HomeMy WebLinkAbout102795 WESCO DISTRIBUTION INC - PURCHASE ORDER - 6604956Date: 08/04/06
�w tr 4
City of Fort Collins
Page Number: 1
City of Fort Collins
Purchase Order Number: 6604956
Delivery Date; 08/04/06 Buyer: DICK,OPAL
Purchase Order number must appear on invoices, packing lists, labels, bills of lading, and all correspondence.
Note:
Line City UOM Description Unit Price Extended Price
1 4 EA T3000151; xfiner
1500kva;pad mount
T3000151
YARD
TRANSFORMER, 1500 kVA PAD -MOUNTED
COMPARTMENTAL TYPE, THREE PHASE
DISTRIBUTION WITH SEPARABLE INSULATED
LOAD BREAK HIGH VOLTAGE CONNECTORS.
HIGH VOLTAGE RATING: 13200 GRDY17620.
LOW VOLTAGE RATING: 480Yl277.
SERIAL NUMBER 151 TO BE IN ACCORDANCE
WITH SPECIFICATION #368-300-151, REVISION MM
MFR. ABB
ESCALATION IS APPLICABLE
ADJUSTMENTS WILL BE
REVIEWED BY CITY PRIOR
TO PRODUCTION AND IN
25,162.000 100, 648.00
Opal Dick7 368dash300.pdf Pale 7
REV. SYM: MM
3.2 SPECIFIC REQUIREMENTS FOR DESIGN OF LOOP -FEED Units
3.2.1 FUNCTIONAL DESCRIPTION
The transformer shall be a three phase, pad mounted, loop feed -safe break, "deadfrord" type for use on a
13.8 kV grounded "Y" distribution system.
3.2.2 DESIGN AND CONSTRUCTION
3.2.2.1 RATINGS
Table 1 - Loon -Feed Transformer Retinas
Stock No. WA Low Nominal
voltacle Impedance
Bushing T e/Confi.
High Voltage
Low Voka e
368-300- 008
75
208Y/120
1.9%
C
of
368-300- 009
75
480YI277
1.7%
C
of
368-300- 015
150
20BY/120
2.1%
C
of
368-300- 016
150
480Y/277
2.1%
C
of
368-300- 030
300
208Y/120
2.5%
C
of
368-300- 031
300
480Y/277
2.5%
c
of
368-300- 060
500
208Y/120
3.04%
c
e
368-300- 051
500
480Y/277
3.04%
c
of
368-300- 076
750
208Y/120
5.75%
C
368-300- 076
750
480Y/277
5.75%
c
368-300- 100
1000
208Y/120
5.75%
c
368-300- 101
1000
480Y/277
5.75%
c
368-300- 151
1500
480Y/277
5.75%
C
368-300- 201
2000
480Y/277
5.75%
C
g
1 368-300- 251
2500
480Y/277
5.75%
C
q
CFigure 1 (V-config.) of this specification
e Low -voltage line and neutral terminals shall be stud type bushings in accordance with ANSI C57.12.2fr1992, Fig. 9(d)
and shall include a separate spade with NEMA standard drilling
f Figure 9(a) of ANSI C57.12.26 -1992 (4-hole pad)
g Figure 9(b) of ANSI C57.12.26 -1992 (6-hole pad)
3.2.2.2 INSULATION LEVEL
3.2.2.2.1 The basic impulse level (BIL) of the comple tely assembled transformer, including high -voltage and
low -voltage terminals shall be 95 kV and 30 kV respectively.
3.2.2.2.2 Dielectric test levels shall be in accordance with the distribution levels in Paragraph 5.10 of ANSI
C75.12.042000
3.2.2.2.3 The unit shall withstand test voltages in ac cordance with ANSI C57.12.00 and impulse tests in
accordance with NEMA Standards for Transfommeis, Publications No. TR1.
3.2.2.3 TRANSFORMER CORE
A five -legged core -coil assembly or three separate core -coil assemblies shall be employed. The use of
three-legged designs is expressly prohibited.
7
368300
O al Dick - 3684ash390.pdf ___Pale
REV. SYM: MIA
3.2.2.4 HIGHVOLTAGE TAPS
A no-load tap changer with external operating handle shall provide two 2 Y: full capacity taps above and
below normal. The operating handle shall be mounted in the primary compartment.
3.2.2.5 BUSHING WELLS AND TERMINALS
3.2.2.5.1 The number, location, and arrangement of bushing wells, terminals and parking stands shall be as
shown in Fig. 1 and Fig. 5 of this specification. All low-votage bushings and high -voltage wells
shall be externally clamped and shall have leads of sufficient length to allow them to be changed
without removing he cover. Welded bushings and wells are expressly prohibited.
3.2.2.5.2 High -voltage bushi rig wells shall be 200A load -break interface 8.304.4 kV bushings in accordance
with ANSI/IEEE Sid. 386.
3.2.2.5.3 Law voltage bushing arrangement and spacing shall be "staggered", as shown in Fig. 5 of this
Specification.
3.2.2.5.4 The low -voltage neutral shall be a fully insu fated bushing. A ground pad shall be provided on the
outer surface of the tank and a removable copper ground strap shall be provided and connected
between the low -voltage neutra I bushing and the ground pad.
3.2.2.5.5 The high -voltage neutral shall be connected to the low -voltage neutral internally with provision for
opening this connection for testing.
3.2.2.6 ACCESSORY CABINET
3.2.2.6.1 The accessory cabinet shall consist of a high -voltage and low- voltage compartment generally
constructed in accordance with applicable ANSI specifications and dimensioned in accordance with
Fig.1 of this Specification.
3.2.2.6.2 Cabinet doors shall be hinged, removable, and lockable. Stainless hinge pins shall be provided.
3.2.2.7 ACCESSORY EQUIPMENT
Accessory equipment shall be provided in accordance with Table 1A and the following details:
3.2.2.7.1 Suitable jack bosses or equivalent jacking facilities shall be provided on the tank. Vertical
clearance for a jack shall be 1'/ inches minimum, 3'/ inches maximum.
3.2.2.7.2 The transformer base shall be arranged for rolling in two directions:
Parallel to and at right angles to the centerline of the high -voltage bushings.
3.2.2.7.3 Four lifting lugs shall be provided. These lugs shall be adequate strength and size and arranged on
the tank to provide a suitable lift for the completely assembled unfit.
3.2.2.7.4 The base of the assembly shall be provided with suitable means for mounting the unit on the pad.
An internal flange shall be provided at the base of the accessory compartment to provide means for
mounting the unit on the pad. (Fig. 1).
3.2.2.7.5 Terminal designations are shown in Figure 1. The identification of terminal connections shall be
shown on the instruction nameplate. Instruction nameplate shall be corrosion resistant, located in
the low -voltage compartment, and shall be readable with cables in place. Where the nameplate is
mounded on a removable part, the manufacturer's name and transfomier serial number shall be
permanently affixed to a non -removable part.
Instruction nameplate shall contain the informal ion specified in ANSI C57.12.00-2000, paragraph
5.12. In addition, either on the nameplate or label affixed near it, the manufacturer shall indicate that
the dielectric fluid is non -PCB.
8
368-300
Opal Dick- 368dash300.pdf Page 9
REV. SYM: MM
3.2.2.7.6 An automatic pressure relief device shall be located within the compartment. This device shall
meet the following requirements:
• Y4" NPT or larger male Inlet Port.
• Exposed parts of weather and corrosion resistant materials.
• Non-deterioratin g gasket and o-ring material.
Manual pull ring able to withstand 25 pound force minimum.
Body able to withstand 100 pound force minimum.
Bug shield.
• Cracking pressure of 10 t 2 psig.
• Resealing pressure of 6 psig minimum.
• Zero leak rate from resealing pressure to —8 psig.
Minimum flow rate of 35 SUM at 15 psig.
3.2.2.8 OILPRESERVATION
Transformers shall be of sealed -tank construction. Sealed -tank construction is that which seals the interior
of the tank from the atmosphere, and in which the gas plus the oll volume remains constant. The
transformer will remain effectively sealed for a top -oil temperature range of —32"C to 105°C.
3.2.2.9 TANKS
The tank shall be donned or sloped to shed water and shall be of sufficient strength to support a minimum
of 500 lbs. Construction of the tank shall be in accordance with ANSI C57.12.26-1992, Section 7, except
bolted cover is preferred.
3.2.2.9.1 If main cover is welded, adequate handhole(s) shall be provided. Handholes shall be concealed.
Bolted -on covers shall be adequately gasketed and tamperproof. Main cover bolts may be
exposed; however, where cover bolts are exposed, the corner looks shall be welded or otherwise
rendered tamperproof.
3.2.2.9.2 Tank grounding provision shall be in accordance with paragraph 7.6.4 of ANSI C52.12.2&1992.
3.2.2.9.3 Locking bolts shall be pentahead style.
3.2.2.10 OVERCURRENT PROTECTION
Overcurrent protection shall consist of a single element current sensing bay-o-net fuse link in series with
an ELSP current limiting backup fuse. Fuses shall be sized as shown in Table 2:
Tahro 9 - Fn4:rnn Rannrremnnie
Expulslom Fuse Cbnfdirdous
Current tlmlting•F43e
suck
WA
g1jrrsnt,1U9ng
continuous C4rrlgtJ£a�ag
Nu fiber
Ca a I
Pa humber' 1
oart Numbe be .,
368-30600E
75kVA
MA
30A
368-300-OW
4000353C06
3574030WIM
115q VA
I
36&300-016
(4000353C081
113544040M61M1
368-300-030
300 VA
1
I
36&306031
(4000353C16)
I (3544065M611A
368-306051
500kVA
40A
100A
4000353C12
3544100M71
368-3(16075
750kVA
65A
125A
368-300-076
750kVA
(4000353C 14)
(3544125M71 M)
368-300-10/)
1000kVA
368-306101
1000kVA
12000kVA
I
ruses
368-300-201
(4000353C 17)
I (3544125M71M)125A
38&306251 12500kVA
1125A
Hi-Arrp OL Un k C05CB 1
:25M71el 125A fuses
125DA
Fuse snap oe as specinea in the table above or shall be an equivalent as approved in
writing by Electric Standards Engineering.
9
368-300
Opal Dick - 368dash3OO.pdf Page 10
REV. SYM: MM
3.2.2.11 COMPONENTS FOR LOOPED PRIMARY
The minimum current -carrying capability of components for the looped primary cable system shall be 200
amperes (continuous) and 10,000 amperes symmetrical (momentary).
3.2.2.12 AUDIBLE SOUND LEVEL
The audible sound level shall be in accordance with NEMA Standard TR1.
3.2.2.13 BASE PLAN
The base plan of a completely assembled unit shall be such that it can be installed on a pad of the
dimensions shown in Fig. 6 of the specification.
3.2.2.14 PAINT
3.2.2.14.1 Surfaces to be painted shall be blast cleaned (commercial blast) to provide a clean dry surface
free of dirt, dust, chalk, loose paint, rust, grease and any other contaminants.
3.2.2.14.2 EEI "Finishing Guidelines" specification shall apply. Finish coat shall be Desert Tan, Munsell
#10YR6.013.0, glossy.
3.2.2.15 SAFETY LABELS
The manufacturer shall not apply NEMA 260 Safety Labels. The Purchaser will apply custom warning
labels after delivery.
3.2.2.16 ANGULAR DISPLACEMENT:
Per Fig.10(b) of ANSI C57.12.26-1992.
10
368-300
Opal Dick- 368dash300.pdf Page 1
LKL
i — A�i NM
au— I11 18 — 4
4 � 4 Xe
661111
&B
I —�- y y #
zz6
FLANGE 31C MIN
1 1m MAX
MOMIN,
XVARATINGS
LOWVOLTAGE
RATINGS
COMPARTMENT
0IMENSION6
(MINIMUM)
BUSHING
HEIGHT
A'
B
7s1w
ALL
n.zs
21
ZL456p
ALL
]S
31
756100p
4fi0j/ .2 YAM
y
q6
15642500
A9BY1227
?0
a8
NOTE:
' NW., Marta dh.,una.
See Fig
Al6nemima in lindnMI.
Mwi n= di nsns r aN1 all . ane M h clenenca arum W, d Id (Fig. 6)
Fiq_ure1 -Accessory compartment & Bushing Dimensions (Config. 1)
REV. SYM: MM
11
368-300
Opal Dick- 368dash300.pdf Page 12
TANK SVRFACE 41
11 TANK SURfAGEi
� � F
i
i I 1
I t 1 f
I
O.F5
57$
0
INSIDE
Cable Aaca vPatkkuy Stawl
Figure 1A —Cable Accessory Packing Stand Detail
ERI:gure (Config. 2) -DELETED 7/92
Figures 3 & 4 - DELETED 11/00
Ref. now to: ANSI C57.12.26 - 1992 figures 9(a)
& 9(b)
REV. SYM: MM
12
368-300
Opal Dick 368dash300.pdf Page 1
REV. SYM: MM
4.0" A A A 4 0 6" RADIUS
MIN MIN TYPICAL 3
PLACES
m 1
W ,
X 1 , —i X3
B
I\ XO i\ X2
CL
KVA RATINGS
LOW VOLTAGE
RATINGS
A
B
75-150
ALL
4.75
8
225-500
ALL
6
8
750-2500
480/277, 208Y1120
6
10
Figure 5- Staggered Low -Voltage Bushing Arrangement
(all dimensions minimum inches).
NOTE:
An area having a 6 inch radius around each bushing
shall remain clear of obstructions such as gauges, etc.
13
368300
Opal Dick - 368dash300 pdf Page 1�
REV. SYM: MM
1
KVA
I SERIAL
I PAD DIMENSIONS (inches)
A
B
c
D
E
F
75
-006 thru -009
75
55
40
21
15
61
150
-015
75
55
40
21
15
61
150
-016
75
55
40
21
15
61
300
-030
75
55
40
21
15
61
300
-031
75
55
40
j 21
15
61
500
-050
75
55
40
21
15
61
500
-051
75
55
40
21
15
61
750
-076,-075
85
72
49
23
15
67
1000
-101,-100
85
72
49
23
15
67
1500
-151
101
87
51
23
15
76
2000
-201
107
88
51
23
15
79
2500
251
107
88
51
23
15
79
Fig.6 - Pad Dimensions
14
368-300
Opal Dick - 368dash300.pdf Pale 1 5
REV. SYM: MM
TABLE 1A
ACCESSORY EQUIPMENT
ACCESSORY I KVA
75-150 300 500-2500
Tap changer handle in HV compartment
X
X
X
Instruction nameplate in LV compartment
X
X
X
Jacking provisions
X
X
X
Provisions for rolling in two directions
X
X
X
Lifting lugs
X
X
X
Provisions for mounting on pad
X
X
X
Arrester mounting provisions
Grounding provisions in Froth compartments
X
X
X
1" oil drain plug
X
1" oil drain valve with sampling device
X
X
Upper filter press and filling plug (or cap) (11
X
X
X
Provisions for oil gauge
X
Provisions for pressure-vacmn gauge
X
X
Oil gauge
X
Thermometer
X
X
X
Secondary CT mounting holes
(4 holes on 4 3/8" x 5 518" centers)
X
X
X
Manual/automat is pressure relief valve
X
X
X
15
368-300
Opal Dick - 368dash300.pdf Page 1
REV. SYM: MM
3.3 SPECIFIC REQUIREMENTS FOR DESIGN OF RADIAL -FEED Units
3.3.1 FUNCTIONAL DESCRIPTION
The transformer shall be a three phase, pad mounted, radial feed safe break, "deadfront" type for use on a
13.8 W grounded "Y" distribution system.
3.3.2 DESIGN AND CONSTRUCTION
The requirements for radial -feed transformers shall be the same as those of loop -feed with the following
exceptions:
3.3.2.1 RATINGS
Table 3 - Radial -Feed Transformer Ratings
Low
Stock No. kVA Impedance
Voltage
L_Bushing Type/Conftg.
High Voltage
Low Voltage
368-300- 006
75
208Y/120
1 9%
d
f h
368-300- 007
75
480Y/277
1 9%
C
f h
d Per Figures 5q & 7 of ANSI C57.12.26-1992 (In-Une) EXCEPTION: high voltage bushings shall be 32 - 36 inches
above the base of the transformer
f Figures 9(a) & 9(d) of ANSI C57.12.26 -1992 (stud with 44,de pad)
h Figure 8(a) of ANSI C57.12.26-1992 (Staggered)
3.3.2.2 ACCESSORY CABINET
The accessory cabinet shall be dimensioned in accordance with Fig. 7 of ANSI C57.12.26-1992.
4. QUALITY ASSURANCE
4.1 GENERAL
4.1.1 RESPONSIBILITY FORINSPECTION
Unless otherwise specified, the vendor is responsible for the performance of all inspection requirements as
specified herein. Except as otherwise specified, the vendor may utilize his own facilities or any commercial
laboratory acceptable to the City of Fort Collins. The City reserves the right to perform or witness any of the
inspections set forth in this Specification where such inspections are deemed necessary.
4.1.2 TEST REPORT
The manufacturer shall furnish to the purchaser certified copies of the results of all tests prior to payment.
Copies shall be sent to the Design Section as well as with the invoice. Unsigned copies are not acceptable
even If accompanied by a signed cover letter. The Quality Control Manager shall review and sign each test
report.
4.2 TEST CONDITIONS
Unless otherwise specified, testing defined in Sectio n 4.6 shall be conducted under the following conditions:
4.2.1 REFERENCE TEMPERATURE
The reference temperature to which losses, impedance, regulation, and efficiency are corrected shall be 85'
C.
4.2.2 TOLERANCE ON IMPEDANCE VOLTAGE
Tolerance shall be as specified in ANSI C57.12.00.
16
368-300
Date: 08/04/06
City of Fort Collins
Page Number: 2
City of Fort Collins
Purchase Order Number: 6604956
Delivery Date: 08/04/06 Buyer: DICK,OPAL
Purchase Order number must appear on invoices, packing lists, labels, bills of lading, and all correspondence.
Note:
Line Qty UOM Description Unit Price Extended Price
ACCORDANCE WITH STATED
INDICES IN PRICING.
ANY INDEX ESCALATION
(INCREASE) AFTER THE
QUOTED DELIVERY DATE
WILL NOT BE ALLOWED.
NO LOAD LOSS - 1813
FULL LOAD LOSS - 8109
TOTAL LOAD LOSS - 9922
IMPEDANCE 5.75%
DELIVERY: 32 WEEKS OR
CITY OF FORT COLLINS MAY
CONSIDER THE CAPACTIY
PLAN ARRANGEMENT AS
PROVIDED IN THE QUOTATION
FOR THESE UNITS WITH
SPECIFIC SHIPMENTS AND
QUANTITIES TO BE
STATED WITHIN THE NEXT
Opal Dick - 368dash300.pdfPage 1
REV. SYM: MM
4.2.3 TOLERANCE ON IMPEDANCE VOLTAGE ON A TAP
The percent departure of tested impedance voltage on any tap from tested impedance voltage at rated
voltage shall not be greater than the total tap voltage range expressed as a percentage of the rated voltage.
4.3 FUNCTIONALTESTS
Functional tests shall consist of those tests and related requirements as cross referenced in Table 4 and shall be
performed on each unit, except Temperature and Noise Tests wh ch shall be performed on one unit of each
design (KVA) per order.
T.M. A C......H....-1 T--,
TEST
TEST PARAGRAPH
REQUIREMENT OR REFERENCE
Examination Of Product
4.6
3.0 3.1 3.2 3.3 hisspecification)
Ratio
4.6
ANSI C57.12.00 Section 8
Polarity And Phase Relation
4.6
ANSI C57.12.00 Section 8
Excitation Loss
4.6
ANSI C57.12.00 Section 8
Excitation Current
4.6
ANSI C57.12.00 Section 8
Impedance & oad Loss
4.6
ANSI C57.12.00 Section 8
Tern ature Tests*
4.6
ANSI C57.12.00 Section 8
Dielectric Tests
4.6.1
3.2.2.2 s specification)
Im ulse Tests
4.6.2
3.2.2.2 hiss ification
Leak Testing
4.6.3
3.2.2.8 & 3.2.2.9 his ification
Noise Testing*
4.6.4
3.2.2.12 hiss cation
VI n UI MI rlCI UM1911 I" ULif,4.
4.4 TEST METHODS -- FUNCTIONAL TESTS
Each completed unit shall be inspected to determine compliance with respect to dimensions, material,
workmanship, construction and marking, and routine tests on all units shall be made as specified in Section 8 of
ANSI Standard C57.12.00, and in ANSI Standard C57.12.90. In addition to routine tests, the following test
requirements arx!<or modifications shall apply.
4.4.1 DIELECTRIC TESTS
Induced and applied potential Dielectric Tests shall be performed in accordance with ANSI C57.12.00 and
C57.12.90. The low voltage windings shall have a test potential to ground of 10,000 volts for one minute.
The test potential between high voltage windings shall be 34,000 volts for one minute.
4.4.2IMPULSE TESTS
ANSI Standard Impulse Tests shall be performed. Full Wave Impulse Test shall use a 1.5 x 50 microsecond
wave.
4.4.3 LEAK TESTING
The transformer tank shall be filled with oil and tested for air and al leaks under (1) 4 psig vacuum for % hour,
(2) 7 prig pressure for 24 hours in the sequence indicated. An altercate method of leak testing may be
performed by injecting halogen gas under 10 psig and detecting leaks through the use of a halogen detector.
(Note, the automatictmanu al pressure relief device must be removed for this test).
4.4.4 NOISE TESTING
Noise testing shall be conducted in accordance with applicable NEMA Standards.
5. PREPARATION FOR DELIVERY
Transformers shall be prefilled with the appropriate amount of transformer oil and shall be shipped by open -bed truck. Units
shall be packaged in such a way as to provide for ease of handli rig and to protect units from shipping damage. Units shall be
fully palletized in four-way universal pallets with 28" minimum openings to facilitate handling from any side. Pallets shall be
independent of the transformer. The Supplier shall give 24-hair notice prior to delivery for any shipments where an individual
transformer weighs over 4,000 pounds. In addition to these requirements, the Supplier shall comply with ary additional
requirements or modifications shown on the purchase order and/or supplemental instructions.
17
368-300
Opal Dick - 368dash300.pdf Page 18�
REV. SYM: MM
6. DEFINITIONS AND ABBREVIATIONS
• Vendor or Supplier -The manufacturer and/or manufacturer's agent supplying or quoting on the specified article.
• Article, Unit, Assembly - All refers to the equipment defined by this specification.
DC or d.c.- Direct Current.
• AC or a.c. - Alternating Current.
• °C- Degree Celsius (Centigrade)
• °F -Degree Fahrenheit
• kV -1000 volts.
• CPS or Hz -Cycles per second.
• psig-Pounds per square inch gauge.
• V or v- Vats.
• kVA -1000 Volt-amperes.
18
368-300
Opal Dick 368dash300.pdf Page 19
REV. SYM. MM
APPENDIX A
Typical pad designs are shown in Figures 1A through 3A
The dimensions in inches of Figures 1A through 3A will fit the minimum compartments on transformers covered by this
Specification as well as the maximum transformer envelope.
19
368.300
I Opal Dick- 368dash300.pdf Page 20'
REV. SYM: MM
I I f
I I
10• I PRIMARY K SEC. A
6 FRO r ..—
-i-- 26' 2T• 17 19' FMR $3 KITH
I LENGTH AND
WIDTH
j—
7 5/9' —s — e
}tJ.
T T
Notes at Pad Material
I.Concrete must be J.000 pef mi irovm.
] 1.1or=w c*nree oa0resota ore 1 1/2 inches.
Spot@ ggAyslnsats for pad and pfingy edltcnno cownel *if generally
be 9X U'. Fxtom to he considered rn hattatiQ the pad include -
1. Aegpablaty - TM transformer Deed Mal at accessible to
line beam trucks equipped for the inelalatlan and remoypl of
hurry transformers. Sudn poendhtlity *hall not require
in Vutlon an, edpod.ft property.
1 Proximity of Buildings. k1a. Barriers. and/or ararhongs -
ln aaddlen to tho elaorMesa rec"rad for italollat.ea and
removal. the miienem clso-arco n front of the transformer pad
shot be eight (8) fact end the minimum clearance from at
other alma anal be Unme (J) feet it the aurdng nos an
ayam*ng• ppanee go pa odge of the venaformer pod tool
be measures harieantaby from the Me adpe of the overhonq.
Tronalormve tieo.ph 300 KV& may be tnstallcd under the
ewmono if as wnx:al deersed satgeom ae pad one tna
",hung k of Iseot )5 toot ad the Jesuitic, is xceesibh to
line boom trucks
J. Codes, and Standords - In addd'w to the above, the
installation shell conform to the National Electric Code and
trdera4 state and Cdy codes and !tondo rds.
2
S 25 93
We N0.
DATE
DWN
D.E. APP
DSNC. ENG APP
DIST ADP
CITY OF FORT COLLINS
DVVC 3PHASEI
LIGHT AND POWER DEPARTMENT
TRANSFORMER PAD DESIGN
aeew serve
75 - 500 KVA
LUM Wd pawn
3 PHASE
Figure 1A- Pad Design (75 -500 KVA) 20
36B-300
Opal Dick - 368dash300.pdf Page 21�
REV. SYM: MM
I I
�3.
I
I I
I I 72-
I --
n I plBNwxv SEIbtISAfly
—
Me
-r7
T{.— 18' 26' ar tg
rag w aEMA
,w LC1(LM Nd VIM.
Nato% an paid hiatrlm -
1. Cpnaela mutt be $.000 pg. rnmmum,
=raum
2. atria uggregste able 1 112 rLvb
9pera rapuearroata fee pta end prsnely afdtem.9 eoenot ii at gassy
be B" x 12'. raatore le be arletesed 1n locatr g toe pod rnet+de -
1 accemwity - The Lronafdrmer pod feel be otteatale w
floe boors tludq eouioaed era the IhelalotM and remavcl of
hooyy trat6falmrs. Suer, eeroasraely 00I not rotpro
ntrtman to, odpcanl property.
2. Plammd of @/dtlnye. *0114 Burl r% one err Wr tl -
h addiitar, to the dearaneas required for Z11ol.=4
quaver, too mRMYm 61*o141"M r from or eL Ifatafalme, pod
"I ere algal (e) teal erne the minimum Doormat from all
other *bfae *hot be four (4) feat, If the bJld'ng hot an
anrhaeq Boaronta to the Mgt of IM treerdrmM pod a,.1
be measuied hor$onlally fam the outs edge ar the ewlhang.
Gerwfolmos BraLlgy+ 300 KyA my be lnotdled under the
sTurtling A Ire wind aware W*oan tee pot once 11,411
oyorhonq fe at lepol 25 feel and the locotion it accessible to
Ire seem trawl
3. Codes and Standard* - In odeitton to the above. the
inotdlot Mr, atoll comorm, to me Notional awing fade we
federal, stole and city Lades once storWarde
11 02 BD
REV NO.
I OATE
OVA
0 E, APP
105140, ENO APP
O15T, APP
CITY OF FORT COLLINS
OWD 3PHASE2
LIGHT AND PO ER DEPARTI III
TRA SFOR ER P O OESIG
wee
500 — 1000 KVA
"�er's►"
3 PHASE
Figure 2A - Pad Design (500 -1000 KVA)
21
368-300
Opal Dick - 368dash300.pdf Page 2
REV. SYM: MM
�- 107'—ter
y—
3
I
��
pplNdrrr
15, I WINDOW SEC4t0lRY I
—Fie'--
28' 2B'
;29'
1 FIVE 87 AEDAb
E(WIH AND VID714
7'
T
Net" on pad Wwo —
1. Sdnarete mutl be S.ODD m Pat mrm. rru
2. yammum C00011e td few 1 1/2 inches,
Space raquIramwts lot pod and primary ayptehng eabelat Ills gowdly
be V X 12'. Fasten to be coneldsrod in locotbq the pod halWo —
1. A[co"abty — me tfohafarn•r pod 001 be occoubw to
line Doom trucks a t.+bcad for the installation and rea I of
ft" transform" Sum occrosolny snon MI raqura
inlnel'n m ad)aaenl property.
2. NorfimllV of Buidngo, *alttr Brrire, and/or Oyerhanao —
In addlian to the deormcta ramrod for installation and
removal, the mimmun Clearmoe In trerd al own transformer pad
'hall to eight (8) fwl and the nlnenum dearanco from all
other Bid, shall be Iaur C4) toot If the buitdbrg has an
erM1b'Ig, p"B"es to tM ad" ea the ndnsrermr pea "I
bee measured horip toly ham the oul , edge of the dvolhong.
Tranb/rmlrt "ougn AO KVA may ad 1,11411w y011111 me
evrwrg d ma wifem deerm" batljaan the pea and v%B
ovrh" is at lwet 25 fast and the location is occeadble to
the boom truce¢.
S. Cod" arm Standards — In addo CA to the cadre, the
mataladan than aanirm to lhd Notta" Eltclre Coda and
fedrdl, slate and dlv, codes and etantfoer�.
ill /02"go
REV NO.
DATE
0 N
D.E. APP
I OSNG. ENG APP
DIST. APP
CITY OF FORT COLLINS
DwG 3PHASE3
®
LIGHT AND POWER DEPAR7'^iENT
1000 - 2500 KVA
v.�........
3 PHASE
Figure 3A - Pad Design (1000-2500 KVA)
22
368-300
Opal Dickm- 368dash300.pdf — Page 23
REV. SYM: MM
APPENDIX B
Transformers purchased under this Specification shall be of the make shown below. Manufacturers not listed below may
submit written proposals demonstrating compliance with these Specifications for consideration of addition to the accepted
manufacturer list prior to the next request for bids. In addition to inclusion on the list below, manufacturer's equipment must
also satisfy all requirements of this Specification to be acceptable.
TABLE 38
MANUFACTURER SERIAL NO.
Cooper Power Systems
All
ASEA Brown-Bovad (ABB)
All
Howard Industries
All
Pauwels Transformers
All
The manufacturers in the following list have been conditionallyapproved and may bid as an alternate. The definition and
intend of "Conditional Approval' of a manufacturer is to allow the City to gain some experience with the manufacturers product.
Should a conditionally approved manufacturer be the evaluated low bidder, the City reserves the right to award all, part, or
none of the order to therm, dependant upon the current rinds of the City for that item or items.
23
36B-300
Opal Dick- 368dash300.pdf Page 241,
REV. SYM: MM
APPENDIX C
The following forms for Individual and Average Transformer Losses are used by the City of Fort Collins to determine loss
penalties.
1) Transformer Loss Evaluation Average Losses Form
2) Individual Transformer Loss Evaluation Form
24
368-300
Opal Dick - 368dash3OO.pdf Page 25
REV. SYM: MM
TRANSFORMER LOSS EVALUATION -AVERAGE LOSSES
City Order No. S/N _
Manufacturer Invoice No.
KVA/Unit
LINE DESCRIPTION AMOUNT
(1) No. of units,
(2) Average core losses
(3) Quoted core losses
(4) Excess average core losses:
line (2) less line (3)
(5) Penalty for excess average core losses:
line (1) x line (4) x $
(6) Average capper losses
(7) Quoted copper losses
(8) Excess average copper losses:
line (6) less line (7)
(9) Penalty for excess average copper losses:
line (1) x line (8) x $ _
(10) Penalty to be assessed manufacturer:
line (5) plus Gne (9) but not less
than zero
Date Prepared By:
Design Engineering
NOTE: If any unit(s) exceeds the loss tolerances of ANSI C57.12.00, Light & Power will either reject it, include it on these
averages, or calculate losses using the Individual Transformer Losses Evaluation Form, whichever is most favorable
to Light and Power.
25
368-300
Opal Dick - 368dash300.pdf Page 26
INDIVIDUAL TRANSFORMER LOSS EVALUATION
City Order No.
Manufacturer
KVA/Unit
LINE
DESCRIPTION
(1) _
Tested core losses
(2)
Quoted core losses
(3)
Excess core losses
line (1) less line (2) but rat less
than zero
(4)
Percent difference
line (3)-line (2) x 100
(5)
Tested total losses
(6)
Quoted total losses
m
Excess total losses
Line (5) less line (6) but not less
than zero.
(8)
Percent difference
Line (7) +- fine (6) x 100
(9)
_ Tested copper losses
00)
Quoted copper losses
(1I)
Excess copper losses
Line (9) less line (10) but not less
than zero.
(12)
Penalty for excess core losses
Line (3) x $
(13)
Penalty for excess capper losses
Line (11) x $
(14)
Penalty to be assessed manufacturer
Line (12) plus line (13)
S/N
Invoice No.
Date Prepared By:
Design Engineering
AMOUNT
REV. SYM: MM
26
368-300
Date: 08104/06
I"
IEisonic
City of Fort Collins
Page Number: 3
City of Fort Collins
Purchase Order Number: 6604956
Delivery Date: 08/04/06 Buyer: DICK,OPAL
Purchase Order number must appear on invoices, packing lists, labels, bills of lading, and all correspondence.
Note:
Line Qty UOM Description Unit Price Extended Price
7 CALENDAR DAYS BY
WESCO
Total
$100,648.00
City of Fort C16111fis Director of Purchasing and Risk Management City of Fort Collins
This order is valid over $2000 unless signed by James B. O'Neill 11, CPPO, FNIGP Accounting Department
City of Fort Collins Purchasing, PO Box 580, Fort Collins, CO 80522-0580 PO Box 580
Fort Collins, CO 80522-0580
Opal Dick - 368dash300instructions.pdf Paje
Revised 12/13/96
Special Conditions and Supplemental Instructions to Bidders
Applicable to Specification 368-300
A. Data to be supplied with Bidder's Proposal
The following data shall be supplied with the bidder's proposal in addition to that information required by
the "Invitation to Bid" and the "Purchase Requisition".
1. Impedance volts in percent (%) at full load, high voltage to low voltage at 85°C
2. No load and total losses at 85°C
3. Delivery in weeks
4. A statement indicating compliance with our Specification with exception or a detailed list of exceptions.
5. Escalation IS / IS NOT applicable for the transformers bid. If escalation applies, the Bidder
shall indicate in his bid, the specific items or materials subject to escalation and shall provide the method
and indices to be used in computing the amount thereof. Escalation occurring after acceptance, if Purchaser
exercises the option to delay shipment after manufacturing is completed, will not be paid.
If the above information and compliance statement are not supplied the proposal will not be evaluated
An alternate bid for the total order may be submitted in addition to the unit bids.
B. Loss Evaluations
Loss penalties and loss evaluations will be based on the following values:
1. No-load or excitation losses at $3.90/watt
2. Load losses at $2.301watt
C. Shipping Terms
Ship F.O.B. point of destination, freight prepaid.
D. Terms of Payment
1. If escalation applies, the City of Fort Collins shall not be billed for escalation occurring after the promised
delivery date.
2. Test reports shall accompany the invoice. If test reports do no accompany the invoice, late payment penalty
charges incurred due to delays in obtaining the test reports will not be paid. Certified copies of test reports
shall be sent to the Standards Engineering Section, Fort Collins Utilities - Light & Power.
3. Loss penalty credits and escalation charges shall be itemized on the invoice.
Opal Dick - 368dash300.pdf Page 1
THE CITY OF FORT COLLINS
Light and Pov✓er Department
P.O. Box 580
Fort Collins, CO 80522
SPECIFICATION NO: 368-300
TITLE: PAD -MOUNTED COMPARTMENTAL-TY PE THREE-PHASE
DISTRIBUTION TRANSFORMERS
MATH SEPARABLE
INSULATED LOAD BREAK HIGH -VOLTAGE CONNECTORS
APPROVED BY:
Kraig Bader
Standards Engineering Division Manager
ORIGINATION DATE: 8/12/83
REVISED: 2/2/2005
Opal Dick - 368dash300.pdf Pa e 2
REV. SYM: MM
ITEMS COVERED BY THIS SPECIFICATION
DESCRIPTION
STOCK
NO.
SPECIFICATION NO.
SERIAL
75
KVA
208Y/120 RADIAL
368-300
006
75
KV
40BY/277 RADIAL
368-300
-007
75
KVA
208Y/120 LOOP
368-300
.008
75
KVA
480Y/277 LOOP
368-300
-009
150
K\A
208Y/120 LOOP
368-300
-015
150
MIA,
480Y/277 LOOP
368-300
-016
300
MA
208Y/120 LOOP
368-300
-030
300
KVA
480Y/277 LOOP
368-300
-031
500
KVA
208Y/120 LOOP
368-300
-m
500
K\/A
480Y/277 LOOP
368-300
-051
750
KVA
208Y/120 LOP
368-300
-075
750
MA
480Y/277 LOOP
36&300
-076
1000
KVA
20BY/120 LOOP
368-300
-100
1000
KVA
480Y/277 LOOP
368-300
-101
1500
KVA,
480Y/277 LOOP I
36&300
-151
2000
KVA
480Y/277 LOOP
368-300
-201
2500
KVA 480Y/277 LOOP
368-300
-251
2
368-300
Opal Dick - WMash300.pdf Page 3
REV. SYM: MM
REVISION DESCRIPTIONS
REVISION DESCRIPTION Previous on file
APPROVED
REVISION FF:
Tim Sagen
Add Paragraph 5.2.2.9.3: pentahead locking bolts
Susan Coram
Paragraph 3.2.2.13.1: add glossy requirement.
10-18-95
REVISION GG:
Susan Coram
• Title page: Remove revised date
Tim Sagen
• Paragraph 4.4 and Table 2A Change Temperature Tests and Ndse Test from every
9-22-95
unit to one unit of design.
REVISION HH:
Opal Dick
GE removed from Appendix B
Tim Sagan
12-13-96
REVISION II
• Add paragraph .3.2.2.10 OVERCURRENT PROTECTION and renumber remaining
paragraphs in section 3.2
Opal Dick
• Revise Fig. 1 to reflect a "V " configuration for the primary bushing arrangement vs. an
Tim Sagen
in4ine arrangement.
613/99
• Revise Fig. 17 to remove requirement for CT mounting studs and increase dimensions
A from 5" and 5.5' to 6" on 225-2500 kVA sizes
REVISION JJ
Bill Bray
Reformat and converted to MS Word, delete List of Active Pages
Tim Sagen
9114 / 2000
REVISION KK
Kraig Bader
Added drawing la to describe cable accessory parking stand detail, revise to reflect
Tim Sagen
current editions of national standard s, charge impedance on 368-300.009 from
9 / 11 1 2001
1.7% to 1.9%.
REVISION ILL
Kraig Bader
• Change fusing from al -immersed current sensing weak link cartridge to a current
412/2004
sensing bay-o-net fuse link in series with an ELSP current limitfng backup
fuse (clause 3.2.2.10).
• Charge column header for impedance table in 3.2.2.1 to clarify that impedance
numbers are nominal values. (Tolerance s are consistent with ANSI C.57.12.00-
2000)
• Charged wording from "Mr. Ouch" in 3.2.2.15 to Waming label"
Revision MM
Kraig Bader
• Charge clause 3.2.2.10 to specify current sensing bayonet fuse link by size and
2/2/2005
part number. Table 2 was added for this pupose.
• Renamed table in 3.3.2.1 to from Table 2 to Table 3
Renamed table in 4.3. from Table 2A to Table 4
3
368-300
Opal Dick- 368dash300.pdf — Page 4
REV. SYM: MM
TABLE OFCONTENTS
ITEMS COVERED BYTHIS SPECIFICATION ............. ._....... ..... ....... ... .... .............. .......... „.. ........... .... ._...
...... _ .........._... 2
REVISIONDESCRIPTIONS ... ..... _......... ............. ......... _._. ................ ............._. ... _........ ..... ........ ......... ..... ._
.......... _. _......... .3
1. SCOPE .._...... _.... ....... ........ ................ ............... ............... ............. ................ ....... ._...... .... _.......... ................ .... .....
..... .........._.... ..5
2.APPLICABLE DOCUMENTS...... ..._..___.. .... .......... ... ._........ ............. ..._._._... ........ ..... _ .............. ........
_..... ............ ....5
3. REQUIREMENTS ............. ...._... ...... ................ .......... .._. ._...... ...... ............ ._... ........ ................. ....... ... .... ......_
........ ..............5
3.1 GENERAL REQUIREMENTS FOR DESIGN .......... ................ ................ ................ ................ ................ .- ........ .....
............... .......5
3.2 SPECIFIC REQUIREMENTS FOR DESIGN OF LOOP -FEED UNITS ........................... .._....... .............. .....
.......... .............7
3.3 SPECIFIC REQUIREMENTS FOR DESIGN OF RADIAL -FEED UNITS .................... ................ ................
................ ......16
CQUALITY ASSURANCE ............ ............ ......... _._ ..___...... ___........ _.......... .._..... .... .............. ....... .._....
....... _....... .16
4.1 GENERAL ................ ................ _............. ................ ................ .-............. ................................................ ................
................ .....16
4.2 TEST CONDITIONS ................ ................ ................-.............. ................ ................ ................................................
................ .....16
4.3 FUNCTIONAL TESTS ........... ................ ................ ................ .... ___ ...... ................ ................ ............... ..... _..... ....
................ .......17
4.4 TEST METHODS - FUNCTIONAL TESTS ................ ................ ................ ................ ................ ................ ................
................ 17
5.PREPARATION FOR DELIVERY.._._ ._._....... ._..._.._.._._.. ..... _....... .......... .._ .... _..... ._...... ._.....
_..... r._. _......17
6.DEFINITIONS AND ABBREVIATIONS.._.._._... ...... ____. _._......... -__.._.__ ........... _....... _. ..............
....._......... ._.... is
APPENDIXA _._.___. ...... ... _. _.__ _.._ ..... ._...___.. _....__..._. ..... ... _... _...._....... .___._.._
._._..__.. ........19
APPENDIXB_. .___. ._ ....._. _._ __ _._...___. .____.._.. .... ... ..... _.._.___. ._.._._._._
...._.._.__ ._._23
APPENDIXC _.____.. ....__.._.. ...._ ._._.. ............ ..... _......... _.__...._.. ._. _ __. ._........_ ._.__..__. .............
._...._..... .... _... 4
TRANSFORMER LOSS EVALUATION -AVERAGE LOSSES .......................... ................ ................ ................
................ .......25
INDIVIDUAL TRANSFORMER LOSS EVALUATION ...................... ................ ................ ................ ................
................- ...... 26
4
368-300
Opal Dick , 368dash300.pdf Page `.i
REV. SYM: MM
SPECIFICATION FOR
PAD -MOUNTED COMPARTMEN TAL-TY PE, THREE-PHASE
DISTRIBUTION TRANSFORMERS WITH
SEPARABLE INSULATED LOAD BREAK HIGH -VOLTAGE CONNECTORS
1. SCOPE
This Specification establishes the minimum electrical requirements and mechanical features of three phase, 60 HZ,
mineral oil immersed, self -cooled, pad -mounted, compartmen tal-type distribution transformers rated 2500 kVA and
smaller, high voltage 13,200 Grd Y/7620 volts, with separab le insulated load break high voltage connectors. These
transformers are used for step down purposes from an underground primary cable supply.
This standard generally conforms to ANSI requirements for pad -mounted compartm ental-type, self -cooled, three-phase,
distribution transformers for use with separable insulated high -voltage connectors, C57.12.26.
2.APPLICABLE DOCUMENTS
The following documents form a part of this Specification to the extent specified herein. The latest issue in effect on the
date of invitation for bids shall form a part of this Specification, unless otherwise noted.
• ANSI C57.12.00 - Distribution, pawer, and regulating transformer s, and shunt reactors, general requirements for
• ANSI C57.12.26 - Pad mooted, compartrtmental-ly, pe, self -cooled three phase, distribution transformers for use with
separable insulated high voltage connectors, high voltage 34,500 Grd Y/19,920 volts and below,
2500 WA and smaller, requirements for
• ANSI C57.12.70 - Terminal markings and corrections for distribution and power transformers
• ANSI C57.12.80-Teminology for power and distribution transformers
• ANSI C57.12.80 - Distribution, power, and regulating transformers, and shunt reactors, test code for
• ANSIREEE 386 - Separable insulated connectors for power distribution systems above 600V
NEMA STANDARD TR1-Trarsfommers, regulators and reactors
3. REQUIREMENTS
3.1 GENERAL REQUIREMENTS FOR DESIGN
3.1.1 BASIC DESIGN STANDARDS
Transformers purchased under these Specifications shall be new and, unless otherwise specified, meet the
requirements of the applicable ANSI Standards and the modification and additions given in the subsequent
paragraphs. In case of conflict, the requirements of the following documents shall apply in the priority shown:
This Specification.
ANSI C57.12.26
Other applicable ANSI and NEMA Standards.
3.1.2 KILOVOLT -AMPERE TEMPERATURE RATINGS
IGlovolt-ampere ratings are continuous and are based on rat exceeding either a 65°C average winding
temperature or an WC hot spot temperature rise. The temperature rise of the insulating al shall not exceed
65°C when measured near the top of the tank. The temperature rise is based on an altitude of 3,300 feet.
3.1.3 GENERAL CONSTRUCTION
3.1.3.1 The pad -mounted compartmenaR ype transformers shall consist of the transformer tank, high -voltage
cable terminating compartment, and the law -voltage cable-terninatin g compartment. All three of these
components shall be assembled as an integral unit, tamperproof and weatherproof for mounting on a
pad. There shall be no exposed screws, bolts or other fastening devices, which are externally
removable, except the main cover bolts may be exposed. VVlmere the main cover bolts are exposed, the
5
368-300
Opal Dick- 368dash300.pdf Page 6
REV. SYM: MM
comer bolts shall be welded or otherwise render ed tamperproof. There shall be no opering through
which foreign objects such as sticks, rods, or wire s might be inserted to contact live parts. Suitable
means for padlocking the compartment door(s) shall be provided.
3.1.3.2 The high and law -voltage compartment shall be located side by side on one side of the transformer tank.
When facing the compartment, the low -voltage compartment shall be on the right.
3.1.3.3 Construction of the unit shall be such that it can be lifted, skidded, and slid into place on the mounting
pad without disturbing the entrance cables.
3.1.3.4 An undercoating over the regular finish or an equivalent treatment shall be applied to all surfaces that
are in contact with the pad to minimize corrosion.
3.1.3.5 Minimum dimensions shall be as shown in Fig. 1 of this Specification. Maximum transformer and
minimum pad dimensions are shown in Fig. 6 of this Specification.
3.1.4 LOSSES
The total losses of a transformer shall be the sum of the excitation losses and the load losses (12R losses).
Load loss tests shall be performed and reported on all units regardless of whether or not a record of such
tests is available on duplicate units. Loss evaluations and loss costs will be based on the values shown in the
"Special Conditions and Supplemental Instructions to Bidders." Transformers will be evaluated on excitation
losses and rR losses at the specified rates. If tested losses exceed quoted losses but are within the
tolerances of paragraph 9.3, ANSI C57.12.00-2000, the additional cost incurred from the differential of losses
will be calculated using the following equation and the above specified rates and will be deducted from the
original Purchase Order or back charged to the manufacturer. In Table 16 and the following equation "Units"
shall mean "Transformers of the same size and design on one order."
Excess loss $ = [No. of units] [(No Load Loss Evaluat ion $) (Avg. No Load Losses — Quoted No Load Losses)
+ (Load Loss Evaluation $) (Avg. Load Losses —Quoted Load Losses)]. If this equation results in a negative
number no credit will be given the Supplier.
If arty unit or units exceed the tolerances of paragraph 9.3, ANSI C57.12.00-2000, that unit or units shall not
be slipped without express permission from the City. If accepted, the deduction for excess losses will be
based on the following equation: Excess loss $ = (No Load Loss Evaluation $) (No Load Losses — Quoted No
Load Losses) But Not Less Than Zero + (Load Loss Evaluation $) (Load Losses — Quoted Losses) But Not
Less Than Zero.
3.1.5 SERVICE CONDITIONS
Service conditions shall be as defined in paragraph 4.1 of ANSI C57.12.00 except the ambient temperature
range shall be 40"C above to 32"C below zero. The transformer shall operate safely with starting
temperatures as law as 32"C below zero.
6
368-300