Loading...
HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 2745209/05/2006 WE 11:42 FAI 970 221 8586 CITY OF FT COLLINS CLRS [it001/001 � C Ct CHANGE ORDER O. S CiU PROJECT TITLE: OAK STREET PLAZA RENOVATION f CONTRACTOR: J-2 Contreeling Co. (0 PROJECT NUMBER: 5951 PURCHASE ORDER NO.: 6601273 DESCRIPTION: 1. Reason for change, Upgrades on paint for handrails and other architectural elements, as well as paving and irrigation_ 2. Description of Change: 1) Powder Coating: $ 3,390.00 Allow for 2 tone Powder Coat on hand rails, substitute powder Coat on vault lid, substitute powder coat on vent caps, powder coat wind sensor 2) Fence changes required to add bronze hardware and make field adj. to $ 2.450.00 compensate for 2-tenths grade change for stormwater requirement. 3) Add 3/4" granite gray colored rock to tree basins $ 466.00 4) Change -out tree bubblers from specified 'pop-up` bubblers. $ 95.00 5) Pavers: Mortor set under laminar streams and under small pavers along $ 825.00 tree grates and grass borders 6) Deduct dis-assemble umbrellas, powder coat poles, reassemble. Powder $ (2,730.00) coat umbrella pole sleeves 3. Change in Contract Cost: $ 4A95.00 4. Change in Contract Time: 14 Days TOTAL APPROVED CHANGE ORDER $ 138,978.90 TOTAL PENDING CHANGE ORDER $ - TOTAL THIS CHANGE ORDER $ 4,495.00 TOTAL % OF ORIGINAL CONTRACT, THIS C.O. 0.47% TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S 14.95% ADJUSTED CONTRACT COST $1,103� ,017.90� (Assuming all change orders approved) ACCEPTED Contractor's ACCEPTED BY: Project Manager REVIEWED BY: Title: APPROVED BY: Title: APPROVED BY: Purchasing Agent over $30,000 cc: City Clark Architect Contractgr Engineer Prolect RID Purchasing DATE: via DATE: d DATE: DATE: DATE: