civil drawings do not detail any storm drains exiting the north side of the building.
If you should have any questions and/or concerns, please contact me at your earliest convenience at (303)
710-1421
Sincerely,
Max Millen
Project Engineer
cc:
05477-F-1.2
Steve White 970-221-6534
Cass Beitler 970-491-7572
Owner response, please sign as appropriate:
Approved, Proceed as Submitted
Rejected, Do Not Proceed, Provide Comments
Other, Do Not Proceed, Provide Comments
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
CHANGE ORDER REQUEST# 18
Unknown Roof Drain
MARK YOUNG CONSTRUCTION LABOR:
Operator (8 HRS @ $46.19/HR)
$370
Laborer (8 HRS @ $27.86/HR)
$223
MYC LABOR TOTAL
$592
$592
MYC MATERIAL
Bedding Material (15 Tons @ $10.50/TN)
$158
MYC MATERIAL TOTAL
$158
$158
MYC EQUIP.
Excavator (1 Day)
$320
Skid -Steer (1 Day)
$87
Trucking (1 HR @ $75.00/HR)
$75
MYC EQUIPMENT TOTAL
$481
$481
MYC OVERHEAD & FEE Q 15.0%
$1,231
SMALL TOOLS & SUPPLIES @ 5% OF LABOR
$30
PAYROLL TAXES & INSURANCE @ 38% OF LABOR
$225
GENERAL CLEANUP: N/A
$0
DELIVERY: N/A
$0
DRAWINGS & SPECS: BY ARCHITECT
$0
SUBTOTAL
$1,486
MYC OVERHEAD & FEE @ 15.0%
$223
SUBTOTAL MYC WORK
$1,709
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase 11
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
SUBCONTRACTS
HUGHES SUPPLY INC.
8" Diameter Pipe (1081-F)
$1,679
Cast Iron Tee (1 EA)
$104
Cast Iron 90 Degree Bend (1 EA)
$78
8"x8" Cast Iron Coupling (2 EA)
$51
8" Gaskets and Bolt Packs
$52
SUBCONTRACT TOTAL
$1,963
$1,963
SUBTOTAL
$1,963
MYC FEE @ 5.0%
$98
SUBTOTAL SUBCONTRACTOR WORK
$2,061
SUBTOTAL (DIRECT COSTS)
$3,770
BUILDERS RISK INSURANCE @ 1.0%
$38
LIABILITY INSURANCE @ 0.75%
$28
MYC BOND:.86 %
$33
SUBCONTRACTOR BOND: N/A
$0
PERMIT FEES: N/A
$0
SALES TAX: N/A
$0
CONTRACTOR CONTINGENCY @ 0%
$0
PROPOSED CHANGE TOTAL
$3,869
MARK YOUNG
CONSTRUCTION
INCORPORATED
Via Facsimile 303-783-0060
February 3, 2006
Coover-Clark & Associates
455 Sherman Street, Suite 205
Denver, CO 80203
Project Title: City of Fort Collins & Colorado State University Transit Center Phase II
Project No. 05477
Subject: Elevator Bucket Sizing Change
RE: Change Order Request Number: COR No: 20
Gentlemen:
Pursuant to the above subject matter, please find enclosed our cost summary, qualifications, and back-up to make
the changes to the elevator bucket size per RFI#20. The total cost to perform the above referenced work is
$4,591.00.
Please note the following during review of this change order request:
1. RFl#18: This RFI was generated by Wayne's Electric and the associated costs were generated from
BCER's response.
If you should have any questions and/or concerns, please contact me at your earliest convenience at (303)
710-1421
Sincerely,
Max Millen
Project Engineer
cc:
05477-F-1.2
Steve White 970-221-6534
Cass Beitler 970-491-7572
Owner response, please sign as appropriate:
Approved, Proceed as Submitted
Rejected, Do Not Proceed, Provide Comments
Other, Do Not Proceed, Provide Comments
MARK YOUNG
CONSTRUCTION
INCORPORATED
Via Facsimile 303-783-0060
November 22, 2005
Coover-Clark & Associates
455 Sherman Street, Suite 205
Denver, CO 80203
Project Title: City of Fort Collins & Colorado State University Transit Center Phase 11
Project No. 05477
Subject: Parapet Wall Re -Design per ASI#9
RE: Change Order Request Number: COR No: 14
Gentlemen:
Pursuant to the above subject matter, please find enclosed our cost summary, qualifications, and back-up to
provide and install the parapet wall along the North Roof Line of the existing building per ASI#9 and detail SK-11
dated 12/6/05. The total cost to perform the above referenced work is $9,168.00.
Please note the following during review of this change order request:
1. Detail SK-11: The material costs for framing of the new parapet wall were based upon the 2'-4"
dimension.
2. Detail SK-11: No additional roof drainage means have been taken and the new built-up roof system
will be returned to its original state.
3. MYC will be self -performing the stud framing, sheathing and cant strip installations to help reduce the
costs to the owner.
If you should have any questions and/or concerns, please contact me at your earliest convenience at (303)
710-1421
Sincerely,
Max Millen
Project Engineer
cc:
05477-F-1.2
Steve White 970-221-6534
Cass Beitler 970-491-7572
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase 11
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
CHANGE ORDER REQUEST# 20
Elevator Bucket Sizing Change (Per RFI#20)
MARK YOUNG CONSTRUCTION LABOR:
MYC LABOR TOTAL
$0
$0
MYC MATERIAL
MYC MATERIAL TOTAL
$0
$0
MYC EQUIP.
MYC EQUIPMENT TOTAL
$0
$0
MYC OVERHEAD & FEE 15.0%
$p
SMALL TOOLS & SUPPLIES @ 5% OF LABOR
$p
PAYROLL TAXES & INSURANCE @ 38% OF LABOR
$p
GENERAL CLEANUP: N/A
$p
DELIVERY: N/A
$p
DRAWINGS & SPECS: BY ARCHITECT
$p
SUBTOTAL
$p
MYC OVERHEAD & FEE @ 15.0%
$p
J.SUBTOTAIL
MYC WORK
$p
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
SUBCONTRACTS
Elevator Bucket Sizing Change (Per RFI#20)
Wayne's Electric
Change the Feed Size to the Elevator Bucket
$4,260
SUBCONTRACT TOTAL
$4,260
$4,260
SUBTOTAL
$4,260
MYC FEE @ 5.0%
$213
SUBTOTAL SUBCONTRACTOR WORK
$4,473
SUBTOTAL (DIRECT COSTS)
$4,473
BUILDERS RISK INSURANCE @ 1.0%
$45
LIABILITY INSURANCE @ 0.75%
$34
MYC BOND:.116 %
$39
SUBCONTRACTOR BOND: NIA
$0
PERMIT FEES: N/A
$0
SALES TAX: NIA
$0
CONTRACTOR CONTINGENCY @ 0%
$0
PROPOSED CHANGE TOTAL
$4,591
MARK YOUNG
IYI
CONSTRUCTION
INCORPORATED
Via Facsimile 303-783-0060
February 3, 2006
Coover-Clark & Associates
455 Sherman Street, Suite 205
Denver, CO 80203
Project Title: City of Fort Collins & Colorado State University Transit Center Phase II
Project No. 05477
Subject: Additional Revised C-Store Lighting Credit
RE: Change Order Request Number: COR No: 21
Gentlemen:
Pursuant to the above subject matter, please find enclosed our cost summary, qualifications, and back-up to
provide the additional credit for the C-Store lighting per COR#4. The total cost to perform the above referenced
work is $-520.00.
Please note the following during review of this change order request:
1. COR#4: The original amount of COR#4 was approved for $-1,789.00 when it should have been $-
1,875.00. The additional $-86.00 credit was applied to this change order. On the backup sheet, the $-
80.00 shown plus fees, insurance, etc. totaled $-86.00.
2. COR#4: The C-Store lighting change order issued originally did not reflect the 81-F of lights in Office 52B
and thus was included into this change order.
If you should have any questions and/or concerns, please contact me at your earliest convenience at (303)
710-1421
Sincerely,
Max Millen
Project Engineer
cc:
05477-F-1.2
Steve White 970-221-6534
Cass Beitler 970-491-7572
Owner response, please sign as appropriate:
Approved, Proceed as Submitted
Rejected, Do Not Proceed, Provide Comments
Other, Do Not Proceed, Provide Comments
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
CHANGE ORDER REQUEST# 21
Additional Revised C-Store Lighting Credit
MARK YOUNG CONSTRUCTION LABOR:
MYC LABOR TOTAL
$0
$0
MYC MATERIAL
MYC MATERIAL TOTAL
$0
$0
MYC EQUIP.
MYC EQUIPMENT TOTAL
$0
$0
MYC OVERHEAD & FEE @ 15.0%
$0
SMALL TOOLS & SUPPLIES @ 5% OF LABOR
$0
PAYROLL TAXES & INSURANCE @ 38% OF LABOR
$0
GENERAL CLEANUP: N/A
$0
DELIVERY: NIA
$0
DRAWINGS & SPECS: BY ARCHITECT
$0
SUBTOTAL
$0
MYC OVERHEAD & FEE @ 15.0%
$0
SUBTOTAL MYC WORK
$0
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
SUBCONTRACTS
Additional Revised C-Store Lighting Credit
Wayne's Electric
Additional Type A2 Liights in Office 52B (81-F)
($440)
Original COR#4 Approved with Incorrect Credit
($80)
SUBCONTRACT TOTAL
($520)
($520)
SUBTOTAL
($520)
MYC FEE @ 5.0%
($26)
SUBTOTAL SUBCONTRACTOR WORK
($546)
SUBTOTAL (DIRECT COSTS)
($546)
BUILDERS RISK INSURANCE @ 1.0%
($5)
LIABILITY INSURANCE @ 0.75%
($4)
MYC BOND:.86 %
($5)
SUBCONTRACTOR BOND: NIA
$0
PERMIT FEES: NIA
$0
SALES TAX: NIA
$0
CONTRACTOR CONTINGENCY @ 0%
$0
PROPOSED CHANGE TOTAL
($560)
MARK YOUNG
IYI
CONSTRUCTION
INCORPORATED
Via Facsimile 303-783-0060
February 2, 2006
Coover-Clark & Associates
455 Sherman Street, Suite 205
Denver, CO 80203
Project Title: City of Fort Collins & Colorado State University Transit Center Phase II
Project No. 05477
Subject: Furring of the Lower Level Restroom Walls
RE: Change Order Request Number: COR No: 22
Gentlemen:
Pursuant to the above subject matter, please find enclosed our cost summary, qualifications, and back-up to furr
out the restroom walls in rooms #47 and #50. The total cost to perform the above referenced work is $1,038.00.
Please note the following during review of this change order request:
1. Per SK-12: The details do not show any additional ceramic tile above what was detailed on the bid set of
drawings. Please advise if additional ceramic file should be included into this change order request.
2. Per SK-12: The walls as detailed will be framed floor to ceiling prior to countertop and sink installations.
The countertops were assumed to be mounted directly to the stud wall.
3. RFI#18: The latest revised version of RFI#18 is dated 1/23/06.
If you should have any questions and/or concerns, please contact me at your earliest convenience at (303)
710-1421
Sincerely,
Max Millen
Project Engineer
cc:
05477-F-1.2
Steve White 970-221-6534
Cass Beitler 970-491-7572
Owner response, please sign as appropriate:
Approved, Proceed as Submitted
Rejected, Do Not Proceed, Provide Comments
Other, Do Not Proceed, Provide Comments
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
SUBCONTRACTS
ASI#10 - Furr Out Lower Level Restrooms
Midwest Drywall
Furr out the restroom walls
$963
- 3-5/8" Studs w/ 1 Layer 5/8" Gyp. BD. (Per SK-12)
SUBCONTRACT TOTAL
$963
$963
SUBTOTAL
$963
MYC FEE @ 5.0%
$48
SUBTOTAL SUBCONTRACTOR WORK
$1,011
SUBTOTAL (DIRECT COSTS)
$1,011
BUILDERS RISK INSURANCE @ 1.0%
$10
LIABILITY INSURANCE @l 0.75%
$8
MYC BOND:.86 %
$9
SUBCONTRACTOR BOND: NIA
$0
PERMIT FEES: N/A
$0
SALES TAX: NIA
$0
CONTRACTOR CONTINGENCY @ 0%
$0
PROPOSED CHANGE TOTAL
$1,038
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
CHANGE ORDER REQUEST# 22
ASI#10 - Furr Out Lower Level Restrooms
MARK YOUNG CONSTRUCTION LABOR:
MYC LABOR TOTAL
$0
$0
MYC MATERIAL
MYC MATERIAL TOTAL
$0
$0
MYC EQUIP.
MYC EQUIPMENT TOTAL
$0
$0
MYC OVERHEAD & FEE 15.0%
$0
SMALL TOOLS & SUPPLIES @ 5% OF LABOR
$0
PAYROLL TAXES & INSURANCE @ 38% OF LABOR
$0
GENERAL CLEANUP: NIA
$0
DELIVERY: N/A
$0
DRAWINGS & SPECS: BY ARCHITECT
$0
SUBTOTAL
$0
MYC OVERHEAD & FEE @ 15.0%
$0
SUBTOTAL MYC WORK
$0
Owner response, please sign as appropriate:
Approved, Proceed as Submitted
Rejected, Do Not Proceed, Provide Comments
Other, Do Not Proceed, Provide Comments
MARK YOUNG
IYI
CONSTRUCTION
INCORPORATED
Via Facsimile 303-783-0060
February 10, 2006
Coover-Clark & Associates
455 Sherman Street, Suite 205
Denver, CO 80203
Project Title: City of Fort Collins & Colorado State University Transit Center Phase II
Project No. 05477
Subject: Re -Size the Heat Exchanger
RE: Change Order Request Number: COR No: 23
Gentlemen:
Pursuant to the above subject matter, please find enclosed our cost summary, qualifications, and back-up to re -size
the heat exchanger. The total cost to perform the above referenced work is $171.00.
Please note the following during review of this change order request:
1. Per CCA's email dated January 25t", 2006, it was stated that there was a pressure drop at CSU which
required a different size heat exchanger.
If you should have any questions and/or concerns, please contact me at your earliest convenience at (303)
710-1421
Sincerely,
Max Millen
Project Engineer
cc:
05477-F-1.2
Steve White 970-221-6534
Cass Beitler 970-491-7572
Owner response, please sign as appropriate:
Approved, Proceed as Submitted
Rejected, Do Not Proceed, Provide Comments
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase 11
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
CHANGE ORDER REQUEST# 23
Re -Size the Heat Exchanger
MARK YOUNG CONSTRUCTION LABOR:
MYC LABOR TOTAL
$0
$0
MYC MATERIAL
MYC MATERIAL TOTAL
$0
$0
MYC EQUIP.
MYC EQUIPMENT TOTAL
$0
$0
MYC OVERHEAD & FEE 15.0%
$0
SMALL TOOLS & SUPPLIES @ 5% OF LABOR
$0
PAYROLL TAXES & INSURANCE @ 20% OF LABOR
$0
GENERAL CLEANUP: N/A
$0
DELIVERY: N/A
$0
DRAWINGS & SPECS: BY ARCHITECT
$0
SUBTOTAL
$0
MYC OVERHEAD & FEE 0, 15.0%
$0
SUBTOTAL MYC WORK
$0
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase 11
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
SUBCONTRACTS
Re -Size the Heat Exchanger
Horizon Sheet Metal, Inc.
Deduct for Heat Exchanger Model B&G SU44-2
($1,015)
Add for Heat Exchanger Model SU45-2
$1,174
SUBCONTRACT TOTAL
$159
$159
SUBTOTAL
$159
MYC FEE @ 5.0%
$8
SUBTOTAL SUBCONTRACTOR WORK
$167
SUBTOTAL (DIRECT COSTS)
$167
BUILDERS RISK INSURANCE @ 1.0%
$2
LIABILITY INSURANCE @ 0.75%
$1
MYC BOND:.86 %
$1
SUBCONTRACTOR BOND: NIA
$0
PERMIT FEES: N/A
$0
SALES TAX: N/A
$0
CONTRACTOR CONTINGENCY @ 0%
$0
PROPOSED CHANGE TOTAL
$171
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase 11
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
CHANGE ORDER REQUEST# 14
Per ASI#9
MARK YOUNG CONSTRUCTION LABOR:
32 MH's @ $30.69 Stud Frame Parapet (108LF)
$982
16MH's @$30.69 Sheathing Each Side
$491
2MH's @$30.69 Place Cant Strip
$61
MYC LABOR TOTAL
$1,535
$1,535
MYC MATERIAL
3-5/8" Mtl. Studs @ $.75LF
$128
- ((108LF/1.333)*2"-0") = 170LF
2x6 Wood Cap - (108LF*3) = 324LF
$405
1 Layer 1/2" Sheathing Each Side
- 15 Sheets @ $32.00/EA
$480
4" Cant Strip (108LF) @ $3.50/1-F
$378
MYC MATERIAL TOTAL
$1,391
$1,391
MYC EQUIP.
MYC EQUIPMENT TOTAL
$0
$0
SUBTOTAL
$2, 925
SMALL TOOLS & SUPPLIES @ 5% OF LABOR
PAYROLL TAXES & INSURANCE @ 38% OF LABOR
.,
$583
GENERAL CLEANUP: N/A
_$0'
DELIVERY: N/A
$0
DRAWINGS & SPECS: BY ARCHITECT
$0
SUBTOTAL
$3,585
MYC OVERHEAD & FEE e 15.0%
$538
SUBTOTAL MYC WORK
$4,123
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
SUBCONTRACTS
Per ASI#9 - Rebuild Existing Parapet on Roof
Front Range Roofing
Salvage Existing EPDM for New Parapet
$2,556
-Patch to top of blocking
New20Ga Galy. Mtl. Flashing
$1,250
-18" above roof and onto roof
- `Excludes hoisting if prior to main roof install
Pre -Fin. Mtl. Flashing to Match Existing Concrete Cap
$775
in Shape and Color
-Use cleats and cont. sealant each side
SUBCONTRACT TOTAL
$4,581
$4,581
SUBTOTAL
$4,581
MYC FEE @ 5.0%
$229
SUBTOTAL SUBCONTRACTOR WORK
$4,810
SUBTOTAL (DIRECT COSTS)
$8,933
BUILDERS RISK INSURANCE @ 1.0%
$89
LIABILITY INSURANCE @ 0.75%
$67
MYC BOND:.86 %
$78
SUBCONTRACTOR BOND: N/A
$0
PERMIT FEES: N/A
$0
SALES TAX: N/A
$0
CONTRACTOR CONTINGENCY @ 0%
$0
PROPOSED CHANGE TOTAL
$9,168
MARK YOUNG
CONSTRUCTION
INCORPORATED
Via Facsimile 303-783-0060
February 3, 2006
Coover-Clark & Associates
455 Sherman Street, Suite 205
Denver, CO 80203
Project Title: City of Fort Collins & Colorado State University Transit Center Phase II
Project No. 05477
Subject: Mechanical Rm. 191 and C-Store Re -design per ASIV
RE: Change Order Request Number: COR No: 15
Gentlemen:
Pursuant to the above subject matter, please find enclosed our cost summary, qualifications, and back-up to
provide and install the new wall layouts of mechanical room 191 and the C-store added soffits per ASIV and details
SK-4 and SK-5. The total cost to perform the above referenced work is $3,026.00.
Please note the following during review of this change order request:
Detail SK-4: The added soffits in this detail are the only added cost for this change order request.
2. Detail SK-4: MYC assumed that the added soffits were to be painted.
3. Detail SK-5: The cost of the air intake louver was included with the re -issued mechanical drawings and the
re -designed walls around Mechanical Room 191 had no added labor or materials.
If you should have any questions and/or concerns, please contact me at your earliest convenience at (303)
710-1421
Sincerely,
Max Millen
Project Engineer
cc:
05477-F-1.2
Steve White 970-221-6534
Cass Beitler 970-491-7572
Owner response, please sign as appropriate:
Approved, Proceed as Submitted
Rejected, Do Not Proceed, Provide Comments
Other, Do Not Proceed, Provide Comments
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase 11
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
CHANGE ORDER REQUEST# 15
Per ASI#7
MARK YOUNG CONSTRUCTION LABOR:
MYC LABOR TOTAL
$0
$0
MYC MATERIAL
MYC MATERIAL TOTAL
$0
$0
MYC EQUIP.
MYC EQUIPMENT TOTAL
$0
$0
MYC OVERHEAD & FEE 15.0%
$0
SMALL TOOLS & SUPPLIES @ 5% OF LABOR
$0
PAYROLL TAXES & INSURANCE @ 38% OF LABOR
$0
GENERAL CLEANUP: NIA
$0
DELIVERY: NIA
$0
DRAWINGS & SPECS: BY ARCHITECT
$0
SUBTOTAL
$0
MYC OVERHEAD & FEE @ 15.0%
$0
SUBTOTAL MYC WORK
$0
MARK YOUNG CONSTRUCTION, INC.
PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II
PROJECT NUMBER: #05477
CHANGE ORDER REQUEST SUMMARY
COST CODES
ACTIVITY DESCRIPTION
AMOUNT
TOTALS
SUBCONTRACTS
Per ASI#7- Mech. Rm & C-Store Re -design
Midwest Drywall
Mech. Rm, 191 New Wall Layouts (Inc. w/ Mech. Dwgs.)
$0
-5/8" Gypsum Board
-3-5/8" Metal Studs to Structure
-Sound Insulation Material
C-Store Added Gyp. Board Soffits
$2,696
Horizon Sheet Metal
B4"x84" Air Intake Louver w/ Interior Screen
$0
-Louver Included in Mech. Re -design Dwgs.
Craftsman Decorating
Paint C-store added Soffit (150SF)
$113
SUBCONTRACT TOTAL
$2,809
$2,809
SUBTOTAL
$2,809
MYC FEE @ 5.0%
$140
SUBTOTAL SUBCONTRACTOR WORK
$2,949
SUBTOTAL (DIRECT COSTS)
$2,949
BUILDERS RISK INSURANCE @ 1.0%
$29
LIABILITY INSURANCE @ 0.75%
$22
MYC BOND:.86 %
$26
SUBCONTRACTOR BOND: NIA
$0
PERMIT FEES: NIA
$0
SALES TAX: NIA
$0
CONTRACTOR CONTINGENCY @ 0%
$0
PROPOSED CHANGE TOTAL
$3,026