HomeMy WebLinkAboutCHANGE ORDER - BID - 5931 MASON STREET HARMONY ROAD FOSSIL CREEK BIKE (2)AUG-21-2006 MON 10:03 AM CFC ENG,
FAX NO, 9702216378
P. 01
>utiaeertug Department
Change Order Form
PROJECT TITt-F' Mason Street Transparation Corridor
PROJECT NUMBER: 30521900.6 (Bid #5931). Harmony Rd., Fossil Creek BikelPedestrain Trail
CONTRACTOR:. Mountain Constructors (PO #5506703)
CHANGE ORDER NUMBER: 2
n preparing c ange orders s ow In o er as separate numbered paragraphs the o owing:
1. Reason for change. 2. Description of change.
3, Change in contract cost. 4. Change in contract time.
1&2. See attached sheet for detail,
3, The contract cost will increase by $ 2,240.00
4. There will be no change In contract time.
ORIGINAL CONTRACT COST L $994,846.35
TOTAL APPROVED CHANGE ORDERS $500.00
TOTAL PENDING CHANGE ORDERS $0.00
TOTAL THIS CHANGE ORDER $2,240.00
TOTAL % OF THIS CHANGE ORDER 0.23%
TOTAL C.O. °/6 OF ORIGINAL CONTRACT 0.28%
ADJUSTED CONTRACT COST $997,686.35
(Assuming all change orders approved)
ACCEPTED BY: �t•9--�� DATE;_
.'Contractor's Representative
SUBMITTED BY: y}� a ItI�—•-- DATE:' Z f ^ O fr
Project Engineer cJ
APPROVED BY: i,.. DATE:l� —
Pro' ck Manager - Engine ing
APPROVED BY:
cc' Purchasing
Accounting
Contractor
Project File
DATE:
(Purchasing Agent over $30,000)
r..o;.,nnrino Departmeat 281 North College Avc»ne • P,O. Box 580 •Fort Collins, CO 80522-0590 (970) 221.6605
AUG-21-2006 MON 10:03 AM CFO ENG. FAX NO. 9702218378 P. 02
CHANGE ORDER - 2
Project 5931- Mason StreetlHarmony Road/Fossil Creek RikelPedestrion Trail
Mountain Constructors
Upgrade Truncated domes to 24x24" Cast-N-Tack Panels
- see attached submittal -
ON FOR CHANGE
Upgrade truncated dome pavers to Cast-N-Tack truncated
dome panels at the request of the City. Pavers are $d/5F and
the Panels are $36+$4(overheadUSF.
E rSTE
Posted to Pay Estimate # 8
FROM FAX N0.
Jul. 07 2003 01:05Ph1 P1
AUG-16-06 WED 09;22 AM CITY/FT COLLINS, PURCHAS FAX NO, 970 2218707
� P, 02/02
CHANGE ORDER NO. f
PROJECT TITLE: DIRECTIONAL BORING CONTRACTOR
CONTRACTOR: Colorado Boring
PROJECT NUMBER: Bid 5978
DESCRIPTION;
1. Reason for change: Add pricing for additional unit pricing
2. Description of Change: Add cost for 4' bore, mlesle, 2°-4"HDPE pipe, saw cut
R&i. concrete/asphalt, surface restoration and vaults per attached.
3. Change in Contract Cost none
44. Change in Contract Time: none
ORIGINAL CONTRACT COST
TOTAL APPROVED CHANGE ORDER
TOTAL PENDING CHANGE ORDER
TOTAL THIS CHANGE ORDER
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O.°/b OF ORIGNINAL CONTRACT
ADJUSTED CONTRACT COST
(Assuming all change orders approved)
BY;
BY,_b
Project
Contractor
Purohasing
$ Work Order
DATE:, Z!�/6 ` O 6-
COLORADO BORING CO.
3813 Canal Dr. Ft. Collins, CO. 80524
970-494-1996 FAX 970-494-4449
Company City of Ft. Collins
Address 700 Wood St.
City, State Ft. Collins, CO.
Phone
Date 7/27/2006
PO #
Rep
Contact
Qty
Description
Unit Price
Added by
change
order #1
City of Ft. Collins Price list.
........
1-2" Directional Bore
$ 4.50
2-2" Directional Bore
$ 6.00
. ............
1-3" Directional Bore
$ 6.36
2-3" Directional Bore
$ 8.75
added
1-4" Directional Bore (plus pipe)
$ 12.50
added
2-4" Directional Bore (plus pipe)
$ 18.00
added
Missle/Hole Hog
10.00
added
2" HDPE pipe
0.98
added
3" HDPE pipe
$ 2.67
added
4" HDPE pipe
$ 3.78
.. .....
added
Saw cut concrete up to 4" per ft.
$ 2.58
added
Saw cut asphalt up to 4" per ft.
$ 1.52
added
R&R concrete per sq. ft. (35'minimum)
$ 16.10
added
R&R asphalt per sq. ft.(35'minimum)
$ 14.45
added
Surface Restoration per foot
$ 4.55
Pothole existing utilities
$ 145.00
added
12"-18"-18" vault
$ 60.00
added
24"-36"-18" vault
$ 85.00
added
24"-36"-36" vault
$ 175.00
Subtotal
Job Location Taxes
2006 Ft. Collins Contract Totall,r$
Thank You
P. 01
TRANSACTION REPORT
AUG-08-06
TUE 05:28 PM
SEND(M)
DATE START RECEIVER
TX TIME PAGES TYPE
NOTE
M# DP
AUG-08 05:27 PM 918883879285
31" 1 SEND
( M) OK
009
TOTAL
31S PAGES:
1
WBRanON
ARTA7. SYSTEMS
SOLUTIONS
HMI 480U
P ONE 80014774634nor8 0/765-7460
FAX: 888/387-9285 or 810/765-7461
e-mail: marshah@shake-itcom
Date: 8R/06
Fax to: Jim Hume
City of Fat Collins
Fax:970-221.6782
From: Marsha Huss
Pages: 4 including cover,
Sub*t Credit Reference Approval
RAarfin t- _r-- .. . .
Huts