Loading...
HomeMy WebLinkAbout102795 WESCO DISTRIBUTION INC - PURCHASE ORDER - 6604957Date: 08104/06 Grp:. City of Fort Collins Page Number: 1 City of Fort Collins Purchase Order Number: 6604957 uenvery ware: uailoiur Buyer: DICK,OPAL Purchase Order number must appear on invoices, packing lists, labels, bills of lading, and all correspondence. (vote: Line Qty UOM Description Unit Price Extended Price 1 30 EA T3000008; transformer 75kVA; 208Y/120 3P pad T3000008 YARD TRANSFORMER, 75 kVA PAD -MOUNTED COMPARTMENTAL TYPE, THREE PHASE DISTRIBUTION WITH SEPARABLE INSULATED LOAD BREAK HIGH VOLTAGE CONNECTORS. HIGH VOLTAGE RATING: 13200 GRDY/7620. LOW VOLTAGE RATING 208Y/120. SERIAL NUMBER 008 TO BE IN ACCORDANCE WITH SPECIFICATION #368-300-008, REVISION MM MFR. ABB ESCALATION IS APPLICABLE ADJUSTMENTS WILL BE REVIEWED BYCITY PRIOR 6,551.000 196,530.00 Opal Dick - 368dash300.pdf Page 7 REV. SYM: MM 3.2 SPECIFIC REQUIREMENTS FOR DESIGN OF LOOP -FEED Units The transformer shall be a three phase, pad mounted, loop feed -safe break, "deadfront" type for use on a 13.8 kV grounded "Y" distribution system. 3.2.2 DESIGN AND CONSTRUCTION 3.2.2.1 RATINGS Table 1 - Loon -Feed Transformer Rafinns Stock No. WA Low Nominal Voltage Impedance BushingT e/Confi . High Voltage Low Voltage 368-300- 0681 75 208Y/120 1.9% c of 368-300- 009 75 480Y277 1.7% c of 368-300- 015 150 208Y/120 2.1% c of 368-300- 016 150 480Y277 2.1% c of 368-300- 030 300 208Y/120 2.5% c of 368-300- 031 300 480Y277 2.5% c of 368-300- 050 500 208Y/120 3.04% C e 368-300- 061 500 480Y277 3.04% C of 368-300- 075 750 208Y/120 5.75% c 368-300- 076 750 480Y277 5.75% c 368-300- 100 1 000-f 208Y/120 5.75% c 368-300- 101 1000 480Y277 5.75% c 368-300- 151 1500 480Y277 5.75% c 368-300- 201 2000 480Y277 5.75% C 368-300- 251 2500 480Y277 5.75% c CFigire 1 (V-config.) of this specification e Low -voltage line and neutral terminals shall be stud type bushings in accordance with ANSI C57.12.26-1992, Fig. 9(d) and shall include a separate spade with NEMA standard drilling f Figure 9(a) of ANSI C57.12.26 - 1992 (4 hole pad) g Figure 9(b) of ANSI C57.12.26 - 1992 (6-tale pad) 3.2.2.2 INSULATION LEVEL 3.2.2.2.1 The basic impulse level (BIL) of the completely assembled transformer, including high -voltage and low -voltage terminals shall be 95 kV and 30 kV respectively. 3.2.2.2.2 Dielectric test levels shall be in accordance with the distribution levels in Paragraph 5.10 of ANSI C75.12.00-2000 3.2.2.2.3 The remit shall withstand test voltages in ac cordance with ANSI C57.12.00 and impulse tests in accordance with NEMA Standards for Transformers, Publications No. TR1. 3.2.2.3 TRANSFORMER CORE A five -legged core -coil assembly or three separate core -coil assemblies shall be employed. The use of three-legged designs is expressly prohibited. 7 368-300 Opal Dick - 368dash300.pdf Page 8� REV. SYM: MM 3.2.2.4 HIGH VOLTAGE TAPS A no-load tap changer with external operating handle shall provide two 2 % full capacity taps above and below normal. The operating handle shall be mounted in the primary compartment. 3.2.2.5 BUSHING WELLS AND TERMINALS 3.2.2.5.1 The number, location, and arrangement of bushing wells, terminals and parking stands shall be as shown in Fig. 1 and Fig.5 of this specification. All law -voltage bushings and high -voltage wells shall be externally clamped and shall have leads of sufficient length to allow them to be changed without removing he cover. Welded bushings and wells are expressly prohibited. 3.2.2.5.2 High -voltage bushi ng wells shall be 200A load -break interfac a 8.3114.4 kV bushings in accordance withANSI1IEEE Std. 386. 3.2.2.5.3 Law voltage bushing arrangement and spacing shall be "staggered", as shown in Fig. 5 of this Specification. 3.2.2.5.4 The low -voltage neutral shall be a fully insu laced bushing. A ground pad shall be provided on the outer surface of the tank and a removable copper ground strap shall be provided and connected between the law -voltage neutra I bushing and the ground pad. 3.2.2.5.5 The high -voltage neutral shall be connected to the low -voltage neutral internally with provision for opening this connection for testing. 3.2.2.6 ACCESSORY CABINET 3.2.2.6.1 The accessory cabinet shall consist of a high -voltage and low- voltage compartment generally constructed in accordance with applicable ANSI specifications and dimensioned in accordance with Fig.1 of this Specification. 3.2.2.6.2 Cabinet doors shall be hinged, removable, and lockable. Stainless hinge pins shall be provided. 3.2.2.7 ACCESSORY EQUIPMENT Accessory equipment shall be provided in accordance with Table 1A and the following details: 3.2.2.7.1 Suitable jack bosses or equivalent jacking facilities shall be provided on the tank. Vertical clearance for a jack shall be 1'/ inches minimum, 31/2 inches maximum. 3.2.2.7.2 The transforrer base shall be arranged for rolling in two directions: Parallel to and at right angles to the centerline of the high -voltage bushings. 3.2.2.7.3 Four lifting lugs shall be provided. These lugs shall be adequate strength and size and arranged on the tank to provide a suitable lift for the completely assembled unit. 3.2.2.7.4 The base of the assembly shall be provided with suitable means for mounting the unit on the pad. An internal flange shall be provided at the base of the accessory compartment to provide means for mounting the unit on the pad. (Fig. 1). 3.2.2.7.5 Terminal designations are shown in Figure 1. The identification of terminal connections shall be shown on the instruction nameplate. Instruction nameplate shall be corrosion resistant, located in the low voltage compartment, and shall be readable with cables in pace. Where the nameplate is mounted on a removable part, the manufacturer's name and transformer serial number shall be permanently affixed to a non -removable part. Instruction nameplate shall contain the informal ion specified in ANSI C57.12.00-2000, paragraph 5.12. In addition, either on the nameplate or label affixed near it, the manufacturer shall indicate that the dielectric fluid is non -PCB. 8 368-300 Opal Dick - 368dash300.pdf Page 9] REV. SYM: MM 3.2.2.7.E An automatic pressure relief device shall be located within the compartment. This device shall meet the following requirements: %" NPT or larger male Inlet Pat. Exposed parts of weather and corrosion resistant materials. Non-detedoratin g gasket and o-ring material. Manual pull ring able to withstand 25 pound fora: minimum. Body able to withstand 100 pound fora: minimum. • Bug shield. • Cracking pressure of 10 t 2 psig. Resealing pressure of 6 psig minimum. • Zero leak rate from resealing pressure to-8 prig. • Minimum flow rate of 35 SCFM at 15 psig. 3.2.2.8 OILPRESERVATION Transformers shall be of sealed -tank construction. Sealed -tank construction is that which seals the interior of the tank from the atmosphere, and in which the gas plus the oil volume remains constant. The transformer will remain effectively sealed for a top -oil temperature range of —320C to 105°C. 3.2.2.9 TANKS The tank shall be domed or sloped to shed water and shall be of sufficient strength to support a minimum of 500 lbs. Construction of the tank shall be in accordance with ANSI C57.12.26-1992, Section 7, except bolted cover is preferred. 3.2.2.9.1 If main cover is welded, adequate handhole(s) shall be provided. Handholes shall be concealed. Bolted -on covers shall be adequately gasketed and tamperproof. Main cover bolts may be exposed: however, where cover bolts are exposed, the corner bolts shall be welded or otherwise rendered tamperproof. 3.2.2.9.2 Tank grounding provision shall be in accordance with paragraph 7.6.4 of ANSI C52.12.26-1992. 3.2.2.9.3 Locking bolts shall be pentahead style. 3.2.2.10 OVERCURRENT PROTECTION Overcurent protection shall consist of a single element current sensing bay-o-net fuse link in series with an ELSP current limiting backup fuse. Fuses shall be sized as shown in Table 2: Ta61a 2 - Fusina Ranuimmanlx Expulsion Fuse Continuous I Current Limiting Fuse Stock kVA Current Rating Continuous Current Rating Number Ca acl Part Number*) Part Numbar` 36&300-00 75kVA 104 304 368-M08 4000353C06 3544030M61M 001'A 6 150kVA I 40A 13554404010161 -1 (13C08) M) I OVA I I 36&300-031 (4000353C10) (3544065M61M) 368-300-051 500kVA 40A 100A 4000353C 12 3544100M71 368300-075 750kVA 65A 125A 3W300-076 7501kVA (4000353C 14) (3544125M71M) 368-300-100 1000kVA 368-300-101 1000kVA 12000kVA I(4000353C17) fuses I 36&300-20115' (3544125M71M1125A 368-30D251 12500kVA 1125A Hi-" OL Link C05CB I 50A : Parallelfuses r71M)125A Fuse shall be as specified in the table above or shall be an equivalent as approved in writing by Electric Standards Engineering. 9 368-300 Opal Dick - 368dash300.pdf _ Page 10 REV. SYM: MM 3.2.2.11 COMPONENTS FOR LOOPED PRIMARY The minimum current -carrying capability of components for the looped primary cable system shall be 200 amperes (continuous) and 10,000 amperes symmetrical (momentary). 3.2.2.12 AUDIBLE SOUND LEVEL The audible sound level shall be in accordance with NEMA Standard TR1. 3.2.2.13 HOSE PLAN The base plan of a completely assembled unit shall be such that it can be installed on a pad of the dimensions shown in Fig. 6 of this specification. 3.2.2.14 PAINT 3.2.2.14.1 Surfaces to be painted shall be blast cleaned (commercial blast) to provide a clean dry surface free of dirt, dust, chalk, loose paint, rust, grease and ary other contaminants. 3.2.2.14.2 EEI "Finishing Guidelines" specification shall apply. Finish coat shall be Desert Tan, Munsell #10YR6.0/3.0, glossy. 3.2.2.15 SAFETY LABELS The manufacturer shall not apply NEMA 260 Safety Labels. The Purchaser will apply custom warning labels after delivery. 3.2.2.16 ANGULAR DISPLACEMENT: Per Fig. 10(b) of ANSI C57.12.26-1992. 10 368-300 Opal Dick- 368dash300.pdf Page 11� FIANGEWMIN 1 117 MAX I KLOWt + — + he i j.L + — Ve —Z * iM -- - - - Ia I I I I I II C�— 45 1 45 1 65 MIN•5 dBs A� KVARATINGS LOWVOLTAGE RATINGS COMPARTMENT DIMENSIONS (MINIMUM) BUSHING HEIGHT A• B 7S15g ALL Mz5 z] TtS500 ALL M 31 7/ 1= 4 Y/]n,] Y 11M a 0 150d]511g IaBYln7 25 49 NOTE. Deml mik hnenebns. "See Fq5 Al tllnwviom in (incMsl Mavmum Umwse INN Al one Imn clearance iron edge W ped (Fg. B). WIN MIN' Figurer -Accessory compartment &Bushing Dimensions (Config. 1) REV. SYM: MM 11 368-300 Opal Dick - 368dash300.pdf Page 12 r--2.65 MIN._.. GGr} j' 'YANK Sr)gf CE L= iANK $UAfACE t Y [ 1 � �4R i I t 9 I i h i i 1 0.75 rta 0 INSIDE CaVe Acw wy Parking5tand Figure 1A —Cable Accessory Parking Stand Detail Figure 2 (Config. 2) - DELETED 7/92 Figures 3 & 4 - DELETED 11/00 Ref. now to: ANSI C57.12.26 - 1992 figures 9(a) & 9(b) REV. SYM: MM 12 36&300 Opal Dick- 368dash300.pdf Page 13� 4.0" ,. A A A X1 i� �� X3 1 � 1 i\ XO �\ X2 \ l q. B CL REV. SYM: MM 6" RADIUS TYPICAL 3 PLACES KVA RATINGS LOWVOLTAGE RATINGS A B 75-150 ALL 4.75 8 225-500 ALL 6 8 750-2500 480/277, 208Y/120 6 10 Figure 5- Staggered Low -Voltage Bushing Arrangement (all dimensions minimum inches). NOTE: An area having a 6 inch radius around each bushing shall remain clear of obstructions such as gauges, etc. 13 368-300 Opal Dick - 368dash300.pdf Page 14� REV. SYM: MM KVA I SERIAL I PAD DIMENSIONS (inches) A I B C I D E F 75 -006 thru -009 75 55 40 21 15 61 150 -015 75 55 40 21 15 61 150 -016 75 55 40 21 15 61 300 -030 75 55 40 21 15 61 300 -031 75 55 40 21 15 61 500 -050 75 55 40 21 15 61 500 -051 75 55 40 21 15 61 750 -076,-075 85 72 49 23 15 67 1000 -101,-100 85 72 49 23 15 67 1500 -151 101 87 51 23 15 76 2000 -201 107 88 51 23 15 79 2500 -251 107 88 51 23 15 79 Fig.6 - Pad Dimensions 14 368-300 Opal Dick,- 368dash300.pdf Page 15 REV. SYM: MM TABLE I ACCESSORY EQUIPMENT ACCESSORY I INA F75-150 F 300 500.2500 Tap changer handle in HV compartment X X X Instruction nameplate in LV compartment X X X Jacking provisions X X X Provisions for rolling in two directions X X X Lifting lugs X X X Provisions for mounting on pad X X X Arrester mounting provisions Grounding provisions in both compartments X X X 1" oil drain pluci X 1" oil drain valve with sampling device X X Upper filter press and filling plug (or cap) (1') X X X Provisions for oil gauge X Provisions for pressure-vacwm gauge X X Oil gauge X Themiorneter X X X Secondary CT mounting holes (4 holes on 4 318" x 5 5/8" centers) X X X Manual/automat is pressure relief valve X X X 15 36&3011 Opal Dick - 368dash300.pdf Page 16 REV. SYM: MM 3.3 SPECIFIC REQUIREMENTS FOR DESIGN OF RADIAL -FEED Units 3.3.1 FUNCTIONAL DESCRIPTION The transformer shall be a three phase, pad mounted, radial feed safe break, "deadfront" type for use on a 13.8 W grounded "Y" distribution system. 3.3.2 DESIGN AND CONSTRUCTION The requirements for radial -iced transformers shall be the same as those of loop -feed with the following exceptions: 3.3.2.1 RATINGS Ta61a 3 . Radial.Faad Stock No. WA Low Voltage Impedance Bushing Type/Config. High Voltage Low Voltage 368-300- 006 7P 208Y/120 1.9% 1— d f h 368-300- 007 75 1 480Y/277 1.9% 1 d f h d Per Figures 5A, & 7 of ANSI C57.12.26-1992 (In-Une) EXCEPTION: high voltage bushings shall be 32 - 36 inches above the base of the transformer f Figures 9(a) & 9(d) of ANSI C57.12.26 - 1992 (stud with 4-hole part) h Figure 8(a) of ANSI C57.12.26-1992 (Staggered) 3.3.2.2 ACCESSORY CABINET The accessory cabinet shall be dimensioned in accordance with Fig.7 of ANSI C57.12.26-1992. 4. QUALITY ASSURANCE 4.1 GENERAL 4.1.1 RESPONSIBILITY FOR INSPECTION Unless otherwise specified, the vendor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the vendor may utilize his own facilities or any commercial laboratory acceptable to the City of Fort Collins. The City reserves the right to perform or witness any of the inspections set forth in this Specification where such inspection are deemed necessary. 4.1.2 TEST REPORT The manufacturer shall furnish to the purchaser certified copies of the results of all tests prior to payment. Copies shall be sent to the Design Section as well as with the invoice. Unsigned copies are not acceptable even if accompanied by a signed cover letter. The Quality Control Manager shall review and sign each test report. 4.2 TEST CONDITIONS Unless otherwise specified, testing defined in Section 4.6 shall be conducted under the following conditions: 4.2.1 REFERENCE TEMPERATURE The reference temperature to which losses, impedance, regulation, aril efficiency are corrected shall be 85° C. 4.2.2TOLERANCE ON IMPEDANCE VOLTAGE Tolerance shall be as specified in ANSI C57.12.00. 16 368-300 4� s� hG M City of Fort Collins Page Number: 2 City of Fort Collins Date: 08/04/06 Purchase Order Number: 6604957 ueuvery vane: usnorui Buyer: DICK,OPAL Purchase vrcler number must appear on invoices, packing lists, labels, bills of lading, and all correspondence. 115-w Line Qty UOM Description Unit Price Extended Price TO PRODUCTION AND IN ACCORDANCEWITH STATED INDICES IN PRICING. ANY INDEX ESCALATION (INCREASE) AFTER THE QUOTED DELIEVERY DATE WILL NOT BE ALLOWED. NO LOAD LOSS - 210 FULL LOAD LOSS - 657 TOTAL LOAD LOSS - 867 IMPEDANCE 1.90% DELIVERY: 32 WEEKS OR CITY OF FORT COLLINS MAY CONSIDER THE CAPACTIY PLAN ARRANGEMENT AS PROVIDED IN THE QUOTATION FOR THESE UNITS WITH SPECIFIC SHIPMENTS AND QUANTITIES TO BE Opal Dick - 368dash300.pdf Page 1 REV. SYM: MM 4.2.3 TOLERANCE ON IMPEDANCE VOLTAGE ON A TAP The percent departure of tested impedance voltage on arry tap from tested impedance voltage at rated voltage shall rat be greater than the total tap voltage rage expressed as a percentage of the rated voltage. 4.3 FUNCTIONAL TESTS Functional tests shall consist of those tests and related requirements as cross referenced in Table 4 and shall be performed on each unit, except Temperature and Noise Tests which shall be performed on one unit of each design (KVA) per order. T.W. A _ C......•i..... 1 T..nM TEST TEST PARAGRAPH REQUIREMENT OR REFERENCE Examination Of Product 4.6 3.0 3.1 3.2 3.3 hiss ification Ratio 4.6 ANSI C57.12.00 Section 8 Polarity And Phase Relation 4.6 ANSI C57.12.00 Section 8 Excitation Loss 4.6 ANSI C57.12.00 Section 8 Excitation Current 4.6 ANSI C57.12.00 Section 8 Impedance & Load Loss 4.6 ANSI C57.12.00 Section 8 Temperature Tests* 4.6 ANSI C57.12.00 Section 8 Dielectric Tests 4.6.1 3.2.2.2 his s ification Im Ise Tests 4.6.2 3.2.2.2 hiss cation Leak Testing 4.6.3 3.2.2.8 & 3.2.2.9 hiss ification Noise Testing* 4.6.4 3.2.2.12 hiss specification) vneunt per design per order. 4.4 TEST METHODS -- FUNCTIONALTESTS Each completed unit shall be inspected to determine compliance with respect to dimensions, material, workmanship, construction and marking, and routine tests on all units shall be made as specified in Section 8 of ANSI Standard C57.12.00, and in ANSI Standard C57.12.90. In addition to routine tests, the following test requirements arKYor modifications shall apply. 4.4.1 DIELECTRIC TESTS Induced and applied potential Dielectric Tests shall be performed in accordance with ANSI C57.12.00 and C57.12.90. The low voltage windings shall have a test potential to ground of 10,000 volts for one minute. The test potential between high voltage windings shall be 34,000 volts for one minute. 4.4.2IMPULSE TESTS ANSI Standard Impulse Tests shall be performed. Full Wave Impulse Test shall use a 1.5 x 50 microsecond wave. 4.4.3 LEAK TESTING The transformer tank shall be filled with oil and tested for air and oil leaks under (1) 4 psig vacuum for '/z hour, (2) 7 psig pressure for 24 hours in the sequence indicated. An alternate method of leak testing may be performed by injecting halogen gas under 10 psig and detecting leaks through the use of a halogen detector. (Note, the autornatictmanual pressure relief device must be removed for this test). 4.4.4 NOISE TESTING Noise testing shall be conducted in accordance with applicable NEMA Standards. 5. PREPARATION FOR DELIVERY Transformers shall be prefilled with the appropriate amount of transformer oil and shall be shipped by open -bed truck. Units shall be packaged in such a way as to provide for ease of handli ng and to protect units from shipping damage. Units shall be folly palletized in four-way universal pallets with 28" minimum openings to facilitate handling from any side. Pallets shall be independent of the transformer. The Supplier shall give 24-hour notice prior to delivery for arty shipments where an individual transformer weighs over 4,000 pounds. In addition to these requirements, the Supplier shall comply with any additional requirements or modifications shown on the purchase order andtor supplemental instructions. 17 368-300 Opal Dick- 368dash300.pdf Page 18 REV. SYM: MM 6. DEFINITIONS AND ABBREVIATIONS • Vendor or Supplier. The manufacturer ardor manufacturePs agent supplying or quoting on the specified article. • Article, Unit, Assembly - All refers to the equipment defined by this specification. • DC or d.c.- Direct Current. • AC or a.c. - Alternating Current. • °C- Degree Celsius (Centigrade) • OF - Degree Fahrenheit • kV -1000 volts. • CPS or Hz -Cycles per second. psig- Pounds per square inch gauge. • V ory -Volts. • WA -1000 Volt-amperes. 18 368-300 Opal Dick - 368dash300.pdf Page 1 REV. SYM: MM APPENDIX A Typical pad designs are shown in Figures 1A through 3A The dimensions in inches of Figures 1A through 3A will fit the minimum compartments on transformers covered by this Specification as well as the maximum transformer ermvelope. 19 36&300 Opal Dick - 368dash300.pdf Page 2] REV. SYM: MM 55' I, 17" I PR1I1dRYV SEC. 6 T LENLfe dND WIDTH 10" d0' 3' r 7 5T/8' — _v _ P F3' T T Noted an Pod VAtw1d - I. Concnle rnuet be J.000 ad m7rhnam. (.lov'mum ] course o0vapota ore 1 1/2 ivdles. 9occe repJyements ter pod and Primary 9lidcnot cabinet *11 generally be e X IT. Fmtcm to be co ddmed In jacotlQ the Pad include - 1. AetaalDldy - TM tlonsformer pod Imal by occeelRXe to line boom troche nufaaed for the instolatkn and remarcl of hsovy traneformers. Such dcceedhilily dedl not req,We atrus.an a adpcwt property. 2 Prsrieity of Efubdinla. *411. 84rrrms. and/w ave 0 go - In 0001Dan to the alewanan rdqurm tar ialallalian and nnavd. the nfn'mam rlawancd n front of the trw5hrmdr Pad shall he eight (6) feel and the minimum clearance from of olhw sign anal be wft (3) fool If lie auhdn9 man an dvamnny. doermea to the saga of the twafdrmx pod deal be maoeures horiyantolly from the outer edge gf the o,wh r% Troafwmwe #Hough JDO KVA may ba tnsidled ands the avemang If WIN Wnedl deans 11Art66ll pal pod e+a the ovorhon9 10 at host 26 toot wM the losat%n is eeeeeaible to line beam truche 3. Coda will Standards - In add -ton to the oboes. the inalallatien chat canfwm In the Notbnal Electric Cede and federal. slate w10 tar Cog" and Slendg109. 2 S 25 93 REV N0. DATE DWN D.E. APP I MG. ENG APP DIST APP CITY OF FORT COLLINS DWG 3PHASEI LIGHT AND POWER DEPARTMENT TRANSFORMER PAD DESIGN 75 — 500 KVA Ira.Iepdrlw 3 PHASE Figure IA- Pad Design (75 - 600 KVA) 20 368-300 Opal hick - 368dash300.pdf Page 21 REV. SYM: MM I I I I I _ _-4---i--I-- T. 9 t7• I PRIWWY sEL0N9ARY I I 8• — — pot— + a -� 7" 1>3• Pe" — P7" lY --i rU.R Y7 REMR —ly `� 1 tcr(tY Md VIarY 1 1J Notes an Pad mound, - 1. Concrete most be 3.00D pal minrnum. 2. mamum anree aggregate ace 1 112 rtdtm 9pace rail onto far pee env pt-r klly attaching cahnot poll generally be 5 x 12'. factors to tre conalderod In lacatrtg the pod Income - f Aeeeesbdrt - me lmnafarrrter pm aaeJ "at he aba to The bean tivam equipped for the Installation and remorol of heavy tranatalraara. Such decomalay anal not ro¢leo nlrtallan an adjacent property. 2. f+ryomny of 6.Iconggs. *ally 9or0arm, one//m tyvarnonga - h addit'un to the cleanness 'attained (d - atulobbn and ramaeel. pta mntnura deGralea m front of me trenawn ar pod "I as arghl (6) feel a'Itl Inv ni mmYa m deanaa sm aall other rides ehdl be four (4) fret, If the 1,00ig hos on aereaar} aaeraneo to Ina saga of the tratafarmor pad aroma he measured hariranlally Gain the oulr edge of the overhand. Tretoformore tlrw.yr JDO KyA may be metalled under the averneng a me vertaxa aaraan toshleon the pod and ma overhang is of legal 25 teal and the Itxzpan is acwsaLa to me add, troche anordr Standards I coniom to lNotlonoi EIWLM Irt�clutles s tan* Case ma ledorol, state and city codes and standarCy 11 02 B0 RE NO. DATE QWN D,E, APP I MG. ENO APP 015T, APP CITY OF FORT COLLINS DWO 3PHASE2 LIGHT AND PO ER DEPARTMENT TRA SF❑R ER P ❑ DESK �a� ea1e� 500 - 1000 K VA a.ae`r aeyw 3 PHASE Figure 2A - Pad Design (500 -1000 KVA) 21 36B-300 Opal Dick- 368dash300.pdf Page 222 REV. SYM: MM 1^---- 107•�f- " I. --I--I--I!- 09 7; I � 15' mR NADr IwWINDOWseeraaw IL t I 6' -- —+. — -T T L 2B' 23' 26' 29'-� II FIVE 97 RETAe 3" LEWD AND VIDtlt 1 7 55//B — — — — — ` 3' T Not" w pad Gaul - 1. URC'Cto mue be 3,00D pal mmmum. 2, ogmbm cootea awssoU slap 1 1/2 inches, Spore raquysmenta nor pan and linmay atbtcnng rabnot Me grwdry ba V % 12'. Foeto s to be coneldred in iecotlrng the Rod indude — 1, ACC@tlethty — Me lrahafdnher pea shall be CetMMee t0 line boom trucks maAdoad for the installation and rtwagl of "Mary loonatarmpR Such orr@aRelay Snail not requve intruolon rn odimenk prapartl. i Prohdmtty of Buidnge, *'din, Borriaro, and/err Omrhangs — In nation to the doormats required for inetall"nn and romowk the rhrin'mVO Clgmae in front at the tlotMlarmar pad shall be eight (0) feel and the mhnrnum daoronce Front oil other aids shall he Far (4) feel If the building has m "Pi". thaerares to this Mdga of the brGrerarmr pea reel be maoourod horirontoly Irom the ouler edge of the Rlerhong. Trmaldrmere Mraugn 700 KVA may 0a k11@Ilee under ma Myrhrlg If mM reroral d"Oh" bMttl@@r the pea one this wrhang Is at local 15 feat and the location is aweedblo to Ina boom iruay. 1. Omsk and Stanaerce — n atltllten to Ins seem, the 'retaliation elan <m1Mrm to the National Elmt,e Coo@ and fadrd, stale and efly wdw and ztmcb der. 11/D2/90 REV N0. DATE D N D.E APP DSNG. ENG APP DIST. APP CITY OF FORT COLLINS DEC 3PHASE3 ® LIGHT AND POWER DEPARTioiENT ID00 - 2500 KVA 3 PHASE Figure 3A - Pad Design (1000-2500 KVA) 22 36&300 Opal Dick - 368dash3OO.pdf Page 23_ REV. SYM: MM APPENDIX B Transformers purchased under this Specification shall be of the make shown below. Manufacturers not listed below may submit written proposals demonstrating compliance with these Specifications for consideration of addition to the accepted manufacturer list prior to the next request for bids. In addition to inclusion on the list below, manufacturer's equipment must also satisfy all requirements of this Specification to be acceptable. TABLE 3B MANUFACTURER SERIAL NO. Cooper Power Systems All ASEA BrowrrBovari (ABB) All Howard Industries All Parwaels Transformers All The manufacturers in the following list have been conditfonallyapproved and may bid as an alternate. The definition and intent of "Conditional Approval" of a manufacturer is to allow the City to gain some experience with the manufacturer's product. Should a conditionally approved manufacturer be the evaluated low bidder, the City reserves the right to award all, part, or none of the order to them, dependant upon the current creeds of the City for that item or items. 23 368-300 Opal Dick - 368dash300.pdf T Page 24 REV. SYM: MM APPENDIX C The following forms for individual and Average Transformer Losses are used by the City of Fort Collins to determine loss penalties. 1) Transformer Loss Evaluation Average Losses Form 2) Individual Transformer Loss Evaluation Form 24 3W300 Opal Dick - 368dash300.pdf Page 2] REV. SYM: MM TRANSFORMER LOSS EVALUATION - AVERAGE LOSSES City Order No. SIN _ Manufacturer Invoice No. KVA/Unit LINE DESCRIPTION AMOUNT (1) No. of units (2) Average core losses (3) Quoted core losses (4) Excess average core losses: line (2) less lire (3) (5) Penalty for excess average core losses: line (1) x line (4) x $ (6) Average copper losses (7) Quoted copper losses (8) Excess average copper losses: line (6) less line (7) (9) Penalty for excess average copper losses: line (1) x line (8) x $ _ (10) Penalty to be assessed manufacturer: line (5) plus line (9) but riot less than zero Date Prepared By: Design Engineering NOTE: If any unit(s) exceeds the loss tolerances of ANSI C57.12.00, Light & Power will either reject it, include it on these averages, or calculate losses using the Individual Transformer Losses Evaluation Form, whichever is most favorable to Light and Power. 25 36&300 Opal Dick - 368dash300.pdf � Page 2 INDIVIDUAL TRANSFORMER LOSS EVALUATION City Order No. Manufacturer KVA/Unit LINE DESCRIPTION (1) _ Tested core losses (2) Quoted core losses (3) Excess core losses line (1) less line (2) but rat less than zero (4) Percent difference Line (3)-line (2) x 100 (5) Tested total losses (6) Quoted total losses (n Excess total losses Line (5) less line (6) but rat less than zero. (8) Percent difference Line (n - line (6) x 100 (9) _ Tested copper losses (10) Quoted copper losses (11) Excess copperlosses Line (9) less line (10) but not less than zero. (12) Penalty for excess core losses Line (3) x $ (13) Penalty for excess capper losses Line (11) x $ (14) Penalty to be assessed manufacturer Une (12) plus line (13) SIN Invoice No. Date Prepared By: Design Engineering AMOUNT REV. SYM: MM 26 368-300 Date: 08/04/06 Citgof Fort Collins Page Number: 3 City of Fort Collins Purchase Order Number: 6604957 veovery vate: usnorvi Buyer: DICK,OPAL rurcnase urger number must appear on invoices, packing lists, labels, bills of lading, and all correspondence. Note: Line Qty UOM Description Unit Price Extended Price STATED WITHIN THE NEXT 7 CALENDAR DAYS BY WESCO Total $196,530.00 City of Fort Ili s Director of Purchasing and Risk Management City of Fort Collins This order is valid over $2000 unless signed by James B. O'Neill II, CPPO, FNIGP Accounting Department City of Fort Collins Purchasing, PO Box 580, Fort Collins, CO 80522-0580 PO Box 580 Fort Collins, CO 80522-0580 Opal Dick - 368dash300instructions.pdf Page Revised 12/13/96 Special Conditions and Supplemental Instructions to Bidders Applicable to Specification 368-300 A. Data to be supplied with Bidder's Proposal The following data shall be supplied with the bidder's proposal in addition to that information required by the "Invitation to Bid" and the "Purchase Requisition". 1. Impedance volts in percent (%) at full load, high voltage to low voltage at 85°C 2. No load and total losses at 85°C 3. Delivery in weeks 4. A statement indicating compliance with our Specification with exception or a detailed list of exceptions. 5. Escalation IS / IS NOT applicable for the transformers bid. If escalation applies, the Bidder shall indicate in his bid, the specific items or materials subject to escalation and shall provide the method and indices to be used in computing the amount thereof. Escalation occurring after acceptance, if Purchaser exercises the option to delay shipment after manufacturing is completed, will not be paid. If the above information and compliance statement are not supplied the proposal will not be evaluated An alternate bid for the total order may be submitted in addition to the unit bids. B. Loss Evaluations Loss penalties and loss evaluations will be based on the following values: 1. No-load or excitation losses at $3.90/watt 2. Load losses at $2.30/watt C. Shipping Terms Ship F.O.B. point of destination, freight prepaid. D. Terms of Payment 1. If escalation applies, the City of Fort Collins shall not be billed for escalation occurring after the promised delivery date. 2. Test reports shall accompany the invoice. If test reports do no accompany the invoice, late payment penalty charges incurred due to delays in obtaining the test reports will not be paid. Certified copies of test reports shall be sent to the Standards Engineering Section, Fort Collins Utilities - Light & Power. 3. Loss penalty credits and escalation charges shall be itemized on the invoice. Opal Dick - 368dash300.pdf Page 1 THE CITY OF FORT COLLINS Light and Parer Department P.O. Box 580 Fort Collins, CO 80522 SPECIFICATION NO: 368-300 TITLE: PAD -MOUNTED COMPARTMENTAL-TY PE.THREE-PHASE DISTRIBUTION TRANSFORMERS VNTH SEPARABLE INSULATED LOAD BREAK HIGH -VOLTAGE CONNECTORS I APPROVED BY: Kraig Bader Standards Engineering Division Manager ORIGINATION DATE: 8112t83 REVISED: 2/212005 Opal Dick - 368dash300.pdf Page 2� REV. SYM: MM ITEMS COVERED BY THIS SPECIFICATION DESCRIPTION STOCK NO. SPECIFICATION NO. SERIAL 75 KVA, 208Y/120 RADIAL 368300 -006 75 KVA, 408Y/277 RADIAL 368-300 -007 75 KVA, 208Y/120 LOOP 368-300 -008 75 KVA, 480Y/277 LOOP 368-300 -009 150 KVA 20BY1120 LOOP 368-300 -015 150 KVA 480Y/277 LOOP 368-300 -016 300 KVA 208Y/120 LOOP 368-300 -030 300 K\/A 480Y/277 LOOP 368300 -031 500 KVA, 208Y/120 LOOP 368-300 -050 500 KVA 480Y/277 LOOP 368-300 -051 750 MA 208Y/120 LOOP 368-300 -075 750 KVA 480Y/277 LOOP 368-300 -076 1000 K\/A 208Y/120 LOOP 368-300 -100 1000 KVA 480Y/277 LOOP 368-300 -101 1500 KVA 480Y/277 LOOP 368300 -151 20DO KVA 480Y/277 LOOP 368-300 -201 2500 KVA 480Y/277 LOOP 368-300 -251 2 366-300 i Opal Dick - 368dash300.pdf Page 3] REV. SYM: MM REVISION DESCRIPTIONS REVISION DESCRIPTION Previous onfile APPROVED REVISION FF: Tim Sagan • Add Paragraph 5.2.2.9.3: pentahead locking bolts Susan Coram • Paragraph 3.2.2.13.1: add glossy requirement. 10-18-95 REVISION GG: Susan Coram • Title page: Remove revised date Tim Sagan • Paragraph 4.4 and Table 2A Change Temperature Tests and Noise Test from every 9-22-95 unit to one unit of design. REVISION HH: Opal Dick GE removed from Appendix B Tim Sagan 12-13-96 REVISION II Add paragraph 3.2.2.10 OVERCURRENT PROTECTION and renumber remaining paragraphs in section 3.2 Opal Dick Revise Fig. 1 to reflect a'Y' configuration for the primary bushing arrangement vs. an Tim Sagan in -line arrangement. 613/99 Revise Fig. 17 to remove requirement for CT mounting studs and increase dimensions A from 5" and 5.5' to 6" on 225-2500 kVA sizes REVISION JJ Bill Bray Reformat and converted to MS Word, delete List of Active Pages Tim Sagen 9 /14 / 2000 REVISION KK Kraig Bader Added drawing la to describe cable accessory parking stand detail, revise to reflect Tim Sagen current editions of national standard s, charge impedance on 368-300-009 from 9 / 11 / 2001 1.7% to 1.9%. REVISION H Kraig Bader • Charge fusing from oil -immersed cmerk sensing weak link cartridge to a current 4/2/2004 sensing bay-o-net fuse link in series with an ELSP current limiting backup fuse (clause 3.2.2.10). • Charge column header for impedance table in 3.2.2.1 to clarify that impedance numbers are nominal values. (Tolerance s are consistent with ANSI C.57.12.00- 2000) • Changed wording from "Mr. Ouch" in 3.2.2.15 to'Waming label" Revision MM Kraig Bader Charge clause 3.2.2.10 to specify current sensing bay-o-rnet fuse link by size and 2/2/2005 part number. Table 2 was added for this purpose. • Renamed table in 3.3.2.1 to from Table 2 to Table 3 Renamed table in 4.3. from Table 2A to Table 4 3 368-300 Opal Dick - 368dash300.pdf Page 4� TABLE OFCONTENTS ITEMS COVERED BYTH IS SPECIFICATION ._._....._ .___......_. .._-_.._._ ...... ...... REVISION DESCRIPTIONS.„ ... .„.„.._..... .......... _. ._........... ._...... „_... „..„..„..„.. .._. 1. SCOPE ..„„„.„..... .......... -- ._._..---. ........... ..„...„.„..„ ............. .... .._....... .... ...„...... ....... ... 2.APPLICABLE DOCUMENTS...... .„_......_.. ... _..... __. ._.._._..„ ...„._.....„ ..___....._ ..... ._..... 3.REQUIREMENTS....... ........ „... .......... „_._....__. _.._._.._. ._._.._.... ......„..„.._ .___._.._ ...... 3.1 GENERAL REQUIREMENTS FOR DESIGN .......... ................ ................ ................ ................ 3.2 SPECIFIC REQUIREMENTS FOR DESIGN OF LOOP -FEED UNITS........... I ............... ..... 3.3 SPECIFIC REQUIREMENTS FOR DESIGN OF RADIAL -FEED UNITS ........................... A nlTAITTV ACCTTRANVF REV. SYM: MM _.........._.._... .._...„.._ 2 .. . _.. _...... _. ... _..... ..3 ..._.._._.... ..„.._...._ ..5 _..__. ............. .._5 . _.......... ._......_.. ........... ............... .......5 .. ................ .............7 ........ ................ ......16 .... _..... . ... ........ ... .16 ......... ................ .....16 ................ .....16 ....... .....I .......... .......17 ................ ................ 17 _.. ......... _. . _...... 17 ....... ._....._.._. .„„„1 S ... ............ ........19 .... _. ._.._.. ...... ..23 „. .............. ._._..2 4 25 ................ I ........ I...... ....... ................ ................ ........26 4 368-300 Opal Dick - 368dash300.pdf Page 5 REV. SYM: MM SPECIFICATION FOR PAD -MOUNTED COMPARTMEN TAL-TY PE, THREE-PHASE DISTRIBUTION TRANSFORMERS WITH SEPARABLE INSULATED LOAD BREAK HIGH -VOLTAGE CONNECTORS 1.SCOPE This Specification establishes the minimum electrical requirements and mechanical features of three phase, 60 HZ, mineral oil immersed, self -cooled, pad -mounted, compartmen tal-type distribution transformers rated 2500 kVA and smaller, high voltage 13,200 Grd Y/7620 volts, with separab le insulated load break high voltage connectors. These transformers are used for step damn purposes from an underground primary cable supply. This standard generally conforms to ANSI requirements for pad -mounted compartm ental-type, self -coded, three-phase, distribution transformers for use with separable insulated high -voltage connectors, C57.12.26. 2.APPLICABLE DOCUMENTS The following documents forth a part of this Specification to the extent specified herein. The latest issue in effect on the date of invitation for bids shall form a part of this Specification, unless otherwise noted. • ANSI C57.12.00 - Distribution, power, and regulating transformer s, and shunt reactors, general requirements for • ANSI C57.12.26 - Pad mounted, compartmental-ty pe, self -coded three phase, distribution transformers for use with separable insulated high voltage connectors, high voltage 34,500 Grd Y/19,920 volts and below, 2500 kVA and smaller, requirements for • ANSI C57.12.70 - Terminal markings and connections for distribution and power transformers • ANSI C57.12.80 -Terminology for power and distribution transformers • ANSI C57.12.90 - Distribution, power, and regulating transformers, and shunt reactors, test code for • ANSI/IEEE 386 - Separable insulated connectors for power distribution systems above 600V NEMA STANDARD TR1 -Transformers, regulators and reactors 3. REQUIREMENTS 3.1 GENERAL REQUIREMENTS FOR DESIGN 3.1.1 BASIC DESIGN STANDARDS Transformers purchased under these Specifications shall be new arid, unless otherwise specked, meet the requirements of the applicable ANSI Standards and the modifications and additions given in the subsequent paragraphs. In case of conflict, the requirements of the following documents shall apply in the priority shorn: a) This Specification. b) ANSI C57.12.26 c) Other applicable ANSI and NEMA Standards. 3.1.2 KILOVOLT -AMPERE TEMPERATURE RATINGS lQovolt-ampere ratings are continuous and are based on riot exceeding either a 65°C average winding temperature or an 80"C hot spot temperature rise. The temperature rise of the insulating oil shall not exceed 65°C when measured near the top of the tank, The temperature rise is based on an altitude of 3,300 feet. 3.1.3 GENERAL CONSTRUCTION 3.1.3.1 The pad -mounted compartmental-t ype transformers shall consist of the transformer tank, high -voltage cable terminating compartment, and the low -voltage cable-terminatin g compartment. All three of these components shall be assembled as an integral unit, tamperproof and weatherproof for mounting on a pad. There shall be no exposed screws, bolts or other fastening devices, which are externally removable, except the main cover bolts may be exposed. Where the main cover bolts are exposed, the 5 368-300 Opal Dick- 368dash300.pdf Page 6� REV. SYM: MM comer bolts shall be welded or otherwise render ad tamperproof. There shall be no opening through which foreign objects such as sticks, rods, or wire s might be inserted to contact live parts. Suitable means for padlocking the compartment door(s) shall be provided. 3.1.3.2 The high and low -voltage compartment shall be located side by side on one side of the transfomner tank. When facing the compartment, the low -voltage compartment shall be on the right. 3.1.3.3 Construction of the unit shall be such that it can be lifted, skidded, and slid into place on the mounting pad without disturbing the entrance cables. 3.1.3.4 An undercoating over the regular finish or an equivalent treatment shall be applied to all surfaces that are in contact with the pad to minimize corrosion. 3.1.3.5 Minimum dimensions shall be as shown in Fig. 1 of this Specification. Maximum transformer and mirimum pad dimensions are shown in Fig. 6 of this Specification. 3.1.4 LOSSES The total losses of a transformer shall be the sun of the excitation losses and the load losses (12R losses). Load loss tests shall be performed and reported on all units regardless of whether or not a record of such tests is available on duplicate units. Loss evaluations and loss costs will be based on the values shown in the "Special Conditions and Supplemental Instructions to Bidders." Transformers will be evaluated on excitation losses and PR losses at the specified rates. If tested losses exceed quoted losses but are within the tolerances of paragraph 9.3, ANSI C57.12.00-2000, the additional cost incurred from the differential of losses will be calculated using the following equation and the above specified rates and will be deducted from the original Purchase Order or back charged to the manufacturer. In Table 18 and the following equation "Units" shall mean 'Transformers of the same size and design on one order." Excess loss $ = [No. of units] [(No Load Loss Evaluat ion $) (Avg. No Load Losses — Quoted No Load Losses) + (Load Loss Evaluation $) (Avg. Load Losses — Quoted Load tosses)]. If this equation results in a negative number no credit will be given the Supplier. If any unit or units exceed the tolerances of paragraph 9.3, ANSI C57.12.00-2000, that unit or units shall not be shipped without express permission from the City. If accepted, the deduction for excess losses will be based on the following equation: Excess loss $ = (No Load Loss Evaluation $) (No Load Losses — Quoted No Load Losses) But Not Less Than Zero + (Load Loss Evaluation $) (Load Losses — Quoted Losses) But Not Less Than Zero. 3.1.5 SERVICE CONDITIONS Service conditions shall be as defined in paragraph 4.1 of ANSI C57.12.00 except the ambient temperature range shall be 40°C above to 32°C below zero. The transformer shall operate safely with starting temperatures as low as 32°C below zero. 6 368-300