HomeMy WebLinkAboutCHANGE ORDER - BID - 5952 SPRING CANYON COMMUNITY PARK (23)08/07/2006 RON 11:51 FAX 970 221 6586 CITY OF FT COLLINS CLRS [a001/002 CHANGE ORDER NO. #11 PROJECT TITLE: SPRING CANYON COMMUNITY PARK CONTRACTOR: ECI PROJECT NUMBER: 5952 PURCHASE ORDER NO.: 6602274 DESCRIPTION: change water mains & structural plate value engineering, revise rundown grade 1, Reason for change: change pipe type of water mains and switch to structural steel plate instead Of concrete box culvert at underpass for value engineering 2. Description of Change: change water mains to PVC-DR1812601f@4.55/If, storm sewer adjust at rundown, regrade rundown, regrade channel for 1' cover, replace concrete box with structural steel plate, staking for rundown revisions. 3. Change in Contract Cost: ($9,279.73) �' Vc. 4. Change in Contract Time: 0 Days TOTAL APPROVED CHANGE ORDER TOTAL PENDING CHANGE ORDER TOTAL THIS CHANGE ORDER TOTAL % OF ORIGINAL CONTRACT, THIS C.O. TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S ADJUSTED CONTRACT COST (Assuming all chap ACCEPTED BY: Contractor's Rep ACCEPTED BY: Project Manager REVIEWED BY: Title: APPROVED BY: Title: APPROVED BY: Purchasing Agent over $30,000 cc: City Clerk Architect Contractor Engineer Project File Purcha6ing 0.23% 11,464,452.13 DATE: ! DATE: d(e DATE: DATE: DATE: 08/07/2006 MON 11:52 FAX 970 221 6586 CITY OF FT COLLINS CLRS 10002/002 ck4,0-tl CHANGE IN WORK REQUEST "14" Initiation Date: 6/13/2006 Project: Spring Canyon Community Park Owner. City of Fort Collins Parks & Recreation To: Ted Johnson, EC1 Requested by: Russell lee Authorized by -- Please furnish change in contract sum for the change in work described below, Do not order material or start any work until approval is received. Every effort will be made to incorporate this change into the work without affecting the contract dame. Description of Proposed Changes - amount Sheet C1.2: Fire Hydrant was moved due to realignment of the foothills rundown $0.00 Sheet 1.2' Change in water mains to PVC-DR18 (1,260 LF a $4.55/1-F) $ (5,733.00) Sheet 01.3: Storm sewer H was adjusted due to the regrading of the foothills rundown Add 3 LF @ $91.09 $273.27 Sheet C1.3: Erosion Control for the rundown was moved to correlate with the new grading of the rundown $0.00 Sheet CIA I The profile for storm sewer H was adjusted due to the regrading of the foothills rundown was ap roximately lfoot due to cover constraints Sheet C2.5: The Erosion Control for the rundown was moved to correlate with the new gradinq of the $0.00 $1,270.00 I $1,455.00 $0.00 $ (7,200.00) $ 656.00 $ (9,279.73) Ted Johnson, ECI , agrees to change the work described above for the change in price shown below. I have attached a breakdown which lists all costs of labor, materials, taxes, overhead, profit, and all other changes and/or charges involved. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The Contract Time will be Unchanged by 0 Days. No change in Contract Sum (Initial if no change) ADD to the Contract Sum $ DEDUCT from the Contract Sum $ (9 2179.73) This information shall be valid for thirty (30) CONTRACTOR'S SIGNA APPROVED BY OWNER: days from the date of signature below. (1) copy a_n4A%Wrmf)F461MAL to DATE: 7/17/2006 DATE: .,Vt. V 9 -) -('Y"o