CHANGE ORDER NO.913
PROJECT TITLE: SPRING CANYON COMMUNITY PARK
CONTRACTOR: ECI
PROJECT NUMBER: 5952
PURCHASE ORDER NO.: 6602274
DESCRIPTION: creekside restroom, plaza & import rock changes/Olander wailditre permit fee
1. Reason for change: change balif eld restroom to creekside restroom footprint, revise size of plaza, correct amount
of import rock to creekside, additional Olander concrete walk, reimburse contractor for
building permit fee for fine
2. Description of Change: change baliffeld restroom to creekside restroom footprint, revise size
of plaza, correct mount of import rock to creekside, additional
Olander concre walk, imburse contractor for building permit fee
for fire I
3. Change in Contract Cost: ($28,455.73)
4. Change in Contract Time: 2 days
19. A. NO
TOTAL APPROVED CHANGE ORDER $35,394.74
TOTAL PENDING CHANGE ORDER ($78761 07)
TOTAL THIS CHANGE ORDER ` ($28 455 73)
TOTAL % OF ORIGINAL CONTRACT, THIS C_O. -0.25%
TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S 0 06%
ADJUSTED CONTRACT COST 11,443,px8.12
(Assuming all change orders approved)
ACCEPTED
Contractor's
ACCEPTED
Project ManE
REVIEWED BY:
Title:
APPROVED BY:
Title:
APPROVED BY:
Purchasing Agent over $30,000
cc: City Clark Architect
Contractor Engineer
PrOJW File Purchasing
DATE: r'ZZ`0&
DATE:
DATE:
DATE:
DATE:
08/28/2006 MON 14:56 FAX 970 221 6586 CITY OF FT COLLINS CLRS IM 002/006
co #c5�
CHANGE IN WORK REQUEST "16"
Initiation Date: 6/27/2006
Project: Spring Canyon Community Park
Owner: City of Fort Collins Parks & Recreation
To: Ted Johnson, ECI
Requested by: Russell lee
Authorized by:
Please furnish change in contract sum for the change in work described below. Do not order material or start any work until
approval is received. Every effort will be made to incorporate this change into the work without affecting the contract date.
Description -61 Proposed Changes - amount
Use creekside restroom instead of ball field restroom and the ballfield restroom location (GTC) $ (11.679.00)
Reduce the plaza size around the new restroom layout Credit 169SF Q $2.80/SF $ (473.20)
(Original Plaza was 1,898 SF, revised plan dated 6/27/06 is 1,727 SF)
"Note_ This does not include any unknown utility modifications due to the footprint change since T.B.D.
the utllitles cafFetstubbed in the locations of the civil drawings"
�.. TOTAL $ (12,152.20)
Ted Johnson, ECI , agrees to change the work described above for the change in price shown below, I have
attached a breakdown which lists all costs of labor, materials, taxes, overhead, profit, and all other changes and/or charges involved.
Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Stun or Contract Time.
The Contract Time will be Unchanged by Days.
No change in Contract Sum (Initial if no change)
ADD to the Contract sum $
DEDUCT from the Contract Sum S (12,152.20)
This information shall be valid for thirty (30) calendar days from the date of signature below.
CONTRACTOR'S
Contractor sW'ietaty.pne (1) copy and rvty 0AIGINAL to Owner
APPROVED BY OWNER:
DATE: *-Z4--47;
Accepted change in work request will be included in a future formal change order. DO NOT bill far this change until a formal
change order has been executed by all parries. Acceptance is direction to proceed with the work described herein. Not valid
unless signed by the owner and the contractor_
08/28/2006 MON 14:57 FAX 970 221 6586 CITY OF FT COLLINS CLRS
[a003/006
CHANGE IN WORK REQUEST " 22"
Initiation Data: 6122/2006
Project:
Spring Canyon Community Park
Owner.
City of Fort Collins Parks & Recreation
To:
ECI Site Construction Mgmt
Requested by:
Ted Johnson
Authorized by_
Kathleen Benedict
Please furnish ebange In contract sum for the change in work described below. Do not order material or start eoy work until
approval is received. Every effort will be made to incorporate this change into the work without af'eeting the contract date.
Descllption of Proposed Changes - -- amount
Actual tonnage or 6" minus crushed concrete imported and placed was 1,648 Ton. Approved
tonnage on RFCs 13a-13c was 3,500 Ton
Credit Haul crushed concrete material and crowd In 1,852 Ton for stabilization @ $13.201 Toh $ (24,448.40)
TOTAL $ (24r446.40)
ECt site Camtruenan PMgmt , agrees to change the work described above for the change in price shown below. I have
attached a breakdown which lists all costs of labor, materials, taxes, overhead, profit, and all other changes and/or charges
involved. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract
Time.
The Contract Time will be no change by Days.
No change in Contract Sum (Initial if no aeanp)
ADD to the Contract Sum S
DEDUCT front the Contract Sum $ 4,446.40
This Information shall be valid for thirty (30)
CONTRACTOR'S
days from the date of signature below,
DATE: 6122t2oo6
APPROVED BY OWNER
1 ccepled change In work request w,11 be included in a future formal change order, DO NOT bill for this change until a formal
.hange order has been eaecded by all parties. Acceptanca is direction to proceed with the work described herein. Not valid
wdess signed by The owner and the contractor.
08/28/2006 MON 14:57 FAX 970 221 6586 CITY OF FT COLLINS CLRS
60 --d o
Z 004/006
CHANGE IN WORK REQUEST "26"
Initiation Date: 7/21/2006
Project: Spring Canyon Community Park
Owner: City of Fort Collins Parks & Recreation
To: ECI Site Construction Mgmt
Requested by: Ted Johnson
Authorized by: Kathleen Benedict
Please furnish change in contract sum for the change in work described below. Do not order material or start any work until
approval is received. Every effort will be made to incorporate this change Into the work without affecting the contract date.
Description of Proposed Changes - amount
Per onsite meeting with the Poudre School District, ECI has been requested to extend the 8' wide sidewalk
an additional 180 LF. The following demolition and concrete work is hereby proposed. No landecaos
or irrigation restoration Is Included In this price. To be included by School District
1). Strip, stockpile, and load existing sod into trucks 1 LS $418.60
2). Hauloff and dispose of sod at landfill. 2 loads (P $287.50 $575.00
3). Form, pour and place 1,440 SF of 5" concrete sidewalk Q $2.80/6F S4,032.00
TOTAL $5,028.60
ECK Site Construction Mgmt , agrees to change the work described above for the change in price shown below. I have
attached a breakdown which lists all costs of labor, materials, taxes, overhead, profit, and all other changes and/or charges
involved. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or
Contract Time.
The Contract Time will be Extended by 2 Days.
No change in Contract Sum (Initial if no change)
ADD to the Contract Sum $ 5,025.60
DEDUCT from the Contract Sum S
This information shall be valid for thirty
CONTRACTOR'S
days from the date of signature below.
ORIGINAL
APPROVED BY OWNER: =1 MEMO
DATE: 7/21/2006
Accepted change in work request idill be included in a future formal change order. DO NOT bill for this change until a formal
change order has been executed by all parties. Acceptance is direction to proceed with the work described herein. Nor valid
unless signed by the owner and the contractor.
08/28/2006 MON 14:57 FAX 970 221 6586 CITY OF FT COLLINS CLRS
0 005/006
(�# &[-;�
CHANGE IN WORK REQUEST "29"
initiation Date: 8/7/2006
Project Spring Canyon Community Park
Owner: City of Fort Collins Parks & Rrcreation
To: ECI Site Construction Management
Requested by: Ted Johnson
Authorized by: Kathleen Benedict
Please furnish change in contract sum for the change in work described below. Do not order material or start any work until
approval is received. Every effort will be made to incorporate this change into the work without affecting the contract date.
Description of Proposed Changes - amount
Refund to GTC for cast of Fire Department review of plans for building permits. $3,117.27
TOTAL $3,117.27
ECI Site Construction Mgmt , agrees to change the work desenbed above for the change in price shown below. I have
attached a breakdown which lists all costs of labor, materials, taxes, overhead, profit, and all other changes and/or charges
involved. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or
Contract Time.
The Contract Time will be unchanged by 0 Days.
No change in Contract Sum (Initial it no change)
ADD to the Contract Sum $ 3,117.27
DEDUCT from the Contract Sum S
This information shall be valid
CONTRACTOR'S SIGNA'
APPROVED BY OWNER:
(30) calendar days from the date of signature below.
to
DATE: 8/li/2006
DATE: O . /4__P4�)
Accepted change in work request will be included in a f ttureformal change order. DO NOT bill for this change until a
formal change order has been executed by allparties. Acceptance is direction toproceed with the work described herein.
Not valid unless signed by the owner and the contractor.
08/28/2006 MON 14:58 FAI 970 221 6586 CITY OF FT COLLINS CLRS
11006/006
I r-6 ms
1 a-q
' . 0-q
oNm A
n � � t "i A
ya� Opt
S � nC
i
CHANGE IN WORK REQUEST "17"
Initiation Date: 6/22/2006
Project: Spring Canyon Community Park
Owner. City of Fort Collins Parks & Recreation
To: ECI Site Construction Mgmt
Requested by: Ted Johnson
Authorized by: Kathleen Benedict
Please furaish change in contract sum for the change in work described below. Do not order material or start any work until
approval is received. Every effort will be made to incorporate this change into the work without affecting the contract date.
Description of Proposed Changes - amount
In accordance with a request from the Stormwater department dated June 14, 2006 from Ayres Associates
1). Install (2) cutoff walls on storm drain lines in the stormwater detention pond berm $3,360.00
2). Change inlet "F" per City detail D-9A $1,210.00
3). Delete Manhole on Storm line T" $ (1,632.00)
TOTAL $2,938.00
ECI Site Construction Mgmt , agrees to change the work described above for the change in price shown below. I have
attached a breakdown which lists all costs of labor, materials, taxes, overhead, profit, and all other changes andtor charges
involved. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or
Contract Time,
The Contract Time will be no change by 0 Days.
No change in Contract Sum (initial if no change)
ADD to the Contract Sum $ 2,910.00
DEDUCT from the Contract Sum $
This information shall be valid for
days from the date of signature below.
CONTRACTOR'S SIGNA --1 DATE: 6/22/2006
a toWormalchange
NAL to Owner 01, 1A_,D r.
APPROVED BY OWNER: DATE: SA/0
l /r o b
Accepted change in work request tnclu a ar. DO NOT 6i11 for fs change until a formal
•hange order has been executed by all parties. Acceptance is direction to proceed with the work described herein. Not valid
anless signed by the owner and the contractor.
MEMORANDUM
To: Russell Lee, BHA Design
From: Eric Lessard, PE
Date: June 14, 2006
Re: Inlet installation at Spring Canyon Community Park
This memo is intended to provide instructions for the installation of an inlet and cut-off wall at
the north end of the regional detention pond in Spring Canyon Community Park. Currently, the
plans show a CDOT Type C inlet at the outlet with a 150 RCP Stormsewer delivering water to
Spring Creek. Dan Mattson with the City of Fort Collins requested that a standard Fort Collins
inlet be installed in order for spare grates to be readily available in case of theft. The attached
standard area inlet was approved by Dan and was analyzed by Ayres Associates to ensure its
suitability. Ayres Associates completed a hydraulic analysis and determined that the
interception capacity of the grate matched the design discharge. Therefore, please install the
inlet according to the detail drawing.
Additionally, Dan indicated he wanted a cut-off wall to ensure no piping occurs. The requested
cut-off wall is to be made of an impermeable clay layer. Please install the cut-off wall according
to the construction drawing sheet number C4.9, detail 1. This detail shows a ditch crossing with
a cut-off wall. The cut-off wall portion of the detail shall be implemented with clay material.
Thank you.
Enclosure
cc: Dan Mattson
Kathleen Benedict
Jason Stutzman
3665 JFK Parkway, Building 2, Suite 200. P.O. Box 270460, Fort Collins, CO W527 BHA6-MMO.DOC
(970) 223-5556, FAX (970) 223-5578 32-0890.08
www.AyresA3sociates.com Page 1 of 1
28 1/4 IN.
6 IN. 16 1/4 IN.
" IN. I IN. MIN \-INLET GRATES
4
LINEOF
IROLINO
r-F
MILET AND
iA
PIPE -
SLOPE FOR
SLOPEFOR
CTION A -A
GENERAL NOTES:
1. AREA INLETS MAY BE USED FOR
DRAINAGEWAY OTHER THAN STREETS.
(EXAMPLE, PARKING LOTS, MEDIANDS,
SUMP BASINS)
RATE AND FRAME BY
OR APPROVED EQUAL.
PLAN VIEW
35 3/4 IN.
6 IN. 23 3/4 IN.
IN CIR. 0 F.
IN: CIR L.F.
a#4 0 12 IN.
CTRS. (TYP.)
ONCRETE
PIPE O.D.
N.
12i IN. M
LA P
3 IN. CIR. O.F.
2 IN. CIR L.F.
12 IN
CTRS. (TYP..)
CONCRETE PIPE
H
-12 IN. MAX.
STEP
SPACING
—#4 0 12 IN. CTRS.
6 IN. TYPICAL WALLS
AND FLOOR
SECTION B-B
AREA INLET
CITY OF FORT COLLINE STORMWATER APPROVED: DETAIL
a, of Fort Collins UTILITIES CONSTRUCTION DETAIL E DATE- 12/8/00 D-9A
DRAWN BY: NBJ