HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 27563SEP-20-2006 WED 09:53 AM CFO ENG, FAX NO. 9702218378 P. 03
�•A
Y
Change Order Form
Znglaeering Department
PROJECT TITLE: Timberline Rd. Widening Project
PROJECT NUMBER: 30523270.6 (Bid #5954)
CONTRACTOR' Connell Resources, Inc. (PO #5601742)
CHANGE ORDER NUMBER: 6
n preparing change orders show in order as separate number paragraphs the ofllewtng
1. Reason for change. 2. Description of change.
3. Change in contract cost. 4. Change in contract time.
1 &2. Soo attached sheet for dglail•
3. The Contract cost will Increase by $24,286.00
4. There will be no change in contract time.
ORIGINAL CONTRACT COST
$5,277,645.27
TOTAL. APPROVED CHANGE ORDERS
$133,739,60
TOTAL PENDfNG CHANGE ORDERS
$0•00
TOTAL THIS CHANGE ORDER
$24,286.00
TOTAL % OF THIS CHANGE ORDER
0.46%
TOTAL C.O. % OF ORIGINAL, CONTRACT
2.99%
ADJUSTED CONTRACT COST
$5,435.670,87
(Assuming all change orders approved)
ACCEPTED
ACCEPTED
REVIEWED
(Engineer)
APPROVED BY: t DATE:�'%.i� • —
1(D panma cad)
APPROVED BY: _ DATE:
(Purchasing Agent over $30,000)^
cc; Conlractor
Punmhasing
ProJett Flu
T Enaineerine Department • 281 North College Avenue - P.n_ line AM . Fnrr rnm a rn lane»_nrnn . re-tm -jii tenr
SEP-20-2006 WED 09:53 AM 0FG ENG, FAX NO. 9702216378 P, 04
CHANGE ORDER NOA
TIMBERLINE ROAD MkOENINO PROJECT - INTER
SUMMARY OF WORK
Connell Resources Inc.
See adsched submlilal
9030
Addillanal Double Type'16Inlets
2
EACH
a 11,555.00
3 23,110.00
9031
9032
9033
Ciedk Work Nol Com lated on SMng Crook Bride Extension
Agdllional Work For Revised Wing Wall
Fire 4-ant at Mid Polm Drive
1
1
1
LS
LS
LS
; 16.170.00
$ 9,700,00
4 2,300.00
$ (10,170.
$ 0,700A0
S 2,=Aa
9034
Fire Hydrant al Sta 56+00
1
LS
$ 3,000.00
E 3.000.00
9035
Additional Coat lot Mix Design Change
460
CY
; 9.10
; 2,346.00
TOTAL.
s 2{,2ee.ee
REABON rOR CHANGE
9030
Addnonei Typo le Inlets added due to a design than ( x includes flowable fdi)
9031
Work not being done par the ad Inal daal n due to Wility conflicts
9032
Revised Win all Design work to be done
9033
Fire HvIrant at Mid-POint Drive Includes OOMIG. excAv3li06, materials and labor
9034
Fire Hydrant work inawles a new hydrant, 90 degree bend with mega -Was to relocate
hydroid
9035
Additional COnerele Curt far Rovieed Mix Design
WHOM POSTED
Posted 10 Pay Esllmatt N0.6