Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 5931 MASON STREET HARMONY ROAD FOSSIL CREEK BIKE (2)AUG-21-2006 MON 10:03 AM CFC ENG, FAX NO, 9702216378 P. 01 >utiaeertug Department Change Order Form PROJECT TITt-F' Mason Street Transparation Corridor PROJECT NUMBER: 30521900.6 (Bid #5931). Harmony Rd., Fossil Creek BikelPedestrain Trail CONTRACTOR:. Mountain Constructors (PO #5506703) CHANGE ORDER NUMBER: 2 n preparing c ange orders s ow In o er as separate numbered paragraphs the o owing: 1. Reason for change. 2. Description of change. 3, Change in contract cost. 4. Change in contract time. 1&2. See attached sheet for detail, 3, The contract cost will increase by $ 2,240.00 4. There will be no change In contract time. ORIGINAL CONTRACT COST L $994,846.35 TOTAL APPROVED CHANGE ORDERS $500.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $2,240.00 TOTAL % OF THIS CHANGE ORDER 0.23% TOTAL C.O. °/6 OF ORIGINAL CONTRACT 0.28% ADJUSTED CONTRACT COST $997,686.35 (Assuming all change orders approved) ACCEPTED BY: �t•9--�� DATE;_ .'Contractor's Representative SUBMITTED BY: y}� a ItI�—•-- DATE:' Z f ^ O fr Project Engineer cJ APPROVED BY: i,.. DATE:l� — Pro' ck Manager - Engine ing APPROVED BY: cc' Purchasing Accounting Contractor Project File DATE: (Purchasing Agent over $30,000) r..o;.,nnrino Departmeat 281 North College Avc»ne • P,O. Box 580 •Fort Collins, CO 80522-0590 (970) 221.6605 AUG-21-2006 MON 10:03 AM CFO ENG. FAX NO. 9702218378 P. 02 CHANGE ORDER - 2 Project 5931- Mason StreetlHarmony Road/Fossil Creek RikelPedestrion Trail Mountain Constructors Upgrade Truncated domes to 24x24" Cast-N-Tack Panels - see attached submittal - ON FOR CHANGE Upgrade truncated dome pavers to Cast-N-Tack truncated dome panels at the request of the City. Pavers are $d/5F and the Panels are $36+$4(overheadUSF. E rSTE Posted to Pay Estimate # 8 FROM FAX N0. Jul. 07 2003 01:05Ph1 P1 AUG-16-06 WED 09;22 AM CITY/FT COLLINS, PURCHAS FAX NO, 970 2218707 � P, 02/02 CHANGE ORDER NO. f PROJECT TITLE: DIRECTIONAL BORING CONTRACTOR CONTRACTOR: Colorado Boring PROJECT NUMBER: Bid 5978 DESCRIPTION; 1. Reason for change: Add pricing for additional unit pricing 2. Description of Change: Add cost for 4' bore, mlesle, 2°-4"HDPE pipe, saw cut R&i. concrete/asphalt, surface restoration and vaults per attached. 3. Change in Contract Cost none 44. Change in Contract Time: none ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDER TOTAL PENDING CHANGE ORDER TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O.°/b OF ORIGNINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) BY; BY,_b Project Contractor Purohasing $ Work Order DATE:, Z!�/6 ` O 6- COLORADO BORING CO. 3813 Canal Dr. Ft. Collins, CO. 80524 970-494-1996 FAX 970-494-4449 Company City of Ft. Collins Address 700 Wood St. City, State Ft. Collins, CO. Phone Date 7/27/2006 PO # Rep Contact Qty Description Unit Price Added by change order #1 City of Ft. Collins Price list. ........ 1-2" Directional Bore $ 4.50 2-2" Directional Bore $ 6.00 . ............ 1-3" Directional Bore $ 6.36 2-3" Directional Bore $ 8.75 added 1-4" Directional Bore (plus pipe) $ 12.50 added 2-4" Directional Bore (plus pipe) $ 18.00 added Missle/Hole Hog 10.00 added 2" HDPE pipe 0.98 added 3" HDPE pipe $ 2.67 added 4" HDPE pipe $ 3.78 .. ..... added Saw cut concrete up to 4" per ft. $ 2.58 added Saw cut asphalt up to 4" per ft. $ 1.52 added R&R concrete per sq. ft. (35'minimum) $ 16.10 added R&R asphalt per sq. ft.(35'minimum) $ 14.45 added Surface Restoration per foot $ 4.55 Pothole existing utilities $ 145.00 added 12"-18"-18" vault $ 60.00 added 24"-36"-18" vault $ 85.00 added 24"-36"-36" vault $ 175.00 Subtotal Job Location Taxes 2006 Ft. Collins Contract Totall,r$ Thank You P. 01 TRANSACTION REPORT AUG-08-06 TUE 05:28 PM SEND(M) DATE START RECEIVER TX TIME PAGES TYPE NOTE M# DP AUG-08 05:27 PM 918883879285 31" 1 SEND ( M) OK 009 TOTAL 31S PAGES: 1 WBRanON ARTA7. SYSTEMS SOLUTIONS HMI 480U P ONE 80014774634nor8 0/765-7460 FAX: 888/387-9285 or 810/765-7461 e-mail: marshah@shake-itcom Date: 8R/06 Fax to: Jim Hume City of Fat Collins Fax:970-221.6782 From: Marsha Huss Pages: 4 including cover, Sub*t Credit Reference Approval RAarfin t- _r-- .. . . Huts