Loading...
HomeMy WebLinkAbout102795 WESCO DISTRIBUTION INC - PURCHASE ORDER - 6604954N �4 a City of Fort Collins Page Number: 1 City of Fort Collins Date: 08/04/06 Purchase Order Number: 6604954 vcnvcly UOLU. VJ/1Ulu / Buyer: DICK,OPAL Purchase Order number must appear on invoices, packing lists, labels, bills of lading, and all correspondence. Note: Line City UOM Description Unit Price Extended Price 1 10 EA T3000050; transformer 15,920.000 159,200.00 500 kVA pad; 208Y/120 T3000050 YARD TRANSFORMER, 500 kVA PAD -MOUNTED COMPARTMENTAL TYPE, THREE PHASE DISTRIBUTION WITH SEPARABLE INSULATED LOAD BREAK HIGH VOLTAGE CONNECTORS. HIGH VOLTAGE RATING: 13200 GRDY/7620. LOW VOLTAGE RATING: 208Y/120. SERIAL NUMBER 050 TO BE IN ACCORDANCE WITH SPECIFICATION #368-300-050, REVISION MM MFR. ABB ESCALATION IS APPLICABLE ADJUSTMENTS WILL BE REVIEWED BYCITY PRIOR TO PRODUCTION AND IN Opal Dick- 368dash300.pdf Page 7] REV. SYM: MM 3.2 SPECIFIC REQUIREMENTS FOR DESIGN OF LOOP -FEED Units 3.2.1 FUNCTIONAL DESCRIPTION The transformer shall be a three phase, pad mounted, loop feed -safe break, "deadfront" type for use on a 13.9 W grounded "Y" distribution system. 3.2.2 DESIGN AND CONSTRUCTION 3.2.2.1 RATINGS Table t - L000-Feed Transformer Retinas Stock No. WA Low Nominal Voltage Impedance Bushing T e/Confi . High Voltage Low Volta e 368-300- 008 75 208Y/120 1.9% c of 368-300- 009 75 480Y/277 1.7% c of 368-300- 015 150 208Y/120 2.1% c of 368-300- 016 150 480Y/277 2.1% c of 368-300- 030 300 208Y/120 2.5% c of 368-300- 031 300 480Y/277 2.5% c of 368-300- 060 500 208Y/120 3.04% c e 368-300- 051 500 480Y/277 3.04% c of 368-300- 075 750 208Y/120 5.75% c 368-300- 076 750 480Y/277 6.75% c 368-300- 100 1000 208Y/120 5.75% c 368-300- 101 1000 480Y/277 5.75% c 368-300- 151 1500 480Y/277 5.75% c 368-300- 201 2000 480Y/277 5.75% c 368-300- 261 2500 480W277 5.75% c CFigure 1 (V-config.) of this specification e Low -voltage line and neutral terminals shall be stud type bushings in accordance with ANSI C57.12.26-1992, Fig. 9(d) and shall include a separate spade with NEMA standard drilling f Figure 9(a) of ANSI C57.12.26 - 1992 (4-hole pad) g Figure 9(b) of ANSI C57.12.26 - 1992 (6-hole pad) 3.2.2.2 INSULATION LEVEL 3.2.2.2.1 The basic impulse level (BIL) of the completely assembled transformer, including high -voltage and low -voltage terminals shall be 95 kV and 30 kV respectively. 3.2.2.2.2 Dielectric test levels shall be in accordance with the distribution levels In Paragraph 5.10 of ANSI C75.12.00-2000 3.2.2.2.3 The unit shall withstand test voltages in ac cordance with ANSI C57.12.00 and impulse tests in accordance with NEMA Standards for Transformers, Publications No. TRII, 3.2.2.3 TRANSFORMER CORE A five -legged core -coil assembly or three separate core -coil assemblies shall be employed. The use of three-legged designs is expressly prohibited. 7 36a-300 „Opal Dick - 368dash300.pdf Page 8 3.2.2.4 HIGH VOLTAGE TAPS REV. SYM: MM A no-load tap changer with external operating handle shall provide two 2 V. full capacity taps above and below normal. The operating handle shall be mounted in the primary compartment. 3.2.2.5 BUSHING WENS AND TERMINALS 3.2.2.5.1 The number, location, and arrangement of bushing wells, terminals and parking stands shall be as shown in Fig. 1 and Fig. 5 of this specification. Al low -voltage bushings and high -voltage wells shall be externally clamped and shall have leads of sufficient length to allow them to be changed without removing he cover. Welded bushings and wells are expressly prohibited. 3.2.2.5.2 High -voltage bushi rig wells shall be 200A load -break interfac a 8.N14.4 kV bushings in accordance with ANSIAEEE Std. 386. 3.2.2.5.3 Low voltage bushing arrangement and spacing shall be "staggered”, as shown in Fig. 5 of this Specification. 3.2.2.5.4 The low -voltage neutral shall be a fully insu laced bushing. A ground pad shall be provided on the outer surface of the tank and a removable copper ground strap shall be provided and connected between the low -voltage neutra I bushing and the ground pad. 3.2.2.5.5 The high -voltage neutral shall be corrected to the low -voltage neutral internally with provision for opening this connection for testing. 3.2.2.6 ACCESSORY CABINET 3.2.2.6.1 The accessory cabinet shall consist of a high -voltage and low- voltage compartment generally constricted in accordance with applicable ANSI specifications and dimensioned in accordance with Fig.1 of this Specification. 3.2.2.6.2 Cabinet doors shall be hinged, removable, and lockable. Stainless hinge pins shall be provided. 3.2.2.7 ACCESSORY EQUIPMENT Accessory equipment shall be provided in accordance with Table to and the following details: 3.2.2.7.1 Suitable jack bosses or equivalent jacking facilities shall be provided on the tank. Vertical clearance for a jack shall be 1 % inches minimun, 3% inches maximum. 3.2.2.7.2 The transformer base shall be arranged for rolling in two directions: Parallel to and at right angles to the centerline of the high -voltage bushings. 3.2.2.7.3 Four lifting lugs shall be provided. These lugs shall be adequate strength and size and arranged on the tank to provide a suitable lift for the completely assembled unit. 3.2.2.7.4 The base of the assembly shall be provided with suitable means for mooting the unit on the pad. An internal flange shall be provided at the base of the accessory compartment to provide means for mounting the unit on the pad. (Fig. 1). 3.2.2.7.5 Terminal designations are shown in Figure 1. The identification of terminal connections shall be shorn on the instruction nameplate. Instruction nameplate shall be corrosion resistant, located in the low -voltage compartment, and shall be readable with cables in place. Where the nameplate is mooted on a removable part, the manufacturer's name and transformer serial number shall be permanently affixed to a norwemovable part. Instruction nameplate shall certain the infornat ion specified in ANSI C57.12.00-2000, paragraph 5.12. In addition, either on the nameplate or label affixed near it, the manufacturer shall indicate that the dielectric fluid is non -PCB. 8 368-300 Opal Dick368dash300.pdf Page 9J REV. SYM: MM 3.2.2.7.6 An automatic pressure relief device shall be located within the compartment. This device shall meet the following requirements: I/V NPT or larger male Inlet Port. Exposed parts of weather and corrosion resistant materials. Norrdeterioratin g gasket and o-ring material. Manual pull ring able to withstand 25 pound force minimum. • Body able to withstand 100 pound force minimum. Bug shield. Cracking pressure of 10 t 2 psig. Resealing pressure of 6 psig minimum. • Zero leak rate from resealing pressure to -8 psig. • Minimum flow rate of 35 SCFM at 15 psig. 3.2.2.8 OILPRESERVATION Transfomlers shall be of sealed -tank construction. Sealed -tank construction is that which seals the interior of the tank from the atmosphere, and in which the gas plus the oil volume remains constant. The transformer will remain effectively sealed for a top -oil temperature range of -32°C to 105°C. 3.2.2.9 TANKS The tank shall be domed or sloped to shed water and shall be of sufficient strength to support a minimum of 500 lbs. Constriction of the tank shall be in accordance with ANSI C57,12.26-1992, Section 7, except bolted cover is preferred. 3.2.2.9.1 If main cover is welded, adequate handhole(s) shall be provided. Handholes shall be concealed. Bolted -on covers shall be adequately gasketed and tamperproof. Main cover bolts may be exposed; however, where cover bolts are exposed, the comer bolts shall be welded or otherwise rendered tamperproof. 3.2.2.9.2 Tank grounding provision shall be in accordance with paragraph 7.6.4 of ANSI C52.12.26-1992. 3.2.2.9.3 Locking bolts shall be pentahead style. 3.2.2.10 OVERCURRENT PROTECTION Overcrrrenl protection shall consist of a single element current sensing bay-o-net fuse link in series with an ELSP current limiting backup fuse. Fuses shall be sized as shown in Table 2: Tnhi. 7 — Fuernn Renubnmonfe Expulsion Fuse Continuous Current Limiting Fuse Stock kVA Current Rating Continuous Current Rating Number Ca acl Part Number*) Part Number*) 36&30&008 7&VA 10A 30A 36&300-009 4000353C06 3544030M61M 11501cVA I I 36&30&016 (4000353C08) (544040M61M1 1300 VA I 36&300.031 (4000353C16) I (3544065M IA 368-300-051 500kVA 40A 100A 4000353C 12 354410OWlFA 368-300-075 750kVA 65A 125A, 368-300-076 750kVA (4000353C 14) (3544125M71M) 368&300.100 1000kVA 368-300.101 1000kVA i I 2: Pwedlel 125A fuses 368-300-201 2MVA (1=353C 17n I (3544125Mr1Mi 36&300.251 1250MVA 1125A Hi-ArM OL Lirdc C05CB 1 1250A4 wallel1ses 1254 fu 2 Fuse shall be as specified in the table above or shall be an equivalent as approved in writing by Electric Standards Engineering. 9 368-300 Opal Dick - 368dash300.pdf Page 10 REV. SYM: MM 3.2.2.11 COMPONENTS FORLOOPED PRIMARY The minimum current -carrying capability of components for the looped primary cable system shall be 200 amperes (continuous) and 10,000 amperes symmetrical (momentary). 3.2.2.12 AUDIBLE SOUND LEVEL The audible sound level shall be in accordance with NEMA Standard TR1. 3.2.2.13 BASE PLAN The base plan of a completely assembled unit shall be such that it can be installed on a pad of the dimensions shown in Fig.6 of this specification. 3.2.2.14 PAINT 3.2.2.14.1 Surfaces to be painted shall be blast cleaned (commercial blast) to provide a clean dry surface free of dirt, dust, chalk, loose paint, rust, grease and arty other contaminants. 3.2.2.14.2 EEI "Finishing Guidelines" specification shall apply. Finish coat shall be Desert Tan, Munsell #10YR6.0/3.0, glossy. 3.2.2.15 SAFETY LABELS The manufacturer shall not apply NEMA 260 Safety Labels. The Purchaser will apply custom warning labels after delivery. 3.2.2.16 ANGULAR DISPLACEMENT: Per Fig.10(b) of ANSI C57.12.26-1992. 10 368300 Opal Dick —3368dash300.pdf Page 11 aB 2.0 F VJJGE31d' MIN 1 1/2. Kw KLOWQ. * +—+ ha I' -- I I i I I i l d.6 0 55 MIN• 45 A KVARATINGS LOWVOLTAGE RATINGS COMPARTMENT DIMENSIONS (MINIMUM) BUSHING HEIGHT A' B 751W ALL 23.25 27 2 54 ALL 2B 31 750�10W d Y/2n,21MY 11M 28 46 15fN}2 ANY1227 2B 46 NOTE: Demles vnMe Aimwabu. ^ See Fg.5 AN dmemims in (rcMsl. Mamum dmensp s W Asrx one imh clw am:e from edge of ped (Fg. 6), WLN MIN• Figure -Accessory compartment & Bushing Dimensions (Config. 1) REV. SYM: MM 11 3W300 Opal Dick - 368dash300.pdf Page 121 I---2AS MIN - TANK SURF CE. TANK SURFACE y I � A � 1 I � i I I OJ5 + 11a _p INSIDE Cable Aao y NrKJ,%Stami Figure 1A—Cable Accessory Parking Stand Detail Figure 2 (Config. 2) -DELETED 7/92 Figures 3 & 4 -DELETED 11/00 Ref. now to: ANSI C57.12.26 - 1992 figures 9(a) & 9(b) REV. SYM: MM 12 36s-300 Opal Dick - 368dash300.pdf Page 13 REV. SYM: MM 4.0"il A A A 4.0" 6" RADIUS MIN MIN TYPICAL 3 PLACES \ 1 / `L X1 —'' x3 i KVA RATINGS LOW VOLTAGE RATINGS A B 75-150 ALL 4.75 8 225-500 ALL 6 8 750-2500 480/277, 208Y/120 6 10 Figure 5- Staggered Low -Voltage Bushing Arrangement (all dimensions minimum inches). NOTE: An area having a 6 inch radius around each bushing shall remain clear of obstructions such as gauges, etc. 13 36&300 Opal Dick - 368dash300.pdf Page 14 REV. SYM: MM KVA SERIAL I PAD DIMENSIONS (inches) A B C I D E F 75 -006 thru -009 75 55 40 21 15 61 150 -015 75 55 40 21 15 61 150 -016 75 55 40 21 15 61 300 -030 75 55 40 21 15 61 300 -031 75 55 40 21 15 61 500 -050 75 55 40 21 15 61 500 -051 75 55 40 21 15 61 750 -076,-075 85 72 49 23 15 67 1000 -101,-100 85 72 49 23 15 67 1500 -151 101 87 51 23 15 76 2000 -201 107 88 51 23 15 79 2500 -251 107 88 51 23 15 79 Fig.6 - Pad Dimensions 14 368-300 Opal Dick - 368dash300.pdf Page 15] REV. SYM: MM TABLE I ACCESSORY EQUIPMENT ACCESSORY I KVA 75- 550 f 300 500-2500 Tap charger handle in HV compartment x x x Instruction nameplate in LV compartment x x x Jacking provisions x x x Provisions for rolling in two directions x x x Lifting lugs x x x Provisions for mounting on pad x x X Arrester mounting provisions Grounding provisions in both compartments x x x 1" oil drain x 1"oil drain valve with sampling device x x Upper filter press and filling plug (or cap) (f) x x x Provisions for oil gauge x Provisions for pressure -vacuum gauge x x Oilgauge x Thermometer x x x Secondary CT mounting holes (4 holes on 4 3n8" x 5 518" centers) X x x Manual/automat is pressure relief valve x x X 15 368-3W Opal Dick - 368dash300.pdf Page_ 6 1 REV. SYM: MM 3.3 SPECIFIC REQUIREMENTS FOR DESIGN OF RADIAL -FEED Units 3.3.1 FUNCTIONAL DESCRIPTION The transformer shall be a three phase, pad mounted, radial feed safe break, "deadfront" type for use on a 13.8 W grounded "Y" distribution system. 3.3.2 DESIGN AND CONSTRUCTION The requirements for radial -feed transformers shall be the same as those of loop -feed with the following exceptions: 3.3.2.1 RATINGS Table 3 - Radial -Feed Transformer Ratings Stock No. WA Low Impedance Voltage I I Bushing TypelConffg. High Voltage Low Voltage 368-300- 006 � 208Y/120 1 9% d f h 368-300- 007 I 75 1480Y/277 I 1.9% I d I f h I d Per Figures 54, & 7 of ANSI C57.12.26-1992 (In -Line) EXCEPTION: high voltage bushings shall be 32 -36 inches above the base of the transformer f Figures 9(a) & 9(d) of ANSI C57.12.26 - 1992 (stud with 4-hole pad) h Figure 8(a) of ANSI C57.12.26-1992 (Staggered) 3.3.2.2 ACCESSORY CABINET The accessory cabinet shall be dimensioned in accordance with Fig. 7 of ANSI C57.12.26-1992. 4. QUALITY ASSURANCE 4.1 GENERAL 4.1.1 RESPONSIBILITY FOR INSPECTION Unless otherwise specified, the vendor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the vendor may utilize his own facilities or any commercial laboratory acceptable to the City of Fort Collins. The City reserves the right to perform or witness any of the inspections set forth in this Specification where such inspections are deemed necessary. 4.1.2 TEST REPORT The manufacturer shall furnish to the purchaser certified copies of the results of all tests prior to payment. Copies shall be sent to the Design Section as well as with the invoice. Unsigned copies are rat acceptable even if accompanied by a signed cover letter. The Quality Control Manager shall review and sign each test report. 4.2 TEST CONDITIONS Unless otherwise specified, testing defined in Sectio n 4.6 shall be conducted under the following conditions: 4.2.1 REFERENCE TEMPERATURE The reference temperature to which losses, impedance, regulation, and efficiency are corrected shall be 85° C. 4.2.2 TOLERANCE ON IMPEDANCE VOLTAGE Tolerance shall be as specked in ANSI C57.12.00. 16 368-300 Date: 08/04/06 °! City of Fort Collins Page Number: 2 City of Fort Collins Purchase Order Number: 6604954 "r Val I VlV f Buyer: DICK,OPAL Purchase Order number must appear on invoices, packing lists, labels, bills of lading, and all correspondence. Note Line Qty UOM Description Unit Price Extended Price ACCORDANCEWITH STATED INDICES IN PRICING. ANY INDEX ESCALATION (INCREASE) AFTER THE QUOTED DELIEVERY DATE WILL NOT BE ALLOWED. NO LOAD LOSS - 906 FULL LOAD LOSS - 2562 TOTAL LOAD LOSS - 3468 IMPEDANCE 3.04% DELIVERY: 32 WEEKS OR CITY OF FORT COLLINS MAY CONSIDER THE CAPACTIY PLAN ARRANGEMENT AS PROVIDED IN THE QUOTATION FOR THESE UNITS WITH SPECIFIC SHIPMENTS AND QUANTITIES TO BE STATED WITHIN THE NEXT Opal Dick-. 368dash300.pdf Page 17] REV. SYM: MM 4.2.3 TOLERANCE ON IMPEDANCE VOLTAGE ON A TAP The percent departure of tested impedance voltage on army tap from tested impedance voltage at rated voltage shall rat be greater than the total tap voltage range expressed as a percentage of the rated voltage. 4.3 FUNCTIONALTESTS Functional tests shall consist of those tests and related requirements as cross referenced in Table 4 and shall be performed on each unit, except Temperature and Noise Tests which shall be performed on one unit of each design (KVA) per order. Y.W. A _ C......�i.....1 T... i.. TEST TEST PARAGRAPH REQUIREMENT OR REFERENCE Examination Of Product 4.6 3.0 3.1 3.2 3.3 s specification) Ratio 4.6 ANSI C57.12.00 Section 8 Polarity And Phase Relation 4.6 ANSI C57.12.00 Section 8 Excitation Loss 4.6 ANSI C57.12.00 Section 8 Excitation Current 4.6 ANSI C57.12.00 Section 8 Impedance & Load Loss 4.6 ANSI C57.12.00 Section 8 Temperature Tests' 4.6 ANSI C57.12.00 Section 8 Dielectric Tests 4.6.1 3.2.2.2 hisspecification) Impulse Tests 4.6.2 3.2.2.2 hisspecification) Leak Testina 4.6.3 3.2.2.8 & 3.2.2.9 's specification) Noise Testi a 4.6.4 3.2.2.12 hiss ification v, M U1 Yl r= uoiyi l W UI=. 4.4 TEST METHODS -- FUNCTIONAL TESTS Each completed unit shall be inspected to determine compliance with respect to dimensions, material, workmanship, construction and marking, and routine tests on all units shall be made as specified in Section 8 of ANSI Standard C57.12.00, and in ANSI Standard C57.12.90. In addition to routine tests, the following test requirements and/or modifications shall apply. 4.4.1 DIELECTRIC TESTS Induced and applied potential Dielectric Tests shall be performed in accordance with ANSI C57.12.00 and C57.12.90. The low voltage windings shall have a test potential to ground of 10,000 volts for one minute. The test potential between high voltage windings shall be 34,000 volts for one minute. 4.4.2IMPULSE TESTS ANSI Standard Impulse Tests shall be performed. Full Wave Impulse Test shall use a 1.5 x 50 microsecond wave. 4.4.3 LEAK TESTING The transformer tank shall be filled with oil and tested for air and oil leaks under (1) 4 psig vacuum for % hour, (2) 7 psig pressure for 24 hours in the sequence indicated. An alternate method of leak testing may be performed by injecting halogen gas under 10 psig and detecting leaks through the use of a halogen detector. (Note, the automatic/manual pressure relief device must be removed for this test). 4.4.4 NOISE TESTING Noise testing shall be conducted in accordance with applicable NEMA Standards. 5. PREPARATION FOR DELIVERY Transformers shall be prefilled with the appropriate amount of transformer oil and shall be shipped by open -bed truck. Units shall be packaged in such a way as to provide for ease of handli rig and to protect units from shipping damage. Urns shall be fully palletized in four-way universal pallets with2V' minimum openings to facilitatehandling from army side. Pallets shall be independent of the transformer. The Supplier shall give 24-hour notice prior to delivery for any shipments where an individual transformer weighs over 4,000 pounds. In addition to these requirements, the Supplier shall comply with ary additional requirements or modifications shown on the purchase order arxUor supplemental instructions. 17 368-300 Opal Dick - 368dash300.pdf Page 18 REV. SYM: MM 6. DEFINITIONS AND ABBREVIATIONS • Vendor or Supplier- The manufacturer andlor manufacturers agent supplying or quoting on the specified article. • Article, Unit, Assembly - All refers to the equipment defined by this specification. DC or d.c.- Direct Current. • AC or a.c. - Alternating Current. • °C- Degree Celsius (Centigrade) • °F -Degree Fahrenheit • kV -1000 volts. • CPS or Hz -Cycles per second. • psig - Pounds per square inch gauge. • V or v- Volts. • kVA -1000 Volt-amperes. 18 368-300 REV. SYM: MM APPENDIX A Typical pad designs are shown in Figures 1A through 34 The dimensions in inches of Figures 1A through M will fit the minimum compartments on transformers covered by tfds Specification as well as the maximum transformer envelope. 19 368300 Opal Dick- 368dash300.pdf Page 20 REV. SVM: MM I I I I IS" I PR]YkRY SEC. I I 3' i?6' 27• 13" ]9' Pun aS LENLfN dNg WIDIM 411 WI 7 5/9' _ _ _ _ _� _ s t3' T 17 on Pod Wstd — 1. Cancrefi meal be 3.000 our mitinurn. Mgimum coons oaweaote die 1 1/2 ndree. Some howiements far pod and prinyy I M:hng caUfnet *I generally be V 1t U'. Factors to be cm4dered rm fIng the pod include — 1. Acassbllty — TM tionsloYmer past 1rIo1 ms acCssglole to line bccml truclu equrpped For the installation and ro novel or heoW transformers. Sudt awasobllity aholl not require inlrualen en oapoent proputy. 2 Prodnity of Buildings. '*bill. Barris, and/w tlwhmge — In ndortlwr to the Cl"MCw rpWV,,d Id nelallbllm one Rmoral. the rnnrnerrt clewwlCp n frank of the transformer pod shol he eight (8) feet and the mnir um clearance tram as oths slew ahol be three (J) feet It the buedn0 has on ovamong. daeramce to aM sago of fee VTslormer pod small IN, meoeums harinntolly from the outs edge of the o hulq. Tronslwrnss through JDO KVA may be tnstolled ends the "Mang It tee vartrdal deormcb setAeen me pod ano tee "hunts is at least 25 feet w+d the Iwatlpn he wcoo ible to line boom trucks J. Cbdw and 3tw+dorde — fn odd.t'cn to the above. the installation shell cmform to the Notknal Elmtrk Code and feaero4 slots ono any coon and %toWp gas. 2 S 25 93 REV NO. DATE DWN D.E. APP I DSNG. ENG APP DIST APP CITY OF FORT COLLINS DWG 3PHASEI ® LIGHT AND POWER DEPADEPARTMENTTRA SFOR ER PAD DE51GN sgeee e.l. oww 75 — 500 KVA mma we pm 3 PHASE Figure 1A- Pad Design (75 -500 KVA) 20 36&300 Opal Dick - 368dash300.pdf Page 2 REV. SYM: MM --I--�-- I I i I I I I 72' --i--�-- +. 3 1]' I PRINAFtY sl:taNn6aV FRd1i T3. T T �-- fir 26, ar (OJR o3 Kw 7' 49' 3. ddd:ru e(a Vtmu —e— Nate% aw paw Material - I. C-Wgtq must be 3.000 M rnmmum, 2. wlmYm aotree IlWoote alye 1112 rrClts Bpen Ieymremenle flat pan nb prilwary ofichrng cabwet Milt generally be B' K 12'. Facing to be conaideraa in Inootrig the pan Inol(oe — i AccrMatly — me tronafarmrr pod "all be ottem , to ILmIe bootrade ebuipoed for the tnotoictllan o+d rerrmrd of hoary traretermns. such aedoememy Mao not "Pro wtrlson m odp009111 prdpnty. 2. fArassInIty Of Buddngqa. *a11a Borreov. oho/or ■ — ti addiiton to the alaaaneee rowfTod for Tool ollobLn�and rM1a Ytl, Iha mwMYM tlearanf4 In flent of me trOMfalmn pad "I ee uga ni (9) feet tnthe mfmmum devmd awe all VOW sides shot be fwr (4) feet, If the b AOhg hot on owhpndy ataranta to the edge at the irmrarmer pad oral be meiap,old ho,dignially torn the ester edge of the ",hong. Gareformne tlrou4, 300 KyA nwy be Installed andw the owhong a me yerlIow wewonoe bet*oon the pod mo the overhand to at loos( 25 lest and the Imotion is occeecLa to IYIe bean buaR 31 Centel, tend the coytCode and rlslalp lerl "Idalanrnrrl to the Notlpnol federal. state and city codes acid stamdords D OZ APP D5NG, E G APP DIST, APP CITY OF FORT COLLINS DWG 3PMASE2 nA== LIGHT AND ER DEPARTMENT IP TRA SFOR ER P D DESK500 - 1000 KVA 3 PHASE Figure 2A - Pad Design (500 -1000 KVA) 21 368300 Opal Dick - 366dash300.pdf Page 22 REV. SYM: MM 107'—F I �� mtENaln 15' I WINDOW SECMDAIW e•gal t♦ _T L 29' 2328' 2B' FEVE 90 N LCNG11d ANDD Vg'ID7N - I I 7 5/2 ---- - T-- hotel w rbd Itfewo - 1, onCrete must be S,OOD pad m�nrnym, 2, OMfuffl C40(M Og1 00% ems 1 1/2 inches, space towlamentg for Poo 0.0 pnmary obtcnhg cannot *I gorway br V X 12'. Feltare to be conalderad in locating the Dad indtda - I. A&COMlddy - me uanNdmd pod Mail be OCCetlble to Ina boom tNchs eetuboad for the installation and rernowl Df heavy tranefar Sits, accesmality Snell nOt raQ.IYo intrvetar gn odiwant vrowlty. 2. ProodmCty of BYOdnP, *died Barriers, wd/a Orerhong, - In adc6an to the doararono reouimd for inatdloGon and remowt, the mfndmt. n clearance in fl nt at am trcn former Poo aholl be eight (a) feet and the rmnrnum deerance Ircw oil other aide shall be low (4) feet If the huiWhg has on e.dP", tleerehee to the eerp of me Ireeafermd pod nee be measured harir taly ban the oetar edge al " tavahong. rrenefw.wg tnrougn =0 KVh may be L01011001 under the ovdhdng d the V.deol deww" wow the pad and the overman 4 at least 25 feel and the location is ocoaee'hie to Im boom iryehv. 1. Codes and Standards - h addition to the 000te, the matOewiw shall adfd to the Natieed Etltltre Cade and federal. Dlote and ally codes and etwdords. 11/p2/g0 REV NO. DATE D N D.E. APP I DSNG. ENG APP DIST. APP CITY OF FORT COLLINS DWG 3PHASE3 ® LIGHT AND POWER DEPARSPARTMENT I1300 - 2500 KVA aa- .ave.e a"e �e ele�l 3 PHASE Figure 3A - Pad Design (1000-2500 KVA) 22 368-300 Opal Dick- 368dash300.pdf Page 23 REV. SYM: MM APPENDIX B Transformers purchased under this Specification shall be of the make shown below. Manufacturers not listed below may submit written proposals demonstrating compliance with these Specifications for consideration of addition to the accepted manufacturer list prior to the next request for bids. In addition to inclusion on the list below, manufacturers equipment must also satisfy all requirements of this Specification to be acceptable. TABLE 3B MANUFACTURER SERIAL NO. Cooper Power Systems All ASEA Brown -Govan (ABB) All Howard Industries All Pauwels Transformers All The manufacturers in the following list have been conditionallyapproved and may bid as an alternate. The definition and intent of "Conditional Approval' of a manufacturer is to allow the City to gain some experience with the manufacturer's product. Should a conditionally approved manufacturer be the evaluated low bidder, the City reserves the right to award all, part, or none of the order to them, dependant upon the current needs of the City for that item or items. 23 36&300 Opal Dick - 368dash300.pdf Page 24] REV. SYM: MM APPENDIX C The following forms for Individual arid Average Transformer Losses are used by the City of Fort Collins to determine loss penalties. 1) Transformer Loss Evaluation Average Losses Form 2) Individual Transformer Loss Evaluation Form 24 368-300 Opal Dick - 368dash300.pdf Page 25J REV. SYM: MM TRANSFORMER LOSS EVALUATION - AVERAGE LOSSES City Order No. SrN Manufacturer Invoice No. KVNUne LINE DESCRIPTION AMOUNT (1) No. of units (2) Average core losses (3) Quoted core losses (4) Excess average core losses: line (2) less line (3) (5) Penalty for excess average core losses: line (1) x line (4) x $ (6) Average copper losses (7) Quoted copper losses (8) Excess average copper losses: line (6) less line (7) (9) Penalty for excess average copper losses: line (1) x line (8) x $ _ (10) Penalty to be assessed manufacturer: line (5) plus line (9) but not less than zero Date Prepared By: Design Engineering NOTE: If arty unit(s) exceeds the loss tolerances of ANSI C57.12.00, Light & Power will either reject it, include it on these averages, or calculate losses using the Individual Transformer Losses Evaluation Form, whichever is most favorable to Light and Power. 25 368-300 Opal Dick - 368dash300.pdf Page 26� INDIVIDUAL TRANSFORMER LOSS EVALUATION City Order No. Marwfacturer KVWUnit LINE DESCRIPTION (1) _ Tested core losses (2) Quoted care losses (3) Excess core losses line (1) less line (2) but rat less than zero (4) Percent difference line (3)-line (2) x 100 (5) Tested total losses (6) Quoted total losses (7) Excess total losses Une (5) less line (6) but not less than zero. (8) Percent difference Line (7) -* line (6) x 100 (9) _ Tested copper losses (10) Quoted copper losses (11) Excess copper losses Une (9) less line (10) but not less than zero. (12) Penalty for excess core losses Une (3) x $ (13) Penalty for excess copper losses Une (11) x $ (14) Penalty to be assessed manufacturer Line (12) plus line (13) SIN Invoice No. Date Prepared By: Design Engineering AMOUNT REV. SYM: MM 26 368-300 Date: 08/04/06 ul� City of Fort Collins Page Number: 3 City of Fort Collins Purchase Order Number: 6604954 Delivery Date: 03/16/07 Buyer: DICK,OPAL Purchase Order number must appear on invoices, packing lists, labels, bills of lading, and all correspondence. Note: Line Qty UOM Description Unit Price Extended Price 7 CALENDAR DAYS BY WESCO Total $159,200.00 City of Fort Cidilifis Director of Purchasing and Risk Management City of Fort Collins This order is valid over $2000 unless signed by James B. O'Neill II, CPPO, FNIGP Accounting Department City of Fort Collins Purchasing, PO Box 580, Fort Collins, CO 80522-0580 PO Box 580 Fort Collins, CO 80522-0580 Opal Dick- 368dash300instructions.pdf Page 1] Revised 12/13196 Special Conditions and Supplemental Instructions to Bidders Applicable to Specification 368-300 A. Data to be supplied with Bidder's Proposal The following data shall be supplied with the bidder's proposal in addition to that information required by the "Invitation to Bid" and the "Purchase Requisition". 1. Impedance volts in percent (%) at full load, high voltage to low voltage at 85°C 2. No load and total losses at 85°C 3. Delivery in weeks 4. A statement indicating compliance with our Specification with exception or a detailed list of exceptions. 5. Escalation IS / IS NOT applicable for the transformers bid. If escalation applies, the Bidder shall indicate in his bid, the specific items or materials subject to escalation and shall provide the method and indices to be used in computing the amount thereof. Escalation occurring after acceptance, if Purchaser exercises the option to delay shipment after manufacturing is completed, will not be paid. If the above information and compliance statement are not supplied the proposal will not be evaluated An alternate bid for the total order may be submitted in addition to the unit bids. B. Loss Evaluations Loss penalties and loss evaluations will be based on the following values: 1. No-load or excitation losses at $3.90/watt 2. Load losses at $2.30/watt C. Shipping Terns Ship F.O.B. point of destination, freight prepaid. D. Terms of Payment 1. If escalation applies, the City of Fort Collins shall not be billed for escalation occurring after the promised delivery date. 2. Test reports shall accompany the invoice. If test reports do no accompany the invoice, late payment penalty charges incurred due to delays in obtaining the test reports will not be paid. Certified copies of test reports shall be sent to the Standards Engineering Section, Fort Collins Utilities - Light & Power. 3. Loss penalty credits and escalation charges shall be itemized on the invoice. Opal Dick - 368dash300.pdf Page 1� THE CITY OF FORT COLLINS Light and Power Department P.O. Box 580 Fort Collins, CO 80522 SPECIFICATION NO: 368a00 TITLE: PAD -MOUNTED COMPARTMENTAL-TY PE THREE-PHASE DISTRIBUTION TRANSFORMERS WITH SEPARABLE INSULATED LOAD BREAK HIGH -VOLTAGE CONNECTORS i APPROVED BY: Kraig Bader Standards Engineering Division Manager ORIGINATION DATE: 8112183 REVISED: 212/2005 Opal Dick- 368dash300.pdf Page 2 REV. SYM: MM ITEMS COVERED BY THIS SPECIFICATION DESCRIPTION STOCK NO. SPECIFICATION NO. SERIAL 75 KVA, 20BY1120 RADIAL 368-300 -006 75 K\/A 40BY/277 RADIAL 368-300 -007 75 MA 20BY1120 LOOP 368-300 -008 75 KVA, 480Y/277 LOOP 368-300 -009 150 KVA 208Y/120 LOOP 368-300 -015 150 KVA 480Y/277 LOOP 368-300 -016 300 KV& 20BY/120 LOOP 368-300 -030 300 MA 480Y/277 LOOP 368-300 -031 500 KVA 208Y/120 LOOP 366-300 -050 500 KVA 480Y/277 LOOP 368300 -051 750 KVA 20BY/120 LOOP 368-300 -075 750 KVA, 480Y/277 LOOP 368-300 -076 1000 KVA 208Y/120 LOOP 368-300 -100 1000 KVA 480Y/277 LOOP 368-300 -101 1500 KVA, 480Y/277 LOOP 368-300 -151 2000 KVA 480Y/277 LOOP 368-300 -201 2500 K\/& 480Y/277 LOOP 368300 -251 2 368-300 Opal Dick - 368dash300.pdf Page 3 REV. SYM: MM REVISION DESCRIPTIONS REVISION DESCRIPTION Previous onfile APPROVED REVISION FF: Tim Sagan • Add Paragraph 5.2.2.9.3: pentahead locking bolts Susan Coram Paragraph 3.2.2.13.1: add glossy requirement. 10-18-95 REVISION GG: Susan Coram • Title page: Remove revised date I Tim Sagen • Paragraph 4.4 and Table 2A: Change Temperature Tests and Noise Test from every 9-22-95 unit to one unit of design. REVISION HH: Opal Dick GE removed from Appendix B Tim Sagan 12-13-96 REVISION II : • Add paragraph 3.2.2.10 OVFRCURRENT PROTECTION and renumber remaining paragraphs in section 3.2 Opal Dick • Revise Fig. 1 to reflect a "V" configuration for the primary bushing arrangement vs. an Tim Sagen in -line arrangement. 6r3r99 Revise Fig. 17 to remove requirement for CT mounting studs and increase dimensions A from 5" and 5.5' to 6" on 22 2500 kVA sizes REVISION JJ all Bray Reformat and converted to MS Word, delete List of Active Pages Tim Sagen 9 /14 / 2000 REVISION KK Kraig Bader Added drawing 1a to describe cable accessory parking stand detail, revise to reflect Tim Sagan current editions of national standard s, change impedance on 368-300-009 from 9 / 11 / 2001 1.7% to 1.9%. REVISION LL Kraig Bader • Change fusing from oil -immersed curets sensing weak link cartridge to a current 4/2/2004 sensing bay-o-nef fuse link in series with an ELSP current limiting backup fuse (clause 3.2.2.10). • Charge column header for impedance table in 3.2.2.1 to clarify that impedance numbers are nominal values. (Tolerance s are consistent with ANSI C.57.12.00- 2000) • Changed wording from "Mr. Ouch" in 3.2.2.15 to "roaming label" Revision MM Kraig Bader • Charge clause 3.2.2.10 to specify current sensing bay-o-net fuse link by size and 2/212005 part number. Table 2 was added for this purpose. Renamed table in 3.3.2.1 to from Table 2 to Table 3 Renamed table in 4.3. from Table 2A to Table 4 3 368-300 Opal Dick - 368dash300.pdf Page 4 REV. SYM: MM TABLE OFCONTENTS ITEMS COVERED BYTH IS SPECIFICATION___ ._.....___. .._.._...»» .._.._..... _ ..___._..... ....... _... _............... ............ 2 REVISIONDESCRIPTIONS .» ...... _...... ....... .._........ _. ............ _.._.�._. _....._.._. ....» »__....--_....._. ._..___..... ..___....3 1. SCOPE_-_... ............ .... _..... _ ...... ............. ......_...... »._._.._.. »..... ___...._»....___ ...___....... _._.._.._... .»......._.... ..5 2. APPLICABLE DOCUMENTS..._ ._»..» __. ._»..» _... .�._.._.» ..._........ .__........ .._..»..__ ..»»._.._.. ..._._.._... _.___....... ....5 3. REQUIREMENTS --------- -------- ...._..»..- •---....»-. _....... »... ..... _....... ....... _.... _........... ............. ......... ..... ............ 3.1 GENERAL REQUIREMENTS FOR DESIGN .......... ................ ................ ................ ................ ................ ................ ............... .......5 3.2 SPECIFIC REQUIREMENTS FOR DESIGN OF LOOP -FEED UNITS ........................... ................ ................ ................ .............7 3.3 SPECIFIC REQUIREMENTS FOR DESIGN OF RADIAL -FEED UNITS ........... ................ ..... __....... ................ ................ ......16 4. QUALITY ASSURANCE ........... ..... _....... ..... _...... .... ...... _... ..».._.._._ ...».._._ .....»»....... ............ ... . _._.._.._ ».».._...... .16 4.1 GENERAL ................ ................ ................ ................ ................ ................ ................................................ ................ ................ ..... I 6 4.2 TEST CONDITIONS ................ ................ ................ ................ ................ ................ .- ....... ...................................... ................ .....16 4.3 FUNCTIONAL TESTS ........... ................ ................ ................ ................ ................ ................ ............... ................. ................ .......17 4.4 TEST METHODS - FUNCTIONAL TESTS ................ ................ ................ ................ ................ ................ ................ ................ 17 5.PREPARATION FOR DELIVERY....... _.»..».._. ... .-....... ._.._....»» ............. ._._.._._. ._.».._ .._.»..„.»...._ ....__..»._. �._..17 6. DEFINITIONS AND ABBREVIATIONS ............. ............ ............ ............ ._..... _..... ...... _.... ............ .__.......... .....»18 APPENDIXA. ..... _.... ........ _... _..».___.. .»......... ._--------- .........._. .»._........ .»......___.._._..»...... ...... ._--------- ...... ... 19 APPENDIXB............ .___..... .... ..... ._».... ._.....___ ......... ..... _...... ...... .............. ...._.._.._. ._........ _......»..»_ .......23 APPENDIXC.»..... »..... ___..»._.. _._.._.».. _�.._..». ._.._._.._.. »__......__ ............. .»....._._.._...»»...... __.._..».». ..._..__... ........ TRANSFORMER LOSS EVALUATION -AVERAGE LOSSES .......................... ................ ................ ................ ................ .......25 INDIVIDUAL TRANSFORMER LOSS EVALUATION ...................... ................ ................ ................ ................ ................ ........26 4 36B-300 Opal Dick - 368dash300.pdf Page 5 REV. SYM: MM SPECIFICATION FOR PAD -MOUNTED COMPARTMEN TAL-TY PE, THREE-PHASE DISTRIBUTION TRANSFORMERS WITH SEPARABLE INSULATED LOAD BREAK HIGH -VOLTAGE CONNECTORS 1. SCOPE This Specification establishes the minimum electrical requirements and mechanical features of three phase, 60 HZ, mineral oil immersed, self -coded, pad -mounted, compartmen tal-type distribution transformers rated 2500 WA and smaller, high voltage 13,200 Grd Y/7620 volts, with separab le insulated load break high voltage connectors. These transformers are used for step down purposes from an underground primary cable supply. This standard generally confoms to ANSI requirements for pad -mounted compartm ental-type, self -cooled, three-phase, distribution transformers for use with separable insulated high -voltage connectors, C57.12.26. 2.APPLICABLE DOCUMENTS The following documents form a part of this Specification to the extent specified herein. The latest issue in effect on the date of invitation for bids shall form a part of this Specification, unless otherwise noted. • ANSI C57.12.00 - Distribution, power, and regulating transformer s, and shunt reactors, general requirements for • ANSI C57.12.26 - Pad mounted, compartmental-ty, pe, self -cooled three phase, distribution transformers for use with separable insulated high voltage connectors, high voltage 34,500 Grd Y/19,920 volts and below, 2500 WA and smaller, requirements for • ANSI C57.12.70 - Terminal markings and connections for distribution and power transformers • ANSI C57.12.80 -Terminology for power and distribution transformers • ANSI C57.12.90 - Distribution, power, and regulating transformers, and shunt reactors, test code for • ANSI/IEEE 386 - Separable insulated connectors for power distribution systems above 600V NEMA STANDARD TR1 -Transformers, regulators and reactors 3. REQUIREMENTS 3.1 GENERAL REQUIREMENTS FOR DESIGN 3.1.1 BASIC DESIGN STANDARDS Transformers purchased under these Specifications shall be new and, unless otherwise specified, meet the requirements of the applicable ANSI Standards and the modifications and additions given in the subsequent paragraphs. In case of conflict, the requirements of the following documents shall apply in the priority shown: a) This Specification. b) ANSI C57.12.26 c) Other applicable ANSI and NEMA Standards. 3.1.2 KILOVOLT -AMPERE TEMPERATURE RATINGS Nlovolt-ampere ratings are continuous and are based on not exceeding either a 65°C average winding temperature or an 80°C hot spot temperature rise. The temperature rise of the insulating oil shall not exceed 65°C when measured near the top of the tank. The temperature rise is based on an altitude of 3,300 feet. 3.1.3 GENERAL CONSTRUCTION 3.1.3.1 The pad -mounted compartmental-t ype transformers shall consist of the transformer tank, high -voltage cable terminating compartment, and the low -voltage cable-terminatin g compartment. Al three of these components shall be assembled as an integral unit, tamperproof and weatherproof for mounting on a pad. There shall be no exposed screws, bolts or other fastening devices, which are externally removable, except the main cover bolls may be exposed. VNmere the main cover bolts are exposed, the 5 368-300 Opal Dick - 368dash300.pdf Page 6� REV. SYM: MM comer bolts shall be welded or otherwise render ed tamperproof. There shall be no opening through which foreign objects such as sticks, rods, or wire s might be inserted to contact live parts. Suitable means for padlocking the compartment door(s) shall be provided. 3.1.3.2 The high and low -voltage compartment shall be located side by side on one side of the transformer tank. When facing the compartment, the low -voltage compartment shall be on the right. 3.1.3.3 Construction of the unit shall be such that it can be lifted, skidded, and slid into place on the mounting pad without disturbing the entrance cables. 3.1.3.4 An undercoating over the regular finish or an equivalent treatment shall be applied to all surfaces that are in contact with the pad to minimize corrosion. 3.1.3.5 Minimum dimensions shall be as shave in Fig. 1 of this Specification. Maximum transformer and minimum pad dimensions are shown in Fig.6 of this Specification. 3.1.4 LOSSES The total losses of a transformer shall be the sum of the excitation losses and the load losses (I2R losses). Load loss tests shall be performed and reported on all units regardless of whether or not a record of such tests is available on duplicate units. Loss evaluations and loss costs will be based on the values shown in the "Special Conditions and Supplemental Instructions to Bidders." Transformers will be evaluated on excitation losses and PR losses at the specified rates. If tested losses exceed quoted losses but are within the tolerances of paragraph 9.3, ANSI C57.12.00-2000, the additional cost incurred from the differential of losses will be calculated using the following equation and the above specified rates and will be deducted from the original Purchase Order or back charged to the manufacturer. In Table 18 and the following equation "Units" shall mean "Transformers of the same size and design on one order." Excess lass $ = [No. of units] [(No Load Loss Evaluat ion $) (Avg. No Load Losses — Quoted No Load Losses) + (Load Loss Evaluation $) (Avg. Load Losses —Quoted Load Losses)]. If this equation results in a negative number no credit will be given the Supplier. If ary unit or units exceed the tolerances of paragraph 9.3, ANSI C57.12.00-2000, that unit or units shall riot be shipped without express permission from the City. If accepted, the deduction for excess losses will be based on the following equation: Excess loss $ = (No Load Loss Evaluation $) (No Load Losses — Quoted No Load Losses) But Not Less Than Zero + (Load toss Evaluation $) (Load Losses — Quoted Losses) But Not Less Than Zero. 3.1.5 SERVICE CONDITIONS Service conditions shall be as defined in paragraph 4.1 of ANSI C57.12.00 except the ambient temperature range shall be 40°C above to 320C below zero. The transformer shall operate safety with starting temperatures as low as 32°C below zero. 6 368-300