HomeMy WebLinkAboutCHANGE ORDER - BID - 5909 DEICING FACILITYSECTION 00950 CHANGE ORDER NO. 1 PROJECT TITLE: Deicing Facility CONTRACTOR: R. C. Heath Construction Co. BID NUMBER: P-5909 DESCRIPTION: The construction of a sand/salt storage dome, a control building and liquid dispensing equipment, complete with related site work and landscaping. Reason for change: Incorporation of various Additional Work Authorizations. 2. Description of change: WO-00001 — Change the flooring in the Control Building from VCT to ceramic tile - $5,145.00; WO-00002 — Delete the fire sprinkler system in the Dome Building — ($66,584.00); WO-00003 — Delete over -excavation from the scope of the earth work — ($32,325.00); WO-00004 — Changes in the foundation design (haunches) that required additional rebar and placement - $1,196.00; WO-00005 — Change overhead doors sizes to 16' X 20', including extra cost for door finish - $2,091.00; WO-00006 — Deduct all sealant scope of work from the exterior of the Dome Building, substitute Lapidolith for the Euclid Surfhard, add Hydozo Silane 40 VOC to interior of Dome Building and add sealer for 10caps at the exterior of the Dome Building - $6,769.00; WO-00007 - Credit for electrical service downsizing, deletion of 2" communication conduit, inverter downsizing, deletion of communication conduit required by note #10, deletion of the fire alarm system and deletion of the semi -automatic feature on the transfer switch and add for the off-load pump connections, conveyor controls, spray bar pumps and controls and motor connections - $12,321.00; WO- 00008 — Add landscaping around the Control Building - $3,797.00; WO-0009 — Changes to mechanical per Addendum #3, including pumps, valves, piping and equipment - $39,772.00; WO-00010 — Supply and install remote mounting kit, signal converter junction box, mounting brackets and 300 feet of cable to each meter - $2,067.00. 3. Change in Contract Cost: ($25,751.00) 4. Change in Contract Time: 115 Days — Substantial Completion is now September 18, 2006. ORIGINAL CONTRACT COST $2,066,500.00 TOTAL APPROVED CHANGE ORDERS 0.00 TOTAL PENDING CHANGE ORDERS 0.00 TOTAL THIS CHANGE ORDER (25,751.00) ADJUSTED CONTRACT COST $2,040,749.00 ACCEPTED BY Contractor's Representative APPROVED BY Date 8/1Uo(' Date cc: Architect, Purchasing, Contractor, Project File