HomeMy WebLinkAboutCHANGE ORDER - BID - 5929 CSU TRANSIT CENTER (2)01Jan� 30... 2006,4 9:143AYT0 2'c0over-dark CITY OF FORT COLLINS No- 3044 P._2/00pa CHANGE ORDER NO, 03 PROJECT TITLE: CSU TRANSIT CENTER CONTRACTOR: MARK YOUNG CONSTRUCTION PROJECT NUMBER- 5W9 DESCRIPTION: CHANGES TO THE CONTRACTOR'S AGREEMENT In preparing Change or+dem show In order as separate numbered paragraphs the %Mowing: 1. Reason for change: Unknown electrical pipe location. 2. Descrlpdon of change: COR No. 8 See Attachments 3. Change in contract cost $3,941.00 4. Change in contract time: (Attach additional sheets as M-g gjmjb ORIGINAL CONTRACT COST.........................................................................$4,318,404.00 TOTAL APPROVED CHANGE ORDERS ....................................................................3868A0 TOTAL PENDING CHANGE ORDERS..............................................................I...........00.00 TOTAL THIS CHANGE ORDER .............................. ........................................ ......32�, ADJUBM CONTRACT COST............................................................ . ..................... .. .. ...................4, 23. TOTAL % THIS CHANGE ORDER ......................... Less than 1% TOTAL C.O. % OF ORIGINAL CONTRACT....................Len than 1% ADJUSTED CONTRACT COST ... .................... ................. ................i4,830,�18.00 REVIEWED BY: e- ACCEPTED BY; ACCEPTED BY:. ACCEPTED BY: CIT Y, BTM WHITE, PROJECT MANAGER j APPROVED BY: APPROVED BY: PURCHASING AGENT OVER MDO O DATE DATE 1 3,0 -45;. DATE DATE DATE ca Project File, Contractor, Purchasing, Engineer JAN-04-2008 WED 09125 AM WAYNES ELECTRIC INC FAX NO. 3036540877 P, 05 CSMS 271 Jon 04, 2M 08..W M Page: 3 F7ro1 Pricing Value (51.. 92t.t3 (%) Atom Code LaborTogl —^ Total C OM D�Mbaae Material 6V6i ad 31e 2rS Labor Overhead Total Overhead 139.71 t 0 boa t?audwe Material Markup Labor Markup G2.11 t6.aaa TotaiMarko Salting Prioe 231.12 10.= 2,550.0a . Fkla1 Price 2,650.0E .1.� Jan. 4. 2006 12:43PM c00rer-clack Dio 12 2005 315OPM MARK YOUHG CONSTRUCTION t.�:• y+• � a RR* 16 DATE TO: COovar-dark & Aasodatss, P.c PR6jwrN: 4511 Shamran WoK GU% 205 PROJECT: Denve r, CO ti0m AT7EWM. Jay Lamtoq, Plsaas advlis a pan of acffon On Its IIYrH tto0r. Panel NO Is fed ftm gow SOC.4. The rieepom b RFkRB no lading 11Ns saRts p e aovLp Idsd In IMPACT. DATE RE8PON9E REQUMSM t3Y: ndu. DEUY SMEDut.i: W CMCVjM. POTENTIAL COST IMPACT IP CHRom - `-- • . on lIt No, H94 P. 2 197O4023O81 P • goo City Of Ft. Caine 3 CSU Tmnd camel I the unknown pipe In 1Me ►"tr level IPW UW 2-1)2' or 3" Wm fords man 1?1f912006 crrinarmrrrlo.•`_` Max Millen From: Jay Lamicq Daylamicq@coover-clark.com] Sent: Thursday, December 22, 2005 3:29 PM To: Dennis Wolfe; Max Millen Cc: Edward Balkin Subject: FW,. CSU Transit Center- Response to RFI #16 Attachments: RFI #16 sketch. pdf 17 RFI *16 sla t. .pdf (99 KB) Max - Below is our response from our electrical engineer in regards to the electrical conduit in the women's bathroom. I wanted to send these options to you to pass along to Wayne's Electric for their input before answering this RFI officially. Here are my comments for these options: Option #1: This option is not possible by code. Option #2: This option is too expensive (Approx. $20,000) to add new copper line to the panel. Option #3: This is a viable option but this will use up most of the panel. Option #4: I would prefer this option above all. We would have to splice the line and cut the slab to get this to work, but I think it is the best solution as far as costs go. Our Electrical Engineer is concerned about cutting the steel pipe to expose the line as well as the time required to splice while power is down. I have attached a sketch describing my intentions. We can provide j-boxes in the wall and also above the ceiling for the splices. Please let me know if option #4 can be done, and call with any questions. Jay R. Lamicq, Assoc. AIA Associate Designer Coover-Clark & Associates 455 Sherman Street, Suite #205 Denver, Colorado 80203 (303) 783-0040 ext. 16 (303) 783-0060 fax Email: jaylamicq@coover-clark.com <mai.lto:jaylamicq@coover-clark.com> Web: www.coover-clark.com <http://www.coover-clark.com/> "The sender believes that this E-mail and any attachments were free of any virus, worm, Trojan horse, and/or malicious code when sent. This message and its attachments could have been infected during transmission. By reading the message and opening any attachments, the recipient accepts full responsibility for taking protective and remedial action about viruses and other defects. The sender's employer is not liable for any loss or damage arising in any way from this message or,its attachments." 1 -----Original Message ----- From: Curtis McMillin [mailto:cmcmillin@bcer.com) Sent: Wednesday, December 21, 2005 2:00 PM To: Jay Lamicq Cc: Matt Killebrew Subject: CSU Transit Center Jay, Matt and I visited the job site this morning. Attached is Electrical Field Observation Report #1. Regarding the existing electrical feeder that rises vertically through WOMENS RR 050 to existing Panel "NM": Option 1) Remove one toilet and move the handicapped stall north, this could save cost, and the electrical feeder riser can remain in its present location. Or, Option 2) Remove feeder conductors and abandon existing conduit below slab. Remove feeder riser in handicapped stall. Provide new 100 Ampere feeder, to replace existing, to Panel "NM" from existing 100A/3P switch/fuse unit in Sub -Distribution Switchboard "SDC-5", (4#2 & It 8G)1-1/2"C. This new feeder may be routed beside the new feeder to new Panel "NFl/NF2". This method is preferred to Options 3 and 4. Or, Option 3) Remove feeder conductors and abandon existing conduit below slab. Remove feeder riser in handicapped stall. Provide new 100 Ampere feeder, to replace existing, to Panel "NM" from new 100A/3P circuit breaker in New Panel "L1A", (4#2 $ 1#8G)1-1/2"C. This method is not recommended as it will use most of the spare capacity presently designed in the New 400A Panel "L1A" and motor inrush voltage drop issues may be an issue. Or, Option 4) Remove feeder conductors and replace with new feeder conductors in existing conduit below slab. Cut and patch concrete floor to reroute feeder around handicapped stall to existing Panel "NM". This method is not preferred as it appears more costly than above options and a lengthy power outage to existing panel "NM" would be necessary. Let me know if you have any questions or desire more information to price or select one of the options above. Thanks, Curt No virus found in this incoming message. Checked by AVG Free Edition. Version: 7.1.371 / Virus Database: 267.14.2/208 - Release Date: 12/20/2005 No virus found in this outgoing message. Checked by AVG Free Edition. Version: 7.1.371 / Virus Database: 267.14.3/209 - Release Date: 12/21/2005 2 Rv,ocwr c-v> j° COAPO K vi mir, 9,e°vy I I Q ii Arch twu Plmmera I.mrdreapes Intariora ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS (ASI) #8 455 Shaman StreeL Suite 205 Denver, Co 80203 Phone: 303-753.0040 Far. 303.783-W50 webmai1ft=over-dwk.eom OWNER [ X) ARCHITECT [ X) CONSULTANT [ I CONTRACTOR IX) FIELD [ l OTHER [ ) PROJECT: CSU & Fort Collins Transit Center ARCHITECTS SUPPLEMENTAL Colorado State University INSTRUCTION NO 8 DATE OF ISSUANCE; 11130/2005 OWNER: Fort Collins & CSU TO: Mark Young Construction (contractor) 4150 Jason Street Denver, CO 80211 CONTRACT FOR: Transit Center CONTRACT DATED: ARCHITECT Coover-Clark & Associates, P C 455 Sherman Street, Ste 205 Denver, CO 80203 ARCHITECTS PROJECT NO 0320 The Work shall be carried out in accordance with the following supplemental instructions issued in accordance with the Contract Documents without change in Contract Sum or Contract Time. Proceeding with the Work in accordance with these instructions indicates your acknowledgement that there will be no change in the Contract Sum or Contract Time. Description 1. New C-store electrical lighting layout, per SK-6 & fixture cut sheet attached, with prismatic lens 2. Trace origin of unknown pipe at women's RR #50 Cut at ceilin and slope to chase connect tc 3. Install new EWC as bid, move to location opposite new Lavatory at men's #47 Tie plumbing in under counter, furr out below counter as required, with gyp. board and metals studs, paint wall, provide CT base to a 6" ht. DO NOT violate ADA clearance. 4. Tie plumbing into "Gridline E" from Breakroom #73, to be covered with cabinets Keep tie-ins below counter. 5. Delete intumescent paint @ pipe columns and change all pipe columns to a 4" nominal XXS with 3 hr wet mix spray applied fire resistive material & provide wrap, see SK-7 and SK-8 Contractor to provide credit for new design. 6. Change UL rating for barrel roof to meet UL design # P502, see SK-9 Contractor to provide credit for new design. 7_ Change slope of (e) conf room 228 ceiling in lieu of flat patch, re -size windows and louver, see SK-10 ASI#8.xls Page 1 Contractor to provide credit for new design. 8. No cost change (a) stained conc. to Pantheon 13"x13 tile, Palo Series 90-105. Lay pattern 45 degree angle to grid w/ 1116" grout. Art pattern to be water jet cut into tile, same colors. Install per mfg. recommendations. 9. Contractor to proceed with external stairs as designed, although MYC may elect to contract SA Miro for re -design services if needed. 10. Additional blinds, beyond those bid at (e) conf. Room 228 are inside and not sun control issues Owner to provide if needed. Attachments: SK-6 to 10 ISSUED BY: Jay Lamicq, Associate ASI#8.xls Page 2 Via Facsimile 303-783-0060 January 5, 2006 Coover-Clark & Associates 455 Sherman Street, Suite 205 Denver, CO 80203 Project Title: City of Fort Collins & Colorado State University Transit Center Phase 11 Project No. 05477 Subject: Unknown Electrical Pipe in Restroom #50 RE: Change Order Request Number. COR No: 8 Gentlemen: Pursuant to the above subject matter, please find enclosed our cost summary, qualifications, and back-up to move the unknown electrical pipe located where the new south wall of Restroom #50 will be located. Pricing is contingent upon the response to RFI#16 issued 12/12/06 to Coover-Clark & Associates. The total cost to perform the above referenced work is $3,941.00. Please note the following during review of this change order request: 1. RFI#16 Response per CCA: Originally it was requested by Coover-Clark and Associates that MYC provide pricing for option #4 as stated in RFI#16. The work to be performed entails cutting the pipe at floor and ceiling levels, saw -cutting the floor slab, moving the electric lines and piping into the stud wall of room 49. Pricing and backup is attached per the meeting with Wayne's Electric, CCA and MYC on Friday, 116/06 and CCA's final response to RFI#16 dated 1/4/06. If you should have any questions and/or concerns, please contact me at your earliest convenience at (303) M-1421 Sincerely, Max Millen Project Engineer cc: 05477-F-1.2 Steve White 970-221-6534 Cass Beitler 970-491-7572 Owner response, please sign as appropriate: Approved, Proceed as Submitted Rejected, Do Not Proceed, Provide Comments Other, Do Not Proceed, Provide Comments MARK YOUNG CONSTRUCTION, INC. PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II PROJECT NUMBER: #06477 CHANGE ORDER REQUEST SUMMARY COST. CODES ACTIVITY DESCRIPTION AMOUNT TOTALS CHANGE ORDER REQUEST#8 ASI#8.2 MARK YOUNG CONSTRUCTION LABOR: $201hr Remove Sawcut Concrete - (4MH's @ $30.69) $123 FRP New 6" Slab - (8MH's @30.69) $246 MYC LABOR TOTAL $368 $368 MYC MATERIAL Concrete to Replace Existing Slab - (1 CY) $84 MYC MATERIAL TOTAL $84 $84 MYC EQUIP. Sawcut Existing 6" Slab - (151-17) $400 MYC EQUIPMENT TOTAL $400 $400 SUBTOTAL $852 SMALL TOOLS & SUPPLIES @ 5% OF LABOR $18 PAYROLL TAXES & INSURANCE @ 38% OF LABOR $140 GENERAL CLEANUP: N/A $0 DELIVERY: N/A $0 DRAWINGS & SPECS: BY ARCHITECT $0 SUBTOTAL $1,010 MYC OVERHEAD & FEE @ 15.0% $152 SUBTOTAL MYC WORK $1,162 l MARK YOUNG CONSTRUCTION, INC. PROJECT NAME: City of Fort Collins and CSU Transit Center Phase II PROJECT NUMBER: #05477 CHANGE ORDER REQUEST SUMMARY COST CODES ACTIVITY DESCRIPTION AMOUNT TOTALS SUBCONTRACTS ASI#8.2 Pricing- Unknown Pine 0 RR#50 Wayne's Electric Move Panel Feed for Panel NQ from the Women's RR#50 $2,550 - Per RFI#16 Relocate 3" Conduit in New Wall - Provide J-Boxes in New Wall w/ Access from RM. 49 SUBCONTRACT TOTAL $2,550 $2,550 SUBTOTAL $2,550 MYC FEE @ 5.0% $128 SUBTOTAL SUBCONTRACTOR WORK $2,678 SUBTOTAL (DIRECT COSTS) $3,840 BUILDERS RISK INSURANCE @ 1.0% $38 LIABILITY INSURANCE @ 0.75% $29 MYC BOND:.86 % $34 SUBCONTRACTOR BOND: N/A $0 PERMIT FEES: NIA SALES TAX: N/A CONTRACTOR CONTINGENCY @ 0% $0 $0 $0 PROPOSED CHANGE TOTAL $3,941 JAN-04-2008 WED 09,24 AM WAYNES ELECTRIC INC FAX NO, 303654OB77 P. 01 Niaps'i eeetrk Mt. WEI WAYNE*S ELECDUC, INC. . 130 S. MAIN ST. BRIGHTON'CO $0601 DATE: NrMBER OF PAGES: , S M4C>;,UDM COVER) TO: FROM: /I Alan White Proiect Manager CELL # 303419-7885 PHONE 303-659-7481 FAX 303-659-0877 COMMENTS: 130 South Main Street 8dghtoa, Colotado $0601. 30"9-7461 • Fax 303-6S4-087y� L ' 1 AN-04-2006 WED 09124 Ail WAYNES ELECTRIC INC FAX N0, 3036540877 CHANGE ORDER WAYNE'S ELECTRIC INC. 130 SOUTH MAIN STREET BRIGHTON COLO. WWI PHONE: 639-7461 FAX:654.0877 CHANGE TO: MYC ATTENTION: MAX JOB LOCATION: CSU TRANI ..max. ./i /II.M nLnY/'SC NNCD WIVY��• WE HEREBY AGREE TO MARE THE CHANGE(S) EPECtFIED BELOW IRFI#16 Move panel feed for panel NO from the new Woman restroom to new storage room a NOTE: THIS CHANGE ORDER BECOMES PART OF AND IN CONFORMANCE WITH THE CONTRACT: WE AGREE TO MARE THE CHANGES) SPECIFIED ABOVE AT THIS PRICE: SZ560.00 DATE: .lame 4_2006 AUTHORIZED SIGNATURE(CONTRACTOR):..- ACCEPTED: DATE OF ACCEPTANCE: SIGNATURE OWNER : P. 02 JAN-04-2006 WED 09:24 AM WAYNES ELECTRIC INC FAX NO. 3036540877 P. 03 0SU16 271 Jan 04, 200(1 09..% M Page:1 Job Name: CSU16 Job Nwabar. 271 Job Path: C1Pmwam FllealAenbid DSWJobdata1271.ES6 Job Typo' Rw Due Data: 011042006 01110AM ex"w Nor: Telephone: fan: . Emaw. Jab aearesa: Nut *=: RR#16 CSU TRANSFER FT COLLINS. CO Client addraes: 1 04aoripbon Qty Doh price U Disc IMat. Adj. Nat PdoO Labor U Total MOO) r 2 EMTCONDUIT t062212005 10 64=2005 �412.11C 760.69le 0.00 0.00 0.00 0-001 0.0D 0.00 412.11 766.62 1,327.29 11.40C 16.600 27.00 42.00 41.21 2 _ _ 130 EMT CONDUIT 2" EMT STL SS CONN 76.63 3 2 1/192005 1,327.20 C C 26.55 4 3" EMT STL SS CONN 4 11191200 , S,153.14 0.00 0.00 0.09 5,153./4 _206.13 39.99 - 72,49 0.19 109.03 _ 62.53 69.93 3 Al 1.31 5 3" EMT STL 08 CPLG 1 1/1812d05 3,999.07 0.00 3,999.07 0.00 C_ 6 3" EMT 90 DEG ELBOW _ 1 11/0/2005 7.249.080 0.00 0.00 0100 0.00 7,249.08 90.00 C 7 3" EMT STRUT CLAMP 2 1 2 12/15/2004 459.50 459.50 19.05 c 6 3" GRC 140-THREAD CONN 9I262005 10,993.00 0•DO 0.00 _ 0.00 10,993.00 49.50 C 9 i0 11 12 3" GRC COUPLING_ 1IMM005 9/262005 3,141.72 C � 0.00 3,141.72 099.25 0.00 15.90 C C 3" PVC r 10 09926 C 0.00 0 00 3" PVC TERM ADAPTER 1 1 21112312005 322005 3220o5 390.51 C 0.00 390.61 42.00 42.00 0.00 120,00 13.36 _ 28.35 156.1_5 C C 3" PVC FEM ADAPTER _ 430.74 365.1110 C 0.00 _0.00 0.00 A30,74 365.11 1,421.00 7,011.89 13 3" PVC COUPLING C M 0.00 0.o0 0.0o 0.00 0.00 0.00 C C M M M 7,30 14 3" PVC 90 DEG ELBOW 1 11/23ft005 _ ' 1,.t21A0 14.21 15 06 TMN 1S _ 45 40 11/30=5 1,011.89 - _ 15.16 18 0310 THHN 1113o/2005 5,599.93 M _ 0.00 0100 5,599.93 252.00 17 _ SER 1/0.1_JO 110-2 (CU) 12/52001 ^_ 0_.00 M 0100 0.00 0.00 0.00 18 0250MOM MECH LUG � �- 2 12292004 2116/2006 7/20/2005 7/14/2004 V 337.15 21085.Oo 116.5 C C E 0,00 0.00 O.OD 0.00 0.00 337.15 2,005.00 25.50 -- 56.660 C 6.74 19 AYP250 250 AL CABLE 4 _ $3.40 233.38 48.39 20 21 22 24)a4x 6" SCREW CVR SOX NEW -2 0.00 115.69 483.90 - 12120 Z.70 16sO E C P-100D 1 5/8" STRUT 10 483.90 C 0.00 D.OD 0.00 3111' PLATED T-ROD 101211512004 16 8wo05 121.20 C 0.00 4.50 3,00 C C 12.12 1,30 23 24 3/8-16 HEX NUT (PLATED] 318" (ENDER WASHER totals _ 0.15 0.00 C 0.00110.00 _ &IS 16 12/5/2001 C O.OD 0.00 / Q* Total H_ oure Lab. Cond. Normal Prix Code 980D1o02006 98001002008 Oesoript on _ - _ 2" EMT CONDUIT Mat. Cond. Normal Manufao4xer Name_ Catalog Number 10 10 2 _ 1.14 1.50 0,54 CONDUIT RIGIO-EMT T 3" EMT CONOUR Normal _ Normal Normal Normal CONDUIT RIGID -EMT CONDUIT 8 CBL FTG_ 3 2"� EMT STL SS CONK .. _ 9Boo7o135D6 4 3" EMT $TL SS CONN _ 4 1.68 Normal Normal CONDUIT 8 CBL F_T 08007013508 5 6 7 3" EMT STL 6S CPLG 1 0.00 0.00 Normal No Labor CONDUIT 3 CBL PTG 98007013we 96002002028 3" BUT 00 DEG ELBOW " 1 Normal Normal Normal Nomrat CONDUIT FIGS RIGIDI 3" EMT STRUT CLAMP _ 3" GRC-AO- BEAD CONN 2 0.38 _ . 0.50 B-LINE SYSTEMS B10_62-3 78101157t445 8 _ 1 2 _ _ 10 Normal Normal _ CONDUIT 6 CBL FT - _ 0007012528 98002000135 8 3" GRC COUPLING 0.00 1.69 OA2 Normal No Labor CONDUIT FIGS RIGID _ 10 3" PVC Normal Normal Normal _ Normal CONDUIT S FTGS _W CONDUIT 6 FTGS _ _ _ _ J 980060060011 11 12 3" PVC TERM ADAPTER 1 1 8800800820e 3' PVC FEM ADAPTER_ 0.42 Normal Normal CONDUIT d PTGS FIV4 98008006216_ 13 3" PVC COUPLING r 2 0.00 Normal No Labor CONDUIT », FTGS PV _ 98006006t06 14 3" PVC 90 DEG ELBOW 1 1.20 Normal Normal CONDUIT 8, r; 98008006p48 AN-04-2006 WED 09;24 AM WAYNES ELECTRIC INC FAX NO, 3036640877 P, 04 CSU16 2T1 Jan 04, 2008 (WOSAM Pop$:2 DaaotWW Qty TOW Hours Mat Card. Lob. Goad. Muw% tuner Name Caalop Number Pace Codo 15 T14W 15 0,20 Narmel Normal COPPER WIRE THHN•648UG195 9801OM3160 18 SMTHHN 45 1.28 Normal Normal COPPER WIRE MN-3/043LK-19S 980100 U10 17 SER 1/0.1/0-1/0.2 (CU) _�— 40 6.25 Normal Normal - .�- 18 Fn� MECH LUG — 2 0.51 Norma9 N_amal ILSCO TA-266 78368986i42 2.35 Normal Normal _ ..,. 5.401 Normal l Normal 1A5 Normal Normal Z, j3WIG HEX NUT (PLATED) 16 0.4d Normal Normal ISCRE 24 34- FENDER WASHER ll 024 Normal Normal Tolah — . , — _ SYSTEMS ATR38X120~.. . VSNUTS-BOLT . _ Labor Type Full Rate Cone Type 1 FOREMAN 31130 _2 JOURNEYMAN 33,70 3 _ APPRENTICE 22.60 — Totais_ M 31.6p Rnal Pd ' Value (3) Pa Ste)..- Alarm Code Oelabate MaWW (E)derulon) 1.397.13 MatKiel Taal Direct Labor 921.13 --