Loading...
HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 27335Change Order Form Engineering Department PROJECT TITLE: Timberline Rd. Widening Project PROJECT NUMBER: 30523270.6 (Bid #5954) CONTRACTOR: Connell Resources, Inc. (PO #6601742) CHANGE ORDER NUMBER: 5 n nranannn clhnnnp nrriprq c nw in nrrip.r as senara a mum ere naraoranirs the followina, 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1 &2. See attached sheet for detail. 3. The contract cost will increase by $32,819.00 The Contract will increase by 19.5 days. ORIGINAL CONTRACT COST $5,277,645.27 TOTAL APPROVED CHANGE ORDERS $100,920.60 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $32,819.00 TOTAL % OF THIS CHANGE ORDER 0.62% TOTAL C.O. % OF ORIGINAL CONTRACT 2.53% ADJUSTED CONTRACT COST $5,411,384.87 (Assuming all change orders approved) ACCEPTED BY ACCEPTED BY: REVIEWED BY: (Engineer) APPROVED BY: APPROVED BY: cc: Contractor Purchasing Project File DATE:��� )ATE: g /I6�� O S /06 T DATE: (De artment Head) �/� {�` / DATE: O / 22J0(a (P c a ing Agent over $30,000) Engineering Department • 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 Connell Resources Inc. TIMBERLINE ROAD WIDENING PROJECT • INTERM See attached submittal Item Quantity Unit S / Unit Total 9026 Additional Concrete for Concrete Mix Design Change 414 CY $ 5.10 $ 2,111.40 9027 10" Crosspan & Apron 1356 SF $ 7.10 $ 9,627.60 9028 Aprons 8 EACH $ 1,600.00 $ 12,800.00 9029 Additional Irrigation Repairs at Gas Metering Station 1 LS $ 2,800.00 $ 2,800.00 9030 Fire Hydrant at South End 1 LS $ 3,900.00 $ 3,900.00 9031 Petro Mat 120 SY $ 2.00 $ 240.00 9032 Additional 3/4' Irri ation Service at Spring Creek Farms 1 EACH $ 1,340.00 $ 1,340.00 9033 Additional Contract Days 1 19.51 DAYS I Is - TOTAL Is 32,819.00 9026 Additional Concrete for Revised Mix Design 9027 No Bid Item for Work at Spring Creek Farms 9028 No Bid Item for Work at Spring Creek Farms 9029 Additional Work completed at the Xcel gas metering station including repairs to the irrigation, backflow preventors, mainline repairs, new sprinkler heads and labor 9030 Additional work to include a fire hydrant at the south end of the project 9031 Install Petro Mat at the Spring Creek Bridge -Pavement Joints 9032 Additional 3/4" Irrigation Service at Spring Creek Farms 9033 Additional Contract Days for the work included in change order 3, 4 and 5. Including work at Pond 5, Pond 11, MSE Wall, Tree Removal, Irrigation Service, Support at the Railroad Crossings and other misc. items. Posted to Pay Estimate No.5