Loading...
HomeMy WebLinkAbout102795 WESCO DISTRIBUTION INC - PURCHASE ORDER - 6604956Date: 08/04/06 �w tr 4 City of Fort Collins Page Number: 1 City of Fort Collins Purchase Order Number: 6604956 Delivery Date; 08/04/06 Buyer: DICK,OPAL Purchase Order number must appear on invoices, packing lists, labels, bills of lading, and all correspondence. Note: Line City UOM Description Unit Price Extended Price 1 4 EA T3000151; xfiner 1500kva;pad mount T3000151 YARD TRANSFORMER, 1500 kVA PAD -MOUNTED COMPARTMENTAL TYPE, THREE PHASE DISTRIBUTION WITH SEPARABLE INSULATED LOAD BREAK HIGH VOLTAGE CONNECTORS. HIGH VOLTAGE RATING: 13200 GRDY17620. LOW VOLTAGE RATING: 480Yl277. SERIAL NUMBER 151 TO BE IN ACCORDANCE WITH SPECIFICATION #368-300-151, REVISION MM MFR. ABB ESCALATION IS APPLICABLE ADJUSTMENTS WILL BE REVIEWED BY CITY PRIOR TO PRODUCTION AND IN 25,162.000 100, 648.00 Opal Dick7 368dash300.pdf Pale 7 REV. SYM: MM 3.2 SPECIFIC REQUIREMENTS FOR DESIGN OF LOOP -FEED Units 3.2.1 FUNCTIONAL DESCRIPTION The transformer shall be a three phase, pad mounted, loop feed -safe break, "deadfrord" type for use on a 13.8 kV grounded "Y" distribution system. 3.2.2 DESIGN AND CONSTRUCTION 3.2.2.1 RATINGS Table 1 - Loon -Feed Transformer Retinas Stock No. WA Low Nominal voltacle Impedance Bushing T e/Confi. High Voltage Low Voka e 368-300- 008 75 208Y/120 1.9% C of 368-300- 009 75 480YI277 1.7% C of 368-300- 015 150 20BY/120 2.1% C of 368-300- 016 150 480Y/277 2.1% C of 368-300- 030 300 208Y/120 2.5% C of 368-300- 031 300 480Y/277 2.5% c of 368-300- 060 500 208Y/120 3.04% c e 368-300- 051 500 480Y/277 3.04% c of 368-300- 076 750 208Y/120 5.75% C 368-300- 076 750 480Y/277 5.75% c 368-300- 100 1000 208Y/120 5.75% c 368-300- 101 1000 480Y/277 5.75% c 368-300- 151 1500 480Y/277 5.75% C 368-300- 201 2000 480Y/277 5.75% C g 1 368-300- 251 2500 480Y/277 5.75% C q CFigure 1 (V-config.) of this specification e Low -voltage line and neutral terminals shall be stud type bushings in accordance with ANSI C57.12.2fr1992, Fig. 9(d) and shall include a separate spade with NEMA standard drilling f Figure 9(a) of ANSI C57.12.26 -1992 (4-hole pad) g Figure 9(b) of ANSI C57.12.26 -1992 (6-hole pad) 3.2.2.2 INSULATION LEVEL 3.2.2.2.1 The basic impulse level (BIL) of the comple tely assembled transformer, including high -voltage and low -voltage terminals shall be 95 kV and 30 kV respectively. 3.2.2.2.2 Dielectric test levels shall be in accordance with the distribution levels in Paragraph 5.10 of ANSI C75.12.042000 3.2.2.2.3 The unit shall withstand test voltages in ac cordance with ANSI C57.12.00 and impulse tests in accordance with NEMA Standards for Transfommeis, Publications No. TR1. 3.2.2.3 TRANSFORMER CORE A five -legged core -coil assembly or three separate core -coil assemblies shall be employed. The use of three-legged designs is expressly prohibited. 7 368300 O al Dick - 3684ash390.pdf ___Pale REV. SYM: MIA 3.2.2.4 HIGHVOLTAGE TAPS A no-load tap changer with external operating handle shall provide two 2 Y: full capacity taps above and below normal. The operating handle shall be mounted in the primary compartment. 3.2.2.5 BUSHING WELLS AND TERMINALS 3.2.2.5.1 The number, location, and arrangement of bushing wells, terminals and parking stands shall be as shown in Fig. 1 and Fig. 5 of this specification. All low-votage bushings and high -voltage wells shall be externally clamped and shall have leads of sufficient length to allow them to be changed without removing he cover. Welded bushings and wells are expressly prohibited. 3.2.2.5.2 High -voltage bushi rig wells shall be 200A load -break interface 8.304.4 kV bushings in accordance with ANSI/IEEE Sid. 386. 3.2.2.5.3 Law voltage bushing arrangement and spacing shall be "staggered", as shown in Fig. 5 of this Specification. 3.2.2.5.4 The low -voltage neutral shall be a fully insu fated bushing. A ground pad shall be provided on the outer surface of the tank and a removable copper ground strap shall be provided and connected between the low -voltage neutra I bushing and the ground pad. 3.2.2.5.5 The high -voltage neutral shall be connected to the low -voltage neutral internally with provision for opening this connection for testing. 3.2.2.6 ACCESSORY CABINET 3.2.2.6.1 The accessory cabinet shall consist of a high -voltage and low- voltage compartment generally constructed in accordance with applicable ANSI specifications and dimensioned in accordance with Fig.1 of this Specification. 3.2.2.6.2 Cabinet doors shall be hinged, removable, and lockable. Stainless hinge pins shall be provided. 3.2.2.7 ACCESSORY EQUIPMENT Accessory equipment shall be provided in accordance with Table 1A and the following details: 3.2.2.7.1 Suitable jack bosses or equivalent jacking facilities shall be provided on the tank. Vertical clearance for a jack shall be 1'/ inches minimum, 3'/ inches maximum. 3.2.2.7.2 The transformer base shall be arranged for rolling in two directions: Parallel to and at right angles to the centerline of the high -voltage bushings. 3.2.2.7.3 Four lifting lugs shall be provided. These lugs shall be adequate strength and size and arranged on the tank to provide a suitable lift for the completely assembled unfit. 3.2.2.7.4 The base of the assembly shall be provided with suitable means for mounting the unit on the pad. An internal flange shall be provided at the base of the accessory compartment to provide means for mounting the unit on the pad. (Fig. 1). 3.2.2.7.5 Terminal designations are shown in Figure 1. The identification of terminal connections shall be shown on the instruction nameplate. Instruction nameplate shall be corrosion resistant, located in the low -voltage compartment, and shall be readable with cables in place. Where the nameplate is mounded on a removable part, the manufacturer's name and transfomier serial number shall be permanently affixed to a non -removable part. Instruction nameplate shall contain the informal ion specified in ANSI C57.12.00-2000, paragraph 5.12. In addition, either on the nameplate or label affixed near it, the manufacturer shall indicate that the dielectric fluid is non -PCB. 8 368-300 Opal Dick- 368dash300.pdf Page 9 REV. SYM: MM 3.2.2.7.6 An automatic pressure relief device shall be located within the compartment. This device shall meet the following requirements: • Y4" NPT or larger male Inlet Port. • Exposed parts of weather and corrosion resistant materials. • Non-deterioratin g gasket and o-ring material. Manual pull ring able to withstand 25 pound force minimum. Body able to withstand 100 pound force minimum. Bug shield. • Cracking pressure of 10 t 2 psig. • Resealing pressure of 6 psig minimum. • Zero leak rate from resealing pressure to —8 psig. Minimum flow rate of 35 SUM at 15 psig. 3.2.2.8 OILPRESERVATION Transformers shall be of sealed -tank construction. Sealed -tank construction is that which seals the interior of the tank from the atmosphere, and in which the gas plus the oll volume remains constant. The transformer will remain effectively sealed for a top -oil temperature range of —32"C to 105°C. 3.2.2.9 TANKS The tank shall be donned or sloped to shed water and shall be of sufficient strength to support a minimum of 500 lbs. Construction of the tank shall be in accordance with ANSI C57.12.26-1992, Section 7, except bolted cover is preferred. 3.2.2.9.1 If main cover is welded, adequate handhole(s) shall be provided. Handholes shall be concealed. Bolted -on covers shall be adequately gasketed and tamperproof. Main cover bolts may be exposed; however, where cover bolts are exposed, the corner looks shall be welded or otherwise rendered tamperproof. 3.2.2.9.2 Tank grounding provision shall be in accordance with paragraph 7.6.4 of ANSI C52.12.2&1992. 3.2.2.9.3 Locking bolts shall be pentahead style. 3.2.2.10 OVERCURRENT PROTECTION Overcurrent protection shall consist of a single element current sensing bay-o-net fuse link in series with an ELSP current limiting backup fuse. Fuses shall be sized as shown in Table 2: Tahro 9 - Fn4:rnn Rannrremnnie Expulslom Fuse Cbnfdirdous Current tlmlting•F43e suck WA g1jrrsnt,1U9ng continuous C4rrlgtJ£a�ag Nu fiber Ca a I Pa humber' 1 oart Numbe be ., 368-30600E 75kVA MA 30A 368-300-OW 4000353C06 3574030WIM 115q VA I 36&300-016 (4000353C081 113544040M61M1 368-300-030 300 VA 1 I 36&306031 (4000353C16) I (3544065M611A 368-306051 500kVA 40A 100A 4000353C12 3544100M71 368-3(16075 750kVA 65A 125A 368-300-076 750kVA (4000353C 14) (3544125M71 M) 368-300-10/) 1000kVA 368-306101 1000kVA 12000kVA I ruses 368-300-201 (4000353C 17) I (3544125M71M)125A 38&306251 12500kVA 1125A Hi-Arrp OL Un k C05CB 1 :25M71el 125A fuses 125DA Fuse snap oe as specinea in the table above or shall be an equivalent as approved in writing by Electric Standards Engineering. 9 368-300 Opal Dick - 368dash3OO.pdf Page 10 REV. SYM: MM 3.2.2.11 COMPONENTS FOR LOOPED PRIMARY The minimum current -carrying capability of components for the looped primary cable system shall be 200 amperes (continuous) and 10,000 amperes symmetrical (momentary). 3.2.2.12 AUDIBLE SOUND LEVEL The audible sound level shall be in accordance with NEMA Standard TR1. 3.2.2.13 BASE PLAN The base plan of a completely assembled unit shall be such that it can be installed on a pad of the dimensions shown in Fig. 6 of the specification. 3.2.2.14 PAINT 3.2.2.14.1 Surfaces to be painted shall be blast cleaned (commercial blast) to provide a clean dry surface free of dirt, dust, chalk, loose paint, rust, grease and any other contaminants. 3.2.2.14.2 EEI "Finishing Guidelines" specification shall apply. Finish coat shall be Desert Tan, Munsell #10YR6.013.0, glossy. 3.2.2.15 SAFETY LABELS The manufacturer shall not apply NEMA 260 Safety Labels. The Purchaser will apply custom warning labels after delivery. 3.2.2.16 ANGULAR DISPLACEMENT: Per Fig.10(b) of ANSI C57.12.26-1992. 10 368-300 Opal Dick- 368dash300.pdf Page 1 LKL i — A�i NM au— I11 18 — 4 4 � 4 Xe 661111 &B I —�- y y # zz6 FLANGE 31C MIN 1 1m MAX MOMIN, XVARATINGS LOWVOLTAGE RATINGS COMPARTMENT 0IMENSION6 (MINIMUM) BUSHING HEIGHT A' B 7s1w ALL n.zs 21 ZL456p ALL ]S 31 756100p 4fi0j/ .2 YAM y q6 15642500 A9BY1227 ?0 a8 NOTE: ' NW., Marta dh.,una. See Fig Al6nemima in lindnMI. Mwi n= di nsns r aN1 all . ane M h clenenca arum W, d Id (Fig. 6) Fiq_ure1 -Accessory compartment & Bushing Dimensions (Config. 1) REV. SYM: MM 11 368-300 Opal Dick- 368dash300.pdf Page 12 TANK SVRFACE 41 11 TANK SURfAGEi � � F i i I 1 I t 1 f I O.F5 57$ 0 INSIDE Cable Aaca vPatkkuy Stawl Figure 1A —Cable Accessory Packing Stand Detail ERI:gure (Config. 2) -DELETED 7/92 Figures 3 & 4 - DELETED 11/00 Ref. now to: ANSI C57.12.26 - 1992 figures 9(a) & 9(b) REV. SYM: MM 12 368-300 Opal Dick 368dash300.pdf Page 1 REV. SYM: MM 4.0" A A A 4 0 6" RADIUS MIN MIN TYPICAL 3 PLACES m 1 W , X 1 , —i X3 B I\ XO i\ X2 CL KVA RATINGS LOW VOLTAGE RATINGS A B 75-150 ALL 4.75 8 225-500 ALL 6 8 750-2500 480/277, 208Y1120 6 10 Figure 5- Staggered Low -Voltage Bushing Arrangement (all dimensions minimum inches). NOTE: An area having a 6 inch radius around each bushing shall remain clear of obstructions such as gauges, etc. 13 368300 Opal Dick - 368dash300 pdf Page 1� REV. SYM: MM 1 KVA I SERIAL I PAD DIMENSIONS (inches) A B c D E F 75 -006 thru -009 75 55 40 21 15 61 150 -015 75 55 40 21 15 61 150 -016 75 55 40 21 15 61 300 -030 75 55 40 21 15 61 300 -031 75 55 40 j 21 15 61 500 -050 75 55 40 21 15 61 500 -051 75 55 40 21 15 61 750 -076,-075 85 72 49 23 15 67 1000 -101,-100 85 72 49 23 15 67 1500 -151 101 87 51 23 15 76 2000 -201 107 88 51 23 15 79 2500 251 107 88 51 23 15 79 Fig.6 - Pad Dimensions 14 368-300 Opal Dick - 368dash300.pdf Pale 1 5 REV. SYM: MM TABLE 1A ACCESSORY EQUIPMENT ACCESSORY I KVA 75-150 300 500-2500 Tap changer handle in HV compartment X X X Instruction nameplate in LV compartment X X X Jacking provisions X X X Provisions for rolling in two directions X X X Lifting lugs X X X Provisions for mounting on pad X X X Arrester mounting provisions Grounding provisions in Froth compartments X X X 1" oil drain plug X 1" oil drain valve with sampling device X X Upper filter press and filling plug (or cap) (11 X X X Provisions for oil gauge X Provisions for pressure-vacmn gauge X X Oil gauge X Thermometer X X X Secondary CT mounting holes (4 holes on 4 3/8" x 5 518" centers) X X X Manual/automat is pressure relief valve X X X 15 368-300 Opal Dick - 368dash300.pdf Page 1 REV. SYM: MM 3.3 SPECIFIC REQUIREMENTS FOR DESIGN OF RADIAL -FEED Units 3.3.1 FUNCTIONAL DESCRIPTION The transformer shall be a three phase, pad mounted, radial feed safe break, "deadfront" type for use on a 13.8 W grounded "Y" distribution system. 3.3.2 DESIGN AND CONSTRUCTION The requirements for radial -feed transformers shall be the same as those of loop -feed with the following exceptions: 3.3.2.1 RATINGS Table 3 - Radial -Feed Transformer Ratings Low Stock No. kVA Impedance Voltage L_Bushing Type/Conftg. High Voltage Low Voltage 368-300- 006 75 208Y/120 1 9% d f h 368-300- 007 75 480Y/277 1 9% C f h d Per Figures 5q & 7 of ANSI C57.12.26-1992 (In-Une) EXCEPTION: high voltage bushings shall be 32 - 36 inches above the base of the transformer f Figures 9(a) & 9(d) of ANSI C57.12.26 -1992 (stud with 44,de pad) h Figure 8(a) of ANSI C57.12.26-1992 (Staggered) 3.3.2.2 ACCESSORY CABINET The accessory cabinet shall be dimensioned in accordance with Fig. 7 of ANSI C57.12.26-1992. 4. QUALITY ASSURANCE 4.1 GENERAL 4.1.1 RESPONSIBILITY FORINSPECTION Unless otherwise specified, the vendor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the vendor may utilize his own facilities or any commercial laboratory acceptable to the City of Fort Collins. The City reserves the right to perform or witness any of the inspections set forth in this Specification where such inspections are deemed necessary. 4.1.2 TEST REPORT The manufacturer shall furnish to the purchaser certified copies of the results of all tests prior to payment. Copies shall be sent to the Design Section as well as with the invoice. Unsigned copies are not acceptable even If accompanied by a signed cover letter. The Quality Control Manager shall review and sign each test report. 4.2 TEST CONDITIONS Unless otherwise specified, testing defined in Sectio n 4.6 shall be conducted under the following conditions: 4.2.1 REFERENCE TEMPERATURE The reference temperature to which losses, impedance, regulation, and efficiency are corrected shall be 85' C. 4.2.2 TOLERANCE ON IMPEDANCE VOLTAGE Tolerance shall be as specified in ANSI C57.12.00. 16 368-300 Date: 08/04/06 City of Fort Collins Page Number: 2 City of Fort Collins Purchase Order Number: 6604956 Delivery Date: 08/04/06 Buyer: DICK,OPAL Purchase Order number must appear on invoices, packing lists, labels, bills of lading, and all correspondence. Note: Line Qty UOM Description Unit Price Extended Price ACCORDANCE WITH STATED INDICES IN PRICING. ANY INDEX ESCALATION (INCREASE) AFTER THE QUOTED DELIVERY DATE WILL NOT BE ALLOWED. NO LOAD LOSS - 1813 FULL LOAD LOSS - 8109 TOTAL LOAD LOSS - 9922 IMPEDANCE 5.75% DELIVERY: 32 WEEKS OR CITY OF FORT COLLINS MAY CONSIDER THE CAPACTIY PLAN ARRANGEMENT AS PROVIDED IN THE QUOTATION FOR THESE UNITS WITH SPECIFIC SHIPMENTS AND QUANTITIES TO BE STATED WITHIN THE NEXT Opal Dick - 368dash300.pdfPage 1 REV. SYM: MM 4.2.3 TOLERANCE ON IMPEDANCE VOLTAGE ON A TAP The percent departure of tested impedance voltage on any tap from tested impedance voltage at rated voltage shall not be greater than the total tap voltage range expressed as a percentage of the rated voltage. 4.3 FUNCTIONALTESTS Functional tests shall consist of those tests and related requirements as cross referenced in Table 4 and shall be performed on each unit, except Temperature and Noise Tests wh ch shall be performed on one unit of each design (KVA) per order. T.M. A C......H....-1 T--, TEST TEST PARAGRAPH REQUIREMENT OR REFERENCE Examination Of Product 4.6 3.0 3.1 3.2 3.3 hisspecification) Ratio 4.6 ANSI C57.12.00 Section 8 Polarity And Phase Relation 4.6 ANSI C57.12.00 Section 8 Excitation Loss 4.6 ANSI C57.12.00 Section 8 Excitation Current 4.6 ANSI C57.12.00 Section 8 Impedance & oad Loss 4.6 ANSI C57.12.00 Section 8 Tern ature Tests* 4.6 ANSI C57.12.00 Section 8 Dielectric Tests 4.6.1 3.2.2.2 s specification) Im ulse Tests 4.6.2 3.2.2.2 hiss ification Leak Testing 4.6.3 3.2.2.8 & 3.2.2.9 his ification Noise Testing* 4.6.4 3.2.2.12 hiss cation VI n UI MI rlCI UM1911 I" ULif,4. 4.4 TEST METHODS -- FUNCTIONAL TESTS Each completed unit shall be inspected to determine compliance with respect to dimensions, material, workmanship, construction and marking, and routine tests on all units shall be made as specified in Section 8 of ANSI Standard C57.12.00, and in ANSI Standard C57.12.90. In addition to routine tests, the following test requirements arx!<or modifications shall apply. 4.4.1 DIELECTRIC TESTS Induced and applied potential Dielectric Tests shall be performed in accordance with ANSI C57.12.00 and C57.12.90. The low voltage windings shall have a test potential to ground of 10,000 volts for one minute. The test potential between high voltage windings shall be 34,000 volts for one minute. 4.4.2IMPULSE TESTS ANSI Standard Impulse Tests shall be performed. Full Wave Impulse Test shall use a 1.5 x 50 microsecond wave. 4.4.3 LEAK TESTING The transformer tank shall be filled with oil and tested for air and al leaks under (1) 4 psig vacuum for % hour, (2) 7 prig pressure for 24 hours in the sequence indicated. An altercate method of leak testing may be performed by injecting halogen gas under 10 psig and detecting leaks through the use of a halogen detector. (Note, the automatictmanu al pressure relief device must be removed for this test). 4.4.4 NOISE TESTING Noise testing shall be conducted in accordance with applicable NEMA Standards. 5. PREPARATION FOR DELIVERY Transformers shall be prefilled with the appropriate amount of transformer oil and shall be shipped by open -bed truck. Units shall be packaged in such a way as to provide for ease of handli rig and to protect units from shipping damage. Units shall be fully palletized in four-way universal pallets with 28" minimum openings to facilitate handling from any side. Pallets shall be independent of the transformer. The Supplier shall give 24-hair notice prior to delivery for any shipments where an individual transformer weighs over 4,000 pounds. In addition to these requirements, the Supplier shall comply with ary additional requirements or modifications shown on the purchase order and/or supplemental instructions. 17 368-300 Opal Dick - 368dash300.pdf Page 18� REV. SYM: MM 6. DEFINITIONS AND ABBREVIATIONS • Vendor or Supplier -The manufacturer and/or manufacturer's agent supplying or quoting on the specified article. • Article, Unit, Assembly - All refers to the equipment defined by this specification. DC or d.c.- Direct Current. • AC or a.c. - Alternating Current. • °C- Degree Celsius (Centigrade) • °F -Degree Fahrenheit • kV -1000 volts. • CPS or Hz -Cycles per second. • psig-Pounds per square inch gauge. • V or v- Vats. • kVA -1000 Volt-amperes. 18 368-300 Opal Dick 368dash300.pdf Page 19 REV. SYM. MM APPENDIX A Typical pad designs are shown in Figures 1A through 3A The dimensions in inches of Figures 1A through 3A will fit the minimum compartments on transformers covered by this Specification as well as the maximum transformer envelope. 19 368.300 I Opal Dick- 368dash300.pdf Page 20' REV. SYM: MM I I f I I 10• I PRIMARY K SEC. A 6 FRO r ..— -i-- 26' 2T• 17 19' FMR $3 KITH I LENGTH AND WIDTH j— 7 5/9' —s — e }tJ. T T Notes at Pad Material I.Concrete must be J.000 pef mi irovm. ] 1.1or=w c*nree oa0resota ore 1 1/2 inches. Spot@ ggAyslnsats for pad and pfingy edltcnno cownel *if generally be 9X U'. Fxtom to he considered rn hattatiQ the pad include - 1. Aegpablaty - TM transformer Deed Mal at accessible to line beam trucks equipped for the inelalatlan and remoypl of hurry transformers. Sudn poendhtlity *hall not require in Vutlon an, edpod.ft property. 1 Proximity of Buildings. k1a. Barriers. and/or ararhongs - ln aaddlen to tho elaorMesa rec"rad for italollat.ea and removal. the miienem clso-arco n front of the transformer pad shot be eight (8) fact end the minimum clearance from at other alma anal be Unme (J) feet it the aurdng nos an ayam*ng• ppanee go pa odge of the venaformer pod tool be measures harieantaby from the Me adpe of the overhonq. Tronalormve tieo.ph 300 KV& may be tnstallcd under the ewmono if as wnx:al deersed satgeom ae pad one tna ",hung k of Iseot )5 toot ad the Jesuitic, is xceesibh to line boom trucks J. Codes, and Standords - In addd'w to the above, the installation shell conform to the National Electric Code and trdera4 state and Cdy codes and !tondo rds. 2 S 25 93 We N0. DATE DWN D.E. APP DSNC. ENG APP DIST ADP CITY OF FORT COLLINS DVVC 3PHASEI LIGHT AND POWER DEPARTMENT TRANSFORMER PAD DESIGN aeew serve 75 - 500 KVA LUM Wd pawn 3 PHASE Figure 1A- Pad Design (75 -500 KVA) 20 36B-300 Opal Dick - 368dash300.pdf Page 21� REV. SYM: MM I I �3. I I I I I 72- I -- n I plBNwxv SEIbtISAfly — Me -r7 T{.— 18' 26' ar tg rag w aEMA ,w LC1(LM Nd VIM. Nato% an paid hiatrlm - 1. Cpnaela mutt be $.000 pg. rnmmum, =raum 2. atria uggregste able 1 112 rLvb 9pera rapuearroata fee pta end prsnely afdtem.9 eoenot ii at gassy be B" x 12'. raatore le be arletesed 1n locatr g toe pod rnet+de - 1 accemwity - The Lronafdrmer pod feel be otteatale w floe boors tludq eouioaed era the IhelalotM and remavcl of hooyy trat6falmrs. Suer, eeroasraely 00I not rotpro ntrtman to, odpcanl property. 2. Plammd of @/dtlnye. *0114 Burl r% one err Wr tl - h addiitar, to the dearaneas required for Z11ol.=4 quaver, too mRMYm 61*o141"M r from or eL Ifatafalme, pod "I ere algal (e) teal erne the minimum Doormat from all other *bfae *hot be four (4) feat, If the bJld'ng hot an anrhaeq Boaronta to the Mgt of IM treerdrmM pod a,.1 be measuied hor$onlally fam the outs edge ar the ewlhang. Gerwfolmos BraLlgy+ 300 KyA my be lnotdled under the sTurtling A Ire wind aware W*oan tee pot once 11,411 oyorhonq fe at lepol 25 feel and the locotion it accessible to Ire seem trawl 3. Codes and Standard* - In odeitton to the above. the inotdlot Mr, atoll comorm, to me Notional awing fade we federal, stole and city Lades once storWarde 11 02 BD REV NO. I OATE OVA 0 E, APP 105140, ENO APP O15T, APP CITY OF FORT COLLINS OWD 3PHASE2 LIGHT AND PO ER DEPARTI III TRA SFOR ER P O OESIG wee 500 — 1000 KVA "�er's►" 3 PHASE Figure 2A - Pad Design (500 -1000 KVA) 21 368-300 Opal Dick - 368dash300.pdf Page 2 REV. SYM: MM �- 107'—ter y— 3 I �� pplNdrrr 15, I WINDOW SEC4t0lRY I —Fie'-- 28' 2B' ;29' 1 FIVE 87 AEDAb E(WIH AND VID714 7' T Net" on pad Wwo — 1. Sdnarete mutl be S.ODD m Pat mrm. rru 2. yammum C00011e td few 1 1/2 inches, Space raquIramwts lot pod and primary ayptehng eabelat Ills gowdly be V X 12'. Fasten to be coneldsrod in locotbq the pod halWo — 1. A[co"abty — me tfohafarn•r pod 001 be occoubw to line Doom trucks a t.+bcad for the installation and rea I of ft" transform" Sum occrosolny snon MI raqura inlnel'n m ad)aaenl property. 2. NorfimllV of Buidngo, *alttr Brrire, and/or Oyerhanao — In addlian to the deormcta ramrod for installation and removal, the mimmun Clearmoe In trerd al own transformer pad 'hall to eight (8) fwl and the nlnenum dearanco from all other Bid, shall be Iaur C4) toot If the buitdbrg has an erM1b'Ig, p"B"es to tM ad" ea the ndnsrermr pea "I bee measured horip toly ham the oul , edge of the dvolhong. Tranb/rmlrt "ougn AO KVA may ad 1,11411w y011111 me evrwrg d ma wifem deerm" batljaan the pea and v%B ovrh" is at lwet 25 fast and the location is occeadble to the boom truce¢. S. Cod" arm Standards — In addo CA to the cadre, the mataladan than aanirm to lhd Notta" Eltclre Coda and fedrdl, slate and dlv, codes and etantfoer�. ill /02"go REV NO. DATE 0 N D.E. APP I OSNG. ENG APP DIST. APP CITY OF FORT COLLINS DwG 3PHASE3 ® LIGHT AND POWER DEPAR7'^iENT 1000 - 2500 KVA v.�........ 3 PHASE Figure 3A - Pad Design (1000-2500 KVA) 22 368-300 Opal Dickm- 368dash300.pdf — Page 23 REV. SYM: MM APPENDIX B Transformers purchased under this Specification shall be of the make shown below. Manufacturers not listed below may submit written proposals demonstrating compliance with these Specifications for consideration of addition to the accepted manufacturer list prior to the next request for bids. In addition to inclusion on the list below, manufacturer's equipment must also satisfy all requirements of this Specification to be acceptable. TABLE 38 MANUFACTURER SERIAL NO. Cooper Power Systems All ASEA Brown-Bovad (ABB) All Howard Industries All Pauwels Transformers All The manufacturers in the following list have been conditionallyapproved and may bid as an alternate. The definition and intend of "Conditional Approval' of a manufacturer is to allow the City to gain some experience with the manufacturers product. Should a conditionally approved manufacturer be the evaluated low bidder, the City reserves the right to award all, part, or none of the order to therm, dependant upon the current rinds of the City for that item or items. 23 36B-300 Opal Dick- 368dash300.pdf Page 241, REV. SYM: MM APPENDIX C The following forms for Individual and Average Transformer Losses are used by the City of Fort Collins to determine loss penalties. 1) Transformer Loss Evaluation Average Losses Form 2) Individual Transformer Loss Evaluation Form 24 368-300 Opal Dick - 368dash3OO.pdf Page 25 REV. SYM: MM TRANSFORMER LOSS EVALUATION -AVERAGE LOSSES City Order No. S/N _ Manufacturer Invoice No. KVA/Unit LINE DESCRIPTION AMOUNT (1) No. of units, (2) Average core losses (3) Quoted core losses (4) Excess average core losses: line (2) less line (3) (5) Penalty for excess average core losses: line (1) x line (4) x $ (6) Average capper losses (7) Quoted copper losses (8) Excess average copper losses: line (6) less line (7) (9) Penalty for excess average copper losses: line (1) x line (8) x $ _ (10) Penalty to be assessed manufacturer: line (5) plus Gne (9) but not less than zero Date Prepared By: Design Engineering NOTE: If any unit(s) exceeds the loss tolerances of ANSI C57.12.00, Light & Power will either reject it, include it on these averages, or calculate losses using the Individual Transformer Losses Evaluation Form, whichever is most favorable to Light and Power. 25 368-300 Opal Dick - 368dash300.pdf Page 26 INDIVIDUAL TRANSFORMER LOSS EVALUATION City Order No. Manufacturer KVA/Unit LINE DESCRIPTION (1) _ Tested core losses (2) Quoted core losses (3) Excess core losses line (1) less line (2) but rat less than zero (4) Percent difference line (3)-line (2) x 100 (5) Tested total losses (6) Quoted total losses m Excess total losses Line (5) less line (6) but not less than zero. (8) Percent difference Line (7) +- fine (6) x 100 (9) _ Tested copper losses 00) Quoted copper losses (1I) Excess copper losses Line (9) less line (10) but not less than zero. (12) Penalty for excess core losses Line (3) x $ (13) Penalty for excess capper losses Line (11) x $ (14) Penalty to be assessed manufacturer Line (12) plus line (13) S/N Invoice No. Date Prepared By: Design Engineering AMOUNT REV. SYM: MM 26 368-300 Date: 08104/06 I" IEisonic City of Fort Collins Page Number: 3 City of Fort Collins Purchase Order Number: 6604956 Delivery Date: 08/04/06 Buyer: DICK,OPAL Purchase Order number must appear on invoices, packing lists, labels, bills of lading, and all correspondence. Note: Line Qty UOM Description Unit Price Extended Price 7 CALENDAR DAYS BY WESCO Total $100,648.00 City of Fort C16111fis Director of Purchasing and Risk Management City of Fort Collins This order is valid over $2000 unless signed by James B. O'Neill 11, CPPO, FNIGP Accounting Department City of Fort Collins Purchasing, PO Box 580, Fort Collins, CO 80522-0580 PO Box 580 Fort Collins, CO 80522-0580 Opal Dick - 368dash300instructions.pdf Paje Revised 12/13/96 Special Conditions and Supplemental Instructions to Bidders Applicable to Specification 368-300 A. Data to be supplied with Bidder's Proposal The following data shall be supplied with the bidder's proposal in addition to that information required by the "Invitation to Bid" and the "Purchase Requisition". 1. Impedance volts in percent (%) at full load, high voltage to low voltage at 85°C 2. No load and total losses at 85°C 3. Delivery in weeks 4. A statement indicating compliance with our Specification with exception or a detailed list of exceptions. 5. Escalation IS / IS NOT applicable for the transformers bid. If escalation applies, the Bidder shall indicate in his bid, the specific items or materials subject to escalation and shall provide the method and indices to be used in computing the amount thereof. Escalation occurring after acceptance, if Purchaser exercises the option to delay shipment after manufacturing is completed, will not be paid. If the above information and compliance statement are not supplied the proposal will not be evaluated An alternate bid for the total order may be submitted in addition to the unit bids. B. Loss Evaluations Loss penalties and loss evaluations will be based on the following values: 1. No-load or excitation losses at $3.90/watt 2. Load losses at $2.301watt C. Shipping Terms Ship F.O.B. point of destination, freight prepaid. D. Terms of Payment 1. If escalation applies, the City of Fort Collins shall not be billed for escalation occurring after the promised delivery date. 2. Test reports shall accompany the invoice. If test reports do no accompany the invoice, late payment penalty charges incurred due to delays in obtaining the test reports will not be paid. Certified copies of test reports shall be sent to the Standards Engineering Section, Fort Collins Utilities - Light & Power. 3. Loss penalty credits and escalation charges shall be itemized on the invoice. Opal Dick - 368dash300.pdf Page 1 THE CITY OF FORT COLLINS Light and Pov✓er Department P.O. Box 580 Fort Collins, CO 80522 SPECIFICATION NO: 368-300 TITLE: PAD -MOUNTED COMPARTMENTAL-TY PE THREE-PHASE DISTRIBUTION TRANSFORMERS MATH SEPARABLE INSULATED LOAD BREAK HIGH -VOLTAGE CONNECTORS APPROVED BY: Kraig Bader Standards Engineering Division Manager ORIGINATION DATE: 8/12/83 REVISED: 2/2/2005 Opal Dick - 368dash300.pdf Pa e 2 REV. SYM: MM ITEMS COVERED BY THIS SPECIFICATION DESCRIPTION STOCK NO. SPECIFICATION NO. SERIAL 75 KVA 208Y/120 RADIAL 368-300 006 75 KV 40BY/277 RADIAL 368-300 -007 75 KVA 208Y/120 LOOP 368-300 .008 75 KVA 480Y/277 LOOP 368-300 -009 150 K\A 208Y/120 LOOP 368-300 -015 150 MIA, 480Y/277 LOOP 368-300 -016 300 MA 208Y/120 LOOP 368-300 -030 300 KVA 480Y/277 LOOP 368-300 -031 500 KVA 208Y/120 LOOP 368-300 -m 500 K\/A 480Y/277 LOOP 368-300 -051 750 KVA 208Y/120 LOP 368-300 -075 750 MA 480Y/277 LOOP 36&300 -076 1000 KVA 20BY/120 LOOP 368-300 -100 1000 KVA 480Y/277 LOOP 368-300 -101 1500 KVA, 480Y/277 LOOP I 36&300 -151 2000 KVA 480Y/277 LOOP 368-300 -201 2500 KVA 480Y/277 LOOP 368-300 -251 2 368-300 Opal Dick - WMash300.pdf Page 3 REV. SYM: MM REVISION DESCRIPTIONS REVISION DESCRIPTION Previous on file APPROVED REVISION FF: Tim Sagen Add Paragraph 5.2.2.9.3: pentahead locking bolts Susan Coram Paragraph 3.2.2.13.1: add glossy requirement. 10-18-95 REVISION GG: Susan Coram • Title page: Remove revised date Tim Sagen • Paragraph 4.4 and Table 2A Change Temperature Tests and Ndse Test from every 9-22-95 unit to one unit of design. REVISION HH: Opal Dick GE removed from Appendix B Tim Sagan 12-13-96 REVISION II • Add paragraph .3.2.2.10 OVERCURRENT PROTECTION and renumber remaining paragraphs in section 3.2 Opal Dick • Revise Fig. 1 to reflect a "V " configuration for the primary bushing arrangement vs. an Tim Sagen in4ine arrangement. 613/99 • Revise Fig. 17 to remove requirement for CT mounting studs and increase dimensions A from 5" and 5.5' to 6" on 225-2500 kVA sizes REVISION JJ Bill Bray Reformat and converted to MS Word, delete List of Active Pages Tim Sagen 9114 / 2000 REVISION KK Kraig Bader Added drawing la to describe cable accessory parking stand detail, revise to reflect Tim Sagen current editions of national standard s, charge impedance on 368-300.009 from 9 / 11 1 2001 1.7% to 1.9%. REVISION ILL Kraig Bader • Change fusing from al -immersed current sensing weak link cartridge to a current 412/2004 sensing bay-o-net fuse link in series with an ELSP current limitfng backup fuse (clause 3.2.2.10). • Charge column header for impedance table in 3.2.2.1 to clarify that impedance numbers are nominal values. (Tolerance s are consistent with ANSI C.57.12.00- 2000) • Charged wording from "Mr. Ouch" in 3.2.2.15 to Waming label" Revision MM Kraig Bader • Charge clause 3.2.2.10 to specify current sensing bayonet fuse link by size and 2/2/2005 part number. Table 2 was added for this pupose. • Renamed table in 3.3.2.1 to from Table 2 to Table 3 Renamed table in 4.3. from Table 2A to Table 4 3 368-300 Opal Dick- 368dash300.pdf — Page 4 REV. SYM: MM TABLE OFCONTENTS ITEMS COVERED BYTHIS SPECIFICATION ............. ._....... ..... ....... ... .... .............. .......... „.. ........... .... ._... ...... _ .........._... 2 REVISIONDESCRIPTIONS ... ..... _......... ............. ......... _._. ................ ............._. ... _........ ..... ........ ......... ..... ._ .......... _. _......... .3 1. SCOPE .._...... _.... ....... ........ ................ ............... ............... ............. ................ ....... ._...... .... _.......... ................ .... ..... ..... .........._.... ..5 2.APPLICABLE DOCUMENTS...... ..._..___.. .... .......... ... ._........ ............. ..._._._... ........ ..... _ .............. ........ _..... ............ ....5 3. REQUIREMENTS ............. ...._... ...... ................ .......... .._. ._...... ...... ............ ._... ........ ................. ....... ... .... ......_ ........ ..............5 3.1 GENERAL REQUIREMENTS FOR DESIGN .......... ................ ................ ................ ................ ................ .- ........ ..... ............... .......5 3.2 SPECIFIC REQUIREMENTS FOR DESIGN OF LOOP -FEED UNITS ........................... .._....... .............. ..... .......... .............7 3.3 SPECIFIC REQUIREMENTS FOR DESIGN OF RADIAL -FEED UNITS .................... ................ ................ ................ ......16 CQUALITY ASSURANCE ............ ............ ......... _._ ..___...... ___........ _.......... .._..... .... .............. ....... .._.... ....... _....... .16 4.1 GENERAL ................ ................ _............. ................ ................ .-............. ................................................ ................ ................ .....16 4.2 TEST CONDITIONS ................ ................ ................-.............. ................ ................ ................................................ ................ .....16 4.3 FUNCTIONAL TESTS ........... ................ ................ ................ .... ___ ...... ................ ................ ............... ..... _..... .... ................ .......17 4.4 TEST METHODS - FUNCTIONAL TESTS ................ ................ ................ ................ ................ ................ ................ ................ 17 5.PREPARATION FOR DELIVERY.._._ ._._....... ._..._.._.._._.. ..... _....... .......... .._ .... _..... ._...... ._..... _..... r._. _......17 6.DEFINITIONS AND ABBREVIATIONS.._.._._... ...... ____. _._......... -__.._.__ ........... _....... _. .............. ....._......... ._.... is APPENDIXA _._.___. ...... ... _. _.__ _.._ ..... ._...___.. _....__..._. ..... ... _... _...._....... .___._.._ ._._..__.. ........19 APPENDIXB_. .___. ._ ....._. _._ __ _._...___. .____.._.. .... ... ..... _.._.___. ._.._._._._ ...._.._.__ ._._23 APPENDIXC _.____.. ....__.._.. ...._ ._._.. ............ ..... _......... _.__...._.. ._. _ __. ._........_ ._.__..__. ............. ._...._..... .... _... 4 TRANSFORMER LOSS EVALUATION -AVERAGE LOSSES .......................... ................ ................ ................ ................ .......25 INDIVIDUAL TRANSFORMER LOSS EVALUATION ...................... ................ ................ ................ ................ ................- ...... 26 4 368-300 Opal Dick , 368dash300.pdf Page `.i REV. SYM: MM SPECIFICATION FOR PAD -MOUNTED COMPARTMEN TAL-TY PE, THREE-PHASE DISTRIBUTION TRANSFORMERS WITH SEPARABLE INSULATED LOAD BREAK HIGH -VOLTAGE CONNECTORS 1. SCOPE This Specification establishes the minimum electrical requirements and mechanical features of three phase, 60 HZ, mineral oil immersed, self -cooled, pad -mounted, compartmen tal-type distribution transformers rated 2500 kVA and smaller, high voltage 13,200 Grd Y/7620 volts, with separab le insulated load break high voltage connectors. These transformers are used for step down purposes from an underground primary cable supply. This standard generally conforms to ANSI requirements for pad -mounted compartm ental-type, self -cooled, three-phase, distribution transformers for use with separable insulated high -voltage connectors, C57.12.26. 2.APPLICABLE DOCUMENTS The following documents form a part of this Specification to the extent specified herein. The latest issue in effect on the date of invitation for bids shall form a part of this Specification, unless otherwise noted. • ANSI C57.12.00 - Distribution, pawer, and regulating transformer s, and shunt reactors, general requirements for • ANSI C57.12.26 - Pad mooted, compartrtmental-ly, pe, self -cooled three phase, distribution transformers for use with separable insulated high voltage connectors, high voltage 34,500 Grd Y/19,920 volts and below, 2500 WA and smaller, requirements for • ANSI C57.12.70 - Terminal markings and corrections for distribution and power transformers • ANSI C57.12.80-Teminology for power and distribution transformers • ANSI C57.12.80 - Distribution, power, and regulating transformers, and shunt reactors, test code for • ANSIREEE 386 - Separable insulated connectors for power distribution systems above 600V NEMA STANDARD TR1-Trarsfommers, regulators and reactors 3. REQUIREMENTS 3.1 GENERAL REQUIREMENTS FOR DESIGN 3.1.1 BASIC DESIGN STANDARDS Transformers purchased under these Specifications shall be new and, unless otherwise specified, meet the requirements of the applicable ANSI Standards and the modification and additions given in the subsequent paragraphs. In case of conflict, the requirements of the following documents shall apply in the priority shown: This Specification. ANSI C57.12.26 Other applicable ANSI and NEMA Standards. 3.1.2 KILOVOLT -AMPERE TEMPERATURE RATINGS IGlovolt-ampere ratings are continuous and are based on rat exceeding either a 65°C average winding temperature or an WC hot spot temperature rise. The temperature rise of the insulating al shall not exceed 65°C when measured near the top of the tank. The temperature rise is based on an altitude of 3,300 feet. 3.1.3 GENERAL CONSTRUCTION 3.1.3.1 The pad -mounted compartmenaR ype transformers shall consist of the transformer tank, high -voltage cable terminating compartment, and the law -voltage cable-terninatin g compartment. All three of these components shall be assembled as an integral unit, tamperproof and weatherproof for mounting on a pad. There shall be no exposed screws, bolts or other fastening devices, which are externally removable, except the main cover bolts may be exposed. VVlmere the main cover bolts are exposed, the 5 368-300 Opal Dick- 368dash300.pdf Page 6 REV. SYM: MM comer bolts shall be welded or otherwise render ed tamperproof. There shall be no opering through which foreign objects such as sticks, rods, or wire s might be inserted to contact live parts. Suitable means for padlocking the compartment door(s) shall be provided. 3.1.3.2 The high and law -voltage compartment shall be located side by side on one side of the transformer tank. When facing the compartment, the low -voltage compartment shall be on the right. 3.1.3.3 Construction of the unit shall be such that it can be lifted, skidded, and slid into place on the mounting pad without disturbing the entrance cables. 3.1.3.4 An undercoating over the regular finish or an equivalent treatment shall be applied to all surfaces that are in contact with the pad to minimize corrosion. 3.1.3.5 Minimum dimensions shall be as shown in Fig. 1 of this Specification. Maximum transformer and minimum pad dimensions are shown in Fig. 6 of this Specification. 3.1.4 LOSSES The total losses of a transformer shall be the sum of the excitation losses and the load losses (12R losses). Load loss tests shall be performed and reported on all units regardless of whether or not a record of such tests is available on duplicate units. Loss evaluations and loss costs will be based on the values shown in the "Special Conditions and Supplemental Instructions to Bidders." Transformers will be evaluated on excitation losses and rR losses at the specified rates. If tested losses exceed quoted losses but are within the tolerances of paragraph 9.3, ANSI C57.12.00-2000, the additional cost incurred from the differential of losses will be calculated using the following equation and the above specified rates and will be deducted from the original Purchase Order or back charged to the manufacturer. In Table 16 and the following equation "Units" shall mean "Transformers of the same size and design on one order." Excess loss $ = [No. of units] [(No Load Loss Evaluat ion $) (Avg. No Load Losses — Quoted No Load Losses) + (Load Loss Evaluation $) (Avg. Load Losses —Quoted Load Losses)]. If this equation results in a negative number no credit will be given the Supplier. If arty unit or units exceed the tolerances of paragraph 9.3, ANSI C57.12.00-2000, that unit or units shall not be slipped without express permission from the City. If accepted, the deduction for excess losses will be based on the following equation: Excess loss $ = (No Load Loss Evaluation $) (No Load Losses — Quoted No Load Losses) But Not Less Than Zero + (Load Loss Evaluation $) (Load Losses — Quoted Losses) But Not Less Than Zero. 3.1.5 SERVICE CONDITIONS Service conditions shall be as defined in paragraph 4.1 of ANSI C57.12.00 except the ambient temperature range shall be 40"C above to 32"C below zero. The transformer shall operate safely with starting temperatures as law as 32"C below zero. 6 368-300