Loading...
HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 27473SEP-07-2006 THU 11:13 AM CFC ENG. FAX NO. 9702216378 P. 02 Change Order Form $ngineerina Department PROJECT TITLE: Ziegler Rd, & Kechter Rd. Roundabout PROJECT NUMBER: 30523285.E (Bid #5979) CONTRACTOR: Gerrard Excavation (PO #6603521) CHANGE ORDER NUMBER: 1 n preparing change orders show rn order as separate num ere paragrap s Me following; 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change In contract time. 1&2. See attached sheet for detail. 3, The contract cost will increase by $ 4,123.31 4. Them will be no change in contract time. ORIGINAL CONTRACT COST $1,456,808.87 TOTAL APPROVED CHANGE ORDERS $0.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $4,123.31 TOTAL % OF THIS CHANGE ORDER 0.28% TOTAL C.O,'% OF ORIGINAL CONTRACT 0,28% ADJUSTED CONTRACT COST $1,460,032.13 (Assuming all change orders approved) ACCEPTED BY: ` DATE: e. ( Contraclor's Representative) REVIEWED BY: DATE: 6 b �} GQd (Project Engineer) ACCEPTED BY: DATE: q• 7 ACCEPTED BY: `' ba iI&C-A' l,L'Liti _ DATE: q •Z •QL ((Department Head - Engineering) APPROVED BY: DATE: (Purchasing Agent over $30.000) cc: Contractor Purdla5ing Project nic T.neinoorino Denartmrnt , 2A1 Nnrth Cnnene Ave,,,,.. 0 n 'A .. ¢RA . V.+ /'on:... rn 2naTf_A42n . iMm -vi, ccne SEP-07-2006 THU 11:13 AM CFO ENG, FAX NO. 9702216378 P. 03 CHANGE ORDER - 01 iiegler Road and Koehler Road Roundabout Project SUMMARY OF WORK Garrard Excavating Additional Items for tho project, - See attached submittal - Item Unit $!Unit Total Gerrard Exeavat n Cost Savings Per Attached Letter dated Ma 23.2008 1 LS $ 50,383.80 S 50,383.80 Gerrard 9xcavatinn Entrance Into Everitt's Property See Attached Proposal 1 LS S 39.582.80 $ 39,582.80 Garrard Excavating Excavate Around Electric Vaults 1LS $ 232,68 $ 232.88 Garrard EXcavatJinq Dewatering During Water Line Installation ILS $ 1.559.03 $ 1,559.03 Gerrard ExcavatAng Restake Curb & Gutter stakes destroyed U Qwast 1L5 $ 230.00 $ 230.00 Garrard Excavadn ig Far Entrance Into Fossil Lake US $ 597.30 $ 597.30 Gerrard Excavating Texture Brooms for Roundabout Concrete Finish 1L5 $ 779.00 $ 779.D0 Garrard 99ravating Additional Landscape Work G0 IS4 Waterbo 1LS $ 9,928.35 $ 9, .21.35 Garrard EzcavaUn Add 90 LF of 4" i e and 2 drain basins /l5 $ 1,370:00 S 1,370.OD Gerrard Excavatin Added 8" Pi a and 45 elbow between headwalls I 1 LS $ 227.75 1 $ 227,75 $ 4,123.31 REASON FOR CHANGE Ploase refer to the attached change order request. 1. Gerrard submitted a proposal of cost saving s that was agreeded upon before the beginning of the project. 2. This work was changeordered Into the roundabout project to keep line development from cutting the new road In the near future. 3. Excavation around the electrical vaults was required In order to raise the vaults to the new proposed grade. 4. Ground water in the trench had to be pumped out to install the 24" water main. 5. Curb & gutter restake after Qwest destroyed original stakes. 5. St2kln9 for the Concrete pan and radii at the entrance to Fossil Lake Place which was not In the original contract. 7, Additional teAura brooms wero required to achieve the finish specified for the concrete in the center of the Roundabout 8. Additional landscape work done by Waterboy as directed by the City of Fort Collins Parks Department. 9. Reld change for drainage from a graded $wale to a pipe and drain basins on the Northwest comer. 10. 8" drain pipe shown In plans was extended in order to maintain a minimum grade from the back of curb, WHEN POSTED Posted to Pay Estimate # 3