Change Order Form
PROJECT TITLE: S. Taft Hill Rd. Improvements - Horsetooth Rd, to Harmony Rd.
PROJECT NUMBER: 30521100.6
CONTRACTOR: Aggregate Industries (PO #6603341)
CHANGE ORDER NUMBER: 3
In preparing change orders show in order as separate numbered paragraphs the following:
I. Reason for change. 2. Description of change.
3. Change in contract cost. 4. Change in contract time.
1Q. See attached sheet fordefail.
3. The contract cost will increase by $18,803.15
4. There will be no change in contract time.
ORIGINAL CONTRACT COST
$1,031,432.50
TOTAL APPROVED CHANGE ORDERS
$1,820.00
TOTAL PENDING CHANGE ORDERS
$0.00
TOTAL THIS CHANGE ORDER
$16,803.15
TOTAL % OF THIS CHANGE ORDER
1.82%
TOTAL C.O. % OF ORIGINAL CONTRACT
2.00%
ADJUSTED CONTRACT COST
g1,052,055.s5
(Assuming all change orders approved)
ACCEPTED BY:
(Contractors' Re�r
ACCEPTED BY: DATE: E'?>„
(Proje "Manager)
REVIEWED BY: % DATE:
(Engin r)
APPROVED BY' DATE: a •:�ii oir
-( partment Head)
APPROVED 6Y: DATE:
(Purchasing Agent,over $30,000)
cc: Purchasing
Accounting
Contractor
Project File
P nAinCn'ina riwnurfmwnnt- 191 V.. h P..11— A.......- .O A 1 -.. can - v.— I-ne-_ 1n nne++ -- i++... ++. .. --
Aggregate industries - WRC, Inc.
Change Order No. 3
SOUTH TAFT HILL ROAD IMPROVEMENTS - HORSETOOTH TO HARMONY (CR 38E)
Date 9112/2006
item I Item Descriptf on I Unit ! Quantity I Unit Price ($) I Item Price ($)—]
CHANGE ORDER NO.3
604
Assist Gas Cc to Jower gas line @ Sta 23+20 (612612006)
LS
1
$ 586, 5D
$ 586.50
604
Expose phone line Sta 23+74 (71512006)
LS
1
$ 552.00
S 552.DD
604
Expose and lower F.O_ line Sta 23+74 (71612006)
LS
1
$ 1,495.00
$ 1.495.00
604
Expose and assist City for cadweld
LS
1
$ 1,236.25
$ 1,235.25
604
RESTOCKING= FEE for 19 x 30 in Elliptical RCP
LS
1
S 448.00
S 448.00
211)
Abandon Fire Hydrant (NE corner of Taft & Harmon
LS
1
$ 966.00
$ 968.00
608
Retaining Wall @ Sidewalk Chase (CIP)
LS
1
$ 550.01)
$ 55D.00
216
Delete Topsoil (Stockpile and Redistrubute
CY
-730
$ 19.00
$ 13,870.0G
215
Topsoil (Import, amend, and place)
CY
730
S 18.00
$ 11,680.00
608
Special Vailey Pan @ JJ's
LF
22
$ 15.00
$ 330.00
610
Change for median cover material thickness
LS
1
$ 1,242.00
$ 1,242.00
400
Installation of Paving Fabric (CIP)
SY
2852
S 2.45
$ 6.987.40
623
SpringfieldCtApartments ROW Irrigation (CIP)
LS
1
$ 6,600.00
$ B,6D0.00
TOTAL
$ 18.803.15