HomeMy WebLinkAboutBID - 5982 SUBSTATION LIGHTNING TOWER (3)ADDENDUM No. 1
5982 Substation Lightning Tower Installation
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid: 5982 Substation Lightning Tower Installation
OPENING DATE: 2:00 (Our Clock) June 27, 2006
To all prospective bidders under the specifications and contract documents described above,
the following changes are hereby made.
CHANGE:
�L1"'101i I) ()'[-) � - I ,
-T- JP R F M F N T
3. t T t-, '
W i-) ,' k -1 11
1), i ,I I ail
m
n
one
hundred forty
(140) "-i[endar
cil)t 'Ya't TirnPs
ccntmt 1.1
t
t P, I
alit
cl(Iv
1 Yill'
F,;Relit
ri, i
a n c
o I (I, -1 n- e- s,,
j ! h I
";i-, 1-i - ,
I I (11 t-
I I I I
one
hundred forty
seven (147)
ilPIS) -tL
lava
If It
f Iji-
T im(
0
1 Itl: .
Liqlj 1 rillted Dat1� arcs.
I-1 Lot!
-i I I tl i DO 1 1 1 '3
a i) it 1 that IX I L ,s attone
hundred forty (140)
ajj I L,,— 1 v -T tc
Questions regarding this addendum should be directed to Opal F. Dick, CPPO, Senior Buyer
(970) 2121-6778.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT
ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN
RECEIVED.
215 NorthVann S I i tic I - 2"" Floor - P.O. lion 580 - I o It(Collins. (O 801 22-W;811 - (970) 22 1-67;; - 1�it x (9711) 22 1-6711' �� t, %, I cone
xuci moa:s, s/ I �/ s( gor prurca u[ c)ust /' rin/,
uay be uLed in oc , I !y |oe ��)uraPocucv-nLx, ��z|
�|o �.uuLcact Docuzouts ace sutticIcnt c scope and
'�cuveV oud" og of alermy and t loos loc nJ
�urusbj_ng cf lle 'Arozk
c,x 1N-[�PRD?L�Il0N3 1,1l,D DDD�NDA.
�ll gues�ionu aboui Lbe meaoing o� �n�eu� cl Lbe 8iddicg
}�c aubm�t-te11 ill wciL-og ro the Cn;Ioecr be D#0EDTcrerpre, tan :/
c|aI icatioua couaidered to t 1ons w�iL bc
�saced on�V bV 6ddeIdPueInnn I sbao sevoc days
/'uapeoIg oI be Bids nnbe aoav;eruly It, os
.�naue�ed by {ozma| *rjtren 8dJeuda wilhe b1cdingit,
�cLerpretaV 1o1)s uz claL iIiiony wibe 'o" tboot 1 l ettcct
guosoua cooceroing :I- :ope or tbis pcohI { b``
J�zee-1 to tbe EugisouzPuesLus reqacdinY sohill it t a f bds 7|"`o/]
be diceczed to tbc Ci-y of Eozl llius Dozc'IauIo(I D'viai, o
')��� 3ddeoda ma alao bo issucd Lo modil� �be Biddic,/ Documes!� as
'Jeemed adnisablo by OW0EK or Fngixeer
�3�ddend� wi|| be mai|ed nr de!�vered �n a!i par�ies /ecorded
0NNbK as ba�iog rece1ned the t, Iddin(I Jocumento.
5.,) 3��TRT1X
5.1. Kacb �-d
muaL be accompao�cd
�i
bv d �cc�ci7 y oaJe
in �h� aroo�ut
statcd
ill I bo uv
ta|no �(I 7l-e eqire�
ausi be iu I be
i orn
of a cezI
d nz baok casbicr s 'j) k pay,J |' o
�>W0[8 o� a Ui1
�ooU ou
Lbe 1oEm cu��'/se6
bcz0 1 7b� �he R�d Rond
'�veroced by a
onr
meetinq ri,
iremeuLo o{ i !to Fno.`ra]
�nr x'xrot� bocJs
E]CDCGENERAL CONDITIONS 1910-8('1990Edi[iai)
-i4 w! CITY OF FORT COLLINS MODIFICATIONS (REV 4l2000)
(This page left blank intentionally.)
EJCDC GENERAL CONDITIONS 1910-8 (1990 Edlia) 35
w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000)
EJCDC GENERAL CONDITIONS 1910-9 (1990 Edilial)
36 w! CITY OF FORT COLLINS MODIFICATIONS (REV 4/IOOO)
EXHIBIT GC -A to General Conditions
of the Construction Contract Between
OWNER and CONTRACTOR
DISPUTE RESOLUTION AGREEMENT
OWNER and CONTRACTOR hereby agree that
Article 16 of the General Conditions of the Construction
Contract between OWNER and CONTRACTOR is
amended to include the following agreement of the parties:
16.1. A]I claims, disputes and other matters in
question between OWNER and CONTRACTOR arising
out of or relating to the Contract Documents or the breach
thereof (except for claims which have been waived by the
making or acceptance of final payment as provided by
paragraph 14.15) will be decided by arbitration in
accordance with the Construction Industry Arbitration
Rules of the American Arbitration Association then
obtaining, subject to the limitations of the Article 16. This
agreement so to arbitrate and any other agreement or
consent to arbitrate entered into in accordance herewith as
provided in this Article 16 will be specifically enforceable
under the prevailing law of any court having jurisdiction.
16.2. No demand for arbitration of any claim, dispute
or other matter that is required to be referred to
ENGINEER initially for decision in accordance with
paragraph 9.11 will be made until the earlier of (a) the date
on which ENGINEER has rendered a written decision or
(b) the thirty-first day after the parties have presented their
evidence to ENGINEER if a written decision has not been
rendered by ENGINEER before that date. No demand for
arbitration of any such claim, dispute or other matter will
be made later than thirty days after the date on which
ENGINEER has rendered a written decision in respect
thereof in accordance with paragraph 9.11; and the failure
to demand arbitration within said thirty days' period will
result in ENGINEER's decision being final and binding
upon OI NER and CONTRACTOR. If ENGINEER
renders a decision after arbitration proceedings have been
initiated, such decision may be entered as evidence but will
not supersede the arbitration proceedings, except where the
decision is acceptable to the parties concerned. No demand
for arbitration of any written decision of ENGINEER
rendered in accordance with paragraph 9.10 will be matte
later than ten days after the party making such demand has
delivered written notice of intention to appeal as provided
in paragraph 9.10.
16.3. Notice of the demand for arbitration will be
tiled in writing with the other party to the Agreement and
with the American Arbitration Association, and a copy will
be sent to ENGINEER for information. The demand for
arbitration will be made within the thirty -day or ten-day
period specified in paragraph 16.2 as applicable, and in all
other cases within a reasonable time after the claim, dispute
or other matter in question has arisen, and in no event shall
any such demand be made after the date when institution of
legal or equitable proceedings based on such claim, dispute
or other maucr in question would be barred by the
applicable statute of limitations
EICDC GENERAL CONDITIONS 1910-5 (1990 Editim)
wi CITY OF FORT COLLINS MODIFICATIONS (REV 9/99)
16.4. Except as provided in paragraph 16.5 below,
no arbitration arising out of or relating to the Contract
Documents shall include by consolidation, joinder or in any
other manner any other person or entity (including
ENGINEER, ENGINEER's Consultant and the officers,
directors, agents, employees or consultants of any of them)
who is not a party to this contract unless:
16.4.1. the inclusion of such other person or entity is
necessary if complete relief is to be afforded among
those who are already parties to the arbitration, and
16.4.2, such other person or entity is substantially
involved in a question of law or fact which is common
to those who are already parties to the arbitration and
which will arise in such proceedings, and
16.4.3. the written consent of the other person or
entity sought to be included and of OWNER and
CONTRACTOR has been obtained for such inclusion,
which consent shall make specific reference to this
paragraph; but no such consent shall constitute consent
to arbitration of any dispute not specifically described
in such consent or to arbitration with any party not
specifically identified in such consent.
16.5. Notwithstanding paragraph 16.4, if a claim,
dispute or other matter in question between OWNER and
CONTRACTOR involves the Work of a Subcontractor,
either OWNER or CONTRACTOR may join such
Subcontractor as a party to the arbitration between OWNER
and CONTRACTOR hereunder. CONTRACTOR shall
include in all subcontracts required by paragraph 6.11 a
specific provision whereby the Subcontractor consents to
being joined in an arbitration between OWNER and
CONTRACTOR involving the Work of such
Subcontractor. Nothing in this paragraph 16.5 nor in the
provision of such subcontract consenting to joinder shall
create any claim, right or cause of action in favor of
Subcontractor and against OWNER, ENGINEER or
ENGINEER's Consultants that does not otherwise exist.
16.6. The award rendered by the arbitrators will be
final, judgment may be entered upon it in any court having
jurisdiction thereof and it will not be subject to
modification or appeal.
I&T OWNER and CONTRACTOR agree that they
shall first submit any and all unsettled claims,
counterclaims, disputes and other matters in question
between them arising out of or relating to the Contract
Documents or the breach thereof ("disputes")' to mediation
by the American Arbitration Association under the
Construction Industry Mediation Rules of the American
Arbitration Association prior to either of them initiating
against the other a demand for arbitration pursuant to
paragraphs 16.1 through 16.6, unless delay in initiating
arbitration would irrevocably prejudice one of the parties.
The respective thirty and ten day time limits within which
to file a demand for arbitration as provided in paragraphs
16.2 and 16.3 above shall be suspended with respect to a
dispute submitted to mediation within those same
applicable time limits and shall remain suspended until ten
days after the termination of the mediation. The mediator
of any dispute submitW to mediation under this Agreement
shall not serve as arbitrator of such dispute unless otherwise
agreed.
GC -At
EJCDC GENERAL, CONDITIONS 1910-8 (1990 Eilitim)
w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9/94)
GC -AI
SE
SECTION 00800
SUPPLEMENTARY CONDITIONS
SECTION 00800
SUPPLEMENTARY CONDITIONS
Conditions of the Contract
These Supplementary Conditions amend or supplement the General Conditions of
the Construction Contract (EJCDC General Conditions 1910-8, 1990 edition with
City of Fort Collins modifications) and other provisions of the Contract
Documents as indicated below.
SC-4.2 Subsurface and Physical Conditions:
A. Add the following language to paragraph 4.2.1 of the General
Conditions.
4.2.1.1.1 The following report(s) of exploration and tests of
subsurface conditions at the site of the Work:
Geotechnical Investigation for Substation Lightning Towers'
Smith Geotechnical
Project NO 06.007
May 2006
Contractor may rely upon the accuracy of the technical data
contained in the geotechnical documents, but not upon nontechnical
data, interpretations or opinions contained therein or upon the
completeness of any information in the report.
B. 4.2.1.2.1 No drawing of physical conditions in or relating to
existing surface or subsurface structures (except Underground
Facilities referred to in Paragraph 4.3) which are at or contiguous
to the site have been utilized by the Engineer in preparation of
the Contract Documents, except the following:
SC-5.4.8 Limits of Liability
A. Add the following language at the end of paragraph 5.4.8.
The limits of liability for the insurance required by the paragraph
numbers of the General Conditions listed below are as follows:
7/96 Section 00800 Page 1
5.4.1 and 5.4.2
Coverage A - Statutory Limits
Coverage B - $100,000/$100,000/$500,000
5.4.3 and 5.4.5 Commercial General Liability policy will have limits of
$1,000,000 combined single limits (CSL). This policy will include
coverage for Explosion, Collapse, and Underground coverage unless waived
by the Owner.
5.4.6The Comprehensive Automobile Liability Insurance policy will have
limits of $1,000,000 combined single limits (CSL).
5.4.9This policy will include completed operations coverage/product
liability coverage with limits of $1,000,000 combined single limits
(CSL).
SC-12.3 Add the following language to the end of paragraph 12.3.
Contractor will include in the project schedule five (5) days lost due to
abnormal weather conditions.
7/96 Section 00800 Page 2
SECTION 00900
ADDENDA, MODIFICATIONS AND PAYMENT
00950Contract Change Order
00960Application for Payment
9/99
SECTION 00950
CHANGE ORDER NO.
PROJECT TITLE: Bid 5982 Substation Lightning Tower Installation
CONTRACTOR:
PROJECT NUMBER:
DESCRIPTION:
1. Reason for change:
2. Description of Change:
3. Change in Contract Cost
4. Change in Contract Time:
ORIGINAL CONTRACT COST $ .00
TOTAL APPROVED CHANGE ORDER 0.00
TOTAL PENDING CHANGE ORDER 0.00
TOTAL THIS CHANGE ORDER 0.00
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O.% OF ORIGNINAL CONTRACT
ADJUSTED CONTRACT COST $ 0.00
(Assuming all change orders approved)
ACCEPTED BY: DATE:
Contractor's Representative
ACCEPTED BY:
Project Manager
REVIEWED BY:
Title:
APPROVED BY:
Title:
APPROVED BY:
Purchasing Agent over $30,000
cc: City Clerk Contractor
Project File Architect
Engineer Purchasing
DATE:
DATE:
DATE:
DATE:
Section 00950 Page 1
'(;NTRACT TIME.
I' I le I It otlbe I of I,, V.s within which, or -I -P dot(- by which I t, k , ', - ) [r,�
t I I-S I -t:11 I nri p I me e and I I 'I so )llu i 1 t h d xlld I padv I F i ri I 1 1 1
L.- i untLact T 1 mpsi are set T oi't I in th^
f , i U I DA'2 L I ) 1 12 ',v] / I _', �-, .
'r ot- i on-', ml 1 i 'UNdated damages 110, set With A Kn' AVII, 'mv "t .
MA' EM-'AL no ,JULPMENT
Aw , 'nnv io,r'r
will bc on
the
basis of mak 1. 11
uI, I -10"Irwilt
es - t i ID P, I n n
the Dr a ov i n rT
s of s p el j
rind
i I -I the S p e r i t 1
A P n s w t hot! I
412sideration
of passible
substitute
-r "or
(-(ii-al" items.
jinenevnT i - i c
nd j -= I pIl r) n
the Drawdnqs
D s F) e c L
tied
i n I he Ape,! A-i
v inns n, I t 0
I t tit or
"ur -oit-I'll"
it,-I[I of ln-ateri_al
or wa 1 pulpla- I 'v"
be tint i
I KAM I ",
O NT R A ( "T C'R if
it cppt id, i I,
to
Fn,rneer, -I pp I I , --II
i ( lt tor -;li -h
AKUPI)t an," it
1 1 not he considered
by
'Eroj
111-it 1-t
t 11l rive
late u the
r eert,[e-,t
pro
C-4 I I
to I I I)lp I t t-, I
oP al 1) such
tut) ati 11
anN considerat_ionby
El I a -' I L
,1't tr t t I in
the tenet T-
1 01-IS
I I i ch Iraq
be
t, t I o r 1 1 tc ci n
r le ne r I
I i. I SUB CON'-''P zlt , ")lj P P-, I F P,") AN F) JT HFPS
(I . I . �, i( I I I) i ddr sha i I submi I at i W Bid )pen 1 1 �j I-) k AMER a I t;_ of
1 1 r 1p1I S I h -: 0 l' I L i c L 0 L tS 11(- j-)LQ useq to use i I ho No r k W, r- t it
:'I,,, i(,n 11111 1 cr.ntai ned wi t I I I [I I It( SP 10.!Itl[[ull' s
It ANITIT or Ennin, -1 a - t e y due M va S I i in 1 of it, t ;- 1. 1 - r I I
i I -in y wOjA)r,pd Sunc on 1, ; a, I i , -it Mi m iy, op'' -r , it .DUI I
i - t 4 P e s L I 1w apj a7 (,ut st-t—ess nul Bil-An'! .11a7ll I M
It';I]r�_'l l t 'I[ -In I 1 -1 e j , Bid pl 1 e. 1 t 'It'l it lit
111 1 i I it I lit ik'' 11.1" S'11st I Ill i')o' I I 1'� -
I t '!'I I :.1 I 1, tt [)0 1 . ]I[ I 'r i I I
,I 1s_
ji- Itli It I it I I
It 11L I :'II' ' t --I );- I. 1:;:! )
j I I I" t I't Ih I to MJLF, I IL(I I : I r' It
it I nr If c r t it
il - (;, � r I I t[I !I , inns
AJ'Fr:T I, pitI I I !iOr to, r q I �i,[,
iL OL�1,11,17ili I I AKS1 WMAII
f
NUMBER
1
2
3
Section 00960
APPLICATION FOR PAYMENT PAGE 1 OF 4
OWNER: City of Fort Collins PROJECT: APPLICATION NUMBER:
APPLICATION DATE:
PERIOD BEGINNING:
ENGINEER: CONTRACTOR: PERIOD ENDING:
PROJECT NUMBER:
CHANGE ORDERS Application is made for Payment as shown below in connection with Contract
DATE
Net Change by Change Order
AMOUNT
$0.00
The present status of the account for this Contract is as
follows:
Original Contract Amount:
Net Change by Change Order:
Current contract Amount:
Total Completed and Stored to Date:
Less Previous Applications:
Amount Due this Application - Before Retainage:
Less Retainage:
AMOUNT DUE THIS APPLICATION:
CERTIFICATION:
The undersigned CONTRACTOR certifies that all obligations of CONTRACTOR incurred in connection with
the Work have been satisfied as required in Paragraph 14.3. of the General Conditions of the Contract.
The above Amount Due This Application is requested by the
CONTRACTOR.
Date:
By:
Payment of the above Amount Due This Application is recommended by the ENGINEER.
Date
By:
Payment of the above Amount Due This Application has been reviewed by the OWNER'S Project Manager.
Date:
By:
Payment of the above Amount Due This Application is approved by the OWNER.
y�yy �yb Section 00960 Page 1
$0.00
$0.00
$0.00
APPLICATION FOR
CONTRACT AMOUNTS
PAYMENT
PAGE 2 OF 4
Work
Work
Work
Completed
Completed
Completed
Stored
This
Previous
To
Bid
Month
Periods
Date
Materials
Total
Item
This
Earned Percent
Unit
Number Description Quantity Units Price Amount
Qty.
Amount
Qty. Amount
Qty.
Amount
Period
To Date Billed
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTALS $0.00
$0.00
$0.00
$0.00
$0.00
7/96 Section 00960 Page 2
CHANGE ORDERS
APPLICATION FOR PAYMENT
PAGE 3 OF 4
Work
Work
Work Completed
Completed
Completed
Stored
This
Previous
To
Bid
Month
Periods
Date
Materials
Total
Item
This
Earned Percent
Unit
To
Number Description Quantity Units
Price Amount
Qty. Amount
Qty. Amount
Qty.
Amount
Period
Date Billed
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTALS CHANGE ORDERS
$0.00
$0.00
$0.00
$0.00
$0.00
PROJECT TOTALS
$0.00
$0.00
$0.00
$0.00
$0.00
7/96 Section 00960 Page 3
STORED MATERIALS
SUMMARY
On Hand Received Installed
Item Invoice Previous This This
Number Number Description Application Period Period
PAGE 4OF4
On Hand
This
Application
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTALS $0.00 $0.00
$0.00 $0.00
7/96 Section 00960 Page 4
PART 1 - GENERAL REQUIREMENTS
Section 1A - GENERAL REQUIREMENTS
IA.I GENERAL
This section covers the general requirements for the equipment, materials and services included
under these specifications.
1A.2 CORRESPONDENCE
All correspondence shall be addressed to the Owner as follows:
City of Fort Collins Utilities
700 Wood Street
P.O. Box 580
FORT COLLINS, COLORADO 80522-0580
ATTENTION: Matt Haag
Letters of transmittal shall accompany all submittals of engineering data. All correspondence
and drawings shall be identified with the project name, Owner's contract number, and
Contractor's job number.
1A.3 PRE -CONSTRUCTION CONFERENCE
Prior to the start of construction, the Owner will hold a pre -construction conference at the office
of the Owner to review matters relative to the performance of this contract. The Contractor, the
Contractor's superintendent for this project, and the Contractor's personnel responsible for
ordering Contractor furnished materials for this project shall attend this conference.
1A.4 DRAWING AND ENGINEERING DATA REQUIREMENTS
1A.4.1 Submittal of Drawings and Engineering Data
Drawings and other engineering data for the specified equipment and materials are essential to
the design and subsequent construction of the project. The Contractor will be required to submit
drawings and engineering data in accordance with the requirements specified in Article 1 AA and
the schedule specified in Article IA. I I to assure compliance with the overall construction and
operating schedule.
1A.4.2 Review of Drawings and Engineering Data
The Owner's review of drawings and engineering data will cover only general conformity of the
drawings and data to the specifications and documents, external connections, interfaces with
City of Fort Collins Power & Light-06.007 IA-1
equipment and materials furnished under separate specifications, and dimensions which affect
plant arrangements. The Owner's review does not indicate a thorough review of all dimensions,
quantities, and details of the equipment, material, device, or item indicated or the accuracy of the
information submitted; nor shall review by the Owner be construed as relieving the Contractor
from any responsibility for errors, omissions, or deviations from the requirements of the contract
documents.
All engineering data submitted, after final processing and acceptance by the Owner, shall
become a part of the contract documents and the work indicated or described thereby shall be
performed in conformity therewith, unless otherwise required by the Owner.
1A.4.3 [This Section Not Used]
1A.4.4 Drawing Requirements
All drawings shall be in accordance with the following requirements.
1A.4.4.1 General
Final drawings are to be submitted on paper copies and electronically to the Owner in Portable
Document Format (PDF) or in AutoCAD (DWG) format.
Drawings shall be in sufficient detail to indicate the kind, size, arrangement, weights of each
component, electrical characteristics, and operation of component materials and devices; the
external connections, anchorages, and supports required; the dimensions needed for installation
and correlation with other materials and equipment.
Certified drawings only shall be submitted unless a requirement for preliminary drawings is
specifically stated in the drawing submittal schedule. Such requirement shall not preclude the
Contractor from submitting certified drawings in lieu of preliminary drawings.
"Preliminary" drawings shall mean drawings not fully completed or approved by the Contractor;
however, they shall be reasonably complete and suitable for the Owner's use in establishing basic
plant arrangements and design requirements. Preliminary drawings shall be clearly stamped
"Preliminary." Preliminary drawings will not be reviewed by the Owner; however, the Owner
will advise the Contractor of any discrepancies or conflicts which he may discover in the
reference to the drawings.
"Certified" drawings shall mean drawings fully completed and certified by the Contractor as to
the compliance of the information contained thereon with the requirements of these
specifications. Certified drawings shall be clearly stamped "Certified" or shall have title block
entries clearly indicating the drawing is certified. Certified drawings will be reviewed by the
Owner and processed as specified in this Section IA.4.4.3.
Each drawing submitted shall be clearly marked with the name of the project, the unit
designation, the contract title and number, and the Contractor's name. If standard drawings or
City of Fort Collins Power & Light-06.007 IA-2
catalog cuts are submitted, the applicable equipment and devices furnished shall be clearly
marked on the front of each drawing.
When the specification requires furnishing equipment and materials for more than one project,
the Contractor shall furnish separate and complete drawings for each project site in accordance
with these specifications. No common drawings are allowed.
Prints shall be black line on white background or blue line on white background. Print size shall
not exceed 24 inches by 36 inches unless, due to the size of the equipment, larger drawings are
necessary. Larger drawing sizes shall not be used without the approval of the Owner.
All drawings shall be suitable for microfilming. Drawing and lettering practices shall be in
general accordance with the requirements of Military Standard Engineering Drawing Practices,
MIL-STD-10013. Drawings submitted which are not suitable for microfilming will not be
accepted.
1A.4.4.2 Drawing Types Required
The drawings and information required to be furnished by the Contractor is listed in each section
of Technical Requirements.
1A.4.4.3 Drawing Processing
A copy of each drawing reviewed will be returned to the Contractor as stipulated herein. Copies
of drawings returned to the Contractor will be in the form of a print with the Owner's marking.
No work shall be performed in connection with the purchase or installation of equipment and
materials until the drawings and data, therefore, have been reviewed by the Owner except at the
Contractor's own risk and responsibility.
Drawings reviewed by the Owner will be returned to the Contractor marked RETURNED FOR
CORRECTION, EXCEPTIONS NOTED, NO EXCEPTIONS NOTED, or RECEIVED FOR
DISTRIBUTION. The Contractor shall make all required corrections to the drawings and
resubmit the required number of prints to the Owner no later than the date indicated in the
Owner's drawing transmittal letter. Each time a drawing is revised an appropriate revision
number and note shall be added to that drawing.
RETURNED FOR CORRECTION (RFC) means that the drawing must be revised in accordance
with the Owner's notations and all work represented by the drawing must cease until the revised
drawing has been resubmitted, reviewed by the Owner, and returned to the Contractor marked
EXCEPTIONS NOTED, NO EXCEPTIONS NOTED, or RECEIVED FOR DISTRIBUTION.
EXCEPTIONS NOTED (EN) means that the drawing must be revised in accordance with the
Owner's notations and resubmitted. Work represented by the drawing may proceed but it must
be in accordance with the Owner's notations.
City of Fort Collins Power & Light-06.007 IA-3
NO EXCEPTIONS NOTED (NEN) means that the Owner has no specific objections to the
drawing at this time. Work may proceed with the understanding that the design process may
require drawing revision at a later time.
RECEIVED FOR DISTRIBUTION (RFD) means that the Owner has not reviewed the drawing
but that the drawing is required for the design process and has been included in the drawing file.
If drawing revisions occur during the course of the contract, the Contractor is obligated to submit
revised copies to the Owner in order to keep the drawing file current.
Initial drawing and data submittals by the Contractor shall be three (3) copies of each. When the
drawings and data are returned by the Owner marked RETURNED FOR CORRECTION or
EXCEPTIONS NOTED, the corrections shall be made by the Contractor as noted thereon and
three (3) copies of the corrected drawing shall be resubmitted to the Owner.
When the drawings are returned marked NO EXCEPTIONS NOTED or RECEIVED FOR
DISTRIBUTION, such drawings shall be considered final and the work shall proceed in
accordance therewith. The Owner will retain 2 copies of the drawing, one for themselves and
one for the Engineer.
If changes are made at the project site to the equipment to correct for manufacturing errors, due
to design changes or wiring revisions; revised drawings indicating the changes made shall be
sent to the Contractor by the Owner. Contractor shall revise the drawings with changes and
submit five (5) of each drawing furnished by the Contractor for this contract.
1A.6 RECEIVING AND HANDLING
1A.6.1 Contractor -Furnished Equipment and Materials
The Contractor shall be responsible for the prompt unloading of all equipment or materials to be
furnished under this contract and shall pay all demurrage incurred. The Contractor shall handle
all equipment and materials carefully to prevent damage or loss. The use of bare wire rope
slings for unloading and handling materials and equipment is prohibited except with the specific
permission of the Owner.
1A.6.2 [This Section Not Used]
1A.7 STORAGE
Contractor shall assume responsibility for and protect all equipment and materials during the
storage period in accordance with the manufacturer or supplier's recommendations.
Stored equipment and materials shall be adequately supported and protected to prevent damage.
Equipment shall be moved to its permanent location as soon as construction will permit.
Stored equipment and materials shall not be allowed to contact the ground.
City of Fort Collins Power & Light-06.007 IA-4
All openings in equipment and piping not stored under weatherproof covers shall be closed to
prevent entrance of dirt or moisture during storage.
All platforms, enclosures, shoring and weatherproof coverings for storage use shall remain the
property of the Contractor and shall be removed upon completion of the work.
All storage methods and schedules shall be acceptable to the Owner.
1A.8 [This Section Not Used]
1A.9 CONSTRUCTION SAFETY
The Contractor shall furnish all necessary safety equipment required for performance of the work
and shall be responsible for persons on the work site. The Contractor shall contact the Owner
before starting work inside an energized substation or near buried power cables or equipment.
The Contractor shall be responsible for maintaining proper electrical clearances from energized
lines and equipment and shall request clearances from the Owner for work that impedes safe
working distances.
1A.10 CONSTRUCTION SERVICES
This section covers the requirements for construction services to be provided by the Contractor
in the performance of the Work.
1A.10.1 Construction Plant and Temporary Facilities
The Contractor shall furnish all construction plant and temporary facilities which are required for
performance of the Work but which will not be incorporated in the completed Work.
All temporary structures and facilities furnished by the Contractor shall remain the property of
the Contractor. When the work is completed, all such temporary structures and facilities shall be
removed from the site and the area restored to a satisfactory condition.
All construction plant and facilities shall be in sound condition, of the proper type and size to
adequately perform the Work, and shall be regularly and systematically maintained throughout
the Work to ensure proper, efficient operation. Plant and facilities that are inadequate or
improperly maintained shall be promptly modified, repaired, or removed from the site and
replaced.
1A.10.2 Temporary Structures
Temporary structures for offices, change houses, warehouses, and other uses for the Contractor
or the Contractor's subcontractors, shall be provided by the Contractor using materials, design,
and construction acceptable to the Owner. Suitable construction trailers may be used in lieu of
temporary structures.
City of Fort Collins Power & Light-06.007 IA-5
Temporary structures or trailers shall be placed only in locations assigned by the Owner.
1A.10.3 Construction Utilities
Construction utilities shall be provided by the Contractor as specified herein.
1A.10.3.1 Telephone
The Contractor shall arrange and provide for the Contractor's own telephone service.
1A.10.3.2 Compressed Air
The Contractor shall provide all air compressors, fuels, lubricants, hoses, piping, and other
apparatus required for supplying compressed air for prosecution of the Work.
1A.10.3.3 Construction Power
The Contractor shall be responsible for obtaining temporary construction power to be metered at
the Contractor's expense.
Temporary power facilities shall conform with applicable safety and code requirements, shall be
constructed and located to provide proper clearances and minimum interference with
construction activities, and shall be acceptable to the Owner.
All temporary wiring in the yard area shall be placed underground at a minimum depth of T-0"
below grade with at least 4 inches of sand cover on all sides of grouped conductors.
Underground cable shall be NEC Type USE.
1A.10.3.4 Temporary Lighting
The Contractor shall furnish and install all temporary lighting required in the prosecution of
work. Conductors shall be not less than 12 AWG copper and insulated for 600 volts. A fuse
shall be provided for the protection of each circuit.
1A.10.3.5 Welding Facilities
The Contractor shall furnish all welding machines and welding equipment required for the
Contractor's work. Electric power may be obtained from the construction power source or from
engine -driven welding machines. The Contractor shall furnish all fuel required for engine -
driven machines.
City of Fort Collins Power & Light-06.007 IA-6
" I I 1-e Work.
i I . ; P : D F C i PT'I .
T, (-: a y the Tn i ( i -- ri - I -he F'or- I L t P )t �ilt ii t
et tI r Foci i�� ho:rid i-
stay retained In, the 11' &W T sply,irato W)oun(i t c PY I
;iIi-ri-I -,". th the Bid.
I . - . F 1 (1 Form, must he nyinp 1 ryt Y At ink --- ! yp ii (I A I Imp nI11:1 I'. I t'y
in t I . E , form I IN 1 S t I ' of a t (� I At WO I W 110 1 11-Inle I 11 S lI1 'a as c C - : 11 I 1 1 -, t
.roads e.,-Ll I--ike precedence. ml[D- pri .as shalt (jr)vPtI) c,er exlpfiy. ic;
siuns .
. . 1 . 5 i cts by rorporn Lon:, must to ozecnit-ed � I[ the c t- ilffi ley I 11�
prey mitt or , i v A cry - p Y e 3 i 3 P n 7 ; o i other approoril atry a t -r An auqo it, it I
by tyviden,-:e of al-m-hcrLLY I L) .iiqn) arld the -corporate seal Shall IM, n I I I Zoo
and Mv,steJ by tho soursary or in assistarut secretary. The ")rp; tut .
and state of incorporation NaLi he shown below V h- T I
tl'trt[( .
I . elids by partnership Inits I he X'-'cute: I --it the p't r-1- rr- t t; :- 1 1) n flt� and
i (ia-a by t, pcii t-r-inr, his ti e mast appear under 11 i y L'In,1 ' I . I t, I . I t h--
t r � ( 1 1 1 al,l! es.s, of the pan n( -,snip rtuyt be shown helow the s Plywil I., —.
j . 5. Hion, W, - ()in-rantt t shu�i L he sign. J by each pint ic-�pnwL I; t t-
r.�, or) t- 11 !—y c I- in, an nuLhoilz—A anont of eHch part . �T( til 1 1
"Itirfle C, 7 P,-iCh "_Son OL Ur.p-ai-y Antpi—sted 1 In 1 he Eid shn 1 1— 1 : vt on
the 131 -1
7h, Fi I cni,,til- !it k it'jellIel-il i) -' L t 1,�- t
f,lulmb-l�, rAlj , th r,- I i I I e-t _tn on f h(2 Bid Form
I TJ(-) a.1 cinn antis i :I Fit Js, rn An I nc 1'r i inted ty-tinn3 I q
Batt I 1 r.3, n - ty l a I , I t a nI uL a ,,;i yr, w i I I u
�11 :I - 'H1 at -t)II -s yi� Ir( I I n i I I a - e I by I 11�, 1 (1 h- T- II j IL t
ill", t-1c -�- 1r1,7t i t, I i t - , -, t1i Z t � t j a I I : � ( , irti 1 1
'I h i i� I a l t
[ i I, 1,111t .— 1 , i 'I t,: t .i I .1 : It t c F- Id _', I - , I I 11, or , h- 1 [
. I -01t. , o F, I 1'S .
i i.. h t' I 1)i ul mi I t t I t i ni, End t I F I
c c L, L I in I I I it -t 1, 1) 1
j_� I
1A.10.3.6 Water
The Contractor shall provide the Contractor's own water for construction and drinking. Piping,
valves, and hoses shall be provided as required for construction distribution. Drinking water
facilities shall include coolers, cups, cup dispensers, and disposal receptacle.
1A.10.3.7 Heat
The Contractor shall provide all heating facilities required for the efficient performance of the
Contractor's work, and as required to prevent freeze damage to equipment under the
Contractor's custody. The method of heating shall be acceptable to the Owner.
Open fires, or other methods that constitute a hazard to personnel or property shall not be used.
All heating equipment shall be provided with adequate safeguards.
1A.10.3.8 Sanitary Facilities
The Contractor shall arrange and provide for the Contractor's own sanitary facilities.
IA.11 CONSTRUCTION SCHEDULE.
1A.11.1 General
This section covers the schedule and scheduling requirements for performance and completion of
the Work under these specifications and documents.
1A.11.2 [This Section Not Used]
1A.11.3 Contractor's Detailed Schedule
Within 15 days after receiving the Owner's Notice to Proceed, the Contractor shall submit a
detailed construction schedule. The detailed schedule shall be based upon the dates specified in
the construction schedule included herein.
The detailed construction schedule shall be in bar graph form acceptable to the Owner.
The detailed construction schedule shall contain all activities of the construction plan, including
acquisition and installation of special materials. For all materials fabricated or supplied by the
Contractor especially for this project, the schedule shall include the sequence of activities
including issuance of purchase orders, preparation of shop drawings, fabrication, and delivery.
Each activity shall be identified on the schedule by a descriptive title and shall be assigned an
estimated number of working days required and an expected completion date.
The Contractor is responsible to determine the sequence and time estimates of the detailed daily
construction activities; however, the Owner reserves the right to require the Contractor to modify
any portion of the schedule the Owner determines to be impractical, infeasible, or unreasonable,
City of Fort Collins Power & Light-06.007 IA-7
and as required to coordinate the Contractor's activities with those of other contractors, and to
assure the completion of the Work by the stipulated date.
Schedules returned to the Contractor for revision or correction shall be resubmitted for review
within 15 calendar days. Upon acceptance by the Owner of the detailed schedule of activities,
the Contractor will be responsible for maintaining such schedule.
Each month the Contractor shall submit a complete list of all deviations from the detailed
construction schedule to reflect the actual progress of the Work, together with the Contractor's
proposed actions to alleviate any delays caused by the deviations.
City of Fort Collins Power & Light-06.007 IA-8
Section 2A - EARTHWORK
2A.1. GENERAL
This section covers excavating, hauling, stockpiling, spoiling, mixing, blending, placing, wetting,
compacting, and other earthwork procedures required for installation of the structures.
All structures shall be constructed to the lines, grades, and details indicated on the Drawings or as
otherwise directed by the Engineer.
2A.2. FREEZING WEATHER RESTRICTIONS
Backfill of new structures shall not be performed during freezing weather except by written
permission of the Engineer. No fill materials shall be placed on frozen surfaces. Frozen materials,
snow, or ice shall not be placed in the fill. Structures shall not be placed on frozen subgrades except
by written permission of the Engineer.
2A.3. SHEETING AND SHORING
Except where banks are cut back on a stable slope, excavations shall be properly and substantially
sheeted, braced, and shored, as necessary, to prevent caving or sliding and to provide protection for
workmen and the work. Sheeting, bracing, shoring, or trench boxes shall be designed and built to
withstand all loads that might be caused by earth movement or pressure, and shall be rigid,
maintaining shape and position under all circumstances. Hazardous and dangerous conditions shall
be prevented and the safety of personnel shall be maintained.
2A.4. REMOVAL OF WATER
The Contractor shall provide for and maintain adequate dewatering to remove and dispose of all
water entering excavations or other parts of the work. Each construction area and excavation shall
be kept dry during subgrade preparation and continually thereafter until the construction required
therein is completed to the extent that no damage from hydrostatic pressure, flotation, or other cause
will result.
All construction areas and excavations which extend down to or below static ground water
elevations shall be dewatered by lowering and maintaining the ground water surface beneath such
excavations.
Surface water shall be diverted or otherwise prevented from entering construction areas and
excavations to the greatest extent practicable.
2A.5. SITE PREPARATION
Ground surfaces within the construction areas shall be cleared of all trees, brush, debris, and surface
City of Fort Collins Power & Light — 06.007 2A-1
vegetation. Stumps and roots larger than 2" in diameter shall be completely grubbed and removed.
Matted roots shall be removed regardless of size. Surface vegetation shall be removed complete
with roots to a depth of not less than 4" below the ground surface.
All combustible and other waste materials shall be removed from the construction areas and
disposed of by and at the expense of the Contractor. Open burning is not permitted at the site.
Aggregate surfacing within the construction areas shall be removed and stored on site for later
replacement.
2A.6. MAINTENANCE OF TRAFFIC
The Contractor shall conduct the Contractor's work so as to interfere as little as possible with the
Owner's operations and the work of other contractors. Whenever it is necessary to cross, obstruct, or
close roads, driveways, parking areas and walks, the Contractor shall provide and maintain suitable
and safe bridges, detours, or other temporary expedience at the Contractor's own expense. In
making open cut road crossing, the Contractor shall not block more than one half of the road at any
time.
2A.7. BLASTING
No blasting or other use of explosive for excavation will be permitted for any of the onsite
excavations or construction.
2A.8. CLASSIFICATION OF MATERIALS
Soil identification shall be in accordance with ASTM D2487. Identification and classification of
materials will be based upon visual examination and simple manual tests performed under the
direction of the Engineer by an independent testing laboratory. If visual examination and manual
tests are inadequate for the required identification and classification, the Engineer will require the
testing laboratory to determine definite index properties of the questionable material.
2A.9. UNAUTHORIZED EXCAVATION
Any material excavated below the elevation or otherwise beyond the limits indicated on the draw-
ings, unless otherwise authorized by the Engineer, shall be replaced and compacted to the density
indicated in 2A.25. The unauthorized excavation of material and subsequent replacement and
compaction shall be by and at the expense of the Contractor.
2A.10. STABILIZATION
Subgrades for structures, fills, and backfills shall be firm, dense, and thoroughly compacted and
consolidated; shall be free from mud and muck; and shall be sufficiently stable to remain firm and
intact under the feet of the workmen or equipment in use.
City of Fort Collins Power & Light — 06.007 2A_2
Subgrades for structures which are otherwise solid but which become mucky on top due to
construction operation shall be covered with two to four inches (2"-4") of gravel by and at the
expense of the Contractor.
The finished elevation of stabilized structure subgrades shall not be above the subgrade elevations
indicated on the drawings.
Stabilization material shall be utilized where necessary and shall be approved by the Engineer. This
material shall generally be minus 4-inch granular material except in areas where the migrations of
fines into the stabilization material would be unacceptable. In these areas, a layer of filter sand or
gravel or geotextile filter fabric may be required.
2A.11. PROTECTION OF UNDERGROUND CONSTRUCTION
The Contractor shall locate, protect, shore, brace, support, and maintain all existing underground
pipes, conduits, drains, and other underground construction which may be uncovered, damaged or
otherwise be affected by the work.
2A.12. TEMPORARY TOPSOIL STOCKPILE — This Section Not Used
2A.13. BORROW AREAS
No borrow material is available.
2A.14. SPOIL MATERIAL
Material that is unsuitable for use in the required fills shall be removed from the site and disposed of
by the Contractor.
2A.15. STRUCTURE FOUNDATIONS AND BACKFILL
This section covers earthwork required for construction of all structures including excavation,
subgrade preparation, structural fill, and backfill.
2A.15.1. Excavation
This article covers the excavation required for all new structures.
The existing subgrade fill material shall be completely removed to the sandy gravel layer below. The
approximate excavation is 9 feet below grade.
A Geotechnical Engineer will inspect the natural soils at the bottom of the excavation prior to
subgrade preparation. Provide Engineer with 72 hours notice when the area is expected to be ready
City of Fort Collins Power & Light — 06.007 2A-3
for such inspection.
Excavation for structures shall be done to the lines and grades indicated on the Drawings and to the
limits required to perform the construction work. Machine excavation shall be controlled to prevent
undercutting the proper subgrade elevation. In order to ensure a controlled operation, only small
excavating equipment and hand tools approved by the Engineer shall be used for excavation within
two feet (2') of existing structures and facilities. Damage to structures incurred during excavation
shall be repaired to the satisfaction of the Engineer at the Contractor's expense.
All excavated materials must be spoiled off site.
Vertical faces of excavations shall not be undercut to provide for extended footings.
Except as otherwise authorized, indicated or specified, all material excavated below the bottom of
concrete walls, footings, slabs on grade, and foundations shall be replaced and recompacted in
accordance with these specifications at the expense of the Contractor.
2A.15.2. Subgrade Preparation
This article pertains to subgrade preparation for all structures indicated on the Drawings.
2A.15.2.1. Stripping
Shall be as required in Section 2A.5.
2A.15.2.2. Compaction
Prior to placement of fill or concrete, the top twelve inches (12") of subgrade shall be thoroughly
compacted to a minimum of eighty-five percent (85%) relative density, or 98% of maximum
Standard Proctor Density, as determined by ASTM D4253 and D4254, or ASTM D698, using
vibratory rollers, plate compactors, or other suitable methods approved by the Engineer. Soft or
otherwise unsuitable material shall be removed from the subgrade and replaced with material
specified in Section 2A.15.3.
No fill material or foundations shall be placed until the subgrade has been properly prepared and
accepted by the Engineer.
2A.15.3. Structural Fill
This article pertains to fill required to bring foundation subgrade elevations to the lines and grades
shown on the Drawings.
City of Fort Collins Power & Light — 06.007 2A-4
2A.15.3.1. Structural Fill Materials
Structural fill material, used as fill beneath slabs or foundations, shall consist of pit run type granular
materials consisting of sands, gravels, and small cobbles. Structural fill material is to be approved
by the Engineer.
Material for structure backfill shall be composed of earth only and shall contain no wood, grass,
roots, broken concrete, stones, trash, or debris of any kind.
2A.15.3.3. Placement and Compaction
The designated structural fill material shall be placed in layers not to exceed eight -inches (8") in
uncompacted thickness. Material deposited in windrows or piles by excavating or hauling
equipment shall be spread and leveled before compaction.
Each layer of material being compacted shall be uniformly compacted using equipment and
materials that shall achieve the specified density and moisture content. The Contractor shall add
water and harrow, disc, blade, or otherwise work the material in each layer as required to insure
uniform moisture content and specified compaction. If the moisture and density requirements are
not met, the lift shall be broken up and recompacted until the specified requirements are met.
Structural fill shall be compacted to 98% of the maximum dry density as determined by a Standard
Proctor test (ASTM D698), at ±2% of the optimum moisture content, unless noted otherwise. If the
material has less than twelve percent (12%) fines, the fill shall be compacted to seventy-five percent
(75%) relative density in accordance with ASTM D4253 and D4254 using vibratory rollers, plate
compactors, or other methods approved by the Engineer.
2A.15.4. Backfill
This article pertains to backfill for all structures shown on the Drawings.
2A.15.4. L Backfill Materials
The materials from the required excavations at Harmony and Overland trail Substations are suitable
for use as backfill materials. The materials from the required excavation at Linden Substation are
not suitable for use as backfill and must be spoiled offsite.
All material placed as backfill shall be free from rocks or stones in excess of 2-inches in size, and
from brush, stumps, logs, roots, organics and other objectionable materials.
All backfill materials shall be sands and gravels or mixtures, thereof. Materials classified in USCS
Groups ML, MH, CH, OL, and OH are not suitable backfill materials and shall not be used. Backfill
materials shall be approved by the Engineer prior to placement.
City of Fort Collins Power & Light — 06.007 2A-5
2A.15.4.2. Placement and Compaction
The designated backfill material shall be placed in layers not to exceed six inches (6") in
uncompacted thickness. Do not backfill against structure until concrete has obtained 28 day
compressive strength. Place backfill simultaneously on both sides of structure, where required, to
prevent differential pressures. Material deposited in windrows or piles by excavating or hauling
equipment shall be spread and leveled before compaction.
Each layer of material being compacted shall be uniformly compacted using equipment and
materials that shall achieve the specified density and moisture content. The Contractor shall add
water and harrow, disc, blade, or otherwise work the material in each layer as required to insure
uniform moisture content and specified compaction. If the moisture and density requirements are
not met, the lift shall be broken up and recompacted until the specified requirements are met.
Cohesive materials with greater than 12 percent (12%) fines (passing the Number 200 sieve) shall be
compacted to a minimum density of 95% of maximum density at ±2% of optimum moisture content
as determined by a Standard Proctor Test, ASTM D698.
Sands and gravels with less than twelve percent (12%) fines shall be thoroughly compacted to a
minimum density of seventy percent (70%) relative density as determined by ASTM D4253 and
D4254 using vibratory rollers, plate compactors, or other methods approved by the Engineer.
Self-propelled rollers and compactors may be utilized for compaction of backfill adjacent but not
immediately adjacent to the structures. Within five feet of the structures, backfill shall be compacted
using vibratory plate compactors or other small equipment approved by the Engineer. Any
structures damaged during backfill compaction shall be replaced or repaired in accordance with
Engineer requirements at the Contractor's expense.
2A.16. EQUIPMENT
The Contractor shall be responsible to provide the size and type of equipment best suited to perform
the various tasks required for the project. Insufficient size and weight of compacting equipment will
not be an excuse for not obtaining compaction.
For compaction of granular materials, vibratory steel drum or plate type vibratory compactors will
be allowed. No segmented pad, sheep's foot rollers, or other rollers that would create high contact
stresses on the granular particles will be allowed. The use of rubber -tired vehicles to provide
compaction will not be allowed except at the direction of the Engineer.
Discs used on the project shall be of sufficient size and weight to fully penetrate the lift.
2A.19. GENERAL FILLS
Earth fill for general purposes shall follow the requirements for placement and compaction as set
City of Fort Collins Power & Light — 06.007 2A-6
forth throughout this section. Compaction of general fills shall be to a minimum of 95% of
maximum density by ASTM D698 at a moisture content ±3% of optimum moisture. For granular
materials with less than 12% fines, compaction shall be to 70% relative density as defined in ASTM
D4253 and D4254.
2A.20. MAINTENANCE AND RESTORATION OF FILLS, BACKFILLS, ROADWAYS
Fills and backfills that settle or erode before final acceptance of the work under these specifications,
and pavement, structures, and other facilities damaged by such settlement or erosion, shall be
repaired at the Contractor's expense. The settled or eroded areas shall be refilled, compacted, and
graded to conform to the elevations indicated on the Drawings or to the elevation of the adjacent
ground surface. Damaged facilities shall be repaired in a manner acceptable to the Engineer.
Existing roadways used during construction shall be regraded and gravel shall be applied as
necessary to return the roadways to their original condition prior to construction. Roadways
constructed under these specifications and used in the process of the construction, shall be regraded
and re -graveled as necessary to return them to their original condition.
2A.21. TOPSOIL —none required.
2A.22. FINAL GRADING
After all construction work under these specifications has been completed, the aggregate surface is
to be replaced to its original condition and all ground surface areas disturbed by the construction
operations shall be graded. The grading shall be finished to the contours and elevations indicated on
the drawings or, if not indicated, to the matching contours and elevations of the original, undisturbed
ground surface. In any event, the final grading shall provide smooth uniform surfacing and effective
drainage of the ground areas.
2A.23. DISPOSITION OF MATERIALS — This Section Not Used
2A.24. CONTROL TESTING
All field and laboratory testing required to determine compliance with the requirements of this
section will be provided by the Owner. The Contractor shall provide the services of one or more
employees as necessary to assist the Owner's field testing representative. The Contractor will be
furnished one copy of the test results.
Maximum density for cohesive compacted materials placed under this section shall be determined in
accordance with ASTM D698, Method A or C, unless otherwise specified. The terms "maximum
density" and "optimum moisture content" shall be as defined in ASTM D698 unless otherwise
specified.
The relative density for compacted granular materials containing less than 12 percent fines (-No. 200
City of Fort Collins Power & Light — 06.007 2A-7
sieve) placed under this section shall be determined in accordance with ASTM D4253 and D4254.
Density testing will be according to ASTM D2922 and D3017.
At least one field moisture and density test will be performed for every 500 cubic yards of the
compacted fill materials. Each lift placed will be tested independent of the number of cubic yards
placed. If determined to be necessary by the Engineer to ensure the quality of the fill and backfill,
additional field control tests will be conducted at a frequency determined by the Engineer to fit the
conditions.
Testing being conducted by the Owner will not relieve the Contractor of his responsibility to ensure
all materials being placed are at the proper moisture content before compaction begins. The testing
by the Owner is to determine that the requirements of the Specifications are being met and are not
intended to provide the Quality Control for the Contractor's operation.
2A.25. CLEANUP
Upon completion of the work associated with this Contract, the Contractor shall perform a cleanup
of the temporary facilities. The cleanup should return the disturbed areas as much as practicable to
the original ground surface contours.
**** END OF SECTION ***
City of Fort Collins Power & Light — 06.007 2A-8
L k ov - t h -he pro j PC 1 1 it V, Hid NO, Met n-tHM in I I i it
i,Iri indl o -:, ompani: d C' I It,,- B tol Rid Form, Ei t F, ri !I*
L L I'd( 1 1 1 it i (-a I io I I S and Sch-,�,Jti I - of fei I
o c t r I '-'I, if the 10 Fo i d is S C ' to t h hi ouclio the tttiiI 1�
i, I , ! u I, [ , :(7 aied erivclopo,, shel I I,tI- eiiLosprl in a eo,,Ier-Ih c en eI e%il) 1)
the I., I ie>li "31P EN(_'T,()S'ED" ()I- the to ei e ,i- iL.
, . __: . Nils Is shall he depo s i t Pe i i I to do s i q n a L red I ey, H t i n: p: i ni I
iiro- daL(, for rece il)L of Bids I to ( I I i �, i I '-- (i in -he Invitation to i..
I o tension -hereof made IDY Phdridl IM . R i (I:s I � c(, ^pd -�l � i- f I P t i o I, it! I
Por rr(_eirot of Rids wilt he t p L I t L l 1,- 1 1 -reopened. If I e 1.1-r i pall i -
I i tO for timely co-. I L %I I I y at -he Lo, vit i CI, No' , III it 1
Rids.
: . , 1 , 0 n a 1 , ; ce 1 e p h o to i c , telegraphic, or fans -mile Bide irp o%v 1 i I nl
.,j I - - I I o t i e-,re-,,-e consideration.
I - .-t . N () B i , I d n L :nay I-- Ithl(Ii 7 More han cnp Hid. 1111 1 ' i I I ( it i +; 1 1, t
11 1 1 1 Y.lit 'i;lIrps, "'Jiii not be aC(-ppt (W from on firm Cr 4sso,d c i2A.
14 . "" FFFIQla" DW AND WITHDRINATe AF "3 1 US .
BL is Ij[(je'T be cto ditipa pi vvirlidi vqn W/ art appiuquin-p clian I
iil ct mariner Mat 1 Rid lovist hp c:cP1;Ute_cl and Ile- o "iI t t -p
vh.- Lo Bids arc -o be Sulottoitlood at any time urior I h- opiA ii t oj
UK .
4 Ft_ ; may also M modified it wit locir,iwn it, poor sent b, -A- lol : p!
Lori 7-d lvvrpsPtlL -it i-,-o' pr( ";id, co f 1e , an 1) L 0 '7rI
i L a It o" time JDI 10]1 1 G I h( OpOilin'! c. t P i IS .
t 4 i - h1rawri Bid, may Iv- i es1wanj rt- j 11 o e to r_ u7 j 'I: " , it[ I I I ! I�
t I.- to 1 Kda pt oviek"I that Kne ; all Cher- fill V LII 1 -it IT Up
10 f qSI Lit( C:IS I t) Fj l(V
i 1 p-lo-d in I I Iti o I -" � ') , ; I " ' : )I — 1' '� f 1" : I I, I I I I i
lit i � - 11 1 �v ; c.1 i 11 1 IV- [ 11 1 1 It t
I— iz,'tC ' , 111(i
r the c:p(r no r R
1 . 1 HL I I,-- I 'i ( )—'LIJ SI, to E( , , rj—,, ehl ie . ,� F T: "I] I'' .
hit I L M, l I I p is
jL it I[ 1 y to L
flit' Li i t y In i t
Section 2B — STEEL STRUCTURES
213.1.1 General
The structures shall be complete with all field connection bolts required for erecting the
structures and required for mounting the equipment furnished under other sections of these
specifications. In addition; mounting bolts, lock washers, etc., shall be furnished for mounting
other equipment furnished by Owner as indicated on the drawings.
No field welding of structural steel shall be required.
Certain dimensions indicated on the Owner's drawings shall be adjusted as required to suit the
equipment furnished by the Contractor under other sections of these specifications. The
dimensions required for the equipment furnished shall be shown on the Contractor's detail shop
drawings and the materials and fabrication required shall be provided as part of the contract
work. There will be no adjustment in price because of these requirements.
All shielding masts shall be tapered tubular steel.
2B.1.2. Manufacturers
The following is a list of approved manufacturers:
1. Dis-Trap Steel Pole, LLC., Pineville, LA; Phone#: (318) 767-5587.
2. JEM Manufacturing, Tulsa, OK; Phone#: (918) 446-4517.
3. Valmont, Valley, Nebraska; Phone#: (402) 359-2201.
2B.1.2 Materials
All materials shall be new and undamaged and shall conform to pertinent AISC and ASTM
standard specifications and the following requirements:
Steel shapes and plates
for structures
ASTM A36 steel. Minimum yield point of
36,000 psi including appurtenant materials.
Structural Tubing ASTM A500 Grade A or B, ASTM A501,
ASTM A513, ASTM A573, ASTM A588,
0.250 inch minimum wall thickness. Square
tube rolled from round pipe will not be
acceptable.
Tubular structures
and attachments
Baseplates for tapered
tubular structures
ASTM A572 weldable quality or ASTM A36;
3/16 inch minimum thickness
ASTM A588, cast or fabricated steel; 1 '/z
inch minimum thickness
City of Fort Collins Power & Light— 06.007 213-1
Welding electrodes:
For steel shapes, plates,
and structural tubing
Connecting bolts and
bolts for equipment mounting:
For steel shapes, plates,
and structural tubing
AWS specifications. Low hydrogen types.
Tensile strength to be compatible with parent
material.
ASTM A394; hexagon bolts and nuts, flat or
beveled washers, and MacLean -Fogg "M-F
Lock Nut #1" locking devices.
For tapered tubular ASTM A325 Type 1, ASTM A354 Grade BC,
structures ASTM A354 Grade BD, or ASTM A687;
heavy hexagon bolts and nuts, flat or beveled
washers, and MacLean -Fogg "M-F Lock Nut
No. 1" locking devices.
Galvanizing:
Shapes, plates, and
structural tubing
Bolts, nuts, and washers
for shapes, plates, and
structural tubing
Tapered tubular structures
Bolts and studs for tapered
tubular structure
Anchor bolts for tapered
tubular structures
2B.1.3 Design
ASTM A123
Galvanized as specified in ASTM A394 and
ASTM A153
ASTM A123
Galvanized as specified in ASTM A325 and
ASTM A1533
ASTM A153
Provide interphase spacing and clearances conforming to the recommended spacing and
clearances listed in IEEE and N.E.M.A. standards, unless larger dimensions are shown on the
drawings. Conform as nearly as possible to the data and dimensions shown on the drawings,
with variations permissible to make the structures fit the manufacturer's standard material or
equipment or to give an improved installation provided the following requirements are
maintained:
(1) Overall space limitations are as shown on the drawings.
(2) Maintain ample aisle space for operation and maintenance of the equipment.
(3) Clearance from fences, structures, and other equipment for both the present and future
City of Fort Collins Power & Light— 06.007 2B-2
development as indicated on the drawings is maintained.
(4) All baseplates shall be designed for installation with leveling nuts and grout.
All bus and equipment stands shall be designed according to NEMA SG-6 and the AISC Manual
for Steel Construction.
All shielding masts shall be designed according to the NESC and Design of Steel Transmission
Pole Structures, ASCE guide and recommendations report of the task committee on Steel
Transmission Poles of the Committee in Analysis and Design of Structures of the Structural
Division, 1978.
2B.1.3.1 Tapered Tubular Design
For a tapered tubular structure the following requirements shall also be met:
Width to thickness ratios or diameter to thickness ratios for the tubular steel members shall be in
accordance with the requirements of the ASCE guide for the "Design of Steel Transmission Pole
Structures" 1978. Unless local buckling resistance is demonstrated by test for polygonal
members, polygonal members shall be proportioned without stress reduction so that:
w/t less than or equal to 240
(Fy)1 /2
where: w = The flat width of a side in inches. In determining w, the actual inside bend
radius shall be used unless it exceeds 4t. Bend radii greater than 4t shall be taken as 4t in
determining w.
t = The thickness of the plate in inches.
Fy = The yield stress in ksi
The value of w=t may exceed 240/(Fy)1/2 the allowable stresses are reduced in accordance with
the applicable formulae in the ASCE guide referenced herein before.
Unless local buckling resistance is demonstrated by test for circular or smooth elliptical cross
sections, the members shall be proportioned using the applicable formulae for bending, axial
load or a combination of the two in the ASCE guide referenced herein before.
Nondestructive testing shall be provided in accordance with the requirements of Article 6.7 of
the referenced AWS code. Magnetic particle inspection or ultrasonic inspection shall be
provided on tubular steel structures at all circumferential welds and all other critical welds.
Inspection and evaluation of the test data shall be performed by persons fully qualified by
training and experience to inspect, evaluate, and accept or reject these welds. Any defective
weld shall be removed, rewelded, and reinspected at the Contractor's expense. All
nondestructive weld inspection and testing shall be performed by the Contractor's quality control
City of Fort Collins Power & Light — 06.007 213-3
inspectors.
Material for tapered tubular sections, excluding ASTM A36, baseplates, anchor bolts, and
welding materials, shall resist a minimum of 15 foot-pounds of energy on a Type A specimen at
a temperature of -207 in accordance with the standard Charpy W" notch impact test. The
Charpy test shall be in accordance with ASTM A370. The Charpy test shall be made on a heat
lot basis.
In addition to the foregoing requirements, the material for the tapered tubular sections shall be
capable of welding without reduction in yield strength or corrosion resistance.
This material shall have a uniform color and appearance after galvanizing.
2B.1.3.2 Structural Tubing Design
This section covers design, materials, and fabrication for substation structural tubing members.
Certain dimensions indicated on the Engineer's drawings shall be adjusted as required to suit the
equipment furnished by the Contractor under other sections of these specifications. The
dimensions required for the equipment furnished shall be indicated on the Contractor's detail
shop drawings and materials and fabrication required shall be provided as part of the contract
work. There will be no adjustment in price because of these requirements.
Drawings and Calculations. Drawings for shop fabrication and field erection of all materials
shall be prepared, checked, and submitted to the Contractor as specified. Field erection data
shall include written instructions for proper structure assembly, erection, and inspection,
including explicit step by step instructions for the proper installation, tightening and inspection
of the connection bolts being furnished. Drawings shall indicate details and dimensions as
required to enable the Contractor to coordinate hardware attachment and electrical clearances.
Supplier shall be responsible for all, equipment and equipment operator assembly interfacing
with structures.
Design data shall be submitted with the proposal including calculations indicating the adequacy
of each structure, steel beams, attachments, and appurtenances regarding strength and deflection.
The calculations shall include baseplate sizes, anchor bolt patterns, anchor bolt lengths, anchor
bolt stress; groundline shears, moments, and axial loads; and all other structure design data
required for the Contractor's foundation design. The accuracy and correctness of the design of
the structures and their components, based on the loads indicated on the Contractor's drawings,
are the sole responsibility of the Supplier. The proposal shall also include the approximate total
weight of each structure.
Design. The yield strength of the material used in the design of the structural shapes shall, not
exceed the yield stress tabulated in the ASTM specification or modified subject to the
Contractor's acceptance.
City of Fort Collins Power & Light— 06.007 2134
Calculated stresses shall not exceed the yield stress of material for the maximum combination
loadings indicated on the drawings. The loads indicated on the drawings include overload
capacity factors.
Substation structures shall be designed to meet the deflection requirements of NEMA SG6, part
36. Switch and interrupting device structures shall be designed to meet the following deflection
requirements. The horizontal deflection of vertical members shall be limited to 1/100 of the
span. The vertical deflection of horizontal members shall be limited to 1 /200 of the span. The
horizontal deflection of horizontal members shall be limited to 1 /200 of the span.
All other structures unless noted otherwise shall be designed to meet the following requirements.
The horizontal deflection of vertical members shall be limited to 1150 of the span. The vertical
deflection of horizontal members shall be limited to 1 /200 of the span. The horizontal deflection
of horizontal members shall be limited to 1/100 of the span.
Deflection criteria indicated shall apply for all load cases using an overload factor of 1.0.
The span shall be defined as the distance between supporting members or the length of the
cantilever.
Anchor bolts shall be designed for a stress not to exceed the yield stress of the anchor bolt
material on the net cross section using the maximum combination loadings indicated on the
drawings. Anchor bolts length shall not be less than the required projection above the
foundation including leveling nuts plus an embedment of the development length required in
accordance with ACI 318-02 based on f c 4,000 psi. Anchor bolts shall include leveling nuts.
Wide flange structures shall be shipped assembled where shipping conditions permit. Each
bidder shall furnish, in the BID DATA section, a list of the structure items that will require field
assembly and shall describe the shipping sections. When proposals are submitted without
statements describing sectional shipments, it will be understood that no field assembly of the
structures will be required.
Anchor Bolts. Anchor bolts, nuts, and washers furnished under this section shall be as scheduled
and detailed on the drawings. Anchor bolts, nuts, and washers shall be hot -dip galvanized after
fabrication, threads being undercut to provide a tolerance equal to ANSI Class 2A. Each bolt
shall be furnished with two nuts and washers and sufficient threads to permit a nut to be installed
on each side of the concrete form or template.
2B.1.4 Loading Criteria
All equipment structures, as indicated on the drawings shall be designed in accordance with the
following loading criteria. All calculations shall be mutually exclusive with the final design
being the worst case condition of the cases.
All equipment stands:
(a) 120 MPH wind on bare equipment and connected bus.
City of Fort Collins Power & Light — 06.007 213-5
(b) 40 MPH wind on''/z inch of ice on equipment and connected bus.
All shielding masts:
(a) N.E.S.C. Heavy Loading Case:
Design all structures for 1 /2" radial ice on conductors and a simultaneous 41bs.
per square foot of horizontal wind pressure on iced conductor and bare structures.
The overload factors shall be as per 1990 N.E.S.C. Section 261A1.
(b) High Wind Case:
Design all structures for 120 mph wind, 37 lbs. per square foot of horizontal wind
pressure, on bare conductor and structures, using an effective net area based on
one of the following multiples of the area of one face:
Round Tubular Shapes - 1.00
Octagonal Tubular Shapes - 1.20
Rectangular Tubular Shapes - 1.70
Rolled Sections, Members of
Lattice, or Truss Structures - 2.00
The overload Factor shall be 1.0 as per 1990 N.E.S.C. Section 260C.
(c) Extreme Ice Load:
Design all structures for 1" radial ice on conductors and a simultaneous 0 lbs. per
square foot of horizontal wind pressure on iced conductor and bare structures with
an overload factor of 1.00 for resultant loading.
2B.1.5 Field Connection and Equipment Mounting Bolts
Field connection and equipment mounting bolts, nuts, washers, and lock washers shall be
furnished for all structure field connections and equipment mounting with an overage of 5
percent, plus five bolts, of each type, size, and length. The length of connection bolts shall
provide sufficient projection for washer, nut, and locknut. With locknuts in place, bolt
projection beyond the locknut shall be from % inch to''/z inch inclusive.
Smooth beveled washers shall be furnished for use when the bearing faces of the bolted parts
will have a slope of 1:20 or greater with respect to a plane normal to the bolt axis.
All field connection bolts for the substation bus and equipment structures shall be of the same
length.
2B.1.6 Fabrication
The structures shall be fabricated in conformity with the dimensions, arrangements, sizes and
City of Fort Collins Power & Light— 06.007 213-6
weights or thicknesses indicated on the drawings or stipulated in the specifications. All
members shall be detailed and fabricated in accordance with AISC standards, specifications, and
details unless otherwise indicated on the drawings or specified herein.
When delivered, members shall be straight, free from warp, unauthorized splices and bends, or
local deformations. Holes and other provisions for field connections shall be accurate and shop
checked so that when the structure is field assembled proper fit will be provided. All punching,
drilling, and reaming of the holes shall be done in the shop before galvanizing.
All fabricated materials shall conform to the tolerances specified in the AISC Manual and ASTM
A6. In addition, the allowable tolerance for sweep shall be no more than 1/8 inch in 10 feet of
length regardless of the type of steel section. If necessary, the Contractor shall cull out or
straighten materials which do not comply with the specified tolerances. Materials which do not
comply with the specified sweep and camber requirements may be rejected.
Baseplates shall also be checked after fabrication and will be rejected if anchor bolt holes are not
within 1/32 inch of their theoretical location with respect to the center of the anchor bolt group
or cluster. Holes in one inch plate or greater will be within 1/16 inch of their theoretical
location.
Contact surfaces at all column splices and at all other compression joints depending upon contact
bearing shall have the bearing surfaces prepared to a common plane by milling, sawing, or other
acceptable means. Only milling will be acceptable where milling is specifically indicated on the
drawings.
Before being laid out or worked in any manner, structural material shall be straight and shall be
cleaned of all rust and dirt. If straightening is necessary, it shall be done by methods that will
not injure or fatigue the metal.
Shearing and cutting shall be performed carefully and all portions of the work which will be
exposed to view after completion shall be finished neatly. Blades shall be sharp and clearances
adjusted to give smooth cuts. Manually guided cutting torches shall not be used.
All holes in structural steel less than 13/16 of an inch thick may be punched to full size unless
otherwise noted on the drawings. Holes shown on the drawings as drilled holes and all holes in
structural 13/16 of an inch or more in thickness shall be drilled or subpunched and reamed. All
holes shall be clean cut and without torn or ragged edges. All burrs resulting from reaming or
drilling shall be removed with a tool making 1/16-inch bevel. All holes shall be cylindrical and
perpendicular to the member. Where necessary to avoid distortion of the holes, holes close to
the points of bends shall be made after bending.
For punching to full size, the diameter of the punch shall be 1/16 of an inch smaller than the
nominal diameter of the die, but shall be not more than 1/16 of an inch larger than the diameter
of the bolt. For subpunching, the diameter of the punch shall be 3/16 of an inch smaller than the
nominal diameter of the bolt and shall not be more than 3/32 of an inch larger than the diameter
of the punch.
City of Fort Collins Power & Light — 06.007 2B-7
Where holes are reamed or drilled, the diameter of the finished hole after galvanizing shall be
not greater than the nominal diameter of the bolt after galvanizing plus 1/16 of an inch, unless
construction tolerances require greater clearance.
All holes shall be spaced accurately in accordance with the drawings and shall be located on the
gagelines. The maximum allowable variation in hole spacing from that indicated on the
drawings for all bolt holes shall be 1/32 of an inch.
Except as otherwise indicated on the drawings or specified herein, shop connections shall be all
welded and field connections shall be all bolted. Bolted connections shall be bearing type with
all threads excluded from the shear planes of the connected parts.
213.1.7 Welding
Except as otherwise specified, all welds, welding, and related operations for steel structures shall
be in conformity with the applicable provisions of the AWS Structural Welding Code, AWS
D1.1, as issued by the American Welding Society.
Welding shall be performed using only those joint details which have a prequalified status when
performed in accordance with the referenced AWS code. Accurate records of operator and
procedure qualifications shall be maintained by the Contractor and shall be available to the
Owner. All welds shall be continuous and shall develop the full strength of the least strength
component unless otherwise indicated on the drawings. Components shall be thoroughly
cleaned before welding and shall be accurately fitted and rigidly secured in position during
welding to provide a sound, full strength weld without distortion. Weld surfaces shall be smooth
and uniform and shall be thoroughly cleaned of all slag and flux before galvanizing. Low
hydrogen electrodes shall be used.
All testing and welding qualifications required by these specifications shall be performed by an
independent testing laboratory retained by the Contractor and accepted by the Owner. All
testing and welding qualification expenses shall be paid by the Contractor.
213.1.8 Identification
All separate structural members and parts shall be plainly marked, as an aid in assembly, with
the identifying mark on the member corresponding to the identical mark on the erection
drawings. Marks shall be metal stamped into each member in painted on the members with
nonpermanent paint in characters not less than one inch high.
213.1.9 Galvanizing
Where indicated steel materials furnished under this section shall be hot -dip galvanized after
fabrication.
After the shop work has been completed and accepted, all material shall be cleaned of rust, loose
scale, dirt, oil, grease, and other foreign substances. Particular care shall be taken to clean slag
City of Fort Collins Power & Light — 06.007 2B_8
from welded areas.
All plates and shapes shall be galvanized after fabrication, except that members of assemblies
built up by welding may be galvanized before they are welded. All welds shall be coated and all
galvanizing damaged by the welding operations shall be repaired as provided herein. Where
members are of such lengths that they cannot be dipped in one operation, great care shall be
exercised to prevent warping. Finished compression members shall not have lateral variations
greater than 1/1000 of the axial length between the points which are to be supported laterally.
All holes in material shall be free of excess spelter after galvanizing.
All plates and shapes which have been warped by the galvanizing process shall be straightened
by being rerolled or pressed. The material shall not be hammered or otherwise straightened in a
manner that will injure the protective coating. If, in the opinion of the Owner, the material has
been harmfully bent or warped in the process of fabrication or galvanizing, such defects shall be
cause for rejection.
The galvanizing coating shall cover all interior surfaces of hollow members as well as exterior
surfaces. Channels, angles, and all other unsymmetrical sections shall be straightened after
galvanizing as required to meet the specified tolerance requirements.
A durable, high quality, relatively smooth coating is required. The Contractor's attention is
directed to the requirements of ASTM A384, ASTM A385, and ASTM A386 in this regard. The
Owner may at his option inspect the galvanizing in process. Grounds for rejection of members
because of galvanizing defects shall be as listed in Table II of the "Inspection Manual for Hot -
dip Galvanized Products" published by the American Zinc Institute except that excessive general
roughness, pimples, lumpiness, excessive discoloration, and runs shall be cause for rejection.
The Owner will determine whether defects are excessive or not.
Precautions shall be taken against embrittlement in accordance with the latest revision of ASTM
specification A143, "Recommended Practice for Safeguarding Against Embrittlement of Hot -
Galvanized Structural Steel Products and Procedure for Detecting Embrittlement."
2B.1.10 [This Section Not Used.]
2B.1.11 Bolting
Bolted connections shall be securely wrench tightened. Wrench tightened is defined as 50 to 75
foot-pounds of torque on 5/8 inch bolts and 75 to 100 foot-pounds of torque on 3/4 inch bolts.
Wherever clearances allow, bolts shall be inserted from the outside to place the nuts on the least
visible side of each connection. Locknuts shall be finger tightened to contact the nut, then
wrench tightened an additional one-half to one full turn. Nuts and bolts shall be handled and
installed in a manner that will not damage the finish. The Contractor shall furnish bolt torques in
the event high strength bolts are used.
2B.1.12 [This Section Not Used.]
City of Fort Collins Power & Light — 06.007 2B-9
2B.1.13 Structure Grounding
Furnish ground tab with 9/16" hole, mounted one (1) foot above base. Ground clamp mounting
holes shall be provided near the bottom of each structure leg and at approximately three (3) to
five (5) foot intervals on the structure legs selected to support ground conductors leading to
equipment ground connections.
Provide means for grounding equipment, CCVTs, switches, bus supports, switch operator
handles and operator platforms.
2B.1.14 [This Section Not Used.]
City of Fort Collins Power & Light — 06.007 2B-10
I . ^, o, , - c i , , , I ' I I E P A ( " T .
I L. OWNER_ re serves theL 1i (jilt t () rel -,-: t anytoo I all 131 j A: %
nnu it 1 informalities ies mt 1 rwo I v i rul price, time t v i c It a n a v n iA the_ ,^ k ,
tc I i�co, ln , e criiit t a ,t I- ro rms wl L h 1h, VICCeRS ELI! Kidder, md -in r 1 10
s t n a a in A zrll noncon! nruninu, not i ewnin;iv inha I aL( 4 d T 11 1 1 -w
,i ; . To I s co , OW N L P, rc cs the L iiji-t -o ,ej I la- P, 1 -1 L liv: 1 1 1, c I it
KNEW 011 i Puns I: Ina L it w(mid nct be it I 1w re.3t: ircl crest lf : he P n 1 -N
I C it :ke Aj I cI I L,,, t 0 L.eaI Bidder, ,hc 1 114,1 lonnause : 50 N J " , Po of
e s 1) C, in s I v e or the si(Iner ; I I I (I �l a L :1 r S 0 1 or 01 Wintful I K In,: I a i I I
it fails to meet aiiv .,ther p,-r-L m ant=t.]r.ClarI () E I riteri sr [I) i sL- I
V, I J F P Ill :L:epa I I nio: hotwo-n I In An I at P I sure of criv , al mill, c, f 1 1 -1 1 1
�ILJ I ly -or rry? sum t .ieLcof wi I I re-, t I I, r 1 to ,, to L et t 1 , or t ,11!1
17 . - . in cva I ,I a t I riq Lids, OWNER ,,, - t- I onsider the utim I i f I >aI Lens qp
-idlers, whether or I, or the F)i Js WnrIj 117 W : t A I he prescribed y P pi j r , op I
,Ill] :� I I Ch a t- e I I la 7 e e , unit pi i ces arm ot lip i -tat a is
1 lie Bid A)m cot pr I ti r lcthe Ick) t- i c, i i i I .
3. (Il OWXFR may iy consider Lhu a! , final ion and i P:l -- o
,Ab�rn L ra,- '_ or S , ,uUp i ers, and other pet saini und ajnanl�, pi 1)
to L tit(-:,)- FAD r L i c I I : of the W�, -, 1, 1 1 _< I n wh i ( T 7 n- K 1prot I I
! I rn.-1 ciroi, Supp 1 1 e I S , 'Aid Ot n, I pc ,13 and or In 111, L rt i
�iilbm i _red Is requested by (MNF�P, )W[\-p t1,So may "plAs i clP r Lira OIJIt I It If I
, Lc s t tilai i L [ f e I i a ric e L ( q i i -i r em e in t: s , L rf:>rma i n ( data a ini q I a r - I i t: — s w I niter
iterii, cF rn& cria I s on i -quir-ITIer-it I)LOI'(air 11 F p I Aimrjuvral 1 r 1 r , h- At k
lca I In 1, it to I ii I P(ji I in L :J t -II)III . t I Pl 1 1) L ip) L t (7) t t(' -'IA t I cc 0 L
WNLP may cln,t, irjV:;I o,,:; ;)WNFT r ens It 1, (�
�3s I sL A -Im, eva I cat inn v)T arn, 12 A r.nW u oitnh lyh I htI sto )ris j I
t I o 1) S and f j rnme,_cl I lI bi IL r fi LI F L il I. I
L :�U!>IriJL71LS ]1AI ot_r or 1 11 r1 oLl ja [I! s, i t I (A to
o L c 11 A n) L I I ,: (-- i'i , I I, I It(' 'r-AIL LA, I In, ii:[[clif rc, ;'."IIP if i
"I tllijl l 11( mescl it> -1 time.
1; i i, ni ; r
Section 2C — CONCRETE
2C.1 DESCRIPTION
This Section covers all concrete, cast -in -place and drilled pier, and includes reinforcing steel
forms, finishing, curing and other appurtenant work.
2C.2 WORK TO BE PERFORMED
The following list is intended to give a general definition of the concrete work to be done and
shall not be construed as a complete listing.
One spread footing and two drilled piers to support lightning masts.
2C.3 CODES AND STANDARDS
Equipment furnished and work performed under these specifications shall be in accordance with
the latest requirements of applicable ASTM, ACI, CASI, PCA, and ANSI standards.
2C.4 DRAWING AND INFORMATION REQUIRED
The Contractor shall submit the drawings and information required in accordance with the
requirements of ARTICLE 1A.4.
2C.4.1 Concrete Materials and Proportions
The source and quality of concrete materials and the concrete proportions for the Work shall be
submitted to the Owner for review before the concrete work is started. This review will be for
general acceptability only and continued compliance with all contract provisions will be
required.
2C.4.2 Shop Drawings and Bar Lists
Bar lists and drawings for the fabrication and placing of reinforcement shall be prepared,
checked and submitted. Each bar list and placement drawing shall have noted thereon "ASTM
A615 Grade 60 only" or a similar statement which identifies the grade of reinforcing indicated
on that drawing.
2C.5 CONCRETE MATERIALS AND PLACEMENT
2C.5.1 General
This Section covers the requirements for all concrete (drilled piers and cast -in -place), reinforcing
steel, forms, finishing, curing, and other appurtenant work.
City of Fort Collins Power & Light-06.007 2C-1
The disposal of all unused excavated material shall be as required in Section 2A.
2C.5.2 Materials
Where the use of the following materials is specified herein, such materials shall be in
accordance with these requirements.
Concrete
Cement
Fine aggregate
Coarse aggregate
Water
Water stop
Admixtures
ASTM C150, Type II, or 1/II
Clean natural sand, ASTM C33
Crushed stone, washed gravel, or other acceptable
inert granular material conforming to ASTM C33
Clean and free from deleterious substances
12 gauge ungalvanized steel not less than 8 inches wide or
PUC ribbed or serrated 9 inches wide, with "0" bulb center
Plasticizer Grace "WRDA," Master Builders "Possolith Normal,"
Protex "PDA 25 XL Normal Set," Sika Chemical
"Plastocrete 161," or acceptable equal
Air entraining agent ASTM C260; Grace "Darex AEA," Master Builders "MB-
AR," Protex "Air Entraining Solution," Sika Chemical
"AER," or acceptable equal
Plasticizing retarder
Reinforcing steel
Bars not otherwise noted
Ties and stirrups
Grace "Daratard," Master Builders
"Pozzolith Retarder," Protex "PDA
25R Retarder," Sika Chemical
"Plastocrete 161 R," or acceptable
ASTM A615 Grade 60 including Supplement
S-1. Yield strength shall be determined by full size
bar.
ASTM A615, Grade 60
Anchor bolts 3/4 inch ASTM [A36] threaded bars, with
and larger nuts conforming to ASTM [A563 Grade A] heavy
hexagon; all galvanized after fabrication.
City of Fort Collins Power & Light-06.007 2C_2
Forms
Anchor bolts smaller
than 3/4 inch ASTM [A307 Grade A] with hexagon heads and
ASTM [A563 Grade A] hexagon nuts; all
galvanized after fabrication.
Prefabricated Simplex "Industrial Steel Frame Fonns," Symons
"Steel Ply," or Universal "Uniform"
Plywood Product Standard PSI, waterproof, resin -bonded,
exterior type Douglas fir; face adjacent to concrete
Grade B or better
Lumber Straight, uniform width and thickness, and free
from knots, offsets, holes, dents, and other surface
defects
Chamfer strips
Clear pine, surface against concrete planed
Form coating Nox-Crete "Nox-Crete Form Coating," L & M
"Debond," Protex "Pro -Cote," or Richmond "Rich
Cote"
Polyethylene film
Insulation
Expansion joint materials
Filler
Sealer
Primer
Epoxy bonding compound
Membrane curing compound
Fed Spec L-P-378, Type I; 6 mil
Styrofoam SM, Fed Spec HH-I-52413, Type II,
Class B, extruded polystyrene
Performed, ASTM D 1752, Type I (sponge rubber)
or closed cell plastic foam (PVC or polyethylene)
Polysulfide rubber, two component, ANSI Al 16.1
and Fed Spec TT-S-227 gray color
As recommended by sealant manufacturer
Sika Chemical "Sikadur Hi -Mod" or acceptable
equal
Fed Spec TT-C-800A, Type II, Class 1; chlorinated
rubber, min 18 percent solids; Grace "Dekote,"
ProSoCo "Kure & Seal," Protex "Triple Seal Series
CCL-18," or T. K. Products "Tri-Kote TK-18"
City of Fort Collins Power & Light-06.007 2C-3
2C.5.3 Limiting Requirements for Concrete Mix
Each concrete mix shall be designed and concrete shall be controlled within the following
limiting requirements.
2C.5.3.1 Strength
The concrete mix classes to be supplied for the project are listed in Table 2C.5.3-1. The location
of use for the various classes is as indicated on the Drawings and as indicated as follows.
Class 1 Concrete - structural concrete for reinforced concrete structures.
Class 2 Concrete - structural concrete for drilled piers.
The minimum acceptable compressive strengths as determined by ASTM C39 shall be as shown
in Table 2C.5.3-1.
TABLE 2C.5.3-1
CONCRETE MIX REQUIREMENTS
Class
Minimum
Minimum
Entrained
Maximum
Maximum
28-Day
Cement
Air Content
Slump
W/C
Strength
Content
(Percent)
(In)
Ratio
PSI
LBS
1
4000
564
6%± 1-1/2%
4.0
0.48
2
4000
564
6%± 1-1/2%
6" to 8"
0.48
All concrete shall exceed the minimum strength and meet all requirements of ACI-318. The
Engineer shall be the sole judge of the quality of the concrete and tests.
2C.5.3.2 Minimum Cement Factors
The quantity of portland cement, expressed in pounds per cubic yard, shall be not less than that
indicated in Table 2C.5.3-1.
Flyash may be substituted for cement but shall not exceed twenty percent (20%) of the total
pozzolanic material.
2C.5.3.3 Water -Cement Ratio
The water to cement ratio shall not exceed the values shown in Table 2C.5.3-1.
City of Fort Collins Power & Light-06.007 2C-4
2C.5.3.4 Slump
Concrete slump shall be kept as low as possible consistent with proper handling and thorough
compaction. Unless otherwise authorized by the Owner, slump shall not exceed that indicated in
Table 2C.5.3-1.
2C.5.3.5 Ratio of Fine to Total Aggregates
The ratio of fine to total aggregates based on solid volumes (not weights) shall be:
Concrete Coarse Aggregate Size Maximum Ratio Minimum Ratio
1 & 2 3/4 inch to No. 4 0.50 0.40
2C.5.3.6 Initial Set
The initial set as determined by ASTM C403 shall not be attained until at least 5 hours after the
water and cement are added to the aggregates. The quantity of retarding admixture shall be
adjusted as necessary to compensate for variations in temperature and job conditions.
2C.5.3.7 Total Air Content
The total volumetric air content of concrete after placement shall be 6%± 1-1/2% or as shown in
Table 2C.5.3-1.
2C.5.3.8 Admixtures
The admixture content, batching method, and time of introduction to the mix shall be in
accordance with the manufacturer's recommendations for the compliance with these
specifications.
2C.5.4 Batching and Mixing
Batching and mixing shall be performed by an acceptable ready -mix concrete supplier.
Personnel at the batching and mixing plant shall be qualified and experienced.
2C.5.4.1 Ready -Mixed Concrete
Ready -mixed concrete shall conform to ASTM C94, except as otherwise specified herein.
Truck mixers shall be revolving drum type and shall be equipped with a mixing water tank.
Only the prescribed amount of mixing water shall be placed in the tank for any one batch, unless
the tank is equipped with a device by which the amount of water added to each batch can be
readily verified.
City of Fort Collins Power & Light-06.007 2C-5
A delivery ticket shall be prepared for each load of ready -mixed concrete delivered. A copy of
each ticket shall be handed to the Owner by the truck operator at the time of delivery. Tickets
shall show the time the mix was batched, the mix identification, the number of yards delivered,
the quantities of each material in the batch, the outdoor temperature in the shade, the time at
which the cement was added, the amount of water that may be added at the placement site, and
the numerical sequence of the delivery.
When a truck mixer or agitator is used for transporting concrete, the concrete shall be delivered
to the site of the work and discharge shall be completed within 1-1/2 hours, after the introduction
of the mixing water to the cement and aggregates, or the introduction of the cement to the
aggregates, when the air temperature is 90' F or less. Exceeding this time limit shall be cause
for rejection. When the air temperature exceeds 90' F, concrete shall be placed in accordance
with the requirements of Section 2C.5.5.4, within a time depending on air temperature and
humidity as set forth by the guidelines of ACI 305 to prevent the temperature of the concrete
from reaching 90' F. On very hot days, the time for placement may be reduced to 30 minutes.
The Contractor shall schedule concrete pours for early morning or evening hours when hot days
are anticipated. Concrete temperatures exceeding 90' F may be cause for rejection.
2C.5.5 Placement
The handling, depositing, and compacting of concrete "shall conform to these specifications
subject to adjustment by the Owner for weather or placement conditions.
Concrete shall not be pumped through aluminum pipe or aluminum alloy pipe.
Prepare slab subgrades in accordance with ACI 301. Moisten subgrade before placement. Do
not cause water to pond, become muddy, or cause soft spots to appear.
Cover with polyethylene film all gravel or crushed stone subgrades that do not contain at least
twenty-five percent (25%) material passing a No. 4 sieve to protect concrete from loss of water.
2C.5.5.1 Bonding to Hardened Concrete
The surface of hardened concrete upon which fresh concrete is to be placed shall be rough, clean
and damp. Surface mortar shall be removed to expose the aggregate to a full amplitude of 1/4 in.
The hardened surface shall be cleaned of all foreign substances (including curing compound),
washed with clean water, and kept saturated during the 24 hour period preceding placement of
fresh concrete or handled per the instructions as indicated by the bonding agent manufacturer.
2C.5.5.2 Conveyance and Distribution
Concrete shall be conveyed to the point of final deposit by methods which will prevent the
separation or loss of the ingredients. Concrete shall be deposited in its final position without
moving it laterally in the forms for a distance in excess of 5 feet.
City of Fort Collins Power & Light-06.007 2C-6
2C.5.5.3 Depositing Concrete
Concrete shall be deposited in approximately horizontal layers of proper depth for effective
compaction; however, the depth of a layer shall not exceed twenty inches (20"). Each layer of
concrete shall be plastic when covered with the following layer, and the forms shall be filled at a
rate of vertical rise of not less then two feet (2') per hour. Horizontal and vertical construction
joints shall be provided as necessary and as accepted by the Engineer to comply with these
requirements.
Maximum height of concrete fall shall not exceed four feet (4' ). Use a tremie for placing
concrete in columns and walls to prevent free fall of more than four feet (4').
2C.5.5.4 Compaction
During and immediately after depositing, all concrete shall be thoroughly compacted, worked
around reinforcements and embedments, and worked into the corners of the forms.
All concrete shall be compacted by means of mechanical vibrating equipment; except concrete
slabs six inches (6") or less in thickness may be either vibrated or tamped. Unless otherwise
accepted by the Engineer, mechanical vibrators shall be spud -type immersion vibrators. The
number and type of vibrators shall be subject to the acceptance of the Engineer. Provide at least
one stand-by vibrator in operable condition at placement site prior to placing concrete.
2C.5.5.5 Hot Weather Concreting
Except as modified herein, hot weather concreting shall comply with ACI 305. At air
temperatures of 90' F or above, special procedures shall be adopted to keep the concrete as cool
as possible during placement and curing. The temperature of the concrete when it is placed in
the work shall not exceed 90' F.
Whenever the air temperature exceeds 95' F, membrane cured slabs shall be kept wet to promote
cooling of the concrete during the curing period.
2C.5.5.6 Cold Weather Concreting
Except as modified herein, cold weather concreting shall comply with ACI 306. The
temperature of concrete at the time of mixing shall not be less than that indicated in the
following table for corresponding outdoor temperature (in shade) existing at the time of
placement.
Outdoor Temperature Concrete Temperature
Below 30' F 700 F
Between 30' F and 450 F 600 F
Above 45' F 450 F
City of Fort Collins Power & Light-06.007 2C-7
When deposited, the temperature of heated concrete shall not be over more than 101 F higher
than the above minimums.
When freezing temperatures may be expected during the curing periods, suitable means shall be
provided for maintaining the concrete at temperatures of not less than 50' F for 5 days or 70° F
for 3 days after the concrete is placed. Concrete and adjacent form surfaces shall be kept moist
at all times. Sudden cooling of concrete shall not be permitted.
The use of calcium chloride will not be permitted.
2C.5.6 Reinforcement
Reinforcements shall be accurately formed and placed in accordance with ACI 117, "Standard
Tolerances for Concrete Construction and Materials.". Unless otherwise indicated on the
drawings or specified herein, the details of fabrication shall conform to the latest version of ACI
318 and ACI 117.
2C.5.6.1 Accessories
The Contractor shall provide all bar supports, ties, spacers, bolsters, inserts, screeds, and other
concrete accessories required to maintain reinforcing in its proper position and permit proper
placement of concrete.
2C.5.6.2 Concrete Cover
Except as otherwise indicated on the drawings, metal reinforcement for concrete shall have the
concrete protective cover specified in Chapter 7 of ACI 318.
2C.5.6.3 Welding
Welding of reinforcement for any purpose, and tack welding in particular, is expressly
prohibited. Reinforcements upon which unauthorized welding has been done shall be presumed
to be damaged and such reinforcing shall be removed and replaced at the Contractor's expense.
Replacement materials shall conform to all applicable requirements of these specifications.
Welded chairs and supports may be used provided they are clamped or wired to the
reinforcement.
2C.5.6.4 Placement
Reinforcements shall be accurately positioned on supports, spacers, hangers, or other
reinforcements, and shall be secured in place with wire ties or suitable clips. Bare metal
supports shall not be used in contact with forms for exposed surfaces. Pre -formed standees are
City of Fort Collins Power & Light-06.007 2C-8
required for all slabs to support and properly space the top layer of steel and fabricated side form
spacers are required for all walls.
2C.5.6.5 Splices
Unless otherwise required by the specifications or drawings, splices shall conform to ACI 318
and shall be tension -lapped splices. Splices shall be Class B tension -lapped splices unless a
different class is indicated on the drawings. Both compression and tension -lapped splices shall
be designed for a steel yield stress and a concrete compressive strength as specified in Section
2C.
2C.5.7 Anchor Bolts
Anchor bolts furnished under these specifications shall be as listed and detailed on the drawings.
Sleeves and anchor plates shall also be provided where they are indicated on the drawings.
Unless otherwise indicated on the drawings, fabrication details for all anchor bolts shall comply
with ASTM A307. Anchor bolts, nuts, and washers shall be hot -dip galvanized after fabrication,
threads being undercut to provide a tolerance equal to ANSI Class 2A. Anchor bolts longer than
3 feet shall have the top 18 inches hot -dip galvanized after fabrication, threads being undercut to
provide a tolerance equal to ANSI Class 2A. Each bolt without a sleeve shall be furnished with
two nuts and sufficient threads to permit a nut to be installed on each side of the concrete form or
template.
2C.5.8 Forms
Forms shall be designed to produce hardened concrete having the shape, lines, and dimensions
indicated on the drawings. Forms shall be substantial and sufficiently tight to prevent leakage of
mortar and shall be maintained in proper position and accurate alignment. Forms shall be
thoroughly cleaned and oiled before concrete is placed and shall not be removed until the
concrete has hardened sufficiently to support all loads without damage.
Form dimensions and placement shall be within 112 inch of the plan dimensions and locations
indicated on the drawings.
Where concrete is placed against dry or porous surfaces, such surfaces shall be covered with
polyethylene film to protect the concrete from loss of water. Joints in the film shall be sealed
with waterproof sealing tape. Unless otherwise accepted by the Owner, all concrete in contact
with dry earth or granular fill shall be placed against polyethylene film.
Vertical concrete surfaces above extended footings shall be formed.
Form ties shall be of the permanently -embedded body type with removable ends that can be
broken off at least'/ -inch inside the form face, and shall have sufficient strength, siffness, and
rigidity to support and maintain the form in proper position and alignment without the use of
auxiliary spreaders. The type of form ties used shall be acceptable to the Engineer.
City of Fort Collins Power & Light-06.007 2C-9
Chamfer strips shall be placed in forms to bevel all salient edges and corners except where
otherwise noted. Bevel dimensions shall be 3/4 inch by 3/4 inch unless otherwise indicated on
the drawings.
2C.5.9 Embedments
Materials that are to be embedded in the concrete shall be accurately positioned and securely
anchored. Embedments shall be clean when they are installed. After installation, surfaces not in
contact with concrete shall be cleaned of all concrete spatter and other foreign substances.
2C.5.10 Finishing Formed Surfaces
All fins and other surface projections shall be removed from all formed surfaces when the forms
are stripped except exterior surfaces that will be in contact with earth backfill. In addition,
exterior surfaces which will be exposed above grade shall be cleaned and rubbed to produce a
smooth, uniform surface free of marks, voids, surface glaze and discoloration.
The removable ends of all form ties shall be removed and the recesses resulting from such
removal shall be filled with mortar and rubbed smooth.
2C.5.11 Finishing Unformed Surfaces
The unformed surfaces of concrete shall be screeded and given an initial float finish followed by
additional floating and troweling where required.
Unformed surfaces which are specified on the drawings to be steel trowel finished shall be
finished to provide a flat profile within 1/8 inch deviation as measured from a 10 foot long
straight edge. The deviation for other surfaces shall not exceed 1/4 inch in 10 feet.
Surfaces designated on the drawings and the exposed top surfaces of equipment bases shall be
steel trowel finished. Troweling shall be performed after the second floating when the surface
has hardened sufficiently to prevent an excess of cement being drawn to the surface. Troweling
shall produce a dense, smooth, uniform surface free from blemishes and trowel marks.
2C.5.12 Curing
Concrete shall be protected from loss of moisture for at least 7 days by membrane curing
compound. Membrane curing compound shall be applied at twice the rate recommended by the
manufacturer. Concrete shall not be permitted to freeze for at least 7 days following placement.
2C.5.13 Repairing Defective Concrete
Defects in formed concrete surfaces shall be repaired to the satisfaction of the Owner within 24
hours, and defective concrete shall be replaced within 48 hours after the adjacent forms have
City of Fort Collins Power & Light-06.007 2C-10
I i . I I , o h 1 F, :' : � -, �' 1 I =. I F L, .
I I, L ion lit ior, i -I":i t I if' siq p twrita 1 'V C c ad it! on s n I -a -1 h Osvp
Gl.remeit as to ix- i f o rmnare and (D I f I," r Fonds. W h e I I � I i , '; t
F i it I'-L d c- I I ver s the �'x( -ut-ed AgicumeM to the YNNER, 1 d I
AGF�DMF'Irli '0 by 1 h- reqtlilt'd '0 n I- f t -te- (- 1, L i t- _j .
F G,PLEMFNT
At en MHE 10 u i ,rem a A ) r i a p o f Awa r d I -t I i e S u i- cs s ri i I P L t iI i , -t 1 1 err
m (A)ITIo3rd pd by :he iwlni red n i i al Lc o- ) -- 111^Ci rote t s ( : r [ H
ltgr- a( ri t- w, th all sthen wri Men Conte act but ument s att'i In K E i t hirt
L t , 5) r in jqg to a r e v f t e r CQJ JTI,�A(--P)p shali s 1 "i 1 a I J- 1 i v
a-,imher ol ni:rji- CL t-i-IP i",(JLC�MPF)t alid I- t , II ioc l.trl 11 ,5
I E P 1 L h 'i q i L - 6 Ponds. _171 thin tern to) dny�� t th., t I F It
tuLly signers ounterijart to UII)N7P2',ITIIP
cunrpart is to r>e a c) rnp c2 n i e -1 by i complete
[''1' X v.
-JjtjZp 15 ex'-'mptr(Jm �OlcYado itn-p Lc. t c nn i Ise T a x cl `� ' i [ [, [ a i , L 1 I . 5 , , T i,
'],I I uman I- to r p o i a' (A in I hO WDrk Sat' AZON AhL 1 1 "W I
n -- I -Idc I i -i the Cor- t r a, It Pr j re. Pi- r. nee i s lttad(= t h,
I:pp L(�jtn -it n, ry i 1 - I of--s .
I i . I F- E TAT ( �-'] .
-,- i �-, ) t, ., ri,- P r - [ L i i g r- o L o i i ya g e a i (, s i, 7 t o r t h in t 11 a 1, a 1 �, N p), I t .
I I - " l'r t I ' I flRLE�',TP 1CT Ft�NS
IL -I !(T r �3 t L - � 't i ) [-[ S : "h- A dJpr s mit hqt i 7ed sPin i it: 1 1 Fie
iro -- ' ,, - fulpi i mc- "%, th 11L :'j I b' 'S pins 11"'; 1 it 1 1
at rIF_ L - ,, I I i(mis au, ava 1 1 A,1- ..: re v b w in i I tv
Fi , I ) 1 or i t- h , , � ' - t / ' L k ' . : , , t t j .
'I]- I,", L, I �- :-'I : I : I " ;IP 1
to i I , -, 1 11 1 1 1 11 11 - � -i , I s 1:1 !
1 1 11 ; r I I I Eit r I t I i I T t
1 t I I 11 , A t I I I I: 1 1 c 1 1 : 1 t
t th 1, 1R :I
t I c[i L I .
been removed. All concrete which is porous, honeycombed, or otherwise defective to a depth in
excess of one inch shall be cut out and removed. Cut surfaces shall be coated with epoxy
bonding compound before the repair concrete is placed.
Concrete repair work shall be performed in a manner that will not interfere with thorough curing
of surrounding concrete. Mortar and concrete used in repair work shall be adequately cured.
2C.5.14 Construction Joints
Construction joints shall be provided where indicated and detailed on the drawings.
Construction joints designated on the drawings shall be provided with a metal water stop.
Junctions between adjacent sections of water stop shall be lapped 5 inches and securely welded
or bolted together.
2C.5.15 Expansion Joints
Expansion joints shall be located and constructed as indicated on the drawings. Accessible
edges of each expansion joint shall be sealed. Polysulfide rubber (Thiokol type) sealants shall
not be used in contact with bituminous or asphaltic materials.
Expansion joints designated on the drawings shall be provided with a flexible water stop.
Flexible water stops shall be spliced in strict conformity with the manufacturer's
recommendations. A sample 90 degree corner splice mitered at 45 degrees shall be prepared and
submitted to the Owner for acceptance before any permanent splices are made.
2C.5.16 Tolerances for Substation Bases
The concrete bases and their embedments for substation yard structures and equipment shall
meet the following tolerance requirements in addition to those specified herein before.
Concrete form dimensions and placement shall be within 1/2 inch of the plan dimensions and
locations indicated on the drawings. The top of the forms shall be accurately set to the elevation
required to produce finished surfaces within the specified tolerances.
The elevation of all points on all float finished surfaces shall be within 1/4 inch of the elevation
indicated on the drawings. The elevation of all points on all trowel finished surfaces shall be
within 1/8 inch of the elevation indicated on the drawings.
Anchor bolts and all other materials that are to be embedded in the concrete shall be accurately
positioned and securely anchored. The center of each anchor bolt group or cluster shall be
within 1/8 inch of the location indicated on the drawings. The center -to -center dimensions
between the anchor bolts in a group or cluster shall be within 1/16 inch of the dimensions
indicated on the drawings.
City of Fort Collins Power & Light-06.007 2C-11
2C.6 DRILLED PIERS
2C.6.1 General
This section covers the requirements for drilling of earth and placing of concrete for foundation
piers. Pier installation shall follow the requirements of ACI 336.1, Reference Specifications for
the Construction of Drilled Piers.
2C.6.2 Drilling
Foundation piers shall be drilled with an auger in earth and with an auger with hardened teeth
suitable for drilling rock or a core drill as required depending on hardness. Casings shall be used
where the sides of the excavation are unstable and may be used at all locations. A pier
excavation will be considered dry if the infiltration of ground water from a source at or near the
bottom is at a rate of less than 1 /2 inch rise per minute at the bottom of the pier. The total
theoretical height of water in the bottom of the pier may not exceed 6 inches at the time
sufficient concrete has been placed to balance the water head.
Drilling equipment shall be designed to drill straight and clean holes. Casings, if used, shall be
installed as the drilling proceeds or immediately after the auger is withdrawn as required to
prevent sloughing and caving of the excavation walls. The Contractor may elect to advance the
excavation and facilitate the removal of cuttings by utilizing a densified fluid. All loose material
shall be removed from the bottom of the pier excavations.
Casings shall be of steel construction and shall be of ample strength to withstand handling and
installation stresses. Casings may be removed as the concrete is placed or left in place at the
Contractor's option. During removal the casing shall be continually plumb and the concrete
surface within the casing shall be continually observed for maintenance of concrete "head"
sufficient to offset the casing's external water head. A minimum head of 4 to 5 feet of concrete
shall be maintained above the bottom of the casing during casing extraction. Casings left in
place shall not be exposed above grade.
Each pier shall be accurately located, sized, and plumbed. The maximum variation of any pier
from its designated location shall not be more than 2 inches at its top elevation. No pier shall be
out of plumb more than one inch in 5 feet of height. Variation of pier location within specified
limits shall not be cause for variation in anchor bolt or concrete cap location.
Each pier excavation shall be made to the depth indicated on the drawings.
2C.6.3 Placing of Concrete
Concrete work for foundation piers shall conform to the requirements of Section 2C.5 and to
these additional requirements. Unless otherwise permitted by the Owner, concrete shall be
placed in the pier holes the same day the holes are drilled.
City of Fort Collins Power & Light-06.007 2C-12
All water and loose materials shall be removed from the holes and pier reinforcing shall be
thoroughly cleaned before any concrete is placed. Pier holes shall be dry when concrete is
placed unless otherwise acceptable to the Owner.
Concrete shall be placed with a tremie or funnel, or pumped to prevent segregation and the top 6
feet shall be rodded or vibrated to provide a dense mass free of voids. During the filling of the
holes, if water begins to accumulate on the top of the concrete, the placement shall be suspended
and the water removed before placement resumes. If water continues to accumulate during the
suspension of placement, the concrete placed shall be removed and the pier shall be installed by
underwater methods. Should there be an accumulation of scum or laitance on the top of the
concrete, it shall be removed and additional concrete shall be placed to bring the pier back to the
proper elevation.
Pumping methods shall conform to ACI 304, Chapter 9. The maximum loss of slump due to
pumping shall be 2 inches. Aluminum or aluminum alloy pipes shall not be used to convey
pumped concrete.
After the concreting is started for each pier, it shall be completed in a continuous process. A
sufficient quantity of concrete to fill the pier shall be in delivery trucks at the pier site when the
first concrete is placed in each pier. If the concreting of any pier is suspended for more than 30
minutes before the pier is completed, laitance and water shall be removed from the joint surface
and the joint surface shall be coated with epoxy bonding compound before concreting is
resumed. In order to provide for an emergency stoppage, bonding compound shall be at the site
before the concreting of piers is started.
Piers shall be reinforced as indicated on the drawings and all reinforcements shall be installed
and secured to prevent shifting during the placement of concrete. The upper portion of the piers
shall be formed where indicated on the drawings. Each pier shall be cured for at least 7 days by
continuous saturation with water or the use of membrane curing compound as specified in
Section 2C.5.12.
If casings are to be left in place, the void areas between the form and the excavation walls shall
be filled with grout. The grout shall be placed and compacted in such a manner that the annular
space is completely filled.
Records shall be kept by the Contractor indicating the exact volume of each pier excavated and
this volume shall then be compared to the volume of concrete actually placed in each pier. A
lesser amount of concrete placed than calculated may indicate fault pier construction. In the
event of such an occurrence, the Owner shall be notified, and immediate remedial action shall
then be taken by the Contractor.
City of Fort Collins Power & Light-06.007 2C-13
2C.6.4 Underwater Concrete
Concrete shall not be deposited under water except with specific permission of the Owner. For
concrete deposited under water the limiting requirements shall be adjusted to provide not more
than 6 inches of slump and to increase the cement content by one sack per cubic yard. Any extra
charges for these changes by the concrete supplier shall be borne by the Contractor.
Underwater concrete shall be placed through 12 inch or larger tremies having a tremie seal at the
lower end and a hopper at the upper end. Before the flow of concrete is started, water shall be
kept out of the tremie by means of a suitable bottom closure. After the flow of concrete is
started, the lower end of the tremie shall be kept below the surface of the deposited concrete.
Agitation of the deposited concrete shall be avoided. When necessary to move laterally, the
tremie shall be lifted free of the concrete and lowered vertically at the new location. The entire
mass of concrete shall be placed as quickly as possible so that it will flow into place without the
necessity of horizontal shifting below water.
The water shall be quiescent when concrete is deposited therein. After placing, the ground water
level in the area adjacent to the pier shall be kept static until the concrete has taken its initial set.
2C.7 GROUTING
2C.7.1 General
This section covers materials and procedures for grouting equipment and structural base plates as
required on the drawings.
Grouting under these specifications shall include only the grouting of equipment and structural
base plates installed under these specifications. Grouting of all other equipment and structural
base plates will be done under separate specifications covering the equipment or base plate
installation.
All grouting shall be done with non -shrinking grout.
Cold weather grouting shall be as specified for cold weather concreting in Section 2C.5.5.5.
2C.7.2 Materials
Where the use of the following materials is specified herein, such materials shall be in
accordance with these requirements:
Water
Clean and free from mud, oil, organic
matter, and other deleterious substances
City of Fort Collins Power & Light-06.007 2C-14
Plasticizer
Grace "WRDA," Master Builders "Pozzolith
Normal," Protex "PDA 25XL Normal Set,"
or Sika Chemical "Plastocrete 161"
Nonshrinking grout Tested in accordance with CRD-C621 and
ASTM C1107, Grade B. Metallic and
nongas-liberating flowable fluid. Minimum
strength of grout, 4,000 psi at 1 day, and
9,000 psi at 28 days.
2C.7.3 Grouting of Bases for Structures and Equipment
Where noted on the drawings, equipment and structural base plates shall be firmly and solidly
grouted in place by methods that will insure complete, uniform, and permanent filling of all
space beneath the base without disturbing or displacing the alignment or level of the base in its
correct position. Should the installation of any equipment be done under the supervision and
direction of a manufacturer's erection superintendent, or other accredited supervisor provided by
the manufacturer of the equipment, then the grouting procedure shall follow his direction.
Otherwise, these specifications shall govern.
2C.7.3.1 Surface Preparation
The surfaces of hardened concrete upon which grout will be placed shall be chipped to remove
laitance and surface mortar and to expose the aggregate. The surface of the hardened concrete
shall be cleaned of all loose materials and shall be saturated with water for not less than 2 hours
immediately before the grout is placed. All excess water shall be removed.
2C.7.3.2 Alignment and Leveling
Each base shall be set in place over its anchor bolts and shall be carefully aligned in proper
position and then brought to accurate level. If permission is given by the Owner in the case of
small bases or equipment bases, steel wedges may be used for leveling, but such wedges shall
be of a type that cannot be easily or accidentally dislodged. Unless otherwise accepted, leveling
shall have three-point control. The use of wood blocking or wood wedges to hold the base in
position will not be permitted.
2C.7.3.3 This Section Not Used
2C.7.3.4 Placing of Grout
After the base has been set, its alignment and level shall be checked and accepted before placing
any grout. Grout may be placed by the "dry pack" method when the least dimension of the base
being grouted is T-0" or less, the grout space is more than one inch, and the grout space is
readily accessible, unless noted otherwise. Dry pack grout shall contain only enough water to
produce a grout which can be tamped in place. Grout shall be tamped in place from one of the
City of Fort Collins Power & Light-06.007 2C-15
longer sides of the base, working against a backing board rigidly wedged against the opposite
side of the base. Tamping shall be done with the end of a board at least 1 by 4 inches in
nominal size. The board shall be struck with a hammer or mallet as required to compact the
grout into a dense mass, free from voids. After the initial set of the grout, all grout which
extends beyond the edge of the base shall be cut off flush and removed.
2C.7.3.5 Finishing of Edges
When the placing of the grout has been completed, it shall be allowed to stand undisturbed until
set stiff. Then immediately the form or dam, if any, shall be taken off, and the portions of the
grout which extend beyond the edges of the base shall be cut off flush and removed. The edges
of the grout shall then be pointed with fresh one -to -two cement mortar pressed firmly to bond
with the body of the grout, and smoothed with a tool to present a smooth vertical surface.
All grouting shall be completed in a proper and workmanlike manner with the exposed edges of
the foundation and the surfaces adjacent thereto left clean and free from cement and grout.
2C.7.4 Nonshrinking Grout
Nonshrinking grout shall be furnished factory premixed so that only water is added at the
jobsite. The grout shall be mixed in a mechanical mixer and no more water shall be used than
recommended by the manufacturer to produce a flowable grout.
Surface preparation and alignment and leveling shall be as specified herein before for portland
cement grout. Nonshrinking grout shall be placed in strict accordance with the grout
manufacturer's directions so that all grout space is completely filled without voids. Edges shall
be finished as specified for portland cement grout.
2C.7.5 Curing
All grout shall be protected against rapid loss of water by covering with wet rags and
polyethylene. After edge finishing is completed, the grout shall be wet cured for at least 7 days
when temperatures of 90' F or above may be expected during curing, special procedures shall
be adopted by the Contractor to keep the grout as cool as possible. In cold weather, the
requirements of Section 2C.5.5.5 shall be followed.
2C.8 TESTING
An air content test shall be made from one of the first three batches mixed each day and from
each batch of concrete from which concrete compression test cylinders are made. Air content
shall be made in accordance with ASTM C231. Slump shall be determined in accordance with
ASTM C143.
Concrete compression test cylinders shall be taken as determined by the Owner. Each set of
compression test cylinders shall be marked or tagged with the date and time of day the cylinders
City of Fort Collins Power & Light-06.007 2C-16
were made, the location, the work where the concrete represented by the cylinders was placed,
the delivery truck or batch number, the air content, and the slump. The cylinders shall be tested
at 7 days and 28 days.
The concrete test cylinders and all field control field testing shall be made by an independent
testing laboratory retained and paid by the Owner. The Contractor shall cooperate with the
testing laboratory representative.
City of Fort Collins Power & Light-06.007 2C-17
> n
wx
O kO &o ii Ow U w
hK9 2 CFO 7 �00 N r-
f2�i 2U� � OU
iii fal � �Jmi m �� n � O
J %2F S23 W O ~ b Zx
WjF O UN Sim i m w z
6W
cOi Y FW WA$'J' 35 o. 0o2 r S� N
n`� a iye14n0F� a� o ]I 2��F 8 I
1�jN yyQQl< wO1— ZN;O thin wasp p z g rif UJ O
�'�, a Q
�Z..-_ w 30:^Es s LJ+ 4u zc �ZJ Z
W]2xF 8�y~1 pN•6 W� 6< 6W2J Zm� `` O
NN a Rj �``440.. jQ. IJJJ FJp S@OD=rZi xcQ W N< 7n 1661 y�(-`JJ r<m m.J n Sr 0
y� mUN �2,29
$jU < ����;�
53w's�g��W�����•� C g�flz� •b m'p0Nueia p
Y O6W ugz J
0
U
N�
LL
2 W
cn
�5 Z O
i W U J
F
J C7
J50 OZ
�h U Z
~m10W �^n
O c7
Y Y3 V, UUU' N V w W Z Z W J
6 V m W a y N gg 6 O O
z x�] p`dw p ^if F- ~ O Z
w R. O
a uwi $W G?nio i. F¢O lU .► : ONE �~
rci N �U< •i F-mQ
U I—
m jN 1 �NL, m
0 o N U o N
m —J
a i Z•ol
7o V (n Q
n U m \} r c
0 0 \ Z N
O Z Z
. N K rn
=w2 u H
W O)) N \ )C/W NIW .9
He
OF .0-.l N VU 00
23 �N COON
Y 0
V¢yN 3 Op CO
0< z U wo U Y
j EH om
UI�Wv
0 z
C
U <
L �
U �
z C
4 « 0
08 C
XVW .0-,L .0-,9 .f-,L w Z_
.9-,8 Y B�Y1 JN z
8l0 .f W
il
6 3 N 0 8
N \ I b
LV F U .S J Z N O
G LL O
p mOn Y 1R O z
z0 i k'\I 0 t_ .L ai
N .09 _ < Z a
p ow ; F m O
x iW z� o m
N
A m w m 810 i =ZZ O x i
Y n Si n r \NZZ 900
W O
W Z Y O Z U • Q L..L
J Z J
zo
N Q Z O N m < O < V i w J W �m��9p1 y6
U �� w N \W U N w N N N O
2 6� x
N H LL w i n F d i< 44-
VIFZZ1 Fy < WO N Z b CMWm
N
z JO0 ONG 3 n' 2W00
mg
xj < O
O
i �r
t
pN q9= z
Z
�jw 0z Hz
"'10 ?W .f-,L .0-10L v)
iC n a m
z
<O 0 z
zz
Zo
Ha
w
b m
y� V�jJ J FJ N
wU 2 U ^z
�Q U OUQ 2
W
N m U N Y O U
J .m d J 3
z0 w) 00
0 !„
uo
N Z LL
N w
0 p
z
GEOTECHNICAL INVESTIGATION
FOR
SUBSTATION LIGHTNING TOWERS
PREPARED FOR
CITY OF FORT COLLINS UTILITIES
700 WOOD STREET
P.O. BOX 580
FORT COLLINS, CO 80522
PROJECT NO. 06.007
MAY, 2006
1005 RED CEDAR CIRCLE
FORT COLLINS, CO 80524
(970) 490-2620
r-
GEOTECHNICAL INVESTIGATION
SUBSTATION LIGHTNING TOWERS
FOR
CITY OF FORT COLLINS UTILITIES
700 WOOD STREET
P.O. BOX 580
FORT COLLINS, CO 80522
SMITH GEOTECHNICAL ENGINEERING, INC.
1225 RED CEDAR CIRCLE SUITE H
FORT COLLINS, COLORADO 80524
2 (970)-490-2620
PROJECT NO.06.007
May 3, 2006
I. 1 1) PE_', [ i 1, T:)' .
I L rl I: o L Ina o n re,(IaL iillg results for Individual J
1 c p F-,' I n d a id to I I v will 1—
Pill T-(F,31uiLs wi I I �,_, e f) c i i the Pitt 1,1,3 j nq o f f i cp sever �
)' I I 'I : : I I i
PERTINENT INFORMATION
ABOUT YOUR
GEOTECHNICAL INVESTIGATION REPORT
Many construction problems are caused by
site subsurface conditions. As troublesome as
subsurface problems can be, their frequency
and extent may be.lessened considerably.
The following suggestions and observations
are offered to help you reduce the
geotechnically related delays, cost overruns,
and other costly headaches that can occur
during a construction project.
A GEOTECHNICAL ENGINEERING
REPORT IS BASED UPON A UNIQUE
SET OF PROJECT SPECIFIC FACTORS.
A geotechnical engineering report is based on
a subsurface exploration plan designed to
investigate a unique set of -project specific
factors. These typically include: (1) the
general nature of the structures involved, (2)
the structures' sizes and configurations, (3)
the locations and orientation of the structures
on the site, (4) additional entities such as
access roads, parking lots, and underground
utilities, and (5) the level of additional risk
which the client assumed by virtue of
limitations imposed upon the exploratory
program. To help avoid costly problems,
consult a qualified geotechnical engineer to
determine how any factors which change
subsequent to the date of the report may affect
its recommendations.
Unless your consulting geotechnical engineer
indicates otherwise, your geotechnical
engineering report should not be used:
• When the nature of the proposed structure
is changed
• When the size or configuration of the
proposed structure is changed significantly
• When the location or orientation of the
proposed structure is modified
MOST GEOTECHNICAL "FINDINGS"
ARE PROFESSIONAL ESTIMATES.
Site exploration identifies actual subsurface
conditions only at those points where samples
are taken at the time of sampling. Data
derived through sampling and subsequent
laboratory testing is extrapolated by
geotechnical engineers who then render an
opinion about overall subsurface conditions,
their likely reaction to proposed construction
activity, and appropriate foundation design.
Even under optimal circumstances actual
conditions may differ from those inferred to
exist, because even the most qualified
geotechnical engineer and the most extensive
subsurface exploration program cannot reveal
what is hidden by earth and rock. The actual
interface between materials may be far more
gradual or abrupt than a report indicates.
Actual conditions in areas not sampled may
differ from predictions. Nothing can be done
to prevent the unanticipated, but steps can be
taken to help minimize their impact. For this
reason, most experienced owners retain their
geotechnical consultant throughout the
construction stage to identify variances, to
conduct additional tests which may be needed,
and to recommend solutions to problems
encountered on site.
SUBSURFACE CONDITIONS CAN
CHANGE.
Subsurface conditions may be modified by
natural or man made forces. Because a
geotechnical engineering report is based on
conditions which existed at the time of the
subsurface exploration. Construction decisions
should not be based on a geotechnical
engineering report whose adequacy may have
been affected by natural or man made forces.
Speak with the geotechnical consultant to
learn if additional tests are advisable before
construction starts. Construction operations at
or adjacent to the site, and natural events such
as floods, earthquakes, or groundwater
fluctuations will affect subsurface conditions
and thus affect the adequacy of the
geotechnical report. The geotechnical
engineer should be consulted on any such
events to determine if additional tests are
necessary.
GEOTECHNICAL SERVICES ARE
PERFORMED FOR SPECIFIC
PURPOSES AND PERSONS.
Geotechnical engineers' reports are prepared
to meet the specific needs of specific
individuals. A report prepared for a
consulting civil engineer may not be adequate
for a construction contractor or even some
other consulting civil engineer. Unless
indicated otherwise, this report was prepared
expressly for the client involved and expressly
for purposes indicated by the client. Use by
any other persons for any purpose, or by the
client for a different purpose, may result in
problems. No individual other than the client
should apply this report for its intended
purpose without first consulting with a
qualified geotechnical engineer. No person
should apply this report for any purpose other
than that for which it was initially intended
without first conferring with a geotechnical
engineer.
A GEOTECHNICAL ENGINEERING
REPORT IS SUBJECT TO
MISINTERPRETATION.
Costly problems can occur when other design
professionals develop their plans based on
misinterpretations of a geotechnical
engineering report. To help avoid these
problems, a geotechnical engineer should be
retained to work with other appropriate design
professionals to explain relevant geotechnical
findings and to review the adequacy of their
plans and specifications relative to
geotechnical issues.
BORING LOGS SHOULD NOT BE
SEPARATED FROM THE
ENGINEERING REPORT.
Final boring logs are developed by
geotechnical engineers based on their
interpretation of their field Iogs and laboratory
evaluation of field samples. Only final boring
logs customarily are included in geotechnical
reports. These logs should not be reproduced
for inclusion in architectural or other drawings
because drafters may commit errors or
omissions in the transfer process. Although
photocopy reproduction eliminates this
problem, it does nothing to minimize the
possibility of contractors misinterpreting the
logs during bid preparation. When this
occurs, delays, disputes, and unanticipated
costs may result. To minimise the likelihood
of boring log misinterpretation, give
contractors ready access to the complete
geotechnical engineering report prepared for
the project. Those who do not provide such
access may proceed under the mistaken
impression that simply disclaiming
responsibility for the accuracy of subsurface
information always insulates them from
attendant liability. Providing the best
available information to contractors helps to
prevent costly construction problems which
may occur.
OTHER STEPS YOU CAN TAKE TO
REDUCE RISK.
Your consulting geotechnical engineer will be
pleased to discuss other techniques which can
be employed to minimize any risk. In
addition, many engineering organizations have
developed a variety of materials which may
be beneficial.
TABLE OF CONTENTS
A. INTRODUCTION........................................................................................................................ I
A.1 PROJECT INFORMATION.................................................................................... I
A.2 SCOPE OF SERVICE.............................................................................................. I
A.3 SITE LOCATION AND DESCRIPTION................................................................ I
A.4 REPORT FORMAT................................................................................................. l
B.
EXPLORATION RESULTS........................................................................................................ l
B.1 SCOPE OF EXPLORATION..................................................................................2
B.2 SUBSURFACE EXPLORATION PROCEDURES................................................2
B.3 SUBSURFACE CONDITIONS...............................................................................2
BA GROUNDWATER DATA.......................................................................................4
C.
ENGINEERING RECOMMENDATIONS..................................................................................4
C.1 PROJECT DATA.....................................................................................................4
C.2 DISCUSSION.........................................................................................................4
C.3 FOUNDATION RECOMMENDATIONS..............................................................4
C.3.1 Site Preparation...............................................................................................4
C.3.2 Foundation Recommendations........................................................................5
C.3.3 Frost and Foundation Depth Considerations...................................................5
C.3.4 Backfill and Fill Requirements.......................................................................5
D.
OBSERVATION AND TESTING...............................................................................................6
E.
STANDARD OF CARE..............................................................................................................6
APPENDIX A
Boring Location Plan
APPENDIX B
Unified Soil Classification System
Description of Terms
Key to Boring Logs
Boring Logs
APPENDIX C
Laboratory Test Results
A. INTRODUCTION
A.1 PROJECT INFORMATION
This report summarizes the subsurface investigations, laboratory testing, conclusions, and recommendations as
prepared by SMITH GEOTECHNICAL for the proposed addition of lightning towers to the.
A.2 SCOPE OF SERVICE
The scope of service for this subsurface exploration is limited to:
Advancement of three (3) borings, one at each of the three sites, for the purpose of gathering
samples and data on soil, rock, and depth to groundwater.
Visual classification of samples obtained.
Laboratory testing of samples.
4. Engineering recommendations.
A.3 SITE LOCATION AND DESCRIPTION
The sites investigated are for the proposed addition of lightning towers to the existing Harmony, Overland
Trail, and Linden Electrical Substations in Fort Collins, Colorado. The substations are located in commercial
areas within the city limits of Fort Collins, and are in existing substations with existing electrical equipment in
place. The sites are generally flat with a layer of gravel across the site, with no trees or shrubbery on the sites.
The sites are at an approximate elevation of 5,000 feet above sea level. A map is included in Appendix A
which shows the site locations.
A.4 REPORT FORMAT
The purpose of this report is to present field observations and visual classification of soils, summarize
laboratory results, and provide engineering recommendations. Provided in Appendix A to this report are the
Boring Location Plans showing boring locations with respect to existing and proposed features. Appendix B
contains Boring Logs showing the type and depth of soil changes and water table locations along with soil
classification information and definitions of terms and symbols. Appendix C contains laboratory test results.
B. EXPLORATION RESULTS
BA SCOPE OF EXPLORATION
The fieldwork, conducted on April 13 h, 2006 consisted of inspecting and sampling one (1) boring per each of
the three substations, numbered BH-1. The boring where advanced to depths ranging from twenty-five (25)
feet to thirty (30) feet below grade. Borings for all three sites were advanced for the purpose of gathering
subsurface data and soil samples.
B.2 SUBSURFACE EXPLORATION PROCEDURES
The borings were advanced with a Central Mine and Equipment (CME) 75 truck mounted drill rig with a 4"
continuous flight auger. Samples were recovered from the boring for visual classification (ASTM D-2488) in
the field and for future laboratory testing.
Disturbed soil sampling was performed in accordance with ASTM D-1586, Standard Penetration Test (SPT).
Using this procedure, a 2-inch outside diameter split -barrel sampler was driven into the soil by successive
blows of a 140-pound weight falling 30 inches. After an initial set of 6 inches, the number of blows required
to drive the sampler an additional 12 inches was recorded as the "penetration resistance" or "N-value". The N-
value is an index of the relative density of cohesionless soils and the consistency of cohesive soils.
Samples were obtained using a California Sampler that consists of a 2-1/2-inch outside diameter barrel with 2-
inch diameter internal brass liners. This sampler is driven into the soil in a similar manner as the split -barrel
sampler by successive blows of a 140-pound weight falling 30 inches in accordance with ASTM D-1586.
As the samples were obtained in the field, personnel from SMITH GEOTECHMCAL visually classified them.
Representative portions of the samples were then returned to the laboratory for further examination and
verification of field classification. Boring logs, indicating the depth and identification of the various strata, and
water level information are included in the appendix. Charts illustrating the soil classification procedure, and
descriptive terminology and symbols on the Boring Logs are also included in the appendix.
B.3 SUBSURFACE CONDITIONS
The subsurface conditions encountered in the borings have been used to infer the general soil conditions at
the site. We assume the soil conditions between borings are fairly represented by the borings. During
construction, ifconditions are encountered other than those described below and as shown on the Borings
Logs included in the appendix to this report, it is important that a geotechnical engineer be informed to
evaluate the exposed conditions with respect to their effect on our recommendations.
The following is a brief review of the various layers of soil encountered for the different project areas. All
depths given are relative to the ground surface at the time of drilling. Please refer to the boring logs in
Appendix B and the laboratory test results in Appendix C for a more complete description of soil conditions at
each boring location.
2
General Description of Subsurface Conditions
HARMONY SUBSTATION:
CLAY: Clay was found from below the gravel base layer to approximately nineteen (19) feet below
grade at the Harmony Substation. The clay was generally tan to brown in color, moist, stiff, plastic, and
has fine grained sand throughout. The soil has a low potential for swell with a swell pressure measured
at approximately 1780 psf with 0.3% volume change.
SAND: Sand was encountered below the overburden clay and extended to an approximate depth of
twenty seven (27) feet below grade. The sand is tan in color, wet, medium to very dense, fine to coarse
grained, well graded, and is mixed with clay
CLAYSTONE: Claystone was encountered below the sand layer and extends to the extents of the
boring at thirty (30) feet. The claystone is tan to mottled brown, moist, soft, severely weathered, plastic,
and interbedded with fine grained sand. The claystone has a high swell potential with a swell pressure
measured at approximately 15,232 psf with 3.3% volume change.
OVERLAND TRAIL SUBSTATION:
CLAY: Clay was found from below the gravel base layer to approximately seven (7) feet below grade
at the Overland Trail Substation. The clay was generally brown in color, moist, stiff to very stiff, and
plastic. The clay has low to moderate swell potential with a swell pressure measured at approximately
4,512 psf with 1.1 % volume change.
SAND: Sand was encountered below the overburden clay and extended to an approximate depth of
twenty (20) feet below grade. The sand is tan in color, wet, loose to medium dense, fine to coarse
grained, with sub angular gravel to 3/8", and is mixed with clay.
CLAYSTONE: Claystone was encountered below the sand layer and extends to the extents of the
boring at twenty five (25) feet. The claystone is brown, moist, soft, severely weathered, plastic, and
interbedded with fine grained sand. The claystone has a high swell potential with a swell pressure
measured at approximately 12,737 psf with 2.2% volume change.
LINDEN SUBSTATION:
FILL: Fill was found from below the gravel base layer to approximately nine (9) feet in depth below
grade. The fill was highly organic material consisting predominantly of coal and hydrated lime slag.
The fill was very soft with low penetration resistance and can not be used as support of any type of
foundation.
Sandy GRAVEL: Sandy gravel was encountered below the layer of fill and extends to a depth of
approximately twenty (20) feet below grade. The gravel is brown in color, wet, dense to very dense,
subangular, with cobbles and fine to coarse grained sand.
SANDSTONE: Sandstone was encountered below the gravel layer and extends to the extents of the
boring at twenty six and one half (26.5) feet. The sandstone is tan in color, moist, very soft, complete to
severe weathering, and is fine to medium grained.
3
B.4 GROUNDWATER DATA
Groundwater levels should be expected to fluctuate seasonally and yearly from the
groundwater readings noted on the boring logs The time of year that the borings were
drilled and the history of precipitation prior to drilling should be known when using the
groundwater readings from the boring logs to extrapolate water levels at other times.
Groundwater was encountered in all three borings at the time of drilling with the depths as follows: Harmony
was at 14.1 feet below grade, Linden was at 9.0 feet below grade, and Overland Trail was at 18.6 feet below
grade. The water level measurements were taken only at the time of drilling and would be expected to fluctuate
from the depths measured during drilling.
C. ENGINEERING RECOMMENDATIONS
CA PROJECT DATA
The engineering recommendations made in this report are based on our understanding of the project as
discussed in the following paragraphs. The recommendations are valid for a specific set of project
conditions If the characteristics of the project should change from those indicated in this section, it is
important that we be informed so that we can determine whether the new conditions affect our
recommendations.
C.2 DISCUSSION
The structures to be installed at the three substation sites consist of 70 foot high steel towers to be supported on
a concrete foundation. Only one tower is to be installed at each site. One bore hole was advanced within or
near the expected footprint of the structure. The recommendations of this report are based on the conditions
encountered in the bore holes.
The subsurface conditions encountered at the three electrical substation sites vary. Harmony Substation and
Overland Trail Substation sites are similar with Linden Substation being very different. The near surface soils
at Harmony and Overland Trail Substations are predominantly clay and are well suited for the installation of
either drilled piers or spread footings. The Linden site, due to the fill encountered and the high groundwater, is
not well suited for the installation of a drilled pier. Drilling would require the use of a temporary casing to
stabilize the hole. The mud and muck that would result from drilling to bedrock below the water table would
have to be pumped from the hole and removed from the site. Due to the conditions, a spread footing is
recommended at Linden with the subgrade over excavated to a depth of approximately nine (9) feet below
grade and the soil replaced with structural fill.
C.3 FOUNDATION RECOMMENDATIONS
C.3.1 SITE PREPARATION
All work areas should be stripped of any and all organic materials, topsoil, vegetation, or foreign material prior
4
to any work being conducted. These materials should not be used as fill or backfill for any structures proposed
for the site. Site excavations should be graded to direct water away from the excavations to minimize subgrade
saturation.
C.3.2 FOUNDATION RECOMMENDATIONS
C.3.2.1 Harmony and Overland Trail Substation
The foundation for the proposed towers at the Harmony Substation and Overland Trail Substation are
recommended to be a 42-inch diameter drilled pier with a minimum pier length below grade of ten (10) feet.
The piers have has been designed for a Lateral Load at the base of the tower of 3.5 kips, a base moment of 110
kip -feet, and a vertical load of 4.0 kips.
C.3.2.2 Linden Substation
The foundation for the Linden tower shall be a spread footing. The existing subgrade (fill) material shall be
removed to a depth of approximately nine (9) feet below grade and replaced with compacted structural fill.
The footings shall be designed for a maximum bearing pressure (dead plus live load) of 1,000 pounds per
square foot The footings shall be designed in accordance with ACI 318-Building Code Requirements for
Structural Concrete and shall be designed for all compression and tensile loads expected due to all dead, live,
uplift loads, hydrostatic pressures and lateral loads from seismic and wind.
The structural fill shall be placed in 12-inch lifts and compacted to a minimum density of 98% of the maximum
density in accordance with ASTM D698 at +2% of optimum moisture content.
C.3.2.3 Pier Foundation Design
The piers shall be designed for all compression and tensile loads expected due to all dead, live, uplift loads,
hydrostatic pressures and lateral loads from seismic and wind loads in accordance with ACI318 and the drilled
SHAFT MANUAL, Volume I and II, U.S. Department of Transportation, Implementation Package 77-21
and ACI 336.1, Reference Specifications for the Construction of Drilled Piers.
All piers shall have minimum reinforcement of 0.33% to resist the potential swell pressures and any additional
reinforcement as necessary to resist all expected tensile forces.
C.3.2.4 Seismic Design
For seismic design of structures and footings at the site, the site should be considered as Site Class D in
accordance with ASCE 7-05.
C.3.3 FROST AND FOUNDATION DEPTH CONSIDERATIONS
The foundation should be placed at least 30-inches below the final exterior grade to provide proper protection
from frost damage.
C.3.4 BACKFILL AND FILL REQUIREMENTS
All backfill in areas that will not support external loads should be compacted to a minimum of 95% of the
maximum dry density as determined by a Standard Proctor test (ASTM D698), at +2% of the optimum
moisture content. The materials from the required excavations at Harmony and Overland trail Substations are
suitable for use as backfill materials. The materials from the required excavation at Linden Substation are not
suitable for use as backfill and must be spoiled offsite.
Structural fill, placed beneath structures and in areas that will support roads or other structures, shall be
compacted to 98% of the maximum dry density as determined by a Standard Proctor test (ASTM D698), at
+2% of the optimum moisture content, unless noted otherwise. If the material has less than 12% fines, the fill
shall be compacted to 75% relative density in accordance with ASTM D4253 and D4254. Only sand and
gravel type materials shall be used as structural fill beneath structures.
To assure adequate and uniform density is obtained, a geotechnical engineer should be retained to test all
fills.
D. OBSERVATION AND TESTING
Since a project of this nature requires many soil -related judgments and decisions, we recommend that an
experienced geotechnical engineer be retained as part of the construction team. We strongly recommend that a
geotechnical engineer visually inspect all footings prior to placing backfill or concrete.
We also recommend that a limited number of compaction tests be performed to document the degree of
compaction obtained in backfill and structural fill and recommend concrete placements be tested to ensure the
quality and requirements for the concrete are met.
E. STANDARD OF CARE
The recommendations contained in this report represent our professional opinions. The recommendations are
based in part on information supplied by others. These opinions were arrived at in accordance with currently
accepted engineering procedures at this time and location and based on the site conditions and type of
structures proposed at the time. Other than this, no warranty, either expressed or implied, is intended.
Prepared and submitted by:
ENGINEERING, INC.
injWP
+WO =
1*1 NO - - ,i
NAL
6
APPENDIX A
Boring Location Plan
3 E ( , 'j, 1 ( ) :j f I f : 'I
RTT) F")Pll
Ar MOW : �l , : ! �
11 S;x
lir
AV
m
in
TATION
01
JOR
I
4 •�
{ L
ti
• f
r
f
5T
1
1
-1
•
Y
ti
• f
�i •
J ma
bd
oD
3
OO
{
a
DRAWN: MAE PROJ. #:06.007 SCALE: Fort Collins Power & Light
l�SmitF�
APPVD: DS DATE: 5 06 NOT TO SCALE 3 Geotechnical
/ / Harmony ENGINEERING CONSULTANTS
%
I�
DRAWN: MAEI PROJ. #: 06.007
APPVDAPPVD: DSJDATE:5/3/06/3/06
SCALE: I Fort Collins Power & Light
NOT TO SCALEI Overland Trail
151C=Smith
Geotechnical
ENGINEERING CONSULTANTS
DRAWN:
MAE
PROJ.
#:06.007
APPVD:
DS
DATE:5/3/06
SCALE: I Fort Collins Power & Light
NOT TO SCALEI Linden
15CSm it
Geotechnical
ENGINEERING CONSULTANTS
APPENDIX B
Unified Soil Classification System
Description of Terms
Key to Boring Logs
Boring Logs
USCS Classifications
GROUP
SYMBOL GROUP AM_
><30%Pius No. 200�<7 %22 plus sNo.
No. 20 Loan day
n `\/\`a 15.29X Plus Na. 100t—a % aaM >X gnat-► Loan day with and
PD7 and Plats—►� L �a X and <% grarN-► Lan clay with gavN
ssn or --he, Xand Z%9raw1 tea.<15% ghnwi Undo lies,d 'A^lira >30% Plus No. 200� \>, ay
�sa.. <15%9rar" Sandy Lan day with Shawl
X and GX gravel —<75% fmd--yGnrNIV lies, day
>75X antl G,,,,Iy lam day with and
<30% plus No. 200 -qZZ<75% plus No. 200 Silly day
15.29X plus No. Z00�,Z % and 2X gnrai+Silty day wild and
4<PI<7 and --►CL-ML �a%and<X nrN+ Inssrtm,c Pits -on or loss. 9 Silty tlay wish Stair,
,I% aM ZX 9ran•�<15X Study laity day
'A^ -aim <Z30% pill% No. 1000 a 75% gnval—►Santly laity day with gnrN
X sat <X Staid<79X dhd`�Gamy laity day
>15%and Gewwiy pity day with and
LL <J Q <3a% Pius No. 200-czzz<15% plus No. 200 Sat
15.29% Plus No. 20a� % and Z% 9n.1+Silt swift and
' DI<4 « Pwti—...;.� <�!313%
y X sat <X q babes '*A --lira gn.l+Silt waft mad
Xvat %gnrN�<19%gnwi� Sandy nit
Plua No. Z00 115% Sneed — Sandy lilt with grarN
% and <% Shansi cz.-:.z I5X +swiss GraMly silt
/LL-avandnsd >_75% and � 13mNIV sat with and
Orgmw LL�,ot dried <0,75) —a-0 L sal figure Its
<30% plus No. 200%pba No. 10�0 nnN�.a$Fyatdday
,S-29% plus No. 100and%Fat dayfawt divary
anoPt Pines anor�' }�%ad <X gmn.Fat day wish grayest "A --lira <'130% PhaNss. 100�%andZ% rayad
X an<X grain �Z15% gal —Sandy In dy with grarN
Inorganic <75% a 1:3 43"was fat dy
Z15% arc GrarNly fat day .rill and
�y <30% Pun No. 200 15% Plus No, elated lilt
PI pros Wbrr�M H /\\/`a 15.19% Plua No.
ra.200�+X and ZX 91--►E7adP lilt slur need
LL Z$ 0 'A' -lira. % and <%Shawl+Elndd hit with sm.
x and %
grarN C+<i5% P'arN�-+•Sygy Blame ult
>30X plus Na, 200< 275%grerN--►Sandy Name aatwid, Stews,
X and <X gravel<15% ano��Gn ally Namc alit
>15% and—Grsn IV elastic silt with and
LLb.n inwi `
organic <0.75I—►QH �Sae tiqun lb
LL-not died
FiG. 1 Flow Chartfcr Classifying Fine -Grained Soil (50 % or More Passes No. 200 Sieve)
GROUP SYMBOL GROUP NAME
6% fin, �CuZ4 and i<Ce<7
G W �<75%+said
W.II-graded grarN
Cu<4 asM!« 1>Cc>3
G P
215% and—
W11-greded travel with seat
�<15%
..it �
Poorly traded gnat
Z,1SX send—
Poorly traded Sit with and
Raw,-ML « MN--G
W -G M�<15%.nd—
Wellyradtl gnviwith ,ilt
CuZi sat iSCaj3�
lion-CL, CN.►G
W -GCi
ZiSX sat ��
Wsllgnded gnrN with Nlt sat and
GRAVEL 1« CLMU
<75X send—►Waligndad
qn+N wish WY (or ,iIN Navl
% Smell > 5.12X lima
Za iSX nd
� Wsligreded Stand wide dadard ay sa,
%seat
<.<4
luridly day sat and)
Oms-ML ssr MM r P -G M
<75X sat
PossrlY graded 9nM wish silt
sat/or t>CJ3 �
215x seat --a
Poody gndad 9ntN with silt and and
n^R-CL C7+.
G P -G G�<75X sad—
Poorly graded amid with day (« laity clay)
(« CLMLI
>-15% uad—
Poorly tided gra-al with clay sat seat
finality clay and osdl
lme-Ml. or MH/
GMom.<7sx
and --.Slaty
gnval
>12X rim _— -lima-CL or CH--G
C
Z75%und—�Sllry
<75X u sd—
gratN wish and
Cayey gnrN
nn•a-cLMi
GC-GM�<tsXsat—n$ilry,daYaYgra+N
wait$% and--r
a.,., gnrN with urd
Z,15% ..it
Sit ry• dayoy gnrN with and
<5% Ilnel CuZ6 and 1$G.e,3
SW
<16%gralsal
- WN11reded land
�Cu<6 aatlssr 1>CJ3
S P
Z15% gnrsi—
Wllgr.d•d land with gnrN
�<15%
11... I—
Poorly Shaded send
215%grarN--r
Poorly gnd.d seed situ grarN
r Ilm,-ML or MM - Q W -SM�<75X
9rwd—�
Wdlgraded seat with�,ilt
C.>S and 1<Cc<3�
limr-CL,.CH,�
SW
Z75% gnrN—
Wallynded and with silt and gran)
SANG
-SC
<15%grnN—+
WNIyndai lard with day for %dry day)
(or CL-MLI
>15% grarN—
WNlyrad d lard wish .LY and 91-1a1
% and > 5.12%lino
<C.<S
(« ,illy day sat gmdl
% grarN
lima-ML or MH—S
P-SM
15% 91-1N
� Poorly traded sat with lilt
aedlor 1>CJ3�
ones-cL.CH.
�<
- SP-SC
2 15%trav-g
rPoorl ytraded ,.edwith Rani
<15X 9rar.1—
Poorly traded lad day with cnY for Wry day)
I« CLML1
�
Z15% pithier —+-Poorly
tided vat with day led tr+r.l
for ,illy day and 9ray.11
lima-ML or M"
.•S M
<16%gnrN—
Silty and
>12X lima fin.,-CLor CH-
�r
-SC
Z15%«... 1--+Silly
<15%
Iardl.lift qn..I
Clay.y and
>15X
Clay., ..it with grant
rims-CLML
SC -Sat
<isx prod —+Silly.
quay., aM
Z75X grsrd—+$illy,
dayry seat with gravel
FIG. 3 Flow Chart for Classifying Coarse -Grained Soils(More Than 50 % Retained on No. 200 Sieve)
GROUP SYMBOL
GROUP NAME
<30% Plus No. 200— <15% Pius No. 200 W Organic day
15.29% Plus No. 200%sand Z% grsv ell Organic day with and
�a % aM <% grave—► Organic day with gravel
or abP1>4 and Plats on %and >%grave <15% gravel---�gandy organic day
or above "A"-liraZ>30% elan No. 200 �>15% gravel— 'sandy organic day with gravid
% and <% gravel <15% and — Gravelly organic day
Z15X and �Gravelly organic day with and
C L <30% plus No. 200 <15% plus No. 200 Organic silt
15.29% Pius No. 200 _q�, % and Z% gravel— Organic silt with and
_�% and <% grave Organic silt with gravel
<PK4 or ploy % and Z%ravel g<15% gavel Sandy organic silt
belpw -A"-line Z30% plus No. 200� 2:15% gravel sandy organic silt with gravel
X and <% gravel <15% and �Gravelly organic silt
Z15% and ►Gravelly organic silt with and
<30% plus No. 200<15% plus No. 200 Organic day
1539% plus No. 200 % and Z% gravid Organic clay with and
% and <% gravel Organic day with gravel
Plans on or % aM Z% gmwl a<75X gravel sandy organic day
above 'A" -line Z30% plus No. MOtea^ >15% gmvd Sandy organic day with gravel
%sand <% grave <15% and— Gravelly organic day
Z15% and Gravelly organic day with and
OH <30% plus No. 200<15% plus No. 200 Organic silt
15.29% plus No. 200 % and Z% gmrel Organic silt with and
% and <% gmvaj� Organic silt with gravel
Plots below % and Z% gravel �<15% gravid —+• Sandy organic silt
"A" -fine >30% Plus No. 200 >15% gravel ► sandy organic silt with gravel
% and C gravel <15% and Gravelly organic silt
Z75%:and s Gravelly organic silt with and
MG. 2 Flow Chart for Classifying Organic Fine -Grained Sail (50 % or More Passes No. 200 Sieve)
70
60
50
x
w
0
? 40
�7__
30
V)
3
0 20
10
10 20
I I
I I
I I
I I
I I
I 01
I I
ICH
IP I
I
I
I I
1 MH or
OH I
I I
I 1
I I I I
I I I I
50 60 70 80 90 1C
LIQUID LIMIT
PLASTICITY CHART
Descriotion of Terms
Stiffness / Relative Densities of Soils Based on SPT N-Values
Clayey Soils
Sandy Soils
N
Consistency
Umconfined Compressive
Strength (psf)
N
Consistency
Relative Density
2
Very Soft
500
<4
Very Loose
c.2
2-4
Soft
500-1000
4-10
Loose
0.2-0.4
4-8
Medium Soft
1000-2000
10-30
Medium Dense
0.4-0.6
8-15
Stiff
2000±020
30-50
Dense
0.6-0.8
15-30
Very Stiff
4000-8606
>50
Very Dense
0.8-1.0
>30
Hard
8000-16000
Descriptions of Rock Hardness
Very Hard - Cannot be scratched with knife or pick point.
Hard - Can be scratched with knife or pick only with difficulty. Hard blow of hammer required to detach hand specimen.
Moderately Hard - Can be scratched with knife or pick. Gouges or grooves to 1/2 inch deep can be excavated by hard blow of pick
point Hand specimen can be detached by a moderate blow.
Medium - Can be grooved readily with knife or pick point Can be excavated in chips to pieces several inches in size by moderate blow;
of a pick point Small thin pieces can be broken by finger pressure.
Soft - Can be gouged or grooved readily with knife or pick point Can be excavated in chips to pieces several inches in size by
moderate blows of a pick point Small thin pieces can be broken by finger pressure.
Very So - Can be carved with a knife. Can be excavated readily with pick point. Pieces an inch or more in thickness can be broken by
finger pressure. Can be scratched readily by fingernail.
Description of Rock Weatherin
Fresh - Rock fresh, crystals bright a few joints may show slight staining.
Very Slin - Rock generally fresh, joints stained, some joints may contain day if open, crystals in broken face show bright
li ht - Rock generally fresh, joints stained, discoloration extends into rock up to one inch. Open joints contain day.
Moderate - Significant portions of rock show discoloration and weathering effects, shows significant loss of strength as compared with
fresh rock.
Moderately Severe - All rock except quartz discolored or stained. Rock shows severe loss of strength and can be excavated with pick
point
Severe - All rock except quartz discolored or stained. Rock fabric dear and evident, but reduced in strength to strong soil. Some
fragments of strong rock usually left
Very Severe - All rock except quartz discolored or stained. Rock fabric discernable, but mass effectively reduced to soil with only
fragments of strong rock remaining.
Complete- Rock reduced to soil. Rock fabric not discernable or discernable only in small scattered locations. Quartz maybe present as
dikes or stringers.
Description of Moisture Content
Der - No obvious moisture present in sample.
Damp - Small amount of moisture can be observed in sample.
Mois - Moisture present in sample, no free water present
Wet - Sample is saturated, visible free water present
Description of Unified Soil Classification System Terms
Samples containing less than 15% of a soil constituent will be described as having a "trace" amount of silt, clay, sand, or gravel
Samples containing 15% to 29% of a soil constituent will be described as "with" , i.e. with silt, with day, with sand, etc.
Samples containing 30% to 50% of a soil constituent will be described as, "silty "clayey", "sandy', or "gravelly"
Symbol Description
Strata sVmbols
I
Gravel
I� �J
Clay
Sand
Shale and Claystone
Schist
1I
Sandstone
Misc.
Symbols
i
Water table at
boring completion
Soil
Samplers
9 California
F] Split Barrel
II
Notes:
1. These logs are subject to the limitations, conclusions, and
recommendations in this report.
112. EON = End Of Hole
3. CFA = Continuous Flight Auger
�—V� C Smith BORING LOG
Geatechnical
ENGINEERING CONSULTANTS BORING NO. 81-1-1
PROJECT
JOB NO.
SHEET OF
Fort Collins Substation Lightning Towers
06.007T
1 1
CLIENT
FIELD ENGINEER
City of Fort Collins Utilities
Kent Flowers
DRILLING COMPANY
DRILL RIG
High Plains Drillin
CME-75 with 4" CFA
LOCATION
ELEVATION
DATE
Harmonv Substation
Grade
04/13/06
DEPTH
(Feet)
LOG
DESCRIPTION OF MATERIAL
BLOWS/6 IN.
INCREMENTS
(PER FOOT)
REC.
REMARKS
0
GRAVEL:
CLAY: brown, moist, stiff, plastic, with fine grained
sand
5/10
(15)
4
5
CLAY: brown, moist, stiff, plastic, with fine grained
sand
5/5
(10)
4
10
CLAY: tan, moist, stiff, plastic, with fine grained sand,
calcareous veins
4/5
(g)
6
15
CLAY: tan, moist, stiff, plastic, with fine grained sand
5/7
(12)
4
20
:::
SAND: tan, wet, medium dense, fine to medium
grained, with clay
9/19
(28)
g
25
SAND: tan, wet, very dense, fine to coarse grained,
well graded, with clay
19/23/32
(>50)
10
30
CLAYSTONE: tan to mottled brown, moist, soft,
severe weathering, plastic, interbedded with fine
rained sand
50 for 5"
>50
4
Boring Backfilled With
Auger Cuttings
EOH:
I,r 7,7: :�Ilh'3tatlorl 1�t%111cL
BE-) P%itM
I' I if
L -i (�
I -i r1(7e with your I, cLat i on t Aid t -
(-)J] c t i t i oris L� iiid-i (iri, I
rn 11 L) � C, i I- I -
t WOL �(D r a n I CAII t1rq tc,_1 Liabi i: ('(niql��inv, P,ai )��i tit 'orltil. 0,
y 11
01
i c-, r I ptoi rP1-hoLiZ('d Lo o 11 ;i 1` 1 e.-3 S 1 1 the ate f I,io
pry es to t A 1-1 1 1 '3 h 11P i tO !.'LVII Itill(I t 1,e t
_)o(IjIIIint s to vil I i -_` I this i eLPL s t( 1 the 0 11 t 1-1, :t 1 ()It of 11 ('111s
on 1-he-ollowitia Bid ?uhe-lu I e or In i -1 it, i I
'lip, itndpr .�_(jtied B L ddtF, i- flops hereby IrA stile P
is made __-i qo,-)d to i rh, thoilt ;col us oc () it cc inn h 11, n,
rt-her person C L J)C' I s 0 11 S IE i 6 (1 1 iq f o r I .F .tame Work, if, I t ai,i it is
f,Ltrsuarice of a in d subject to all the t rms 1-1(i Colkli ons he
nVi n Or' t 11d I I LacLopslets, I t I I t T I i
le I -i I I e , I ��p � 'i r cations, �irt� i t 1w Pi: -cv i - I s t) C L t 1111 t It n the stork
In
-1-lie
onI � 1 i-) f It It i,,-(, h(�(�rf x -Im� I f-v - lif, fill lr� 1 -r-iPJj
n yi I I (I L I I is 'Ll i s I- i f 1 p d fn r�a s It I it-, I,- irtcl I 1 12 i ( I
I , (n ri -,, i I I n h I I m " E:
�n 1-1 1 L C I nt r 1 �,V t I i 'he III i t i r, I-" I I
iiid Tinst frfi.ions to B, I c1ci(,r: s .
4 Alz -1 LSiddt'L Iq_' i s Lc 1 e —in P! i I i f I is
lion 1 1, , i f P - i ,ill, , it Enoti I L(:i If lit In of the t in
t I -Ild-i I3t5 r Y (-,I [I t he 1, -
iwaL I f t llt on L Ict Ls t �l �(z Lim I i ):i I
The tilt Ill( al1Lc.ss of `Ilc En -1 1 1 t I cl t L
1 L L I 11 ,r
I I I If I'' p1_nI.n t'L P 1, 1 'n t I
t het I t f It t i t If 1
I I I I lllt, I nt L I I I I
cI'F
f
f, I I 7 'En W,1-1 C 1 ii If' r I
4- 1 p
�CSmith BORING LOG
Geotechnical
ENGINEERING CONSULTANTS
BORING NO. BH-1
PROJECT
JOB NO.
SHEET OF
Fort Collins Substation Lightning Towers
06.007T
1 1
CLIENT
FIELD ENGINEER
City of Fort Collins Utilities
Kent Flowers
DRILLING COMPANY
DRILL RIG
High Plains Drillin
CME-75 with 4" CFA
LOCATION
ELEVATION
DATE
Overland Trail Substation
Grade
04/13/06
DEPTH
(Feet)
LOG
DESCRIPTION OF MATERIAL
BLOWS/6 IN.
INCREMENTS
(PER FOOT)
REC.
REMARKS
0
GRAVEL:
CLAY: brown, moist, very stiff, plastic
8/8
(16)
8
5
CLAY: brown, moist, stiff, plastic
5/5
(10)
4
SAND: tan, wet, loose, fine to coarse grained, with
subangular gravel to 3/8", with clay
3/4
(7)
2
10
15
.
SAND: tan, wet, medium dense, fine to coarse
grained, with subangular gravel to 3/8", with clay
10/12
(22)
8
20
SAND: tan, wet, medium dense, fine to coarse
rained, with suban to 3/8",
8111
8
----
ular ravel with cla
19
25
CLAYSTONE: brown, moist, soft, severe weathering,
plastic, with fine grained sand
50 for 4"
>50
8
Boring Backfilled With
Auger Cuttings
EOH:
30
Smith BORING LOG
Geatechnical
ENGINEERING CONSULTANTS BORING NO. BH-1
PROJECT
JOB NO.
SHEET OF
Fort Collins Substation Lightning Towers
06.007T
1 1
CLIENT
FIELD ENGINEER
City of Fort Collins Utilities
Kent Flowers
DRILLING COMPANY
DRILL RIG
High Plains Drillin
CME-75 with 4" CFA
LOCATION
ELEVATION
DATE
Linden Substation
Grade
04/13/06
DEPTH
(Feet)
LOG
DESCRIPTION OF MATERIAL
BLOWS/6 IN.
INCREMENTS
(PER FOOT)
REC.
REMARKS
0
GRAVEL:
r
r
FILL: black, damp, very soft, organic soil with coal and
lime slag
4/7
(11)
8
5
r
r
FILL: black, damp, very soft, organic soil with coal and
lime slag
1 for 12"
(1)
8
10
i
Sandy GRAVEL: brown, wet, dense, subangular gravel
to 3/4" dia., with cobbles and fine to coarse grained
14/18/19
(37)
10
sand
15
Sandy GRAVEL: brown, wet, very dense, subangular
gravel to 3/4" dia., with cobbles and fine to coarse
20/40/40
(>50)
10
grained sand
20
Sandy GRAVEL: brown, wet, very dense, subangular
gravel to 3!4" dia., with cobbles and fine to coarse
50 for 5"
>50
2
rained sand
SANDSTONE: tan, moist, very soft, complete
weathering, fine to medium grained sand
25
SANDSTONE: tan, moist, very soft, severe
weathering, fine to medium grained sand
SANDSTONE: same
EOH:
50 for 2"
(>50)
50 for 2"
>50
1
1
Boring Backfilled With
Auger Cuttings
30
APPENDIX C
Laboratory Test Results
SUMMARY OF LABORATORY TEST RESULTS
JOB NAME: Fort Collins Substation Lightning Towers JOB NUMBER: 06.007 Date: April, 2006
Depth (ft)
Sample Type
Recovery
(inches)
Blow Counts
Moisture
(%)
Dry Density
(pcf)
Atterberg Limits
LL / PL / PI I I
% Passing No.
200 Sieve
Sieve Analysis
y
Swell Pressure s
(p
% Swell
armory ;
1-2
California
4
5/10
18.2
110.9
4-5
California
4
5/5
21.8
99.7
40 / 17 / 23
1.718
0.3
9-10
California
6
4/5
14-15
California
4
5/7
17.3
111.1
29 / 13 / 16
1,780
0.3
19-20
California
8
9 / 19
24-25.5
Split Spoon
10
19 / 23 / 32
15.1
22.7
(2)
29-30
California
.C�VilI dT1l�Fdl).
4
50 for 5
15.1
117.3
...
...:...,:.
15,232
3.3
1-2
California
8
8/8
4-5
California
4
5/5
15.7
109.0
39 / 15 / 24
4,512
1.1
9-10
California
2
3/4
10.3
120.7
14-15
California
8
10 / 12
7.2
23.3
(2)
19-20
California
8
8 / 11
16.9
112.6
24-25
California
8
50 for 4"
14.0
118.0
12,737
2.2
B#IA ;:.
LilttEn
................
..::
1-2
California
8
4/7
4-5
California
8
1 for 12"
9-10.5
Split Spoon
10
14 / 18 / 19
10.3
6.9
(2)
14-15.5
Split Spoon
10
20 / 40 / 40
708.0
j
5.8
(2
19-20.5
Split Spoon
2
50 for 5"
24-25
California
1
50for 2"
25-26.5
S lit S oon
1
50 for 2"
(1) LL = Liquid Limit PL = Plastic Limit PI= Plasticity Index (2) See attached graphs
INaLUIQI ury uens. LL PI 5p. Uverburden Pc C C Swell Press. Swell e
Sat. Moist. (Pc� Gr. (W (pso c r (W ox o
21.8 % 99.4 J 1 3010 1718 0.3
MATERIAL DESCRIPTION USCS AASHTO
CLAY: brown, moist, stiff, plastic, with fine grained sand
Project No. 06.007T Client: City of Fort Collins Utilities Remari
Project: Fort Collins Substation Lightning Towers
Source: BH-1 Elev./Depth: 4
CONSOLIDATION TEST REPORT
SMITH GEOTECHNICAL
Figure
11aLu101
ury wens.
ILL
PI
Sp.
Overburden
PC
cc
C
Swell Press.
Swell
e
Sat.
Moist.
(Pcf)
Gr.
(W
(Wr
(W
%
o
17.3 %
111.4
2978
1780
0.3
MATERIAL DESCRIPTION
USCS
AASHTO
CLAY: tan, moist, stiff, plastic, with fine grained sand
Project No. 06.007T Client: City of Fort Collins Utilities R
Project: Fort Collins Substation Lightning Towers
Source: 131-1-1 Elev./Depth: 14
CONSOLIDATION TEST REPORT
SMITH GEOTECHNICAL
Figure
CONSOLIDATION TEST REPORT
-15
-12
!
I
6
3
I
\,
c
o
a)
I
WATER ADDED
3
6
I
Ii I
I,III
'
I I
12
;
'
15 10 20
50 100 200 500 1000 2000 5000 10000
20000
50000 10
Applied Pressure - psf
Natural
Dry Dens,
LL
PI
Sp.
Overburden
Pc
C o
Cr
Swell Press.
Swell
e
Sat.
Moist.
(Pc�
Gr.
(psf)
(psf)
(psf)
%
o
15.1 %
1 117.3
5633
15232
3.3
MATERIAL DESCRIPTION
USCS
AASHTO
CLAYSTONE: tan to mottled brown, moist, soft, severe weathering, plastic, interbedded with fine grained
sand
Project No. 06.007T Client: City of Fort Collins Utilities
Remarks:
Project: Fort Collins Substation Lightning Towers
Source: BH-1
Elev./Depth: 29
CONSOLIDATION TEST REPORT
SMITH
GEOTECHNICAL
Figure
CONSOLIDATION TEST REPORT
-15
,z
9
_6
3
ca
I �
3
�
WATER ADDED
s
12
15 10 20 50 100 200 500 1000 2000 5000 10000 20000 50000 10
Applied Pressure - psf
Natural
Dry Dens.
ILL
PI
Sp.
Overburden
Pc
C °
C r
Swell Press.
Swell
e °
Sat.
Moist.
(pc�
Gr.
(psf)
(psf)
(psf)
%
15.7 %
109.4
3276
4512
1.1
MATERIAL DESCRIPTION
USCS
AASHTO
CLAY: brown, moist, stiff, plastic
Project No. 06.007T Client: City of Fort Collins Utilities
Remarks:
Project: Fort Collins Substation Lightning Towers
Source: BH-1 Elev./Depth: 4
CONSOLIDATION TEST REPORT
SMITH GEOTECHNICAL
Figure
CONSOLIDATION TEST REPORT
,5
_12
9
6
3
c 0
I
WATER ADDED
3
i
6
9
12
i
15 10 20 50 100 200 500 1000 2000 5000 10000 20000 50000 10000
Applied Pressure - psf
Natural
Dry Dens.
(pcfl
LL
PI
Sp.
Gr.
Overburden
(psf)
Pc
(psf)
C c
C r
Swell Press.
(psf
Swell
%
e o
Sat.
Moist.
14.0 %
117.6
3343
12737
2.2
MATERIAL DESCRIPTION
USCS
AASHTO
CLAYSTONE: brown, moist, soft, severe weathering, plastic, with fine grained sand
Project No. 06.007T Client: City of Fort Collins Utilities
Remarks:
Project: Fort Collins Substation Lightning Towers
Source: BH-1 Elev./Depth: 24
CONSOLIDATION TEST REPORT
SMITH GEOTECHNICAL
Figure
Particle Size Distribution Report
GRAIN SIZE - mm
% COBBLES
% GRAVEL
% SAND
% SILT % CLAY
0.0
37.1
39.6
23.3
SIEVE
SIZE
PERCENT
FINER
SPEC!
PERCENT
PASS?
(X=NO)
1 in.
100.0
.75 in.
96.6
.5 in.
78.8
.375 in.
73.6
#4
62.9
#8
56.7
#16
50.9
#30
45.0
#50
36.7
#100
28.5
#200
23.3
Soil Description
SAND: tan, wet, medium dense, fine to coarse grained, with
subangular gravel to 3/8", with clay
Atterbera Limits
PL=
LL= P1=
Coefficients
DS5= 14.7
D60= 3.64 D50= 1.06
D30= 0.173
D15= D10=
CU=
Cc=
Classification
USCS=
AASHTO=
Remarks
tno specincanon proviaea)
Sample No.: Source of Sample: BH-1 Date: 04/24/06
Location: Elev./Depth: 14
SMITHClient: City of Fort Collins Utilities
Project: Fort Collins Substation Lightning Towers
GE OT E C H N I CA L Project No: 06.007T Figure
I ":1' ;UUT Fa=c L'I,I �u p t,rtim
BID SCHEDULES
BID SCHEDULE A HARMONY SUBSTATION
LIGHTNING
MAST
[ITEM NO. I
DESCRIPTION
EST.QTY I
UNIT PRICE I
TOTAL
UNIT
[ ob i l i � it i or, 1n:> Ynce,
1
L:
1
> i 11ec1 k i er �:�c:ac ztic;n
1
L'3
—
—
0 te pig L LotIITIaLion
�I
T Ihtnirio mr >t :n ll r,r 1a Ls
L:
T!ghtni rq rr;>t iratai lation
1
L-;
ace t- I crm nt, ''inzl
rr�tTing-
Subtotal Bid Schedule A --� - -
BID SCHEDULE B - OVERLAND TRAIL SUBSTATION LIGHTNING MAST
ITEM NO. — DESCRIPTION EST-QTY UNIT UNIT PRICE I TOTAL
rhili�at on, su ance,
T,
- -
--
P,c;n�ls
L il_I_eJ pier ex avation
L>
poi l
L`l
1
�ncret _ ,ri et to,tn:Tat i o-t
1
T.S
�
i
T i ghtn l tag _r:a:rt 1t, x iais
LS
Li-gt:tntri.a m-ist installation
LS
t S-.r i en, Aggr-eg .-e T,S
sir I i..-Heart, Fir :.
- Subtotal Bid Schedule B -
BID SCHEDULE C - LINDEN SUBSTATION LIGHTNING MAST I
ITEM NO. DESCRIPTION I EST. QTY j UNT UNIT PRICE TOTAL
I �] rl x 1 i tr xor, Cnsr� rrr �,
�I t ir,-t'. _
Tit It
r
flit I I 1t<1 ITT ;t
}�� -mer L , CitI:a 1
-
T
Subtotal Bid Schedule C
T
z
LL
I—
z
W
U
W
W
d
Particle Size Distribution Report
GRAIN SIZE - mm
% COBBLES
% GRAVEL
%SAND
% SILT %CLAY
0.0
53.9
40.3
5.8
SIEVE
SIZE
PERCENT
FINER
SPEC."
PERCENT
PASS?
(X=NO)
1 in.
100.0
.75 in.
80.9
.5 in.
66.5
.375 in.
60.7
#4
46.1
#8
36.1
#16
27.5
#30
20.6
#50
14.0
4100
8.8
#200
5.8
Soil Description
Sandy GRAVEL: brown, wet, very dense, subangular gravel
to 3/4" dia., with cobbles and fine to coarse grained sand
Atterbero Limits
PL=
LL= Pl=
Coefficients
D85= 20.4
D60= 9.20 D50= 5.78
D30= 1.46
D15= 0.335 DSO= 0.181
Cu= 50.69
Cc= 1.27
Classification
USCS=
AASHTO=
Remarks
(no specuication provided)
Sample No.: Source of Sample: BH-1 Date: 04/25/06
Location: Elev./Depth: 14
Client: City of Fort Collins Utilities
SMITH
Project: Fort Collins Substation Lightning Towers
GEOTECHNICALProject No: 06.007T Fiaure
100
90
80
70
W 60
z
LL
Z 50
W
U
of
W 40
a
30
20
10
0
Particle Size Distribution Report
GRAIN SIZE - mm
% COBBLES
% GRAVEL
% SAND
% SILT I % CLAY
0.0
11.2
66.1
22.7
SIEVE
SIZE
PERCENT
FINER
SPEC.'
PERCENT
PASS?
(X=NO)
.5 in.
100.0
.375 in.
97.7
#4
88.8
#8
73.0
#16
54.5
#30
40.8
#50
30.5
#100
25.6
#200
22.7
(no specification provided)
Sample No.:
Location:
Soil Description
SAND: tan, wet, very dense, fine to coarse grained, well
graded, with clay
Atterberg Limits
PL=
LL= PI=
Coefficients
D85= 3.90
D60= 1.46 D50= 0.968
D30= 0.286
D15= DSO=
Cu=
Cc=
Classification
USCS=
AASHTO=
Remarks
Source of Sample: BH-1
Date: 04/23/06
Elev./Depth: 24
SMITH Client: City of Fort Collins Utilities
Project: Fort Collins Substation Lightning Towers
GEOTEC H N ICAL Project No: 06.007T Figure
u
W
W
Z
LL.
F-
30
10 N
Particle Size Distribution Report
GRAIN SIZE - mm
% COBBLES
% GRAVEL
% SAND
% SILT °/n CLAY
0.0
42.8
50.3
6.9
SIEVE
SIZE
PERCENT
FINER
SPEC.'
PERCENT
PASS?
(X=NO)
I in.
100.0
.75 in.
83.5
.5 in.
72.3
.375 in.
68.7
#4
57.2
#8
43.8
#16
31.5
#30
22.6
#50
15.9
#100
10.3
#200
6.9
Soil Description
Sandy GRAVEL: brown, wet, dense, subangular gravel to 3/4'
dia., with cobbles and fine to coarse grained sand
Atterberci Limits
PL= LL= PI=
Coefficients
D85= 19.7 DB0= 5.52 D50= 3.26
D30= 1.07 D15= 0.271 D10= 0.143
Cu= 38.58 Cc= 1.45
Classification
USCS= AASHTO=
Remarks
(no specmcation provided)
Sample No.: Source of Sample: 131-1-1 Date: 04/25/06
Location: Elev./Depth: 9
Client: City of Fort Collins Utilities
SMITH
Project: Fort Collins Substation Lightning Towers
EGEOTECHNICAL ProiectNo: 06.007T Figure
No Text
SPECIFICATIONS
. W
CONTRACT DOCUMENTS
FOR
Substation Lightning Tower Installation
BID NO. 5982
CI
PURCHASING DIVISION
215 NORTH MASON STREET, 2ND FLOOR, FORT COLLINS
June 27, 2006 — 2:00 P.M. (OUR CLOCK)
II e i nq 1) Lrcc =Iml 1 1 n
'I jJ- aI I
I !Jq, t-e-rov-i I ,
()V( Lhead,
)fi t, i
-)w[ Work r r I a
L that
Ifi.
r
, i r q
Mer- -u I )L it—S f Illy 1
f[l 11 (-f
I S ;,F, P't Uri o.
h
:K W(p 1, t �y- t�i ./_ [), , Writ
( , — :
r= t La= Pvj 1: arnrl r I t Fr
RE S P F J L
B p,: T T F -) :
('r)NI P,7\,,l y
S ri
Title
Lic�nc-N U HJ T
L ('f> S
SLr"TiON W),1W)
SUPPTFMENT') '-'(' LiD FNiS
()()4 11) R I a Bond
I � ii I�t,iternant c) I I 3 i < i I(-- L ' S (,"11 --1 1 i f t I a I io I I o
(') 1 3 () S-hedlul(, of
Ell-) BON I
AIt'll L FY THESE 1 '14 E S F ° F- L" I
I c L It I "tild 1-( IMQ oritC I lil-2 I I t F,art.
vIN E P in thesill[ of
'-a vt tic, It t- it which, w e I I -a - I o kin flla V; c tic- reti�7 n I I I I in I
t_Lllit , 11 , S , - �1 ;1 13 It() 1 11 f
711E ('NDT N,c)lj of I , L r -1
- I I i �i C) t 1 l I n i�� I ,
0 I-W t v Of Fo t L ills, o to t 1-1 r tC Mj I I V I 11 Cl E
I P(D I t o enter into a or s L LI1 17 1 (ln Agr nv' I I t he
Fort Coo I ins PT-o j e :t 2 S b s I , I f 1 n I I i h L n i ro-1 nac,r
4- Nlt 11 �PE I
,a! -: f , � a id I P, i, I -) h a L I he r p -i e,- t (; 1, or
I Bit steal' be (i , - e p [ ( % ( I -I - I I ' I' - T r- i n c i p, a I sIIJI I I �-X. 'II[ I l, ( I ]- I I -,-, � t
ract in t tic, form of Pori] r I I t -ILI 1,hPd I c-, I to I , T- r )I ) (-' I " -)
Jandancr wiLh S -I a Bid and shallfurnish -I BIND I , ) - ll i
L L 11: 1-7-11-1 of':retract, andfor a r, t of all. l Is t,e r r Tl r1r;
'11)� I t L f it rn is ni I ma t i I in Conn I, c, I t I i -F r e,,,., i
I
LheT resp—t-,s perform Lhc Agreei,[Erlt ,jr or
j,-
I- h(m -h I s 1) 1) 1 i shall I) e ✓c L, g e t [-I e -m e sri i m, i r
ri -I ('xill Y 1 1' t ()C -J 'I r,
I d ih Li c r I LC ollt V 17 0 r any
ie r
her:. I i t p -1
L I I
>a id I e 1 nd is NC
v x 53 1 T I I F
If i I I I E AiaEPEOF, h1t2Ly '� 3 e aF-recut . t,-i t tr is
Slt'. '1 - t II
�o"I pc! itiolll- h 1%'( r 'o,por_ ate seal s to be heret t :c: i t hr se
signed by .hel I t toper oL f irs, tI la aIa ar t
rott h,
PRINCIPAL SURETY
Pv:
t
il LAL'1
(SLALj
�) -("1 1 PL I I I J I-'":
�>TATEMEIJT (:F BTDBF3'„� VjAf TFT('HTT(,'FI.-,
fit
ITIJ It- i �-a T-, [11 s t C1 I �,7ell 1T11',3
his st-,it-eTlierit mu-�ti be not it iced. If tieuF
it un at t plc he (I !'It,- BJI icifi— may :mi-imi t t
intorr'atior. he desires.
ame of Bidder: -
11,1in olti (:e l,ldres-I
�?I t:,4 a I I i z ( d
t I (D T i U r whoa iIICO Fo7) I cIt e J
,,: 'lr9Ity y P--I I s t a v i! io,t ,t-IC- ['-I e 1 1. 1, the r: 0 n L r a I 1 1 11
1"11 L VOUI present I iLm o L i,lc
c) n t t s on hard: ;Schedule
I - �3 liq the amount or ach
,[I' I 't- and the appropli it 1--t- i Ip(-it ed daLi,s of :,oninlp- 1
of Wc.,Lk pPT forw, A 1) your oTl p a n v
oll P7,7PI [-,Ii I t :(mp.ct it,: w,-iL,J(-,A
is L,iitl i it, :t[ i
tutu 1 lift,
orlant t)tulecr.: I 1-1v o-rlpl�tF,d V 1 a14 3"'.
T tllr rpprox.mi11F �o-I of -i [-I and tt Month -tr,I nl.
t i:m rn:i '_y� - of orstructlon.
-. oI_ri nr, or lilt ipinenL a i]_at lr t��r Lhis xc1111
n:;� 1r� �:onat_ru I`lcr Work 5un1 '. ;r i:npC rLal e Lr: Lhi<s
�_. :ick lo1Ind ciA xpertence oL Lhe ��ir-�ipa1 rrember� �;uui �;i rani;. t .cr-,
r'-1 _mind
u, t4,or-equesE Lill rt;t leI- 1"'d t 3[11 1-1a1 n. i
olt. �r infiormai_I r Chat I'laV be L iir- i f h,
-
t S, I `1 ,chat _:J t`i r ')uII `! a7L
�l
-I -II -
fir rd,tic < rn
I i I i !h I DE -A f
C) m I I -I s I I- I i f mI I
q I- v oaathOrl. 71 -S if ETj t)( l' MI
L( t i Cwt.
r rl t L I-1 �-3 1 arty V 1 11tol III �L ioll po I I j
L L i(-at ioll or the -1 e 'i I II
(D I IS.
o uI - t �' of
W C) L I I (".'i -'s III(I a tyv
- -- - - - - - - - - - - - - - - - -
name of(),- (jal, Sil t- i oIl )
LhP I Iswe rS I he L o-:'CJo1 r, CT i11rStl0Ci <iti all 3 r I t Piip, I I- nTi
-
1 11 r I COPY'
Inc In t m iJ
H ;I IJT R T J 11D r, ITZPAc 0P
List �aa oifLL Ito for t I rk items ?fisted bplooa and a1 ;lrr
Twmin:l the
ITEM SUBCONTRACTOR
f I , 0,-)] 0 1! " ; t I - r () L v.: "A I I
SFf 'T T I I 003 I C
N'Yl i " E (,'IL WAP L)
Da'.
T : I
I P TF� F S I ibS t- a t lon Li::' I Ln i., ,vo L I rt� t t I
W:ij [ 1, 1 -P'l COLLINS
he Yrl ri = I t e - Y"_eleL L e d
t by r t V (D I Bid lat J
t) cl L P, r I t- t rS=ul
ion r,aar la x are I e rn e n t r D 8 J u I-) :3 I ltlon Tower Tnstal latron:
L -),,i L Aci I ee-ne I I t
the os e, I I, L , �i t 7) 7 r I 1,-i T f I I a�-,L or
T1 I I e is s if the e L;- twiiIf-i�� 1 1
Al - ITI� ]]I-
h tic) or Award.
or o t hip t: ,is m�, J(- f -,,- 1 1 1 hI i i atF
llo r 0 1.7 r I (I C( 1-1'-ti i 0 1 5 I ede L Adr �li �l I r t t
J, v r cl r11_S 110 t I C: P of T� Wa r i `1t is bV
I 1C li',-( L to r i-i P, Glvj t I E Ic I hil,(, 3) t
nt i ri C, I uding all t I ! e �'O n t r L I) o i :iri o n t 3 1
rnllst hear
voul signature on tie cover oL
with I he ex(�. lit-, I fg t -��ttt�_iit- the r-t t
you k p l t i eJ it;
at d :; I 1p! A ("("n I L 'i
I ri I. iiff-
3 L 1 1 1 1
Pi J rh i s R), L
t I
( , � r [ .)L - If - - , I [ :f , ;
CONTRACT DOCUMENTS TABLE OF CONTENTS
Section Pages
BID INFORMATION
00020
Notice Inviting Bids
00020-1
- 00020-2
00100
Instruction to Bidders
00100-1
- 00100-9
00300
Bid Form
00300-1
- 00300-3
00400
Supplements to Bid Forms
00400-1
00410
Bid Bond
00410-1
- 00410-2
00420
Statements of Bidders Qualifications
00420-1
- 00420-3
00430
Schedule of Major Subcontractors
00430-1
CONTRACT DOCUMENTS
00500
Agreement Forms
00500-1
00510
Notice of Award
00510-0
00520
Agreement
00520-1 - 00520-6
00530
Notice to Proceed
00530-1
00600
Bonds and Certificates
00600-1
00610
Performance Bond
00610-1
- 00610-2
00615
Payment Bond
00615-1
- 00615-2
00630
Certificate of Insurance
00630-1
00635
Certificate of Substantial Completion
00635-1
00640
Certificate of Final Acceptance
00640-1
00650
Lien Waiver Release(Contractor)
00650-1
- 00650-2
00660
Consent of Surety
00660-1
00670
Application for Exemption Certificate
00670-1
- 00670-2
CONDITIONS OF THE CONTRACT
00700 General Conditions 00700-1 - 00700-34
Exhibit GC -A GC -Al - GC-A2
00800 Supplementary Conditions 00800-1 - 00800-2
00900 Addenda, Modifications, and Payment 00900-1
00950 Contract Change Order 00950-1 - 00950-2
00960 Application for Payment 00960-1 - 00960-4
SPECIFICATIONS
SOILS REPORT
A(REEMENT
THTS WEiIETZ is Aitud ns of -linC as I of he
Saar )L and shall he pfte,-t or (t-it, iris a.,I.LF;L7EN'i' gral f,•✓
1'hi F,v ilt Fort un i 1 1 ns ihov- imr7m c I I ed OWHhz 1 drp I
There r it,-, L - : -,,, I le,t 'c) !,JT ir,(ln(_',P!
TeT 1, 1 P i -icI : -'(J lil T R (7 T ( , JC, , i it -orris -Jur it j on vt I I ne mt,t i it v - i I, C n t : cra a III t s -, t
form, lq—(- as follow :
APT C : , -,, I . li, J p _rt
"')PITRiti
shall complete ill Work as suciaMpri
or Avii(vived Pit
ti, ('. 'it r,,(,t
fir) c _,m. ra-s.
Ph( Project for which 11vi Work
sn lei , It(: r'o n r r 3,-: t r
utit rit-s T, a ,, h,,
;ill -y- a part is T f i riad as
Up mist t Un7 i tv:1 L
t h- R I I KAU
ula ttiol.
1, (Tht ning PUWUL 111stxi I I a 11 ; tI
s t (,, 1) � aaf LIt(' I)i a
the e 1) 1 1' ' I I c�
S Ci Of three suhStation liClAtninn
tOWerS and WM:t rat
til rn it 1 1, r
ILI I i�,, i:i-
'� 11b:i t I t I C) T)S w I t ii I n I 11a - I t y -)t 1-0
r I C:11i ns . The inc
v; I I I it -I it in
AM i nrl,
-x-avatiraj, anti construct on of
t Lc pi er tutAin it j orl
mis h 1 n- t urn
rind ii-''t
^[ Of L I I(, ittcc1 tower, ofid
tc T -s t of a I i OL in i
s qmv r rr I I y
Wn-i . ly-I
i n Section PHI
ApfICIA .1. E `,R-, I N L ER
11 i c Pa t) j — t
has been :h--si( ned IDV
.sitith 11
LJ10 i s
I I r i ns I
�]E( Tlill,liit in
l %vht- will nsiun- all
rill-le's and it Aponnik
i L ., Wn
ard aNALI Ini, i, [it,
i tf I-, r , t1i'l
as s i q!i, (I
- t-t I - N G I N I; E P n lac
)riI
: i t I tt : . it
(Aane Tor.
%vi Vh mmp , eL ion of
the Jock i in ar p ,
Wit-'e
A- it r it npt I I A
to("JIT I
ART 7('! , t'( I117 T I 'F,'
i . I P" u h i"kcal 1 1; 1 1 h.- 1 11 1 f t , i 1 1 , 1, ill) I (,I i i . : i , 1 1 1 ' , , 'i . I
t t c r n I I r- 'It f 11e : , [ it r !, t- 'T j 1 r t 1 1, 1
:� ! 1 Caanalt 111. 1 in 1 , 1 , - - I , I t 1 1 ! P
an -i it I I- a T :I,'i "i t 1, P- i; 'I r''ai 'Ida V, It 1
i t t t t ra I t I I.t
kigar I' e,i -1 tia I T-s . rP 'al i a �ITT:,P't, 1: r ) I I I i.: r 11 t
o r it 1 9 /,,( I , i :CI r'.II 1 that j "I I A 11 !,it :Pat "I I
% [c, it t
I.
T L)Urn 7e 't dt? a vs , ->41ons"S
-a A diit I i(-:
I' T 1 t-:i ii 1 11 I t i I,
in I j)LPCwA-diIt!j I he
A 7via1 Loss
quFfeted by
QWNEP it I b- t r: I I
(, nt,pl, I I on Limo. _:�(:(:C c
i I-i'l I Y, -_nst(
a'I c,f le(JUI I
Lnq any ;it( 1 p: (), !
inki C )NIRM"FOR ameo thur
as MIA _fated
damages Enr
del Out Salt In I A t I 'Z'
OMPACT A sha 1 1 pay OWNER
I he anvnnt
yob Larch hereafter
Pr
iai Colmnle-
i it-[:
L'_v- Fiindye I 1011ai
v WNW
I o f each
no 1 -nd a I i !V —L L w
I UZI CZO f That t oz:p I rp.-, . I r t (" ubstantialal In I )i,- I - cir. of
('o-np I e t e.
_'inat Tc(-:,-:ej_,t ]I (:e:
Af tot Subst ant DO
enc:<_II la,, or
I ','I (,,11(ZndaL day
Work is recadv to -
T\ 1) 7 1 � * , F I . :V N I'Ric P e I C L
t `w r i i I I 1 eI i t I
I - he Work anti I tho clock k :> 1 i �isL II i -i I y
4 inr , I - Iron, :rive 1H ]nd red T) C t I -c I -; I � 1 1 ' I I I ) I 1 -1 't,
r Y S i. n t how )f that expires i L I - I he I , t I lic; I
LDC-L-Ad for Finai ?,ayi[[ent ana A >701p7 M ,Ict t he
F j n a I ;'aym�Zrlt and A(:uPpLan(_e.
4 . I )il N E, P s h a y. p (a y (J IcIT R 71 CT () I f o r p e _,: - - o L Ina n:- - A -
I I a n, w i I i the Coint i ac r Do,nninc tits in vir rAynt funds is 1 1
D ) larS, In a a a () i do n - P with Se, tl0"1 f103UJ, L I_ a (- h - I In 1-1
hc�j At :I 1,v __,[is Iefe-,e!-i,-:-.
�1 P ,, , C - E I-, . L'1
sha L I sabmiL plic ri eons for PaYMPPIL P 1 cw Tan- w i t n
I I c f hi, r i � I a L Con.lc t i ons 7, p p I :a I Iis for t A ,�n_ I - t j)(,
plc. _ � - 1 1) v PH3 T NF F IT a s 1r w, I I n i I I (i I I (a L, ! 1 ' o ri o 1 1
P R C , (,P, E S_-, r, i P: E I: Yt S . N F P r h i I I make 1) 1 a q r a s s I , i ym, A' ,n mitt
L ,nt L „1 PlOw on t1w La S ! 3 1, MY1 :1CP , s iapj'l i :AI i "o : 11,
-T 11 P-Pio I by On, I NEIAP, Q11 nAl Inol th M1 I i no nows I ru-" I I'l 17-tt
1 011 All C Mi iVlilc I I be I I I In- Las i a ct r I c I ) I t
I - JU i j a a I ):1 1, 1
I t- t 1, Hitt Ll- I ti a: ll'i I -,t I o k
t
t no I I I I
t a I t t.f I II I;.:1 11 o": i A II
i o I t s I s tL Jntoi,nt M i,
1 P I L 1 1 1 -1,-, "'; i t L z I I
t i L I millet. Icr :7
f Eli 1: I'l, te II _at t r I
let::[ L aL as i " n I I tj as t h , 11 a 1 1ct-,I 1nul r,I Oil I I - s s of r I I 1sir
s I I t 1 1-1 e T'I , I I e_ I- on w L I I - o -- 1 1 , F i 1 1- i or I at 1 v t a in a c I �" t
-c )it I L , "I i C-asp Lee lumain j ng h) L I,, I L (� SS Iviymen ts pI on i it Ii, n; I I I i
Corny I tioII be in an i amount equal i a . OU of i tin Work -,omp I e t- I. i
Mat.: I 3IS 111 t rquipmomt not Awn-Imi-Iteril lP- t In e RAD r K I bit i- i 1,r) ] I':, I i, on I -, a1h, 1
il I III I at:,'omp,ani.o(i by du(oorn�ntatiol-. s a 1 .3 c L c) r v try OWNEW a l 1 Ovi > I . n
of r In el Ge I-Ic L a 1 c lid i t I ( 1-1 4 rma y I r— 1 rcl it ptl I I I h; uq)i it inc
Upon S I Ihs t, an t i a I Carol) 1 ;- t cm payrt-W will he male in an ww"m
-,:I- to increase LoLal payment A * , > METPACTCR I u ') in of I nw i ent a ,
P! I w, j o 3s such amounts ae EililGIMEEP -,[I i I I ie, eLmna (,)L i)b,iJJEP jr,ly .%:I I hl)e I I I jj
a i to paiaqf aph A or the VnptaL 17,troditicu'_,; sr rc prc)-; I ii-
I . - � . t iNAL PAYMENT Upoin Final Will) ct Lon and Acceptant-e if he Work 1 -i
o' ", I 1'n nl, I I I r) a I ag r: aph 14. 1 1 of the Gen, rai rAiridivions, OWNEF) shill [,, I , t li
I if trie C-OTntt-a(_:1 as r(-( ommi-YAM my ENGINELP. as pi )o'i i�od I In a i I
1 'lit tell L I . t 3.
ifpff'� 'l ". CONTP.-ACTOR'S, REPPFSFTJTnV_''!,):l
It I .her to ricni(- OWNER no crin-, 111to it IK
�tI I ,r L I inq lepres�jL,atioris :
I
t_'oNPAC'1OP' has f h,_i,a()_r will, the n-iluiit,, t xt-r-nt . i '_'
:I, :I t I Dociim(mts, Work L e 1( 1 i ty, ind wiLh all t:; al and , t tcn'"
i:l i livs and Reaulalicns -hat in ani; Hanncr ma y -affect Q pr(moss,
ne rI c, riati or fur K sh I in cT of L hi ;n A 11: .
: . Cp r 1 1 s itli-i I e-1 r , I L, t i I I i- i'. I reports of , xj) I () I -, t i c I i:, ill 1
I absl_i fa(v conditions ani (h, '1�"; I 'nl -, in T !�hysial - on th i I I ,
I n I In, ene'll iLV 'oll a i t )11�i Ii j,L0'.'1,A(-',1 1 n par -I I I Ut! 4 h.
P hay wl Alpi I 1A i 11"rully Ct 11,1j, 1 1 in A
or o- i i It I ti'l III I 'gar I I t nlyI1 tl al - s I I CH i I
'li", iXt '[_it I-, i nt I]-li( tt 11 1, i ')n I
f
t r h I
6 1 t y I cl th pelt. :m,-a p I I I i On I r nil 1 h t"
I n%- I-, i :1 1 t ont 1, 1' 1 'tc��ol iir th !i
t - r o, it Ltif I In it At! I
L'if 1; 1 1 milaph d L 1 lit 1 1 a 1 md t t i n:a A 1S7 ill'III 1
i I I I t"I np I 1 ' I s: poct �i 1,
I it 1 11 or t I 1 i"fil, 1 p(
. j . "MRIMAOR has m Anw'l and chn MA s I I i 1) f ol War 1 � l
in'l 1rtt I
1 1 i i
it c,irn I or, the Cq n n r a r t Dr rumenLn w I h iH meni T o , _:i tiiig
i i (it- i I1
i o� coii I i .jnoi,.,; I ci 1 he a d t and assumes rival) O,s
1 11 1 y t h"'
p Dew t L cm o f raid Underground bo i i t i es No -i d d i I i (n t i i J
c x mina- i
11%
-gar ono, p (i T -i -, i cl,.Ns , teats, reports, a, srudics or sim i W
T_ i in f o r u at Lot,
or
-[ � i'.a'pp :t- :) t said tjnderq r otum Fan i I i t i n a are e or rot I 1 1)e
i e(Iiii i c- I l,y
.:;1: t'l
1; d in ml( r to per t-trilln and f ur-AU 1 he WULk at OW _'-)nf
i n. � I 1 11
f 1, i
t I n [ i I I I- T im- a 'I I'd -_ 11 1 c or tame s i L I I . he ot 11ro
I t to - 'Jc"
('o I J, 1 i
i c t L t h 7,,) 1 1 t Do cl ime i i t s 1ncii..ling s IN ;irrca11y tK,
P s10,1
I) cl L, C_j
II)i I of the General COlpi-t ions .
.5..'OR 1'.' I a - r e I aced I he results of all sII
of sn1 t I
T"
I ill 'sf t qat- I Otis , tpsLs, LPPP: _S and data v i i It
In t " rm and
Ol
L,r�. of t�np 'or.1 tact _)o,,umerjrs
0 N TKA U 10 F? has given E NRA I I J E E 40 written notice o all
I i
Prr
01 liarm,pancips Azar he has di sco-ered in Up (,antra,
I
lip to
i -7-n rest Rr !oil tly'rent by QUITHEER A aCPPI)ITable to 70H1FWTOP.
DOL'UME=,,
I 'I I [c ... r I -r racy F)o -:I I fne 1-1 L s W-'Iirh ' it l" t' r i s p I Ill (,I" t- a re t ..-en
r_( l 'ofln'ernilu t I i P- vj I: , olt s i � ; n o r � I i - ( ' i ) -- I , i ,
n( 11T o"' (:oll'l i I c rl s . t Im a - items to ; 11 i r ip d in t In e in I i in i r 1-t
no, ,in, ri in AlL V 1 e 1 16 of -he General OnWitions, and sti, h nhnyi il m
,il e ll F-1 I j, r-, I in t h L ti Arta -le a L ,% in i (, In a rP L Ili- o L po I ;I f e(i hE in 1 1
Forms in: use by CONTRIANT i n perl mmincT the l�j I otni I - I it I
1 :91 L Vi lip Out Ina 1_,'LlllS of :lis Agreement %'1l pinF 1� i
F, i nil i r �() r i f (vd herein by t l P t - re" Iip'n, a,rl F: , 1 1, .1- I Ot
I It., f he to I I :
1 L ) t 1ln' t ant I '. , l'pllP t
. I i of Final iQ -q)t mcp
er. 1 P P � P n a
'A 1! t on (I V
f l r mop t I I I alc=
t , r L % - i I i e I i I
I i ,.; i i i r ; , r �- t mi ot v he .T tilj,: -d % I
, 12 __ 1 n N', a, t a l [ I Fo 111 ll 1'l r i oIr '
1 . , I, I it I Ill i r :r i o I lilt 1 1.� '�'
'5�he Coo�za�cL
]ocumeois
lsu
no!ude
ail yz
c ''rnbnenmi
o|ier
duccoo,Ls ameodiog,
1110di1ying,
oc
nCyp-ement
ing he
c1 Uoc'n nLs
t oruo..nC
to paiaqraphs 3
ad ].6 o[
Lhe
[ieuocal
�ood��ioos
There azo uo
Con-ract
Docu/oeoLs
ocher hao
rL;sn lisl'`��
�ncnr}`o�u,cd
b� reference
it', Lbio C'CrLi
, Ie
7. Tbo
�i [w,
may on|y
be ,m/'u/lio'{,
mod1fled or
iu pconided
in pay qqrnphu
oud a
Lbe o.^seI
�i Cooditioos.
C!.K B. MT3CELLA,UyCUS
�. 1 . Term^ osed it- Lbis eement vqhich ac dol1uo0 ic n,/'ic e 1 L ihe
[�otrz.'l uod�Liono obal] bavc L|10 joiogs ilid! cn7ed K e
CondC I iooy
- .2 . No assiqnment by o part y bezet o it auy iiqbLu uudez a ioLerexiy in
L:je irtract Docunzuta will te binding nr another party beio:o oit|"out |bc
*riiI n /-onoeot of Lbe ?arLy soonh; co Ve beood; aid sqn-per1fic°lly I A riot
�L fbmI litit iLaLinns, moneys that bocnz/e due aud moueys ik11e rce may
not t assigned wiLbouL such conaent (ex(:ept- to the extent thor Tbp ef{p, ,,f
iLis euLAc1:ion may be limited by law), and uuleus ayeci{lca-]y sLaied c |be
rnntz'c� iuy *riLLen couueot to on auyi4nmeut no assC Intit enre|r
"Iis'harje that aosiguor fzom any du, y to responyibiiLn coJoI L|e Coxcrac!
Dm�um.�ot
3�O�NkR -,nd CON7KAC7OR earh hjcds Atse�t, irs parrcers, �ucC /s,
ussi-IC s aI logal reAzeseuLaLives no Lbe oLher paLLy he: -I it pay |cozs,
succesaors, assigna and legal reureaeota/Oes in respecT ro i|| ronenaxts,
�qzro/nnL aud obligaLions cuotained in tLe :onInra'- t ' ) � �cu^eo1 .
OWNER: CITY OF FORT COLLINS CONTRACTOR:
By:
JAMES B. O'NEILL II, CPPO, FNIGP
DIRECTOR OF PURCHASING
AND RISK MANAGEMENT
Date:
Attest:
City Clerk
Address for giving notices:
P. 0. Box 580
Fort Collins, CO 80522
Approved as to Form
Assistant City Attorney
Title:
Date:
(CORPORATE SEAL)
Attest:
Address for giving notices:
LICENSE NO.:
9/12/01 Section 00520 Page 6
SECTION 00530
NOTICE TO PROCEED
Description of Work: Bid 5982 Substation Lightning Tower Installation
To:
This notice is to advise you:
That the contract covering the above described Work has been fully executed by
the CONTRACTOR and the OWNER.
That the required CONTRACTOR's Performance Bond and Payment Bond have been
received by the OWNER.
That the OWNER has approved the said Contract Documents.
Therefore, as the CONTRACTOR for the above described Work, you are hereby
authorized and directed to proceed within ( ) calendar days from
receipt of this notice as required by the Agreement.
Dated this day of , 20
The dates for Substantial Completion and Final Acceptance shall be ,
and , 20, respectively.
City of Fort Collins
OWNER
By:
Title:
ACKNOWLEDGMENT OF NOTICE
Receipt of the above Notice to Proceed is hereby acknowledged this
day of 20.
CONTRACTOR:
By:
Title:
7/96 Section 00530 Page 1
SECTION 00600
BONDS AND CERTIFICATES
00610 Performance Bond
00615 Payment Bond
00630 Certificate of Insurance
00635 Certificate of Substantial Completion
00640 Certificate of Final Acceptance
00650 Lien Waiver Release (CONTRACTOR)
00660 Consent of Surety
00670 Application for Exemption Certificate
SECTION 00610
PERFORMANCE BOND
• 0_�roz
KNOW ALL MEN BY THESE PRESENTS: that
(Firm)
(Address)
(an Individual), (a Partnership), (a Corporation), hereinafter referred to as
the "Principal" and
(Firm)
(Address)
hereinafter referred to
of Fort Collins, 300 La
Corporation) hereinafter
as "the Surety", are held and firmly bound unto City
Dorte Ave, Fort Collins, Colorado 80522 a (Municipal
referred to
for the payment of which sum well
successors and assigns, jointly and
as the "OWNER", in the penal sum of
_ in lawful money of the United States,
and truly to be made, we bind ourselves,
severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered
into a certain Agreement with the OWNER, dated the day of ,
20_, a copy of which is hereto attached and made a part hereof for the
performance of The City of Fort Collins project, Bid 5982 Substation Lightning
Tower Installation.
NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its
duties, all the undertakings, covenants, terms, conditions and agreements of
said Agreement during the original term thereof, and any extensions thereof
which may be granted by the OWNER, with or without Notice to the Surety and
during the life of the guaranty period, and if the Principal shall satisfy all
claims and demands incurred under such Agreement, and shall fully indemnify
and save harmless the OWNER from all cost and damages which it may suffer by
reason of failure to do so, and shall reimburse and repay the OWNER all outlay
and expense which the OWNER may incur in making good any default then this
obligation shall be void; otherwise to remain in full force and effect.
7/96 Section 00610 Page 1
PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates
and agrees that no change, extension of time, alteration or addition to the
terms of the Agreement or to the Work to be performed thereunder or the
Specifications accompanying the same shall in any way affect its obligation on
this bond; and it does hereby waive notice of any such change, extension of
time, alteration or addition to the terms of the Agreement or to the Work or
to the Specifications.
PROVIDED, FURTHER, that no final settlement between the OWNER and the
CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim
may be unsatisfied.
PROVIDED, FURTHER, that the Surety Company must be authorized to transact
business in the State of Colorado and be acceptable to the OWNER.
IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts,
each one of which shall be deemed an original, this _ day of ,
20
IN PRESENCE OF: Principal
(Corporate Seal)
IN PRESENCE OF:
IN PRESENCE OF:
(Surety Seal)
(Title)
(Address)
Other Partners
By:
Surety
By:
By:
(Address)
NOTE: Date of Bond must not be prior to date of Agreement.
If CONTRACTOR is Partnership, all partners should execute Bond.
7/96 Section 00610 Page 2
TNVTTATION TO 11-)
SECTION 00615
PAYMENT BOND
Bond No.
KNOW ALL MEN BY THESE PRESENTS: that
(Firm)
(Address)
(an Individual), (a Partnership), (a Corporation), hereinafter referred to as
the "Principal" and
(Firm)
(Address)
hereinafter referred to as "the Surety", are held and firmly bound unto the
City of Fort Collins, 300 Laporte Ave., Fort Collins, Colorado 80522 a
(Municipal Corporation) hereinafter referred to as "the OWNER", in the penal
sum of in lawful money of the
United States, for the payment of which sum well and truly to be made, we bind
ourselves, successors and assigns, jointly and severally, firmly by these
presents.
THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered
into a certain Agreement with the OWNER, dated the day of ,
20 , a copy of which is hereto attached and made a part hereof for the
performance of The City of Fort Collins project, Bid 5982 Substation Lightning
Tower Installation.
NOW, THEREFORE, if the Principal shall make payment to all persons, firms,
subcontractors, and corporations furnishing materials for or performing labor
in the prosecution of the Work provided for in such Agreement and any
authorized extension or modification thereof, including all amounts due for
materials, lubricants, repairs on machinery, equipment and tools, consumed,
rented or used in connection with the construction of such Work, and all
insurance premiums on said Work, and for all labor, performed in such Work
whether by subcontractor or otherwise, then this obligation shall be void;
otherwise to remain in full force and effect.
7/96 Section 00615 Page 1
PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates
and agrees that no change, extension of time, alteration or addition to the
terms of the Agreement or to the Work to be performed thereunder or the
Specifications accompanying the same shall in any way affect its obligation on
this bond; and it does hereby waive notice of any such change, extension of
time, alteration or addition to the terms of the Agreement or to the Work or
to the Specifications.
PROVIDED, FURTHER, that no final settlement between the OWNER and the
CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim
may be unsatisfied.
PROVIDED, FURTHER, that the Surety Company must be authorized to transact
business in the State of Colorado and be acceptable to the OWNER.
IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts,
each one of which shall be deemed an original, this _ day of ,
20
IN PRESENCE OF:
(Corporate Seal)
IN PRESENCE OF:
IN PRESENCE OF:
(Surety Seal)
Principal
By:
(Title)
(Address)
Other Partners
Surety
By:
By:
(Address)
NOTE: Date of Bond must not be prior to date of Agreement.
If CONTRACTOR is Partnership, all partners should execute Bond.
7/96 Section 00615 Page 2
SECTION 00630
CERTIFICATE OF INSURANCE
CONTRACTOR shall insert his own standard form for Certificate of Insurance.
7/96 Section 00630 Page 1
SECTION 00635
CERTIFICATE OF SUBSTANTIAL COMPLETION
TO: CITY OF FORT COLLINS
(OWNER)
DATE OF SUBSTANTIAL COMPLETION: PROJECT TITLE: Bid 5982 Substation Lightning
Tower Installation
PROJECT OR SPECIFIED PART SHALL LOCATION: Fort Collins, Colorado
INCLUDE:
OWNER: Citv of Fort Collins
CONTRACTOR:
CONTRACT DATE:
The Work performed under this contract has been inspected by authorized
representatives of the OWNER, CONTRACTOR, and the ENGINEER and the project (or
specified part of the project, as indicated above) is hereby declared to be
substantially completed on the above date.
A tentative list of items to be completed or corrected is appended hereto.
This list may not be exhaustive, and the failure to include an item on it does
not alter the responsibility of the CONTRACTOR to complete all the Work in
accordance with the Contract Documents.
ENGINEER
AUTHORIZED REPRESENTATIVE DATE
The CONTRACTOR accepts the above Certificate of Substantial Completion and
agrees to complete and correct the items on the tentative list within the time
indicated.
By:
CONTRACTOR
AUTHORIZED REPRESENTATIVE DATE
The OWNER accepts the project or specified area of the project as
substantially complete and will assume full possession of the project or
specified area of the project at 12:01 a.m., on
responsibility for heat, utilities, security, and insurance
Documents shall be as set forth under "Remarks" below.
CITY OF FORT COLLINS, COLORADO By:
OWNER
REMARKS:
The
under the Contract
AUTHORIZED REPRESENTATIVE DATE
7/96 Section 00635 Page 1
SECTION 00640
CERTIFICATE OF FINAL ACCEPTANCE
TO:
Gentlemen:
20
You are hereby notified that on the _ day of , 20, the City of
Fort Collins, Colorado, has accepted the Work completed by
for the City of Fort Collins project, Bid 5982 Substation Lightning Tower
Installation.
A check is attached hereto in the amount of $ as Final
Payment for all Work done, subject to the terms of the Contract Documents
which are dated
In conformance with the Contract Documents for this project, your obligations
and guarantees will continue for the specified time from the following
date:
Sincerely,
OWNER: City of Fort Collins
By:
Title:
ATTEST:
Title:
7/96 Section 00640 Page 1
SECTION 00650
LIEN WAIVER RELEASE
(CONTRACTOR)
TO: City of Fort Collins, Colorado (OWNER)
FROM:
(CONTRACTOR)
PROJECT: Bid 5982 Substation Lightning Tower Installation
1. The CONTRACTOR acknowledges having received payment, except retainage
from the OWNER for all work, labor, skill and material furnished,
delivered and performed by the CONTRACTOR for the OWNER or for anyone in
the construction, design, improvement, alteration, addition or repair of
the above described project.
2. In consideration of such payment and other good and valuable
consideration, the receipt and adequacy of which are hereby acknowledged,
the CONTRACTOR voluntarily waives all rights, claims and liens, including
but not limited to, mechanic's liens, Miller Act claims (40 U.S.C.A. 270
a and b), stop notices, equitable liens and labor and material bond
rights which the CONTRACTOR may now or may afterward have, claim or
assert for all and any work, labor, skill or materials furnished,
delivered or performed for the construction, design, improvement,
alteration, addition or repair of the above described project, against
the OWNER or its officers, agents, employees or assigns, against any fund
of or in the possession or control of the OWNER, against the project or
against all land and the buildings on and appurtenances to the land
improved by the project.
3. The CONTRACTOR affirms that all work, labor and materials, furnished,
delivered or performed to or for the construction, design, improvement,
alteration, addition or repair of the project were furnished, delivered
or performed by the CONTRACTOR or its agents, employees, and servants, or
by and through the CONTRACTOR by various Subcontractors or materialmen or
their agents, employees and servants and further affirms the same have
been paid in full and have released in full any and all existing or
possible future mechanic's liens or rights or claims against the project
or any funds in the OWNER'S possession or control concerning the project
or against the OWNER or its officers, agents, employees or assigns
arising out of the project.
4. The CONTRACTOR agrees to defend and hold harmless the OWNER, the lender,
if any, and the Surety on the project against and from any claim
hereinafter made by the CONTRACTOR'S Subcontractors, materialmen,
employees, servants, agents or assigns against the project or against the
OWNER or its officers, employees, agents or assigns arising out of the
7/96 Section 00650 Page 1
project for all loss, damage and costs, including reasonable attorneys
fees, incurred as a result of such claims.
5. The parties acknowledge that the description of the project set forth
above constitutes and adequate description of the property and
improvements to which this Lien Waiver Release pertains. It is further
acknowledged that this Lien Waiver Release is for the benefit of and may
be relied upon by the OWNER, the lender, if any, and Surety on any labor
and material bonds for the project.
Signed this day of , 20
CONTRACTOR
By:
Title:
ATTEST:
Secretary
STATE OF COLORADO )
)ss.
COUNTY OF LARIMER )
Subscribed and sworn to before me this day of
20 , by
Witness my hand and official seal.
My Commission Expires:
Notary Public
7/96 Section 00650 Page 2
SECTION 00660
CONSENT OF SURETY
TO: City of Fort Collins, Colorado
(hereinafter referred to as the "OWNER")
CONTRACTOR:
PROJECT: Bid 5982 Substation Lightning Tower Installation
CONTRACT DATE:
In accordance with the provisions of the Contract between the OWNER and the
CONTRACTOR as indicated above, for
(Surety)
on bond of
hereby approves of the Final Payment to the CONTRACTOR, and agrees that Final
Payment to the CONTRACTOR shall not relieve the Surety Company of any of its
obligations to the OWNER, as set forth in the said Surety Company's Bond.
IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this
day of ,
(Surety Company)
By
ATTACH: Power of Attorney and Certificate of Authority of Attorney(s)-in-
Fact.
7/96 Section 00660 Page 1
SECTION 00670
APPLICATION FOR EXEMPTION CERTIFICATE
DR 0172 (12196)
COLORADO DEPARTMENT OF REVENUE
DENVERCO6026'I (303) 232-2416 CONTRACTOR APPLICATION
FOR
EXEMPTION CERTIFICATE
Puifsuantto Statute
Section 39 26.114(1)(a)QW
The exemption certificate for which you are applying crust be used only for the purpose of purchasing construction and building
materials for the exempt project described below. This exemption does not include or apply tothe purchase or rental of equipment,
supplies, and materials which are purchased, ferried, or consumed by the contractor and which do not become part of the structure,
highway, road, street, or other public works awned and used by the exempt organization.
Any unauthorized use oft he exemption certificate will result in revocation of your exemption certificate and other penalties provided
by law.
A separate certificate is required for each contract.
Subcontractors will not be issued Certificates of Exemption by the Department of Revenue. It is the responsibility of the prime
contractor to issue certificates to each of the subcontractors. (See reverse side).
FAILURE TO ACCURATELY COMPLETE ALL BOXES WILL CAUSE THE APPLICATION TO BE DENIED.
R89svadorJAcmtrt o.to be assigned by
PINaO
0170-750 (999)$0.00
race name _ ner, pa ner, or corporate name
Mailing address(City, State, ip).
ontac Person
E-Mail address: Federal Employer's Idenl cation Number
Dd amount for your contract.
ax um er'_ Business telephone number'.
ore o wthholding lax amount number
��tIF��I�l7 iPi% �� Gtil 8�1!}i GOT14"�18i ijt' , �r�:'a
`�tKeaeprca�firactargp�rffFeesmltd;fie°_
} tlR'k ��i9 e Ip
and't27D4r#ieAttFlge
aVcf ,.
eme or exempt organization ass own on contract) -
emp organize on s num r
98 -
Address ofexemp organizelion (City,State.Zip)_
Principal contact at exempt organization.
cirpal contact's le epri number
Physical location of project site give actual address when applicable and CiUu5 and/or County ties where projec Is ocaled)
Scheduled Month usy ear
construction start date_
Estimated Month ay ear
wmpletion date.
I declare under penalty of perjury in the second degree that the statements made in this application are true and
complete to the best of my knowledge
Signature of owner, partner or corporate officer
the of corporate oflicer
Date.
vv nvr "Mill M UCLVrr IM1IJ Emit:
Section 00670 Page 1
Special Notice
Contractors who have completed this application in the past, please note the following changes in procedure
The Department will no longer issue individual Certificates of exam ption to subcontractors. Only prime contrac-
tors will receive a Contractor's Exemption Certificate on exempt projects.
Upon receipt of the Certificate, the prime contractor should make a copy for each subcontractor involved in the
project and complete it by filling in the subcontractor's name and address and signing it.
The original Certificate should always be retained by the prime contractor. Copies of all Certificates that the
prime contractor issued to subcontractors should be kept at the prime contractor's place of business for a
minimum of three years and be available for inspection in the event of an audit.
Once an 899 has been assigned to you, please use the next five numbers following it for any applications
submitted for future projects. This should be your permanent number. For instance, if you were assigned 89-
12345-0001, every application submitted thereafter should contain 89-12345 on the application. The succeed-
ing numbers will be issued by the Department of Revenue. DO NOT enter what you believe to be the next in
sequence as this may delay processing of your application.
Section 00670 Page 2
SFCTT1lN �_ � i.'
TNVTTATTON `:) '- 1 _)
iI . -1a',, ",
�,t I - 1 P._ is soil! ,>e rby I Ii' C f y or Fort Collins het _iIt: p t W 1
,"ve'N-L; -i: th<' ottl ce of I t.F- Pur h-a:-,1 nil li'.1S10n, _:w L ._.. , ow Y x,
cn nc 7, 2006, for t Inc `,abstat or Trw i InotaLlaLion; PSI IS "10. �> If
delivered, they arc t :, he pie I i,,i r d 5 Hurt DOaoil St r eet_ oor , 1" .n r
_ _1f15, .OLOr,3CiC:, 8UL4 If mailed, ni' lll,ll 1 i r`:'1 ,1daYp:35 1 ti
r l�alili rime, an.i prom t-y L v L, It:too r, all 'WA, t_hit ,t:'r;
r�Sj I ;e Ilubli,ened art 1 r l,l 1cud.
n:onCr- 't tccumer t p I- o ,ide fqr the �c,nstruntian of F!-11 A_
Sul Ali nil F w;er lnstit I I aLion.
t r is I'isL he i-I with t Ic 'onLrac-_ Doculrrr-i-s al Ci t,ri
.,1t'; 1 2hrt Uol I ins, 215 Nor Lh t ason SL , Aid 'IOOY, FSt:L
.:II1 , : l —un<n.,._11 he -,1 lt, )1i06.
.owrlln;1c1 e Bid from 111, F)m :1-1:-;inC wehp,lge, ('irrr-,[t_
at:
i
11 ome T-,y Pnr::hasinq at !',, _J:>rth. P-7a_.or.SL., 1 I L-oor, I,'o r
arr(l IF:lip, rl -1 } v )f the Li:i.
,7 1 r. i I I I- rc pi alo Bel- forth in I IT, 7 hViAn Do_:unou'_s.
.r,,1 Lo h(� orrncr<<-d i-1 ill t_]le imc I,-,1 I „I k I I I,
mn 1 t-1on : Air 1: i ill l r I .n
�sn:l Li.i:liir iiL11 W it NA III 1 I t Itai!s't L' 1 ' n ['II i:,i I
i'a11t' -1r:I r-ll Ll1ft:l n, t :IT111.'1 �11 �' r11- r I";'If ... .':
c nr it s1:1_I Irwin 'he t.t1I)lITln� I ,I I
d IT G. : t _1 11 1 .,. W i t l i :7 a t e _ i r 1 '; t ` y L 1 L !
`- PdRf'L� r�ie r_ {ht C.1r ur1 ,11 I N_
,s
.. i,T 1 I ,
SECTION 00700
GENERAL CONDITIONS
GENERAL CONDITIONS
OF THE
CONSTRUCTION CONTRACT
These GENERAL CONDITIONS have been developed by using the
STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION
CONTRACT prepared by the Engineers Joint Contract Documents
Committee, EJCDC No. 1910-8 (1990 Edition), as a base. Changes to
that document are shown by underlining text that has been added and
striking through text that has been deleted.
EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION)
WITH CITY OF FORT COLLINS MODIFICATIONS (REV 9/99)
TABLE OF CONTENTS OF GENERAL CONDITIONS
Article or Paragraph
Page
Article or Paragraph
Page
Number & Title
Number
Number & Title
Number
1. DEFTMTIONS
......................................................1
2. PRELIMINARY MATTERS ................................
3
1.1
Addenda ..................................
_....... .1
2.1
Delivery of Bonds _.................
3
1.2
Agreement..........................................1
2.2
....
Copies of Documents........_...._.......3
...
1.3
Application for Payment, ......................
1
2.3
Commencement of Contract
1.4
Asbestos ,,,,,,,,,,,,,_- .............
I
Times; Notice to Proceed
3
1.5
Bid ....................................................
1
2.4
................
Starting the Work ............
3
1.6
Bidding Documents ... _................
........1
2.5-2.7
Before Starting Construction;
1.7
Bidding Requirements.
CONTRACTORS Responsibility
1.8
Bonds_.,._....,_„ _ __.,... ,.___.._.1
to Report, Preliminary Schediles,
1.9
Change Orden.....,_._ . ..................
1
Delivery of Certificates of
1.10
Contract Documents... ..... ..........
......... 1.
Insurance ...................................
3-4
1.11
Contract Price _.....,,.......
........ 1
2.8
Preconstruction Conference
4
1.12
Contract Times ......... ...........................
1
2.9
...............
Initially Acceptable Schedules ......_„4
1,13
CONTRACTOR ..................................
1
1.14
defective ........ ...._ ..............._.......1
3. CONTRACT
DOCUMENTS: INTENT,
1.15
Drawings...__.....................................1
AMENDING, REUSE ...._..._...............__...........A
1.16
Effective Date of the Agreement
........... 1
3.1-3.2
Intent..................4
1.17
ENGE\MER, ....... „_._.. .......
1
3.3
Reference to Standards and Speci-
1.18
ENGINEERS Consultant .............
..... .. 1
fications of Technical Societies;
1.19
Field order .......... ... ___..__..... _...,.,.....I
Reporting and .Resolving Dis-
1.20
General Requirements ............. ....
........ 2
crepancies ...............
4-5
1.21
Hazardous Waste ............. ......_...........
2
3.4
Intent of Certain Terms or
1.22.a
Laws and Regulations; Laws or
Adjectives,,,,__....................._....._5
Regulations.. . ............ .....................
_ 2
3.5
Amending Contract Dociments.,,,,,,_,5
1.22.b
Legal Holidays ......... ,,,___._.._..2
3.6
Supplementing Contract
1.23
Liens.................................................2
Documents ...................................
5
1.24
Milestone._.,,,,,,,._ ................
2
3.7
Reuse ofDocuments ..........................
5
1.25
Notice of Award ..................................
2
1,26
Notice to Proceed,,,,,,..._ ........ .......
__....2
4, AVAILABILITY
OF LANDS;
1.27
OWNER..., ........ ....
.... ._.2
SUBSURFACE AND PHYSICAL CONDITIONS;
1.28
Partial Utilization ...... _,,,,____.......
.,. 2
REFERENCE POINTS .........................................
5
1.29
PCBs ............. ..... ......... __.............
..2
4.1
Availability of Lands .....................
5-6
1.30
Petroleum ...,,,,__...........__,_._....._..2
42
Subsurface and Physical
1.31
Project...
Conditions.... .._..............._..........6
1.32.e
Radioactive Material .........................._2
4.2.1
Reports and Drawings,,,,,*
1,32.b
Regular Working Hours.. .....................
2
4.2.2
Limited Reliance by CONTRAC-
1.33
Resident Project Representative .......
..,..2
TOR Authorized; Technical
1.34
Samples ..................... ...........
2
Data.........._._...
1.35
Shop Drawings.__._............................2
4.2.3
_............. ......
Notice of Differing Subsurface
.6
] 36
Specifications ............ .. ........
2
or Physical Conditions. ...................
6
L37
Subcontractor ............ ...............
.... 2
4.2.4
ENGINEERsReview
6
1.38
Substantial Completion ...............
42.5
.......... _............
Possible Contract Documents
1.39
Supplementary Conditions ................
„2
Change....._......
1.40
Supplier ......... .......... ................
_.2
4.16
Possible Price and Times
1.41
Underground Facilities,,.._...............2-3
Adjustments ...... ..._............
6-7
1.42
Unit Price Work,.,._............._........_...3
4.3
.
Physical Conditions --Underground
1.43
Work
3
Facilities.,,__
1.44
Work Change Directive ...... _.3
4.3.1
Shown or Indicated
7
1.45
Written Amendment,,,
3
4.3.2
Not Shown or Indicated
7
4.4
Reference Points
7
EICDC GENERAL CONDITIONS 1910-8 (1990 EDITION
wi C1TY OF FORT COLLINS MODIFICATIONS (REV 9/99)
Article or Paragraph
Page
Article or Paragraph
Page
Number & Title
Number
Number &
Title
Number
4.5
Asbestos, PCBs, Petroleum,
6.25
Submittal Proceedures; CON -
Hazardous Waste or
TRACTOR's Review Prior
Radioactive Material... ...........
..7-8
to Shop Drawing or Sample
Submittal,,.,.,.
16
5. BONDS AND INSURANCE .........................
I . 8
6.26
_._
Shop Drawing & Sample Submit-
5.1-5.2
Performance, Payment and Other
talc Review by ENGINEER,,,__
16-17
Bonds........ I .............. ..........
8
6.27
Responsibility for Variations
5.3
Licensed Sureties and Insurers;
From Contract Documents
17
Certificates of Insurance....................8
6.28
............
Related Work Performed Prior
5.4
CONTRACTOR's Liability
to ENGINEER's Review and
Insurance............ _............ _.............9
Approval of Required
5.5
OWNF,R'sLiability Insurance __.,._._...9
Submittals
17
5.6
Property Insurance......_.................9-10
6.29
...................................
Continuing the Work ......................
17
5.7
Boiler and Machinery or Addi-
6.30
CONTRACTOR's General
tional Property Insurance„.............10
Warranty and Guarantee .........
5.8
Notice of Cancellation Provision ........
10
6.31-6.33
Indemnification
17-18
5.9
CONTRACTOR'sResponsibility
6.34
Survival of Obligations ................
.18
for Deductible Amounts ....................
10
5,10
Other Special Insurance....__,.,,.__......10
7. OTHER WORK..........._............_
5.11
Waiver of Rights ............ I ...................
7.1-7.3
...................._18
Related Work at Site
18
5.12-5.13
Receipt and Application of
7A
........................
Coordination _....,_..._,,..._..._..
18
Insurance Proceeds.. ........ ..„_.,.10-11
5.14
Acceptance of Bonds and Insu-
8. OWNER'S
RESPONSIBILITIES ..........................
18
ance; Option to Replace....._„ ..........11
8.1
Communications to CON-
5.15
Partial Utilization --Property
TRACTOR .................................
18
Insurance ... .....................................
11
8.2
Replacement of ENGINEER,,. .........
8
8.3
Furnish Data andPay Promptly
6. CONTRACTOR'S RESPONSIBILITIES,_......_,.,,11
When Due
18
6.1-6.2
Supervision and Superintendence..._.,,
11
SA
Lands and Easements; Reports
6.3-6.5
Labor, Materials and Equipment...
11-12
and Tests,.,.....,,_._._....._._.
6.6
Progress Schedule.,._,_,__ .....
. ......
._.12
8.5
„.18-19
Insurance19
6.7
Substitutes and "Or -Equal" Itcros;
8.6
Change Orders . ............ ........ _..
19
CONTRACTOR's Expense,
8.7
Inspections, Tests and
_
Substitute Construction
Approvals., ..... ... .. .....
19
Methods or Procedures,
8.8
Stop or Suspend Work;
ENGINEER'sEvaluation ........,,,12-13
Terminate CONTR4CTOR's
6.9-6.11
Concerning Subcontractors,
Services
19
Suppliers and Others;
8.9
Limitations on OWNER'S
Waiver of Rights._.. „_......... .....13-14
Responsibilities.._._..,
19
6.12
Patent Fees and Royalties_.,_„ .............
14
8.10
..........
Asbestos, PCBs, Petroleum,
.
6.13
Permits..............__..-..._.........14
Hazardous Waste or
6.14
Laws and Regulations, _.,__...........
I... 14
Radioactive Material
19
6,15
Taxes_.14-15
8.11
.....................
Evidence ofFinaneal
6-16
Use of Premises......__... ...........15
Arrangements.,......._........._......19
6.17
Site Cleanliness. . ,.
.............................
15
6.1 S
Safe Structural Loading_ .............
15
9. ENGINEER'S STATUS DURING
6.19
Record Docum ents
15
CONSTRUCTION........._........_
6.20
Safety and Protection„.................15-16
9.l
.............._.....19
OWNER'sRepresentative
6.21
Safety Representative ..,__16
9.2
.......,__19
Visits to Site.,
19
622
Hazard Communication Programs ......
16
9.3
...........
Project Representative
6.23
Emergencies.._,,,_,,.._..,.,
16
94
...... __ _.,19-21
Clarifications and lnterpre-
624
Shop Drawings and Samples .........16
tations, ..._....._.._21 .......................
95
Authorized Variations in Vbik
21
EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION)
w/ CI7T OF FORT COLLINS MODIFICATIONS (REV 9/99)
Article or Paragraph
Page
Article or Paragraph
Page
Number & Title
Number
Number & Title
Number
9.6
Rejecting Defective Work ...................
21
13.8-13.9
Uncovering Work at ENGI-
9.7-9.9
Shop Drawings, Change Orders
NEER's Request... . ...............
and Payments....................................21
13.10
OWNER May Stop the Work.......,...28
_27-28
9.10
Determinations for Unit Prices......
21-22
13.11
Correction or Removal of
9.11-9.12
Decisions on Disputes; ENGI-
Defective Work .................
28
NEER as Initial Interpreter..............22
13.12
___
Correction Period ............................
28
9.13
Limitations on ENGINEER'S
13.13
Acceptance ofDefective Work28
Authority and Responsibilities._.22-23
13.14
OWNER May Correct Defective
Work.....................................
28-29
CHANGES IN
THE WORK ........... _ _. _........_... _.
_..23
10.1
OWNER's Ordered Change_ _.............23
14. PAYMENTS
TO CONTRACTOR AND
10.2
Claim for Adjustment,._....._.,.,,,_
_._23
COMPLETION ......................._......_
29
10.3
Work Not Required by Contract
14.1
Schedule of Values ..........................
29
Documents _ ........... ........_23
14.2
Application for Progress
10A
Change Orders ...._..I ...... ._... .......
..... 3
Payment .......... ........
105
Notification of Surety ........... ....._._._23
14.3
................_.29
CONTRACTOR'S Warranty of
Title... . ..... I ... I ..........................
CHANGE OF CONTRACT PRICE ._................. ..........
23
14.4-14.7
Review of Applications for
_29
11.1-11.3
Contract Price, Claim for
Progress Payments...... .............
29-30
Adjustment; Value of
14.8-14.9
Substantial Completion.,,,,,_,._..,...
30
the Work .,,,,,,,...........................
23 1-4
14.10
Partial Utilization .......................
30-31
11.4
Cost of the Work...........................24-25
14.11
Final Inspection ,_,..,_._..___„__
31
11.5
Exclusions to Cost of the Work, _..,
...... 25
14.12
Final Application for Payment_....._.31
......
11.6
CONTRACTOR'S Fee......
25
14.13-14.14
Final Payment and Acceptance..._, 31
11.7
Cost Records ,.,.,...._,___._....._._._25-26
14.15
Waiver of Claims
31-32
11.8
Cash Allowances,,,,.... „.............26
11.9
Unit Price Work, ......... .....................26
15. SUSPENSION
OF WORK AND
TERMINATION ...............................................
32
CHANGE OF CONTRACT TIMES ........... .................
26
15.1
OWNER May Suspend Work.........,32
12.1
Claim for Adjustment t...__...............
26
15.2-15.4
OWNER May Terminate
2
12.2
Time of the Essence..,,,
26
15.5
...
CONTRACTOR May Stop
...
12.3
Delays Beyond CONTRACTOR'S
Work or Terminate ..................
32-33
Control_._ .................................
26 27
12.4
Delays Beyond OWNER'S and
16, DISPUTE RESOLUTION
33
CONTRACTOR'S Control .................
27
IT MISCELLANEOUS......_............_
TESTS AND
INSPECTIONS; CORRECTION,
17.1
...................33
Giving Notice,,,.._.._,.....,,
33
REMOVAL OR ACCEPTANCE OF
17.2
..........
Computation of Times...................33
DEFECTIVE
WORK....__...__ ............. ... ......___.....
27
17.3
Notice of Claim..........__....__..__.33
13.1
Notice of Defects .............__.....,.,?7
17.4
Cumulative Remedies
33
13.2
Access to the W'ork...,„ _.
27
ITS
......................
Professional Fees and Court
13.3
Tests and Inspections,
Costs Included
CONTRACTOR's Cooperation ,.._.,
27
17.6
..............._...........33
Applicable State Laws ................
3-34
13.4
OWNER's Responsibilities,
Intentionally left blank.,_ ......... __
35
Independent Testing Laboratory
....... 17
13.5
CONTRACTOR's
EXHIBIT GC -A:
(Optional)
Responsibilities .......................
27
Dispute Resolution Agreement,
GC -Al
13.6-13.7
Covering Work Prior to Inspec-
16.1-16.6
Arbitration ...............................
GCAl
lion, Testing or Approval ... ,.... _.___27
16.7
Mediation
GC-A]
tv EJODC GENERAL CONDITIONS 1910-8 (1990 EDITION) -
w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9!99)
INDEX TO GENERAL CONDITIONS
City of Fort Collins modifications to the General Conditions of the Construction Contract are not shown in this index
Article or Paragraph
Number
Acceptance of --
Bonds and Insurance 5.14
defective Work ...........................10.4.1, 13.5, 13.13
final payment ....................................... 9.12, 14.15
insurance .............. 5.14
other Work, by CONTRACTOR 7.3
Substitutes and "Or -Equal" Items ....... -.6.7.1
Work by OWNER ........ .. . ...... 2.5, 630, 6.34
Access to the --
Lands, OWNER and CONTRACTOR
responsibilities .............................................. 4.1
site, related Work ............
Work-, - 13.2, 13.14, 14,9
........................................
Acts or Omissions, Acts and Omissions --
CONTRACTOR -6.9.1, 9.13.3
ENGINEER ....................... . . 6.20, 9. 13.3
OWNER ........................ 6.20, 8.9
Addenda --definition of (also see
definition of Specifications) ........(1. 6, 1.10, 6.19), 1.1
Additional Property Insurances, ......................... 5.7
Adjustm ents--
Contract Price or Contract
Times....__ ...... ... ...... 1. 5. 3.5, 4.1, 4.3.2, 4, S. 2,
................... I ......... :4.5.3, 9.4, 9.5, 10.2-10.4,
....... .................. ............. 11, 12, 14.8, 15.1
progress schedule .... ........... ........................ .... 6.6
Agreement --
definition of ' 1.2
"All -Risk" Insurance, policy form....,,,_,__...............5.6.2
Allowances, Cash, ......................................... ... 11.8
Amending Contract Documents........ ............. 3.5
Amendment, Written --
in general., ............... 1. 107 1.45, 15, 5. 10, 5.12, 6.6.2
.................... 6.8.16.19, 10.1, 10.4, 11.2
1 ... ... .................. ... 12A, 13.12.2, 14.7.2
Appeal, OWNER or CONTRACTOR
intent to ' ** 9.10, 9.11, 10.4, 16.2, 16,5
Application for Payment--
definition of., ..... I ...... 11.11_1 .......... - 13
ENGINEERs Responsibility..... � ............... 9.9
final payment ..... ............. 9.13.4, 9,115, 14.12-14. 15
in general ..2.8, 2.9, 5.6.4, 9.10, 15,5
progress payment......__....._ ........ ........ 14.1-14.7
review of......... 144-14.7
Arbitration ............. 16.1-16,6
Asbestos --
claims pursuant thereto... . ...... 4.5.2, 4 5.3
CONTRACTOR authorized to stop Work.. ... 4.5.2
definition
Article or Paragraph
Number
OWNER responsibility for '
4.5.1, 8.10
possible price and times change ........................
4.5.2
Authorized Variations in Work_.._.,_,.
3.6, 6.25, 6.27, 9.5
Availability of Lands
8.4
Award, Notice of --defined
1.25
Before Starting Construction ... .
..... ...... .. 2,5-2.8
Bid --definition of_.......,,_.,_ _ _ J. 5
(1, 1, 1.10, 2.3, 3.3,
I I ............ 4.2.6.4, 6,11 11.4.3, 11.9.1)
Bidding Documents --definition
of.1.1 ... 11 ...........................
...... 1,6(6.8.2)
Bidding Requirements --definition
of ...... ..............
1.1.7 (1.1, 4.2.6.2)
Bonds --
acceptance of .................................._................5.14
additional bonds
11.4.5.9
Cost of the Work
11.5.4
definition of
1.8
delivery of..... .................... ...
.... ....... 211 5.1
final Application for Payment .............
.. _1 4. 12-14.14
general ......................................
1. 10, 5.1-5.3, 5.13,
- 1.. 1. -_ .... I ........ . ... ......
9.13, lo.5, 14.7.6
Performance, Payment and Other
... ...... ....... 5.1-5.2
Bonds and Insurance --in general
5
Builder's risk "all-risk" policy form„ _........
_... � 5.6.2
Cancellation Provisions, Insurance ....
... 5A 11, 5.8, 5.15
Cash Allowances .............
........ ...... 11.8
Certificate of Substantial Completion,
1,38, 6.30.2.3,
.... 14.8, 14A0
Certificates of Inspection. . .......... .....
9.13.4, 13.5, 14.12
Certificates of Insurance . � .... _.. 17,
53, 5.4.11, 5.4,13,
I .......... ........... 5.65, 5.8,
5.14, 9A3.4, 14.12
Change in ContractPrice--
CashAllowances, ............. .....
1.8
claim for price
adjustment........_.. 4.1, 4_16.
4.5, 5.15, 6.8.2, 9.4
..__.._.9.5, 9 11, 10
2, 10, 5, 11 2, 13.9,
- _ .............. J3.11, 13,14,
14.7, 15 1, 15 5
CONTRACTOR's fee. .. ......
11.6
Cost of the Work
general ... ......... .. ........
A-11.7
Exclusions to
11.5
Cost Records
IL7
in general .............1.19, 1.44, 9,11,
10,4.2, 10.43, 11
Lump Sum Pricng
11,12
Notification of Surety ......
los
Scope of .... _ , . , . . ....
10.3-10.4
Testing and Inspection,
Uncovering the Work, .. . .....
... ... .. .... 13.9
EJCDC GENERAL CONDITIONS 1910-8 (1990 EDMONI
w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9,991
Unit Price Work.............._..........._.............J1.9
Article or Paragraph
Number
Value of Work..................................................11.3
Change in Contract Times --
Claim for times adjustment ........
4.1, 4.2.6, 4.5, 5,15,
............ 6.8.2, 9.4, 9.5, 9.11,
10.27 10.5, 12.1,
...... _..13.9,13.13,13.14,14.7,15.1,15.5
Contractual time limits.....................................12.2
ACTOR's Delays beyond CONTR
control..................... _....._........
. _........12.3
Delays beyond OWNER's and
CONTRACTOR's control .........................._12.4
Notification of surety .........................
........ .._....10.5
Scope of change ........................
_.............10.3-10.4
Change Orders --
Acceptance o£Defecfive Work .................
_........ 13,13
Amending Contract Documents .......
_.............. 3.5
Cash Allowances..............................................11.8
Change of Contract Price..,_.,,,,.._._....__,
,. 11
Change of Contract Times ....... .......................
....12
Changes in the Work ..........................................
10
CONTRACTOR's fee ..... ,._„_.___..,._..._..,_._....11.6
Cost of the Work ......... ...._.._.......
_.__.11.4-11.7
Cost Records .............. ............
......„.... _ . _ 11.7
definition of _... .................._.
._........1.9
emergencies ........................................
_ _ _.. _.. 6.23
F,NGINF.ER'sresponsibility ........
.8, 10.4, 11.2, 12.1
executionof... ... ... ... .....................
..._................10.4
Indemnifiction .......................... 6.12, 6.16, 6.31-6.33
Insurance, Bonds and ....... ,..............
, ,10, 5.13, 10.5
OWNER may terminate_.,.,..... ___
..............152-15.4
OWNER's Responsibility, ...... .......
_ .......... 8.6, 10.4
Physical Conditions --
Subsurface and ................ .... ......................._.4.2
Underground Facilities ............
............ .._..4.3.2
Record Documents ..........................................
6.19
Scope of Change ..........................
_ ..........10.3-10.4
Substitutes................._........................6.7.3,
6.8.2
Unit Price Work ....... .............................11.9
value of Work, covered by, ....
__................11.3
Changes in the Work,__,_.....,.,.,__......
...................... ]0
Notification of surety ..... .......... _..
_........-_ _ _ _... 10.5
OWNER's and CONTRACTOR's
responsibilities,.,........._ ......
..............._J0.4
Right to an adjustment....._... _..........................10.2
Scope of change. ..... .._........ _._
..............10.3-10.4
Claims --
against CONTRACTOR ....... ....__........
.......6.16
against ENGINEER. . _.....,..__,
__.. __.. ......632
against OWNER _._ ....... .._......_.....__......
._..6.32
Change of Contract Price, .............
9.4, 112
Change of Ccrtract Times ........
._.. 9A, 12.1
CONTRACTOR's....... _..__4, 7.1,
9A, 9.5, 9.11, 10.2.
...............112, 11.9,
121, 13.9, 14 8,
........................._.................15.1,
15.5, 17.3
4l
CONTRACTOWs Fee ......_............. _......._.__,,,11.6
Article or Paragraph
Numher
CONTRACTOR's liability_ ..... __5.4, 6.12, 6.16, 6.31
Cost of the Work_.._._....._............._........11.4,
11.5
Decisions on Disputes .......... ...... .............9.11,
9.12
Dispute Resolution ................ _ _............
_.. _... _.16.1
Dispute Resolution Agreement.,___.....,_.,,
16.1-16.6
ENGINEER as initial interpretor ,,,,..,..
.,,.,.9.11
Lump Sum Pricing ................... ..............
I........ 11.3.2
Noticeof...._.........._..._..................._...........17.3
OWNER's..... _............. 9.4, 9.5, 9.11,
10.2, 11.2, 11.9
.......... 12.1, 13.9, 13.13, 13.14, 17.3
OWNER sliability..,. ....... _ ...............................
J.5
OWNER may refuse to make payment.
_..._.....,..... 14.7
Professional Fees and Court Costs
Included .....................................................
I T 5
request for formal decision on............................9.11
Substitute Items......................_....._...,,.,,___,_6.7.1.2
Time Extension,._... I ....................... ...............
Time requirements ........... I ........... .. _...
_.....9.11, 12.1
Unit Price Work.. ..... ...................................
11.9.3
Valueof..................__..._...........................__.11.3
Waiver of --on Final Payment .......
14.14, 14.15
Work Change Directive __,_._.......,_-.
10.2written
notice required-
...... .....9,11,
11.2, 12.1
Clarifications and Interpretations ............
3.6.3, 9.4, 9.11
CleanSite.........................................._..............,6.17
Codes of Technical Society, Organization
or Association .........................................._.....
3.3.3
Commencement of Contract Times ............................
2.3
-
Communications_
general ....... ........ ...... .............. .........
6.2, 6.9.2, 8.1
Hazard Communication Programs„_ ...................
6.22
Completion --
Final Application for Payment ................_......14.12
Fina l Inspection .. _...........................
_.............14.11
Final Payment and Acceptance ................
14.13-14.14
Partial Utilization_......................_.._.._..,.__..,.14.10
Substantial Completion.... ..... ......
1.38, 14.8-14.9
Waiver of Claims...............__........__.._........14.15
Computation oflintes..................._...___..172.1-I
T2.2
Concerning Subcontractors, Suppliers
and Others. _..........................._ _..............
6.8-6.11
Conferences --
initially acceptahle schedules ........
....... _ 2.9
preconstruction ................................
Conflict. Error, Ambiguity, Discrepancy --
CONTRACTOR to Report....._,,, ..........
_., 2.5, 3.3.2
Construction, before starting by
CONTRACTOR. _ .....................................
2.5-2.7
Construction Machinery, Equipment, etc,
....... .......,. 6A
Continuing the Work .....................................6.29,
10.4
Contract Documents--
Amending.... ....... ....... ...... ................ .....__.........3.5
Bonds
EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION)
w,' CITY OF FORT COLLINS MODIFICATIONS (REV 9199)
Cash Allowances........ _....... _........... _..............11.8
Article or Paragraph
Number
Change of Contract Price,.,,,._
-11
Change of Contract Times _._...........,_......._...
12
Changes in the Work, ........... _._....... .........
0.4-10.5
check and verify ................
Clarifications and
Interpretations ........_.„....,....... .2, 3.6, 9A, 9,11
definition of... ...... .. I ........ ................
1.10
ENGINEER as initial interpreter of ........
... .11
ENGINEER as OWNER'S representative ...........
..9.1
general3
Insurance...........................................................5.3
Intent .. ... ..................... ..............................3.1-3.4
minor variations in the Work .. ..................3.6
OWNER's responsibility to furnish data„.............8.3
OWNER's responsibility to make
prompt payment ......... ,_,,,_....... _.8.3, 14A,
14,13
precedence ........................_._.............. _..3.1,
3.3.3
Record Documents ................ ..... _ _,, .. _-... _.
_..., .6. l9
Reference to Standards and Specifications
of Technical Societies.._._.,..,_.....,.....___.__.....
3.3
Related Work... ......
_7.2
Reporting and Resolving Discrepancies...... ........
2.51 3.3
Reuse of... _ ..........................._.....
3.7
Supplementing ................................. _ ...............
3.6
Termination of ENGINEER's Employment..
.......... 8.2
Unit Price Work ........................................
_.....11.9
variations.......................I.................3.6,
6.23, 6.27
Visits to Site, ENGINEER's................_..._.___,...
9.2
Contract Price --
adjustment of....._._.,.,_.3.5, 4 1, 9.4, 10.3,
11.2-113
Change of ._.... ......................
11
Decision on Disputes.., _........ _ ............... _
_. _ , .. 9,11
definition of ....................................................
L i l
Contract Times --
adjustment of ..........................3.5, 4.1, 9.4, 10.3, 12
Change of............. ..........................
12.1-12.4
Commencement of ...... .............._.........._2.3
definition of _....................
CONTRACTOR --
Acceptance of Insurance .................._._..
.i 14
Communications,
6.2, 6.9.2
Continue Work ....... .................._._........... .29, 10A
coordination and scheduling ...... .......... ......
692
definition of...,,,
1 13
Limited Reliance on Technical
Data Authorized.........._ .................
_.....4.2.2
May Stop Work or Terminate
15.5
provide site access to others,,..,.,__.,....._.
7.2, 132
Safety and Protection,....,._.,, _ _ _. 4.3.12, 6.16,
6.18,
... ............................... 6,21-6.23,
22. 13.2
Shop Drawing and Sample Review
Prior to Submittal. .................
................
.. _ 6.25
to
Stop Work requirements.. ..... ....... ....4.5.2
CONI'R4CTOR's-
Article or Paragraph
Number
Compensation .................................. _ ... _...11.1-112
Continuing obligation... ....... ......................._
14.15
Defective Work.. _...... 9.6, 13.10-13.14
Duty to correct defective Work ..........................13.11
Duty to Report --
Changes in the Work caused by
Emergency... ....... ... _ .........................
6.23
Defects in Work of Others ...............................
7.3
Differing conditions„...................._.._,._._._4.2.3
Discrepancy in Documents_....__ 2.5, 3.3.2,
6.14.2
Underground Facilities not indicated...,......
4.3.2
Emergencies,
6.23
Equipm ent and Machinery Rental, Cost
of the Work...........................................11.4.53
Fee --Cost Plus _.........._.._„._._...11.4.5,6, 11.5.1,
11.6
General Warranty and Guarantee.......................6.30
Hazard Communication Programs ..............
.6.22
Indemnification ...._,,....__..,....... 6 12, 6.16, 6.31-6.33
Inspection of the Work ...............__..,,
7.3, 13.4
Labor, Materials and Equipment. ....... _...
_ 6.3-6.5
Laws and Regulations, Compliance by .... _...
_...6,14.1
Liability Insurance...... ........
_.... .5.4
Notice of Intent to Appeal ..........................9.10,
10.4
obligation to perform and complete
theWork....................................................6.30
Patent Fees and Royalties, paid for by................6.12
Performance and Other Bonds,.,...._.. .................
5.1
Permits, obtained and paid for bY..__,,,,_............613
Progress Schedule... .... ._.........._._..2.6, 2.8,
2.9, 6.6,
_.._ ..........................6,29, 10.4,
15.2.1
Request for formal decisionon disputes .............
9.11
Responsibilities_
Changes in the Work ..................._,......._.,,
10.1
Concerning Subcontractors, Suppliers
and Others .............. .................... ....6.8-6.11
Continuing the Work„._.. _,,,,__....,...-629,
10.4
CONTRACTOR's expense.,.
„.. 6.7.1
CONTRACTOR's General Warranty
and Guarantee ....,_,,,_.
. __.6.30
CONTRACTOR's review prior to Shop
Drawing or Sample submittal .............
6.25
Coordination of Work,__...,. ..,.,.
6.9.2
Emergencies..........„ ..........6.23
ENGINEER'S evaluation, Substitutes
or "Or -Equal" Items .... ...............6.7.3
For Acts and Omissions
of Others. _ . _...................... 6.9.1-6.92, 9.13
for deductible am ounts, insurance. ,_......
_ 5.9
general... .._,...._„_.._....._...._....6, 72,
7 3, 8.9
Hazardous Communication Programs, _.......
,.6 22
Indemnification ................ _.......... _..._
5, 31-6,33
EICDC GENERAL CONDITIONS 1910-8 (1990 EDITION
W CItY OF FORT COLLINS MODNFICA'LIONS (REV 9/99)
Labor, Materials and Equipment ...... ..... ...6.3-6.5
Laws and Regulations ........................ ..._._.6.14
Liability Insurance, .......... ....... . 5.4
Article or Paragraph
Number
Notice of variation from Contract
Documents ...........................................
6.27
Patent Fees and Royalties.... _ _............
_... _ . 6.12
Perm its .......................... .............................
6.13
Progress Schedule.........................................6.6
Record Documents... ........ . ..... ................
_ 6,19
related Work performed prior to
ENGINEER's approval of required
submittals .............................................
6.28
safe structural loading ............. ....................
6.18
Safety and Protection.. ..... ...........620, 7.2, 13.2
Safety Representative. _„_ _...... ...................
. _.6.21
Scheduling the Work ............ ......................
6.9.2
Shop Drawings and Samples...__ .................
6.24
Shop Drawings and Samples Review
by ENGINEER ......_..............................6.26
Site Cleanliness .................„.._....................
6.17
Submittal Procedures,,,,.._ ...........................6.25
Substitute Construction Methods
and Procedures........ __....._....__......6.Z2
Substitutes and "Or -Equal" Items .............
..6.7.1
Superintendence—, ......................................
6.2
Supervision ........................ _.................
...... 6.1
Survival of Obligations......_........................6.34
Taxes.........................................................
6.15
Tests and Inspections.... . ......... ........
.. 13.5
To Report .......................
..... 2.5
Use of Premises ...... ............ ....6.16-6.18, 6.302.4
Review Prior to Shop Drawing or
Sample Submittal ....................._.................
6.25
Right to adjustment for changes in the Work.....10
2
right to claim .......... . 4, 7.1, 9.4, 9.5, 9.11,
10.111.2,
11.9, 12.1, 139, 14.8, 15.1,
15.5, 17.3
Safety and Protection ........... ....... 620-6.22,
7.2, 13.2
Safety Representative ...... I ........ ,_,
Shop Drawings and Samples Submittals, ....
6.24-628
Special Consultants,._._.,......,_,.._...... _,....11AA
Substitute Construction Methods and Procedures 6.7
Substitutes and "Or -Equal" Items,
Expense ........ .................. ......... ..._6.7.1,
6.7.2
Subcontractors, Suppliers and Others ..........
6.8-6.11
Supervision and Superintendence,_,._..,_6.1,
6.2, 6,21
Taxes, Payment by..........- ................... .......16
15
Use of Premises ... ............. _ .. .......... _ .. _ ....
6.16-6.18
Warranties and guarantees_ ..
6.5, 6.30
Warranty of Title ................_
......................
._...,14.3
Written Notice Required --
CONTRACTOR stop Work or terminate.,..
Reports of Differing Subsurface
and Physical Conditions .......................
4 2 3
Substantial Completion ..... _..... ......___.
...... 14.9
viii
CONTRACTORS --other .............. _.............................. 7
Contractual Liability Insurance.._..._ ............... - ..... 5..4.10
Contractual Time Limits ........ .12.2
Article or Paragraph
Num her
Coordination--
CONTRACTOR'sresponsibility... _._ ................6.92
Copies of Documents
2.2
Correction Period..................................................13.12
Correction, Removal or Acceptance
of Defective Work--
in general, .................. .......... 10A
L13.10-13.14
Acceptance of Defective Work ... ..........
_,.,....... 3.13
Correction or Removal of
Defective Work_,.,,,... _
...6.30, 13.11
Correction Period.... .................. ...................
13.12
OWNER May Correct Defective Work..............13.14
OWNER May Stop Work ................... _............13.10
Cost --
of Tests and Inspections._,_,....
.., 13.4
Recordsll.7
Cost of the Work --
Bonds and insurance, additional. ..............
... 11.4.5.9
Cash Discounts._ .....................................
..11.4.2
CONTRACTORS Fee ......... .. ...__.......
_ 11.6
Employee Expenses........... _....... .._..........
..11.4.5.1
Exclusions to ....................................................
11.5
General 11.4-11.5
Home office and overhead expenses ....................11.5
Losses and damages, .................... _..
11.4.5.6
Materials and equipment.... ..... _......
11.4.2
Minor expenses..
11.4.5.9
Payroll costs on changes,. _..... .. .. ... .......
... . ......11.4.1
performed by Subcontractors...........................11.4.3
Records11.7
Rentals of construction equipment
and machinery ........................... ...........
11.4.5.3-
Royalty payments, permits and
license fees ......................... _,.._.._._..,..,,,11.4.5.5
Site office and temporary facilities....._
........11.4.5.2
Special Consultants, CONTRACTOR'S .............
11.4.4
Supplemental.........._......._..........._ ..._......._11.4.5
Taxes related to the Work..,...,. ,._.......
_., 1 L45A
Tests and Inspection_,.,...._.._
. ..........................
,_ 13.4
Trade Discounts............._.........._..................11.4.2
Utilities, fuel and sanitary facilities..............11.4.5.7
Work after regular hours ,_...........
Covering Work ....... _ .....................13.6-13.7
Cumulative Remedies._...................._......__...17.4-17.5
Cutting, fitting and patching...... ,___
........ ,... 22
Data, to be furnished by OWNER......... _ ....
..... _ _..... 8.3
Day --definition of ................ ..................
17.22
Decisions on Disputes .................... .... .._..___._,9.11,
9.12
defective--clefinitionof...., _,,.._.-.._.
114
defective Work--
Acceptanceof......... .......... ........... ..
10AA, 13.13
EJCDC GENERAL CONDITIONS 1910-8
(1990 EDITION)
w/ CITY OF FORT COLLINS MODIFICATIONS
(REV 9i99)
Correction or Removal of .... ....... __....,_.10.4.1, 13.11
Correction Period...........................................13.12
in general._ ....... ............................... 13, 14.7, 14.11
Article or Paragraph
Number
Observation by ENGINEER ................................
9.2
OWNER May Stop Work ......... ........................
13.10
Prom pt Notice of Defects ...... ..... .... _.......
_ „_. _..13.1
Rejecting............................. _ ...........................9.6
Uncovering the Work.................................I....13.8
Definitions...__.._ ,.,..... .......................................
1
Delays .... ............ 6.29, 12.3-12.4
Delivery of Bonds..... __.......................................
_.. 2.1
Delivery of certificates of insurance .... _..............
_.....2.7
Determinations for Unit Prices
......9,10
Differing Subsurface or Physical Conditions --
Notice of.. . .......... ..........
423
ENGINEER's Review .......................................
4.2.4
Possible Contract Documents Change.... .
....... 4.2.5
Possible Price and Times Adjustments.. ..
.....
Discrepancies -Reporting
and Resolving ......... ...................... 2.5, 3.3.2,
6.14.2
Dispute Resolution—
Agreement ._.......... __....... _....... _._........16.1-16.6
Arbitration_...__..._.........._._..................16.1-16.5
genera116
Mediation.._....................................................
16.6
Dispute Resolution Agreement....... „.. . ............1.6.1-16.6
Disputes, Decisions by ENGINEER .... ..............9.11-9.12
Docum ents--
C:opies of ....... ................_..............................._.'
2
Record 6.19
Reuse of....,
3.7
Drawings --definition of..... ...... .........................
1.15
Easements .......... ......... ......
4.1
Effective date of Agreement -- definition of.. ............1.16
Emergencies ...............................
6.23
ENGINEER --
as initial interpreter on disputes„ ...............
9.11-9.12
definition of .... ... ...................................1,17
Limitations on authority and responsibilities.,.,.
9.13
Replacement of,_....._................................._......8.2
Resident Project Representative ....................
9.3
ENGINEER's Consultant -- definition of
.....................
1.18
ENGINEER's--
authority and responsibility, limitations on...
,,..9.13
Authorized Variations in the Work
.......................
9.5
Change Orders, responsibility for....... 9.7,
10, 11, 12
Clarifications and Interpretations ....... ,.__,3.6.3,
9A
Decisions on Disputes.._ ............ ...... .._9.11-9
12
defective Work, notice of...
13.1
Evaluation of Substitute Items.... ..........
6.7.3
Liability____ ..................... _..... __6.32,
9.12
Notice Work is Acceptable ........ ..............
14.13
Observations..
630.2, 92
ix
OWNER's Representative.............__.,__..._..._._.,,9.1
Payments to the CONTRACTOR
Responsibility for...9.9,
14
Recommendation of Payment....................14A,
14.13
Article or Paragraph
Number
Responsibilities --Limitations on.................9.11-9.13
Review of Reports on Differing Subsurface
and Physical Conditions,..... _..........
.. .... _... 4, 2.4
Shop Drawings and Samples, review
responsibility, ............ ..........................6.26
Status During Construction --
authorized variations in the Work
....................
9.5
Clarifications and Interpretations .................9.4
Decisions on Disputes ......................
. .. 9.11-9.12
Determinations on Unit Price ........................
9.10
ENGINEER as Initial Interpreter ....
9.11-9.12
ENGINEER'S Responsibilities ...............9.1-9.12
Limitations on ENGINEER'S Authority
and Responsibilities:_._.._,.__..._
9.13
OWNER'S Representative...,.........................
9.1
Project Representative......._ .............._......
9.3
Rejecting Defective Work... ... ..................
_... 9.6
Shop Drawings, Change Orders
and Payments......._.............__.......9.7-9.9
Visits to Site ...................... . _.............
_......... 9.2
Unit Price determinations._....._ .............
„ 9.10
Visits to Site, „ _...
9.2
Written consent required ..............................
72, 9.1
Equipment, Labor, Materials and ...... ,.._ ..............
6.3-6.5
Equipment rental, Cost of the Work ..................
11.4.5.3
Equivalent Materials and Equipment.........
_........... _ 6.7
error or omissions..................................................6.33
Evidence of Financial Arrangements .......................8.11
Explorations of physical conditions ........................4.2.1
Fee, CONTRACTORs--Costs Plus......,....._........_,,.11.6
Field Order_
definition of_......_................_......._...............1.19
issued by ENGINEER ......
3.6.1, 9.5
Final Application for Payment ...............................
14.12
Final Inspection.,._..,...
14.11
Final Payment --
and Acceptance............ _....... _....... .......14.13-14.14
Prior to, for cash allovences ................................
11.8
General Provisions ........... _........ ...............
......17.3-17.4
General Requirements --
definition of......___............._.._..__...........,,,.1.20
principal references to ..... ,... ..,.2.6. 6.4,
6.6-6.7, 6.24
Giving Notice ................................. .....................17.1
Guarantee of Work --by CONTRACTOR,, . .....
6.30, 14.12
Hazard Communication Programs, ......................
,_ 6.22
Hazardous Waste --
definition of.._...............:..................................1.21
general ....... _........... ..... ......
. _._._4.5
OWNER's responsibility for,._ ..................._...._
R.10
EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION)
w%CITY OF FORT COLLINS MODIFICATIONS (REV 9,99)
i. the -mT i ijitc L i ;() t- I I sr t j-- ') of r I- e �c I a L f, i i
h- 7 ri7 �,)e c i L i (wl in 7 he - r jrt :tic cs t ) FII d,lL n .
F 1 1 t riI i I I i ( 7 t of lilt rest: N r t j e o,,,— M,
financial iI I P, s t t I Lhe sale to the U- I v
I C' I tl U L rperty, e q; i i pme r i ia, i t- r r u car t-
se
I- C, F cycc
r n j n such ,I I e, or anv ;wp( r i s 1 autrit_y
11( iC L 'TI This 1 als. it I I ies L C) .3 1 :L, )n I a'- : :Ls t I
or T3 Copting any g L J t u- t r Ti 'n t L t
t lue f I on no 1 _ a s or
3 W L II the j f L�'o r t CC) I ri f -)h ib j r ed
It TIT of Fort
BY
James s. O'N e I L li, C'PPO, FN I G P
pu rc I ITi 5 i n(1 1, i k Mai i,,i qeme ii L i I (T :t 0 1
Indemnification..............................6.12,
6.16, 6.31-6.33
Initially Acceptable Schedules...........
„. . . .. .. . ........ . .. . 2.9
Inspection—
Certificates of.............................9.13.4,
13.5, 14.12
Final ...........................................................
1.. 4.11
Article or Paragraph
Number
Special, required byENGINEER............. ............
9.6
Tests and Approval ............................. 8.7, 13.3-13.4
Insurance --
Acceptance of, by OWNER ... . .......... _...........5.14
Additional, required by changes
in the Work............................................11.4.5.9
Before starting the Work, ... ................ ...............
2.7
Bonds and --in general............ _............................
5
Cancellation Provisions ....................................
... 5.8
Certificates of _...._......_2.7, 5, 5.3, 5.4.11,
5A4 13,
. _. 5.6.5, 5.8, 5.14, 9.13.4,
14,12
completed operations_....._.._................._....._5A.13
CONTRACTOR's Liability_, ......... ...................
..5 4
CONTRACTOR's objection to coverage .............
5.14
Contractual Liability ......................................5.4.10
deductible amounts, CONTRACTOR's
responsibility........... . ...........................
........5.9
Final Application for Payment..._,.. _................14.12
Licensed Insurers
5.3
Notice requirements, material changes ........
5.8, 10.5
Option to Replace_..........................................5.14
other special insurances,,,,,..._....._.__...__.,...,,,_5.10
OWNER as fiduciary for insureds.. _.5.12-5.13
OWNER's Liability .......... _............ _..................
S.5
OWNER's Responsibility.. ........................._.._....8.5
Partial Utilization, Property Insurance...............5.15
Property...... .......... I
_5.6-5.10
Receipt and Application of Insurance
Proceeds.......... _..... _...... _..................
5.12-5.13
Special Insurance ......................... ..........
I....... 5.10
Waiver of Rights..............................................5.11
Intent of Contract Documents ................................
Interpretations and Clarifications ......
3.6.3, 9.4
Investigations of physical conditions .........................4.2
Labor, Materials and Equipment, ...... ...........6.3-6.5
Lands --
and Easements .........._. _..,__,_......,..8A
................ .
Availability of ..................... ..........
4.1, 8A
Reports and Tests......................................._......8.4
Laws and Regulations --Laws or Regulations--
Bonds._........._........._..._.._......__........5.1-5.2
Changes in the Work ..... .......
Contract Documents ................. _....................
3.1
CONTRACTOR's Responsibilities ....................6.14
Correction Period, defective Work .. ..............13.12
Cost of the Work, taxes... ..... ...... .._. ... 1.1._
11.4.5.4
definitionof. ..__........ ......... _......._. _.........
.
genera16.14
Indemnification ........ ................ .... ...._...,..
6.31-6. 33
Insurance..........................................................5.3
Precedence................................................3.1,
3.3.3
Reference to....................................................3.3.1
Safety and Protection ................................
6,20, 13.2
Subcontractors, Suppliers and Others ..........
Article or Paragraph
Number
Tests and Inspections ........ ............. . . .. ....
.....13.5
Use of Premises ... ......................................._.
6.16
Visits to Site.. _.................... _.......................
_....9.2
Liability Insurance--
CONTRACTORs..............................................5.4
OWNERs..........................................................
5.5
Licensed Sureties and Insurers
..................................
5.3
Liens --
Application for Progress Payment._.... _.....
14.2
CONTRACTOR's Warranty of Title
.... 14.3
Final Application for Payment,, ...... ...... ..........
1.4.12
definition of,... _.
1 .23
Waiver of Claims.. ..........................................14.15
Limitations on ENGINEER's authority and
responsibilities .................................... _... _......
9.13
Limited Reliance by CONTRACTOR
Authorized........._ _....._...................._.......4.2.2
Maintenance and Operating Manuals --
Final Application for Payment...._.... .... .... ..._..1.4.12
Manuals (of others) --
Precedence...................................................
3.3.3.1
Reference to in Contract Documents, ............
.
Materials and equipment --
furnished by CONTRACTOR ..............._......_.....
6.3
not incorporated in Work....__ .............. ....... ._.._..14.2
Materials or equipment --equivalent__.......................
6.7
Mediation (Optional) ................... _.............. _...
...... 16.7
Milestones --definition of.. . ........... ......
1.24
Miscellaneous_
Computation of Times .............................._..,.._
17.2
Cumulative Remedies..__.....,_....._,__._,..._
..17.4
Giving Notice....................................................17.1
Notice o£Claim...........__.......................__.......17.3
Professional Fees and Court Costs Included
17.5
Multi -prime contracts ...................................... _.........7
Not Shown or Indicated ... _......................4.3.2
Notice of --
Acceptability of Project...................._._.._,,.„14.13
Award, definition of......_.__...._.....,,,._.._........125
Claim. ............. _...-.............__......._...1.7.3
Defects, I I I
Differing Subsurface or Physical Conditions...._.
4.2.3
Giving
_ ... IT 1
Tests and Inspections _..._.....13.3
Variation, Shop Drawing and Sample.......,__.,._ 6.27
Notice to Proceed --
definition of 1.26
...................................................... .
givingof__..._....._.....__..._.............._.........._.2.3
EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION)
w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9/99)
Notification to Surety ......... ............
............. .„_........ 10.5
Observations, by ENGINEER ...............
.......... ..6,30, 9.2
Occupancy of the Work...................5A5,
6.30.2.4, 14.10
Omissions or acts by CONTRACTOR
...............6.9, 9.13
Open Peril policy form, Insurance .......................
_.5.6 2
Option to Replace .... ............ _ _ ........
5.14
Article or Paragraph
Number
"Or Equal" Items......................................................6.7
Other work 7
Overtime Work --prohibition of ........................
__.., 6.3
OWNER --
Acceptance of defective Work... ............ .......
-13.13
appoint an ENGINEE.R.......................................8.2
as fiduciary ......................... ........... ...........
5.12-5.13
Availability of Lands, responsibility... _ ..............
. 4.1
definition of ............. .................... ........ ._
......... 1.27
data, furnish.. ........ ....... _ ........... . ...
. . ..8.3
May CorrectDefective Work ....... ....................1.3.14
May refuse to make payment .... ........................
14.7
May Stop the Work .............
13.10
May Suspend Work,
Terminate..,_.............__.....8.8, 13.10,
15.1-15.4
Payment, make prompt... ......... ........ 8.3, 14.4,
14.13
performance of other work......... __........._,_.___
7.1
permits and licenses, requirements........_.__...
6.13
purchased insurance requirements.... .. . . ......5.6-5.10
OWNER's--
Acceptance of the Work...............................6.302.5
Change Orders, obligation to execute ...........
.6, 10.4
Communications ....... _.....................................8.1
Coordination of the Work ................... ..............
7.4
Disputes, request for decision .................. __.......9,11
Inspections, tests and approvals. ., _ . . .........
.8.7, 13.4
Liability Insurance, . . _ ........ _. „ _. ....................
......, 5.5
Notice of Defects..............................................13.1
Representative --During Construction,
ENGINEER'S Status--, .... ................9.1
Responsibilities --
Asbestos, PCBs, Petroleum, Hazardous
Waste or Radioactive Material .................
8.10
Change Orders .... .............._......8.6
Changes in the Work ..... .......................10.1
communications, ................ _..........
....... 8. l
CONTRACTOR's responsibilities ..................8.9
evidence of financial arrangements ,.... _
.. _ _. & I I
inspections, tests and approvals .................
8.7
insurance_, .....................................................
8.5
lands and easements_ ...,.._.........................8.4
prompt payment by, .........
8.3
replacement of ENGINEER . _ . _...... _ _ ......
.. 8.2
reports and tests ......... ....... ..... .................__..8.4
stop or suspend Work._..... ......... 8.8, 13.10, 15.1
terminate CONTRACTOR's
services ___....$.8,
15.2
separate representative at site _,,..,.... _
_93
testing, independent ..............
use or occupancy
of the Work .......................
written consent or approval
required
...........................
5.15, 6.30.2.4, 14.10
....... I ... _9.1, 6.3, 11.4
xi EICDC GENERAL CONDITIONS 1910-8 (1990 EDITIONI
w1 CITY OF FORT COLLINS MODIFICATIONS tREV W991
Article or Paragraph
Number
written notice required._....._...............
7.1, 9.4, 9,11,
.I .......................... 1 L2, 11.9, 14.7, 15.4
PCBs --
definition of
1.29
general ..... ..........................4.5
OWNER's responsibility for ...............................8.10
Partial Utilization --
definition of '
1.28
general 6.30.2.4, 14.10
Property Insurance ........ ...... .... .........................5.15
5.15
Patent Fees and Royalties.......................................6.12
Payment Bonds .............................................
. ... 5.1-5.2
Payments, Recommendation of ..... ...
4.4-14.7, 14.13
Payments to CONTRACTOR and Completion --
Application for ProgressPayments,
.................. . 14.2
CONTRACTOR's Warranty of Title .......
........ I ,. 14.3
Final Application for Payment ..........................
14.12
Final Inspection ................. .....................
....... 14.11
Final Payment and Acceptance ................
14.13-14.14
general............................ ..............
........ 8.3, 14
Partial Utilization
14.10
Retainage..... _ ........................ .........................
1.4.2
Review of Applications for
Progress Payments .... ..................
14.4-14.7
prompt paym ent.
Schedule of Values- ..........................................
14. 1
Substantial Completion ..... .........................
I ' 4.8-14.9
Waiver of Claims ......
14.15
when payment-, due..._
...... 14.4, 14,13
withholding payment....,.._ .......
.......... .... 14.7
Performance Bonds
Permits
6.13
Petroleum --
definition of
1.30
general.. .................... ...................
...... 4.5
OWNER's responsibility for.. . ...............
....... 8.10
Physical Conditions --
Drawings of, in or relating to ............. ...........
4.2.1.2
ENGINEER's review....,..,
4,2.4
existing structures..... - ............ ........
4.12
genera14 .... ..... - 1. 1. .......
..........
Notice of Differing Subsurface or... . .................
4.23
Possible Contract Documents Change ...............
+2.5
Possible Price and Times Adjustments
4.2.6
Reports and Drawings ..... . ................ .
..... _421
Subsurface and,....,.,_,_,...._
4.2
Subsurface Conditions
4.11.1
Technical Data, Limited Reliance by
CONTRACTOR Authorized... _
.... _4.2.2
Underground Facilities --
general ......... ...... . .- ........ ..................
..... 4.3
Not Shown or Indicted
43.2
Protection of._ .... ....... .... .......
.. 43,620
Xii
Article or Paragraph
Number
Shown or Indicated
4.3.1
Technical Data ............................ .......
A.2. 2
Preconstruction Conference
I .... I I .... I ............................
2.8
Preliminary Matters .... ..... ..............................
........... 2
Preliminary Schedules ... I ............ ......
... ........ ...2.6
Premises, Use of ................ .............
6.16-6.18
Price, Change of Contract *
' I I
Price, Contract --definition 0 * f
1.11
Progress Payment, Applications for ..................
......
... 14.2
Progress Payment--retainage .... ... ....
. _ . _ 14.2
Progress schedule, CONTRACTORS .... ........
2.6, 2X 2.9,
' * * ........ ....... I... 6.6, 6.29,
10.4, 15.2.1
Project --definition of
1.31
Project Representative--
ENGINEEWs Status During Construction 9.3
Project Representative, Resident --definition of... ...... 1,33
prompt payment by OWNER........_....._........
...... 8.3
Property Insurance_
Additional
5.7
general5.6-5. in
Partial Utilization
5.15, 14.10.2
receipt and application of proceeds... ........
5.12-5.13
Protection, Safety and.
0 -40-6,21, 13.2
Punch list
1 4.11
Radioactive Material--
defintion of ...
1.32
gencra14.5
OWNER's responsibility fo...............................8.10
Recommendation of Payment .................. 14.4, 145, 14.13
Record Documents .........
...6.19, 14.12
Records, procedures for maintaining ..... ....................
2.8
Reference Points
4.4
Reference to Standards and Specifications
of Technical Societies
3.3
Regulations, Laws and (or)
6.14
Rejecting Defective Work .......................
.............. ... 9.6
Related Work --
at Site
71-7.3
Performed prior to Shop Drawings
and Samples submittals review .......
........... .. 6.28
Remedies, cumulative
' I I I.. � 17.4, 17.5
Removal or Correction ofDe.fective Work ......
,. 1. .1 1 1.1111
rental agreements, OWNER approv al required
11.4.53
replacement of ENGINEER by OWNER ......
..... ... 8.2
Reporting and Resolving
Discrepancies— ...... 2.5.
3.3.2, 6.14.2
Reports --
and Drawings ... ........ .... . . .. ... .......
4.2.1
and Tests, OWNEIZ!s responsibility .....
- 8A
Resident and Project Representative --
definition
provision for . ........... _ .. ............... ... ...... ... .. .. ...... 93
EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION)
W/ CITY OF FORT COLLINS MODIFICATIONS IRE V 9/99)
Article or Paragraph
Number
Resident Superintendent, CONTRACTOR ... .......... ._6.2
Responsibilities--
CONTRACTOR's-in general_,_ - ..................... 6
ENGINEER's-in general .................
I......................9
Limitations on ... I.........................................9.13
OWNER's-in general .............................
............. 8
Retainage......................... _.............
.............. .... 1.4.2
Reuse of Docum ents......................................
_........3.7
Review by CONTRACTOR: Shop Drawings
and Samples Prior to Submittal.
................. 6,25
Review of Applications for
Progress Payments ............. ... .....................14.4-14.7
Right to an adjustment.. .... _._...............
...10.2
Rights of Way..........................................................4.1
Royalties, Patent Fees and............................_........6.12
Safe Structural Loading..........................................6.18
Safety --
and Protection...............................4.3.2,
6.16, 6.18,
....... ......... .I....6.20-6.21,
7.2, 13.2
general ............ _..................
... 6.20-6.23
Representative, CONTRACTOR'S .................
Samples --
definition of ... ................_....__...............1,34
general ....................................................
6.24-6.28
Review by CONTRACTOR .. _...............
_. _ . _....6.25
Review by ENGINEER ................. _..
_.......6.26, 6.27
related Work .............................. ...............
6.28
submittal of.. _,.
6.24.2
submittal procedures..... ...................................
. 6.25
Schedule of progress ............. ,.._... ___....2.6,
2.8-2.9, 6.6,
... I ... I.................... .......6.29,
10.4, 15.2.1
Schedule of Shop Drawing and Sample
Submittals .............._......_ ...... 2.6, 2.8-2.9, 6.24-6.28
Schedule of Values_..........................._2.6,
2.8-29, 14.1
Schedules --
Adherence to.._...... _.................. ..................
. 15.2.1
Adjusting... _....... _............ _........................
_.... 6.6
Change of Contract Times..
10.4
Initially Acceptable..._._ ..
.. 2.8, 2.9
Preliminary_ ........ ............. .. .
2.6
Scope of Changes,_._......................._.__.10.3-10.4
Subsurface Conditions .._.... ...............
.. .4.2.1.1
Shop Drawings --
and Samples, general...... ...... I ..,
.. 6.24-6.28
Change Orders & Applications for
Payments, and_.. ....... ..........
9 7-9.9
definition or....... ......... ...........
_ 1.35
ENGINEER's approval of................................3.6.2
ENGINEER's responsibility
for review ... .... .............. ..- .............
.7, 6.24-6.28
related Work
..._....._6.28
review procedures ......
...................... .
_.2.8, 6.24-6.28
Article or Paragraph
Number
submittal required ..............................................
6.24.1
Submittal Procedures_.._,_.,.___.....__............._„6.25
use to approve substitutions ....................
6.7.3
Shown or Indicated... .............
Site Access......................................................7.2,
13.2
Site Cleanliness ......................„ .........................
. .... 6.17
Site, Visits to --
by ENGINEER......._..................................9.2,
13.2
by others .. ........................___ ..._..............
13.2
"special causes of loss" policy form,
insurance., .........__........................................
5.6.2
definition of ............................. _....... _.............1.36
Specifications—
defination of............_.._..__.........._.............._1.36
of Technical Societies, reference to
.....................
3.3.1
precedence, .......... ........................
Standards and Specifications
of Technical Societies,,,,,...__ ............._.._.,,....
3.3
Starting Construction, Before...............................2.5-2.8
Starting the Work ................. ..........................
...........2.4
Stop or Suspend Work--
by CONTRACTOR ............._..........--.--..........15.5
by OWNER.... ..... .... .._.._......... ..- 8.8, 13.10, 15.1
Storage of materials and equipment ...................4.1,
7.2
Structural Loading, Safety ........................................6.18
Subcontractor --
Concerning... _............ _...... _......... _..........0.8-6.11
definition of.....................................................1.37
delays.............................................................12.3
waiver of rights, ............ .............. ..
6.11
Subcontractors --in general .. . ... ... ....... ... _., _ ..,-_.
6.8-6.11
Subcontracts --required provisions, .... .._.5.11, 6.11,
11.4.3
Subm ittals--
Applications for Payment ............._.,........_.__...,
14.2
Maintenance and Operation Manuals...............14.12
Procedures......................................................
6.25
Progress Schedules ...... .............. ...... ............
2.6, 2.9
Samples. _............ _........................
0.24-6.28
Schedule of Values _.......,.,,.__.... _ - ..____2.6,
14.1
Schedule of Shop Drawings and Samples
Submissions._.........._...._..............._2.6,
28-2.9
Shop Drawings _...... _.......... ..................
6.24-6.28
Substantial Completion
certificationof..._,_...,....,__,,..... ,6.30.2.3,
14.8-14.9
definition of... .......-._...__.... ..__..............1.38
Substitute Construction Methods or Procedures
6.7 2
Substitutes and "Or Equal" Itemg...... __....._,.,
.6.7
CONTRACTOR'.sExpense ._.. _,_....,.,-
....6.7.1.3
ENGINEER'sEvaluation ........ ............_.,,,.._
6.7.3
"Or -Equal".... _....
_6,7.1.1
Substitute Construction Methods
EJCDC GENERAL CONDITIONS 1910-9 (1999 EDMON)
w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9/99)
Article or Paragraph
Number
or Procedures.............................................6.7.2
Substitute Items ..............._..... _........._....
__...6.7.1.2
Subsurface and Physical Conditions --
Drawings of, in or relathg to ..............._
....... 4.2.1.2
ENGINEER'S Review..........................
4.2.4
general ....... ...............................
4.2
Limited Reliance by CONTRACTOR
Authorized ...............................
_. , 42.2
Notice of Differing Subsurface or
Physical Conditions._._
.........., 4.2.3
Physical Conditions... ............ ............
... 4.2.1.2
Possible Contract Documents Change................4.2.5
Possible Price and Times Adjustments
..........4.2.6
Reports and Drawings .........................,
_
.......... 4.2.1
Subsurface and....................................................4.2
Subsurface Conditions at the Site .....................
4.2.1.1
Technical Data.................................................4.2.2
Supervision_
CONTRACTOR's responsibility ....... _..............
6.1
OWNER shall not supervise_.,,.,_ ..... ............
...... 89
ENGINEER shall not supervise ........ .
_,. 9.2, 9.13.2
Superintendence ... _........... __.................
Superintendent, CONTRACTOR'sresident .....___._.....6.2
Supplemental costs............_ ................_......,..._..
11.4.5
Supplementary Conditions --
definition of......................................................1.39
principal references to ................ _1.10, 1.18, 2.2, 2.7,
......................4 2, 4.3, 5.1, 5.3, 5.4, 5.6-59,
....... ....... ..5.11,6.8,6.13,7.4,8.11,9.3,9.10
Supplementing Contract Documents, .............
..........3.6
Supplier --
definition of ..... ....._........._............._................1.40
principal references to ........... 3.7, 6.5, 6.8-6,11,
620,
...... ...... I . .................... ._... 6.24, 9.13, 14.12
Waiver of Rights ..............................................
Surety--
consenttofinal payment ........................
14.12, 14.14
ENGINEER has no duty to........, _.
. .............
. ... _. 9.13
Notification of,._ .... _...... __........-. 10
^
.1, 10.5, 15.-
qualification of. _..._................. _........._......5.1-5.3
Survival of Obligations..__......................_.__...__...6.34
Suspend Work, OWNER May ............... ........
13.10, 15.1
Suspension of Work and Termination--.._, ..........
,_. 15
CONTRACTOR May Stop Work
or Terminate_....._,_. _ ._,....._..___...,.15.5
OWNER May Suspend Work ............. .............
15.1
OWNER May Terminate. ....,
15.2-15A
Taxes --Payment by CONTRACTOR . ...........
........ _ 6.15
Technical Data --
Limited Reliance by CONTRACTOR.. ..........
4.22
Possible Price and Times Adjustments.._.,....
4.26
Reports of Differing Subsurface and
Physical Conditions .................................
xiv
,4.2.3
Temporary construction facilities .... ,,,....................... .1
Article or Paragraph
Number
Term ination--
by CONTRACTOR...........................................15.5
by OWNER....................._.................8.8,
15.1-15.4
of ENGINEER'S employment .... ............
_.... _. 8.2
Suspension of Work-in general .............................15
Terms and Adjectives._..,.., .
.3.4
Tests and Inspections—
Access to the Work, by others.. _ . ,.... _ . .......
... ,.13.2
CONTRACTOR's responsibilities .......................13.5
cost of 13.4
covering Work prior to .........................
..... 13.6-13.7
Laws and Regulations(or) ......................_,.,,..--
13.5
Notice of Defects ........ .......
OWNER May Stop Work ............. ......_...........
113,10
OWNER'S independent testing ..........................13.4
special, required by ENGINEER ,,,_........
_........... 9.6
timely notice required,_........,..___....._
.. 13.4
Uncovering the Work, at ENGINEER's
request, ....... ........... ............. - .........
13.8-13.9
Times--
Adjusting........................................................6.6
Change of Contract ,......... ... ....................
. _.12
Computation of........_.........................__....17.2
Contract Times --definition of ...........................].12
day......................................................1.7.2.2
Milestones .............................
..........................
12
Requirements --
appeals............ _ ............ _....................
9 10. 16
clarifications,
claims and disputes ._.............. _9.11,
11.2, 12
Commencement of Contract Times
..................
2.3
Preconstruction Conference..._...___
.... I., ...... 2,8
schedules ................_.......,,........
.......
2.6, 2.9, 6.6
Starting the Work..........................................2.4
Title, Warranty of....._.........._ ............. .......
....._.....14.3
Uncovering Work ............................................
13.8-13.9
Underground Facilities, Physical Conditions --
definition of.,.,.__.,..,...._ _......_„_._........_......1.41
Not Shown or Indicated .................... ....._____
4.3.2
protection of.... ...... ... ......... _.
...........
.... 4.3, 6.20
Shown or Indicated ..............................
4.3_ I
Unit Price Work--
claims.._................._..............._......_.........1,L9.3
definition of..........._.........._.._........
............
.. 1.42
.
general11.9, 14.1, 14.5
Unit Prices--
general11.3.1
Determination for.......................___............_.9.10
Use of Premises..,..,... _... _ 6.16, 6.18,
6.30.2.4
Utility owners ......... ........ ........._6.13, 6.20, Z1-7.3, 13.2
Utilization, Partial. ........ 128, 5.15, 6.302A, 14.10
Value of the Work .................................
113
Values, Schedule of... ....... ....... _._.....__2.6, 2.8-2.9, 14.1
EICDC GENERAL CONDITIONS 1910-8 (1990 EDITION
w' CITY OF FORT COLLINS MODIFICATIONS (REV 9/99)
Variations in Work --Minor
Authorized_.......................................6,25,
6.27, 9.5
Article or Paragraph
Number
Visits to Site --by ENGINEER ............................__..._
9.2
Waiver of Claims --on Final Payment„
_............ _ _ . _14.15
Waiver of Rights by insured parties.................5.11,
6.11
Warranty and Guarantee, General --by
CONTRACTOR ...............................................
6.30
Warranty of Title, CONTRACTORS.-
............
Work--
Accessto, .... .... ........ .._.__.............
_........_.13.2
by others ........................... .
Changes in the .............................................
_ 10
Continuing the ..................... ...........................
629
CONTRACTOR May Stop Work
or Terminate.. ...... ...... ...........
5.5
Coordination of ...............................
7A
Cost of the.................................................11.4-11.5
definition of ............................ ....................
1.43
neglected by CONTRACTOR. , ........
........ . J 3.14
otherWork.. __..................................................
..7
OWNER May Stop Work................................13.10
OWNER May Suspend Work...................13.10,
15.1
Related, Work at Site ...... ,. _...__..___..
7.1-7.3
Starting the,.,. . ..........................
......... .........2.4
Stopping by CONTRACTOR.......,_.
_,...,._....15.5
Stopping by OWNER ....................
.............15.1-15.4
Variation and deviation authorized, minot..,,,,.,,..3.6
Work Change Directive --
claims pursuant to
10_2
definition of.....................................................1.44
principal references to......................3.5.3,
10.1-10.2
Written Amendment --
definitionof .....................................................
1.45
principal references to,..............1.10,
3.5, 5.10,15.12,
.............. ....._.... 66.2, 6.8.2,
6.19, 1O.1, 10.4,
_.............11.27 12.1, 13.12.2, 14.7.2
Written Clarifications and
Interpretations................................3.6.3,
9.4, 9.11
Written Notice Required --
by CONTRACTOR ......................
7.1, 9.10--9.1 I,
......... _.... _........... ...._.......
10.4, 11.2, 12.1
byOWNER ....... _._......... .10-9.11,
10.4, 11,2, 13.14
xv EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION)
w%CITY OF FORT COLLINS LIODIFICA'11ONS (REV 9/99)
(This page left blank intentionally)
x`^ EJCDC GENERAL CONDITIONS 1910-8 (1990 EDITION
w/ CITY OF FORT COLLINS MODIFICADOM (REV 9/991
GENERAL CONDITIONS
ARTICLE 1--DEFINITIONS
Wherever used in these General Conditions or in the other
Contract Documents the following terns have the
meanings indicated which are applicable to both the
singular and plural thereof:
1.1. Addenda --Written or graphic instruments issued
prior to the opening of Bids which clarify, correct or
change the Bidding Requirements or the Contract
Documents.
1.2. Agreement —The written contract between OWNER
and CONTRACTOR covering the Work to be performed;
other Contract Documents are attached to the Agreement
and made a part thereof as provided therein.
1.3. Application for Payment --The form accepted by
ENGINEER which is to be used by CONTRACTOR in
requesting progress or final payments and which is to be
accompanied by such supporting documentation as is
required by the Contract Documents.
1.4. Asbestos --Any material that contains more than one
percent asbestos and is friable or is releasing asbestos fibers
into the air above current action levels established by the
United States Occupational Safety and Health
Administration.
1.5. Bid -The offer or proposal of the bidder submitted
on the prescribed form setting forth the prices for the Work
to be performed.
1.6. Bidding Documents —The advertisement or
invitation to Bid instructions to bidders, the Bid form, and
the proposed Contract Documents (including all Addenda
issued prior to receipt of Bids).
1.7. Bidding Requirements --The advertisement or
invitation to Bid instructions to bidders, and the Bid form.
L8. Bonds —Performance and Payment bonds and other
instruments of security.
1.9. Change Order —A document recommended by
ENGINEER, which is signed by CONTRACTOR and
OWNER and authorizes an addition, deletion or revision in
the Work, or an adjustment in the Contract Price or the
Contract Times, issued on or after the Effective Date of the
Agreement
1.10. Contract Documents --The Agreement, Addenda
(which pertain to the Contract Documents),
CONTRACTOR's Bid (including documentation
accompanying the Bid and any post Bid documentation
submitted prior to the Notice of Award) when attached as
an exhibit to the Agreement, the Notice to Proceed, the
Bonds, these General Conditions, the Supplementary
Conditions, the Specifications and the Drawings as the
EJCDC GENERAL CONDM ONS 19105 (1990 Echlim)
wi CITY OF FORT COLLINS MODIFICATIONS (RF.V 4/N00)
same are more specifically identified in the Agreement,
together with all Written Amendments, Change Orders,
Work Change Directives, Field Orders and ENGINEER's
written interpretations and clarifications issued pursuant to
paragraphs 3.5, 3.6.1 and 3.6.3 on or after the Effective
Date of the Agreement. Shop Drawing submittals
approved pursuant to paragraphs 6.26 and 6.27 and the
reports and drawings referred to in paragraphs 4.2.1 and
4.2.2 are not Contract Documents.
1.11. Contract Price —The moneys payable by
OWNER to CONTRACTOR for completion of the Work
in accordance with the Contract Documents as stated in
the Agreement (subject to the provisions of
paragraph 11.9.1 in the case of Unit Price Work).
I.12. Contract Times —The numbers of days or the
dates stated in the Agreement: (i) to achieve Substantial
Completion, and (ii) to complete the Work so that it is
ready for final payment as evidenced by ENGINEER's
written recommendation of final payment in accordance
with paragraph 14.13.
1.13. CONTRACTOR --The person, firm or corporation
with whom OWNER has entered into the Agreement
1.14. defective —An adjective which when modifying
the word Work refers to Work that is unsatisfactory, faulty
or deficient in that it does not conform to the Contract
Documents, or does not meet the requirements of any
inspection, reference standard test or approval referred to
in the Contract Documents, or has been damaged prior to
ENGINEER's recommendation of final payment (unless
responsibility for the protection thereof has been assumed
by OWNER at Substantial Completion in accordance with
paragraph 14.8 or 14.10).
1.15. Drawings --The drawings which show the scope,
extent and character of the Work to be furnished and
performed by CONTRACTOR and which have been
prepared or approved by ENGINEER and are referred to
in the Contract Documents. Shop drawings are not
Drawings as so defined.
116. Effective Date of the Agreement --The date
indicated in the Agreement on which it becomes effective,
but if no such date is indicated it means the date on which
the Agreement is signed and delivered by the last of the
two parties to sign and deliver.
1.17. ENGINEER --The person, firm or corporation
named as such in the Agreement.
1.18. ENGINEER's Consultant --A person, firm or
anporation having a contract with ENGINEER to furnish
services as ENGINEER's independent professional
associate or consultant with respect to the Project and who
is identified as such in the Supplementary Conditions.
1.19. Field Order —A written order issued by
ENGINEER which orders minor changes in the Work in
accordance with paragraph 9.5 but which does not involve
a change in the Contract Price or the Contract Times.
1.20. General Requirements --Sections of Division 1 of
the Specifications.
1.21. Hazardous Waste —The term Hazardous Waste shall
have the meaning provided in Section 1004 of the Solid
Waste Disposal Act (42 USC Section 6903) as amended
from time to tim e.
1.22.a. Laws and Regulations, Laws or Regulations --Any
and all applicable laws, rules, regulations, ordinances,
codes and orders of any and all governmental bodies,
agencies, authorities and courts having jurisdiction.
1.22.b. Legal Holidays --shall be those holidays observed
by the City of Fort Collins.
1,23. Liens --Liens, charges, security interests or
encumbrances upon real property or personal property.
1.24. Milestone --A principal event specified in the
Contract Documents relating to an intermediate completion
date or time prior to Substantial Completion of all the
Work.
1.25. Notice of Award —A written notice by OWNER to
the apparent successful bidder stating that upon compliance
by the apparent successful bidder with the conditions
precedent enumerated therein, within the time specified
OWNER will sign and deliver the Agreement.
1.26. Notice to Proceed -A written notice given by
OWNER to CONTRACTOR (with a copy to ENGINEER)
fixing the date on which the Contract Times will
commence to run and on which CONTRACTOR shall start
to perform CONTRACTOR'S obligations under the
Contract Documents.
1.27. OWNER --The public body or authority,
corporation, association, firm or person with whom
CONTRACTOR has entered into the Agreement and for
whom the Work is to be provided.
1.28. Partial Utilization —Use by OWNER of a
substantially completed part of the Work for the purpose
for which it is intended (or a related purpose) prior to
Substantial Completion of all the Work.
1.29. PCB--Polychlorinatedbiphenyls.
1.30. Petroleum --Petroleum, including crude oil or any
fraction thereof which is liquid at standard conditions of
temperature and pressure (60 degrees Fahrenheit and
14.7 pounds per square inch absolute), such as oil,
petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene
and oil mixed with other non -Hazardous Wastes and crude
oils.
1.31. Project --The total construction of which the Work -
to be provided under the Contract Documents may be the
whole, or a part as indicated elsewhere in the Contract
Documents.
1 12-a. Radioactive Matenal--Source, special nuclear, or
byproduct material as defined by the Atomic Energy Act of
EJCDC GENERAL CONDITIONS 1910-8 (1990ECRim)
W.' CITY OF FORT COLLINS MODIFICATIONS (REV 4l2000)
1954 (42 USC Section 2011 et seq.) as amended from
time to time.
1.32.b. Regular Working Hours --Regular working hours
are . defined as 7:00am to &00pm unless otherwise
specified in the_General Regquirements.
1.33. Resident Project Representative --The authorized
representative of ENGINEER who may be assigned to the
site or any part thereof.
1.34. Samples -Physical examples of materials,
equipment, or workmanship that are representative of
some portion of the Work and which establish the
standards by which such portion of the Work will be
judged
1.35. Shop Drawings -All drawings, diagrams,
illustrations, schedules and other data or information
which are specifically prepared or assembled by or for
CONTRACTOR and submitted by CONTRACTOR to
illustrate some portion of Work.
1.36. Specifications —Those portions of the Contract
Documents consisting of written technical descriptions of
materials, equipment, construction systems, standards and
workmanship as applied to the Work and certain
administrative details applicable thereto.
1.37. Subcontractor. -An individual, firm or corporation
having a direct contract with CONTRACTOR or with any
other Subcontractor for the performance of a part of the
Work at the site.
1.38. Substantial Completion --The Work (or a
specified part thereof) has progressed to the point where,
in the opinion of ENGINEER as evidenced by
ENGINEER's definitive certificate of Substantial
Completion, it is sufficiently complete, in accordance with
the Contract Documents, so that the Work (or specified
part) can be utilized for the purposes for which it is
intended; or if no such certificate is issued, when the
Work is complete and ready for final payment as
evidenced by ENGINEER's written recommendation of
final payment in accordance with paragraph 14.13. The
terms "substantially complete" and "substantially
completed" as applied to all or part of the Work refer to
Substantial Completion thereof
1.39. Supplementary Conditions —The part of the
Contract Documents which amends or supplements these
General Conditions.
1.40. Supplier --A manufacturer, fabricator, supplier,
distributor, materialman or vendor having a direct contract
with CONTRACTOR or with any Subcontractor to
furnish materials or equipment to be incorporated in the
Work by CONTRACTOR or any Subcontractor.
1-41. Undemgroumd Facilities —All pipelines, conduits,
ducts, cables, wires, manholes, vaults, tanks, tunnels or
other such facilities or attachments, and anv encasements
containing such facilities which have been installed
underground to famish any of the following services or
materials: electricity, gases, steam, liquid petroleum
products, telephone or other communications, cable
television, sewage and drainage removal, traffic or other
control systems or water.
1.42. Unit Price Work -Work to be paid for on the basis
of unit prices.
1.43. TVork--The entire completed construction or the
various separately identifiable parts thereof required to be
furnished under the Contract Documents. Work includes
and is the result of performing or furnishing labor and
furnishing and incorporating materials and equipment into
the construction, and performing or furnishing services and
furnishing documents, all as required by the Contract
Documents.
1.44. Work Change Directive -A written directive to
CONTRACTOR, issued on or after the Effective Date of
the Agreement and signed by OWNER and recommended
by ENGINEER, ordering an addition, deletion or revision
in the Work, or responding to differing or unforeseen
physical conditions under which the Work is to be
performed as provided in pamgraph4.2 or 4.3 or to
emergencies under paragraph 6.23. A Work Change
Directive will not change the Contract Price or the Contract
Times, but is evidence that the parties expect that the
change directed or documented by a Work Change
Directive will be incorporated in a subsequently issued
Change Order following negotiations by the parties as to its
effect, if any, on the Contract Price or Contract Times as
provided in paragraph 10.2.
1.45. Wntten Amendment --A written amendment of the
Contract Documents, signed by OWNER and
CONTRACTOR on or after the Effective Date of the
Agreement and normally dealing with the nonengineering
or nontechnical rather than strictly construction -related
aspects of the Contract Documents.
ARTICLE 2-PRELIMINARY MATTERS
Delivery ofBoneiv.
2.1. When CONTRACTOR delivers the executed
Agreements to OWNER, CONTRACTOR shall also
deliver to OWNER such Bonds as CONTRACTOR may
be required to furnish in accordance with paragraph 5 1.
Copies of Documents:
22 OWNER shall fir sh to CONTRACTOR up to ten
copies (unless otherwise specified in the Supplementary
Conditions) of the Contract Documents as are reasonably
necessary for the execution of the Work. Additional copies
will be fiimished, upon request, at the cost of reproduction.
Commencement q(Contract Times; Notice to Proceed
2.3. The Contract Times will commence to run on the
thirtieth day after the Effective Date of the Agreement, or,
EJCDC GENERAL CONDITIONS 1910-8 (1990 Edtim)
wi CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000)
if a Notice to Proceed is given, on the day indicated in the
Notice to Proceed. A Notice to Proceed may be given at
any time within thirty days alter the Effective Date of the
Agreement. in no event will the ('
ef;3itlepening-ar to
of the A .teem .
Starting the Work:
2.4. CONTRACTOR shall start to perform the Work
on the date when the Contract Times commence to run,
but no Work shall be done at the site prior to the date on
which the Contract Times commence to run.
Before Starting Construction:
2.5. Before undertaking each part of the Work,
CONTRACTOR shall carefully study and compare the
Contract Documents and check and verify pertinent
figures shown thereon and all applicable field
measurements. CONTRACTOR shall promptly report in
writing to ENGINEER any conflict, error, ambiguity or
discrepancy which CONTRACTOR may discover and
shall obtain a written iNerpretation or clarification from
ENGINEER before proceeding with any Work affected
thereby; however, CONTRACTOR shall not be liable to
OWNER or ENGINEER for failure to report any conflict,
error, ambiguity or discrepancy in the Contract
Documents, unless CONTRACTOR knew or reasonably
should have known thereof.
2.6. Within ten days after the Effective Date of the
Agreement (unless otherwise specified in the General
Requirements), CONTRACTOR shall submit to
ENGINEER for review:
2.6.1. a preliminary progress schedule indicating
the times (numbers of days or dates) for starting and
completing the various stages of the Work, including
any Milestones specified in the Contract Documents,
2.6.2. a preliminary schedule of Shop Drawing and
Sample submittals which will list each required
submittal and the times for submitting, reviewing and
processing such submittal;
2.6 2.1. In no case will a schedule be
acceptable which allows less than 21 calendar
days for each review by Engineer.
2.6.3. A preliminary schedule of values for all of
the Work which will include quantities and prices of
items aggregating the Contract Price and will
subdivide the Work into component parts in sufficient
detailto serve as the basis for progress payments
during construction. Such prices will include an
appropriate amount of overhead and profit applicable
to each item of Work.
2.7. Before any Work at the site is started,
CONTRACTOR a-d.7.,'-: a shall eaeh deliver to the
other OWNER, with copies to eaehHdditional-insared
idantifiad in : the S .pplo_. r ENGINEER..
PI!) -)LP,,;
certificates of insurance (and other evidence of insurance
rea5enab4y Fequest requested by OWNER) which
CONTRACTOR and OWNER fespeativaly aF is required
to purchase and maintain in accordance with
paragraphs 5 ^, ` 5..'I.
Preconstruetion Conference:
2.8. Within twenty days after the Contract Times start to
run, but before any Work at the site is started, a conference
attended by CONTRACTOR, ENGINEER and others as
appropriate will be held to establish a working
understanding among the parties as to the Work and to
discuss the schedules referred to in paragraph 2.6,
procedures for handling Shop Drawings and other
submittals processing Applications for Payment and
maintaining required records.
Initially Acceptable Schedules:
2.9. Unless otherwise provided in the Contract
Documents, at least ten days, befefe submission of the first
before any work at the site bed
a conference attended by CONTRACTOR, ENGINEER
and others as apffeMete designated by OWNER, will be
held to review for acceptability to ENGINEER as provided
below the schedules submitted in accordance with
paragraph 2.6. and Division i - General Requirements
CONTRACTOR shall have an additional ten days to make
corrections and adjustments and to complete and resubmit
the schedules. No progress payment shall be made to
CONTRACTOR until the schedules are submitted to and
acceptable to ENGINEER as provided below. The
progress schedule will be acceptable to ENGINEER as
providing an orderly progression of the Work to
completion within any specified Milestones and the
Contract Times, but such acceptance will neither impose on
ENGINEER responsibility for the sequencing, scheduling
or progress of the Work nor interfere with or relieve
CONTRACTOR from CONTRACTOR'S full
responsibility therefor. CONTRACTOR's schedule of
Shop Drawing and Sample submissions will be acceptable
to ENGINEER as providing a workable arrangement for
reviewing and processing the required submittals
CONTRACTOR's schedule of values will be acceptable to
ENGINEER as to form and substance.
ARTICLE 3--CONTRACT DOCUMENTS: INTENT,
AMENDING, REUSE
Intent:
3.1. The Contract Documents comprise the entire
agreement between OWNER and CONTRACTOR
concerning the Work The Contract Documents are
complementary, what is called for by one is as binding as if
called for by all. The Contract Documents will be
construed in accordance with the law of the place of the
Project.
3-2. It is the intent of the Contract Documents to
EJCDC GENERAL CONDITIONS 1910-5 (1990 Editi"i)
w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4.:?000)
describe a functionally complete Project (or part thereof)
to be constructed in accordance with the Contract
Documents. Any Work, materials or equipment that may
reasonably be inferred from the Contract Documents or
from prevailing custom or trade usage as being required to
produce the intended result will be furnished and
performed whether or not specifically called for. When
words or phrases which have a well-known technical or
construction industry or trade meaning are used to
describe Work, materials or equipment, such words or
phrases shall be interpreted in accordance with that
meaning. Clarifications and interpretations of the Contract
Documents shall be issued by ENGINEER as provided in
paragraph 9.4.
3.3. Reference to Standards- and Specifications of
Technical Societies; Reporting and Resolving
Discrepancies:
3.3.1. Reference to standards, specifications,
manuals or codes of any technical society, organization
or association, or to the Laws or Regulations of any
governmental authority, whether such reference be
specific or by implication, shall mean the latest
standard, specification, manual, code or Laws or
Regulations in effect at the time of opening of Bids (or,
on the Effective Date of the Agreement if there were
no Bids), except as may be otherwise specifically
stated in the Contract Documents.
3.3.2. If during the performance of the Work,
CONTRACTOR discovers any conflict, error,
ambiguity or discrepancy within the Contract
Documents or between the Contract Documents and
any provision of any such Law or Regulation
applicable to the performance of the Work or of any
such standard, specification, manual or tale or of any
instruction of any Supplier referred to in paragraph 6.5,
CONTRACTOR shall report it to ENGINEER in
writing at once, and, CONTRACTOR shall not
proceed with the Work affected thereby (except in an
emergency as authorized by paragraph 6.23) until an
amendment or supplement to the Contract Documents
has been issued by one of the methods indicated in
paragraph 3.5 or 3.6, provided, however, that
CONTRACTOR shall not be Gable to OWNER or
ENGINEER for failure to report any such conflict,
error, ambiguity or discrepancy unless
CONTRACTOR knew or reasonably should have
known thereof.
3.3.3. Except as otherwise specifically stated in the
Contract Documents or as may be provided by
amendment or supplement thereto issued by one of the
methods indicated in paragraph 35 or 3.6, the
provisions of the Contract Documents shall take
precedence in resolving any conflict, error, ambiguity
or discrepancy between the provisions of the Contract
Documents and:
3.3.3.1. the provisions of any such standard,
specification, manual, code or instruction (whether
or not specifically incorporated by reference in the
Contract Documents); or
3.3.3.2. the provisions of any such Laws or
Regulations applicable to the performance of the
Work (unless such an interpretation of the
provisions of the Contract Documents would result
in violation of such Law or Regulation).
own risk.
No provision of any such standard, specification, manual,
code or instruction shall be effective to change the duties
and responsibilities of OWNER CONTRACTOR or
ENGINEER, or any of their subcontractors, consultants,
agents or employees from those set forth in the Contract
Documents, nor shall it be effective to assign to OWNER,
ENGINEER or any of ENGMER's Consultants, agents or
employees any duty or authority to supervise or direct the
furnishing or performance of the Work or any duty or
authority to undertake responsibility inconsistent with the
provisions of paragraph 9.13 or any other provision of the
Contract Documents,
3.4. Whenever in the Contract Documents the terms "as
ordered", "as directed", "as required", "as allowed", "as
approved" or terms of like effect or import are used, or the
adjectives "reasonable", "suitable", "acceptable", "proper"
or "satisfactory" or adjectives of like effect or import are
used to describe a requirement, direction, review or
judgment of ENGINEER as to the Work, it is intended that
such requirement, direction, review or judgment will be
solely to evaluate, in general, the completed Work for
compliance with the requirements of and information in the
Contract Documents and conformance with the design
concept of the completed Project as a functioning whole as
shown or indicated in the Contract Documents (unless there
is a specific statement indicating otherwise). The use of
any such term or adjective shall not be effective to assign to
ENGINEER any duty or authority to supervise or direct the
furnishing or performance of the Work or any duty, or
authority to undertake responsibility contrary to the
provisions of paragraph 9.13 or any other provision of the
Contract Documents.
4mending and Supplementing Contract Documents
3.5. The Contract Documents may be amended to
provide for additions, deletions and revisions in the Work
or to modify the terns and conditions thereof in one or
more of the following ways:
3.5.1. a formal Written Ain endment,
35.2. a Change Order (pursuant to paragraph 10 4),
or
EICDC GENERAL CONDITIONS 1910-8 (1990 Edilion)
wI CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000)
3.5.3. a Work Change Directive (pursuant to
paragraph 10.1).
3.6. In addition, the requirements of the Contract
Documents may be supplemented, and minor variations
and deviations in the Work may be authorized, in one or
more of the following ways:
3.6.1. A Field Order (pursuant to paragraph 9.5�
3.6.2. ENGINEER's approval of a Shop Drawing or
Sample (pursuant to paragraphs 6.26 and 6.27), or
3.6.3. ENGINEER's written interpretation or
clarification (pursuant to paragraph 9.4).
Reuse of Documents.•
3.7. CONTRACTOR, and any Subcontractor or
Supplier or other person or organization performing or
furnishing any of the Work under a direct or indirect
contract with OWNER (i) shall not have or acquire any
title to or ownership rights in any of the Drawings,
Specifications or other documents (or copies of any
thereof) prepared by or bearing the seal of ENGINEER or
ENGINEER's Consultant, and (ii) shall not reuse any of
such Drawings, Specifications, other documents or copies
on extensions of the Project or any other project without
written consent of OWNER and ENGINEER and specific
written verification or adaptation by ENGINEER.
ARTICLE 4--AVATLABILITY OF LANDS;
SUBSURFACE AND PHYSICAL CONDITIONS;
REFERENCE POINTS
Availability of Lands:
4.1. OWNER shall furnish, as indicated in the Contract
Documents, the lands upon which the Work is to be
performed, rights -of --way and easements for access
thereto, and such other lands which are designated for the
use of CONTRACTOR. Tlperrreasenable-wfitten-rega ,
OWNER shah furnish GG�4RAOTQR with a eeffee
ads upon whioh the Worl; Y"'
OWNER shall identify any encumbrances or restrictions
not of general application but specifically related to use of
lands so furnished with which CONTRACTOR will have
to comply in performing the Work. Easements for
permanent structures or permanent changes in existing
facilities will be obtained and paid for by OWNER, unless
otherwise provided in the Contract Documents. If
CONTRACTOR and OWNER are unable to agree on
entitlement to or the amount or extent of any adjustments
in the Contract Price or the Contract Times as a result of
any delay in OWNER's furnishing these lands, rights -of -
way or easements, CONTRACTOR may make a claim
therefor as provided in Articles 11 and 12.
CONTRACTOR shall provide for all additional lands and
access thereto that may be required for temporary
construction facilities or storage of materials and
equipment.
4.2. Subsurface and PhysicalCondltions:
4.2.1. Reports and Drawings: Reference is made to
the Supplementary Conditions for identification of
4.2.1.1. Subsurface Conditions: Those reports of
explorations and tests of subsurface conditions at or
contiguous to the site that have been utilized by
ENGINEER in preparing the Contract Documents,
and
4.2.1.2. Physical Conditions: Those drawings of
physical conditions in or relating to existing surface
or subsurface structures at or contiguous to the site
(except Underground Facilities) that have been
utilized by ENGINEER in preparing the Contract
Documents.
4.2.2. Limited Reliance by CONTRACTOR Authorized -
Technical Data: CONTRACTOR may rely upon the
general accuracy of the "technical data" contained in such
reports and drawings, but such reports and drawings are not
Contract Documents. Such "technical data" is identified in
the Supplementary Conditions. Except for such reliance on
such "technical data", CONTRACTOR may not rely upon
or make any claim against OWNER, ENGINEER or -'any of
ENGINEER's Consultants with respect to:
4.2.2.1. the completeness of such reports and
drawings for CONTRACTOR's purposes,
including, but not limited to, any aspects of the
means, methods, techniques, sequences and
procedures of construction to be employed by
CONTRACTOR and safety precautions and
programs incidem thereto, or
4.2.2.2. other data, interpretations, opinions
and information contained in such reports or shown
or indicated in such drawings, or
4.2.2.3. any CONTRACTOR interpretation of
or conclusion drawn from any "technical data" or
any such data, interpretations, opinions or
information.
4.2.3. Notice of Differing Subsurface or Physical
Conditions: If CONTRACTOR believes that anv
subsurface or physical condition at or contiguous to the site
that is uncovered or revealed either:
4 23.1, is of such a nature as to establish that
any "technical data" on which CONTRACTOR is
entitled to rely as provided in paragraphs 4.2.1 and
4.22 is materially inaccurate, or
4.2.32. is of such a nature as to require a
change in the Contract Documents, or
423.3 differs materially from that shown or
ESCDC GENERAL CONDITIONS 19195 (1990 E(fition)
w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4120001
indicated in the Contract Docurents, or
4.2.3.4. is of an unusual nature, and differs
materially from conditions ordinarily encountered
and generally recognized as inherent in work of
the character provided for in the Contract
Documents, then
CONTRACTOR shall, promptly immediately, after
becoming aware thereof and before further disturbing
conditions affected thereby or performing any Work in
connection therewith (except in an emergency as
permitted by paragraph 623), notify OWNER and
ENGINEER in writing about such condition.
CONTRACTOR shall not further disturb such conditions
or perform any Work in connection therewith (except as
aforesaid) until receipt of written order to do so.
4.2.4. ENGINEER's Review: ENGINEER will
promptly review the pertinent conditions, determine the
necessity of OWNER's obtaining additional exploration or
tests with respect thereto and advise OWNER in writing
(with a copy to CONTRACTOR) of ENGINEER's
findings and conclusions.
4.2.5. Possible Contract Documents Change: If
ENGINEER concludes that a change in the Contract
Documents is required as a result of a condition that meets
one or more of the categories in paragraph 4.2.3, a Work
Change Directive or a Change Order will be issued as
provided in Article 10 to reflect and document the
consequences of such change.
4.2.6. Possible Price and Times Adjustments: An
equitable adjustment in the Contract Price or in the
Contract Times, or both, will be allowed to the extent that
the existence of such uncovered or revealed condition
causes an increase or decrease in CONTRACTOR's cost
of, or time required for performance of the Work; subject,
however, to the following:
4.2.6.1. such condition must meet any one or
more of the categories described in
paragraphs 4.2.3.1 througTr 4.2.3.4, inclusive;
4.2.6.2. a change in the Contract Documents
pursuant to paragraph 4.2.5 will not be an
automatic authorization of nor a condition
precedent to entitlement to any such adjustment,
42.6.3. with respect to Work that is paid for
on a Unit Price Basis, any adjustment in Contract
Price will be subject to the provisions of
paragraphs 9.10 and 11.9, and
42.6.4. CONTRACTOR shall not be entitled
to any adjustment in the Contract Price or Times
if.
4.2.6.4.1_ CONTRACTOR knew of
the existence of such conditions at the
time CONTRACTOR made a final
commitment to OWNER in respect of
Contract Price and Contract Times by the
submission of a bid or becoming bound
under a negotiated contract; or
4.2.6.4.2. the existence of such
condition could reasonably have been
discovered or revealed as a result of any
examination, investigation, exploration,
test or study of the site and contiguous
areas required by the Bidding
Requirements or Contract Documents to be
conducted by or for CONTRACTOR prior
to CONTRACTOR's making such final
commitment; or
4.2.6.4.3. CONTRACTOR failed to
give the written notice within the time and
as required by paragraph 4.2.3.
If OWNER and CONTRACTOR are unable to agree on
entitlement to or as to the amount or length of any such
equitable adjustment in the Contract Price or Contract
Times, a claim may be made therefor as provided in
Articles 11 and 12. However, OWNER, ENGINEER and
ENGINEER'S Consultants shall not be liable to
CONTRACTOR for any claims, costs, losses or damages
sustained by CONTRACTOR on or in connection with any
other project or anticipated project.
4.3. Physical Cond lions -Underground Facilities:
4.3.1. Shown or Indicate& The information and data
shown or indicated in the Contract Documents with
respect to existing Underground Facilities at or
contiguous to the site is based on information and data
furnished to OWNER or ENGINEER by the owners of
such Underground Facilities or by others. Unless it is
otherwise expressly provided in the Supplementary
Conditions:
4.3.1.1. OWNER and ENGINEER shall not be
responsible for the accuracy or completeness of any
such information or data; and
4.3.1.2. The cast of all of the following will be
included in the Contract Price and CONTRACTOR
shall have full responsibility for: (i) reviewing and
checking all such information and data, (ii) locating
all Underground Facilities shown or indicated in the
Contract Documents,(iii) coordination of the Work
with the owners of such Underground Facilities
during construction, and (iv) the safety and
protection of all such Underground Facilities as
provided in paragraph 6.20 and repairing any
damage thereto resulting from the Work.
4.3.2. Arot Shown or Indicated: If an. Underground
Facility is uncovered or revealed at or contiguous to
the site which was not shown or indicated in the
Contract Documents, CONTRACTOR shall, promptly
immediately after becoming aware thereof and before
further disturbing conditions affected thereby or
performing any Work in connection therewith (except
in an emergency as required by paragraph6.23),
identify the owner of such Underground Facility and
EJCDC GENERAL CONDITIONS 1910-5 (1990 EMim)
w! CITY OF FORT COLLINS MODIFICATIONS (REV 4l2000)
give written notice to that owner and to OWNER and
ENGINEER ENGINEER will promptly review the
Underground Facility and determine the extent, if
any, to which a change is required in the Contract
Documents to reflect and document the consequences
of the existence of the Underground Facility. If
ENGINEER concludes that a change in the Contract
Documents is required, a Work Change Directive or a
Change Order will be issued as provided in Article 10
to reflect and document such consequences. During
such time, CONTRACTOR shall be responsible for
the safety and protection of such Underground
Facility as provided in paragraph6.20.
CONTRACTOR shall may be allowed an increase in
the Contract Rice or an extension of the Contract
Times, or both, to the extent that they are attributable
to the existence of any Underground Facility that was
not shown or indicated in the Contract Documents
and that CONTRACTOR did not know of and could
not reasonably have been expected to be aware of or
to have anticipated. If OWNER and CONTRACTOR
are unable to agree on entitlement to or the amount or
length of any such adjustment in Contract Price or
Contract Times, CONTRACTOR may make a claim
therefor as provided in Articles 11 and 12. However,
OWNER, ENGINEER and ENGINEER'S
Consultants shall not be liable to CONTRACTOR for
any claims, costs, losses or damages incurred or
sustained by CONTRACTOR on or in connection
with any other project or anticipated project.
Reference Points:
4.4. OWNER shall provide engineering surveys to
establish reference points for construction which in
ENGINEER's judgment are necessary to enable
CONTRACTOR to proceed with the Work.
CONTRACTOR shall be responsible for laying out the
Work, shall protect and preserve the established reference
points and shall make no changes or relocations without
the prior written approval of OWNER. CONTRACTOR
shall report to ENGINEER whenever any reference point
is last or destroyed or requires relocation because of
necessary changes in grades or locations, and shall be
responsible for the accurate replacement or relocation of
such reference points by professionally qualified
personnel.
4.5. Asbestos, PCBs, Petroleum, Hazardous Waste or
Radioactive Material:
4.5.1. OWNER shall be responsible for any
Asbestos, PCBs, Petroleum, Hazardous Waste or
Radioactive Material uncovered or revealed at the site
which was not shown or indicated in Drawings or
Specifications or identified in the Contract
Documents to be within the scope of the Work and
which may present a substantial clanger to persons or
property exposed thereto in connection with the Work
at the site. OWNER shall not be responsible for any
such materials brought to the site by
CONTRACTOR, Subcontractors, Suppliers or
anyone else for whom CONTRACTOR is
responsible.
A5-3-4t-.,Rwr_resuch--Speeiai'- written riatie
such -
based -en-a-reaseneble be lief--it-is-unsafe, ea-- does no
:.b:ee
e+ such Work under such resume
peeial
eanditisf
the )AIM-i that is in connection with such hazardo
eaMition or in sueh affeeted area to be deleted ffem
the II EdE it rIIIIATCD and CONTRACT(1D aarmot
agree as to entitlement to or the amourit of ef-am of an
as 6 result of deleting sueh portion of the WorlE, then
either_part _ n;ay-make if -claim therefor as provided in
A...:_t__ 11 and In /11lATD � .. L fty _._L deleted-
of the Work
OW�Mgs ow
fereesor-oth
harmless ___Ck)NT vACTOR, Sabc
R�GPIEL4�, E4TGRIFFR's Consultants arid the
eflieers davoters, employees; agents, ether
consultants and stihoommotem of each arid any o
them firmin and against ail claims; erift lesses
not intended to apply to Asbestos, 1Y'Bs, Petroleum
Heurfeus III. rte r .. DEl' . . 2 A - I
EICDC GENERAL CONDITI ONS 1910-9 (1990 Ediuuo
W CITY OF FORT COLLINS MODIFICATIONS (REV 4R000)
ARTICLE 5--BONDS AND INSURANCE
Performance, Payment and Other Bonds:
5.1. CONTRACTOR shall furnish Performance and
Payment Bonds, each in an amount at least equal to the
Contract Price as security for the faithful performance and
payment of all CONTRACTOR's obligations under the
Contract Documents. These Bonds shall remain in effect
at least until one year after the date when final payment
becomes due, except as provided otherwise by Laws or
Regulations or by the Contract Documents.
CONTRACTOR shall also furnish such other Bonds as
are required by the Supplementary Conditions. All Bonds
shall be in the form prescribed by the Contract Documents
except as provided otherwise by Laws or Regulations and
shall be executed by such sureties as are named in the
current list of "Companies Holding Certificates of
Authority as Acceptable Sureties on Federal Bonds and as
Acceptable Reinsuring Companies" as published in
Circular570 (amended) by the Audit Staff, Bureau of
Government Financial Operations, U.S. Treasury
Department. All Bonds signed by an agent must be
accompanied by a certified copy of such agent's authority
to act.
5.2. If the surety on any Bond furnished by
CONTRACTOR is declared a bankrupt or becomes
insolvent or its right to do business is terminated in any
state where any part of the Project is located or it ceases to
meet the requirements of paragraph 5.1, CONTRACTOR
shall within ten days thereafter substitute another Bond
and surety, both of which must be acceptable to OWNER
&3. Licensed Sureties and Insurers; Certificates of
Insurance:
5.3.1. All Bonds and insurance required by the
Contract Documents to be purchased and maintained
by OWNER or CONTRACTOR shall be obtained
from surety or insurance companies that are duly
licensed or authorized in the jurisdiction in which the
Project is located to issue Bonds or insurance policies
for the limits and coverages so required. Such surety
and insurance companies shall also meet such
additional requirements and qualifications as may be
provided in the Supplementary Conditions.
5.32. CONTRACTOR shall deliver to OWNER,
with copies to each additional insured identified in the
Supplementary Conditions, certificates of insurance
(and other evidence of insurance requested by
OWNER or any other additional insured) which
CONTRACTOR is required to purchase and maintain
in accordance with paragraph 5A OlAq-IL.- .._r.nR—,.shall
.. �L� l.l:t' .l\ .. L:..L 11lSATTJ .
er :..:r .—aaysreRal--m9urvd) wmen--GVaMR-ii
paragraphs 5.6 and 5.4 her -of.
CONTRACTOR's Liabiity Insurance:
5.4. CONTRACTOR shall purchase and maintainsuch
liability and other insurance as is appropriate for the Work
being performed and furnished and as will provide
protection from claims set forth below which may arise out
of or result from CONTRACTOR's performance and
furnishing of the Work and CONTRACTOR's other
obligations under the Contract Documents, whether it is to
be performed or furnished by CONTRACTOR, any
Subcontractor or Supplier, or by anyone directly or
indirectly employed by any of them to perform or furnish
any of the Work, or by anyone for whose acts any of them
may be liable:
5.4.1. claims under workers' compensation, disability
benefits and other similar employee benefit acts;
5.4.2. claims for damages because of bodily injury,
occupational sickness or disease, or death of
CONTRACTOR's employees;
5.4.3. claims for damages because of bodily injury,
sickness or disease, or death of any person other than
CONTRACTOR's employees;
5 4 4 ela ms F r damages insured by eusternaw
persona{ image wltieh ere sus(aine:
feqult of an V indireetly-rel4EtaEl to the -empleymvnt e€sush-perseri-by
othef"Feasei%
5A.5. claims for damages, other than to the Work
itself, because of injury to or destruction of tangible
property wherever located, including loss of use
resulting therefrom; and
5.4.6. claims for damages because of bodily injury or
death of any person or property damage arising out of
the ownership, maintenance or use of any motor
vehicle.
The policies of insurance so required by this paragraph 5.4
to be purchased and maintained shall:
5.4.7. with respect to insurance required by
paragraphs 5.43 through 5.4.6 inclusive and 5.4.9,
include as additional insureds (subject to any
customary exclusion in respect of professional
liability), OWNER, ENGINEER, .ENGiNEER's
Consultants and any other persons or entities identified
in the Supplementary Conditions, all of whom shall be
listed as additional insureds, and include coverage for
the respective officers and employees of all such
additional insureds,
5.4.8. include the specific coverages and be written
for not less than the limits of liability provided in the
Supplementary Conditions or required by Laws or
Regulations, whichever is greater;
5.4.9. include completed operations insurance;
EJCDC GENERAL CONDITIONS 1910.8 (1990 Edtim)
w/ CITY OF FORT (OLLINS MODIFICATIONS (REV 4/2000)
5.4.10. include contractual liability insurance
covering CONTRACTOR's indemnity obligations
under paragraphs 6.12, 6.16 and 6.31 through 6.33;
5.4.11. contain a provision or endorsement that the
coverage afforded will not be cancelled, materially
changed or renewal refused until at least thirty days'
prior written notice has been given to OWNER and
CONTRACTOR and to each other additional insured
identified in the Supplementary Conditions to whom
a certificate of insurance has been issued (and the
certificates of insurance furnished by the
CONTRACTOR pursuant to paragraph 5.3.2 will so
prcvide);
5.4.12. remain in effect at least until final payment
and at all times thereafter when CONTRACTOR may
be correcting, removing or replacing defective Work
in accordance with paragraph 13.12; and
5.4.13. with respect to completed operations
insurance, and any insurance coverage written on a
claims -made basis, remain in effect for at least two
years after final payment (and CONTRACTOR shall
furnish OWNER and each other additional insured
identified in the Supplementary Conditions to whom
a certificate of insurance has been issued evidence
satisfactory to OWNER and any such additional
insured of continuation of such insurance at final
payment and one year thereafter).
OW AER's Liability Insurance:
5.5. In addition to insurance required to be provided
by CONTRACTOR under paragraph 5.4, OWNER, at
OWNER's option, may purchase and maintain at
OWNER's expense OWNER's own liability insurance as
will protect OWNER against claims which may arise from
operations under the Contract Documents.
Properi , Insurance:
1.6. Unless oth@Fwise provided in the ",
upplemen
Conditions, �^I'mli---pilrCl-+g c' and
of the full repla6emtrA east dweaf (srubjobl to sue
deduetihle a...ea..ts as .nay--be--provided—in—the
5.6.1. inelnde the interests of OWNER,
Co ;TRACTOR Subeen'raater, ENG Pi E17s
$ENE'-IN€ER's-Censultants�nd-any -oF}ier--persu er
enlitl
each of whern is e,,, , .Lv1CVUCicJ[
additione,
peril
or al ^ 4 oss liey-form r -that
"P St least 11161kide Y"
�.6he Work, t�6buildin.-..•�.�,—fialsawaiic
nd Work in ti^asitand .L..II ,4at�9t
thefollewiilg perils fire, lid Ring, e?Eteflded
es ifieurred in the repair
oa.., f t _ i c��but-twf
limited to fees and . arges ofan
d
architects) 6 engineers
or at aAeHizr-laceby
'
nlauideli thatt .,,L FA ,. :AIS td e . L i _-
ineltj
by v ry
NAw
a4w evidenee thOF001) required to be purchased and
maintained.l-bY (DA v��e w
it
and en..fF _.ied a. end6ffiemeitt that the J]Y.....t cancelled .._ mate, -:ell„
ehenged er' renewal-reftued until et4eastAhi -days-prier
o ittert -net.
them a cert'f'eate f - L been issued and will
00ni$H3---waiyeer---provisteris n—aCeordanee—..-with
paragraph'5-rr
59. OWNER shall not be responsible for purchasing
and maintaining any property insurance to protect the
interests of CONTRACTOR, Subcontractors or others in
the Work . the _.tent of "d d. 'LI
identified deductible araoun� will be borne
nsfDnn p
xc �O�ubGFN)kaCfer-er'etliCfS.SHftertAg-ny
sueh loss and if any of them wishes propeFt�' 41suFftned
covera
..,1,,.Se and TnBiAtRifl it at L L '
r r
EJCDC GENERAL CONDITIONS 1910.8 (1990 E(itiml)
10 w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4,2000)
5.11.1. 0;WPD and CONTRACTORintend that all
policies'purchaS din deco da,ae&A"ithTafagFaphs_'�
RFA 5 7 ..ill PfOteO;WlTD n
�k3bE(iRt{a2tBrs-E-NU DD •• l
corsultants�all Other P
inplernentary Coaditiom to ha listed
i�recls-er-additietlel-tilstxr'a�.' x-�T�olieiey-amj
eoverW for all lagges and,
lamlla ,.ed L .Le rails ., d L Ly. Il
in the event of ...,,.ment of any loss or darnage L
_:..L... ..r _e,,....e.. f
the .Fads. OF t..dd' I a L a
against each other d their ve offieeFs
d " ..arr, employees -and -agents for II losses d
Ray of 4ie--pon4-covefed-by
Other
in addition; waive a}1 suelr
,jUb69rxtraftBr��{�Eyl+ICi�>�g
ill-t}iP, guppleme" . J -Cend" - -to be lFug-a9
aliHr
les�mages so--seuseA—Plene-e(t}>e "shave
waiveFs shall e e_id to the rights that anypa
Leld L. nrSTTL'D L
J
vu..nLle tde
r ] any p"olion*aTso -`ARTd
flga tnSE--�{�NTRAF,T-9R; �er$S
cnri±inmr-n�_5.11.2. in addition, GJAWER waives all fights
ENGRMER2s GonsulterAs and dfe
Shear, -few
of use or adher a
beyond _d L..�:wl la rcr—or_..da,. age ..,
y..�.. am..a6�--zv3f the Work eaused by,
ject or part thereof caused by. arising Oat Of
ut�
l.. fliflintRinAd
cHR'Cajec{-errperk-Eherepliy-E)1ANER
duringPartial"tilimtten parsua t is
paragia
Aff i tsaranee_'^Folie), rffaa„atned-L :=R-u�vertag
any less,dent.._ e in L
paragniph 511. t �.. .._ ....L.. n_ that
in 'Lr-erne--went - of-payarerit .,L less, t
a
Receipt andApplicatfon ofInsuraneeProceeds:
5.12. Any insured loss under the policies of insurance
required by paragraphs 5.6 and 5.7 will be adjusted with
OWNER and made payable to OWNER as fiduciary for the
insureds, as their interests may appear, subject to the
requirements of any applicable mortgage clause and of
paragraph 5.13, OWNER shall deposit in a separate
account any money so received and shall distribute it in
accordance with such agreement as the parties in interest
may reach If no other special agreement is reached the
damaged Work shall be repaired or replaced, the moneys so
received applied on account thereof and the Work and the
cost thereof covered by an appropriate Change Order or
Written Amendment,
5.13. OWNER as fiduciary shall have power to adjust
and settle any loss with the insurers unless one of the
parties in interest shall object in writing within fifteen days
after the occurrence of loss to OWNER's exercise of this
power. If such objection be made, OWNER as fiduciary
shall make settlement with the insurers in accordance with
such agreement as the parties in interest may reach If no
such agreement among the parties in interest is reached,
OWNER as fiduciary shall adjust and settle the loss with
the insurers and if -era _ed : . ib
,any
5�Hall—erupnterest0�
Acceptance ojBonds and Insurance; Option to Replace:
5.14. If
OWNER has any objection to the coverage afforded by or
other provisions of the Bondsr insurance required to be
purchased and maintained by the athff party
CONTRACTOR in accordance with Article 5 on the basis
of nonconformance with the Contract Documents, the
eb)eetnng-MV "H setre9fy-Eke-ether-peRy OWNER will
noti, CONTRACTOR in writing within ten fifteen days
after reeeipt delivery of the certificates (er etherevidease
requested) to OWNER as required by paragraph 2.7.
the r"IF0d 00veraV W41[11011 prejudice toaRy-ether right
Bonds oFtr>suranee--
a Ghani� QFdff- shall be issued to adjust the
.,,,....gym
Partial L'bGwtion--Property Insurance:
5.15. If OWNER finds it necessary to occupy or use a
portion or portions of the Work prior to Substantial
EJCDC GENERAL CONDITIONS 1910-8 (1990 Edilim)
nd CITY OF FORT COLLINS MODIFICATIONS (REV 4Y2000)
Completion of all the Work, such use or occupancy may
be accomplished in accordance with. paragraph 14.10;
provided that no such use or occupancy shall commence
before the insurers providing the property insurance have
acknowledged notice thereof and in writing effected any
changes in coverage necessitated thereby. The insurers
providing the property, insurance shall consent by
endorsement on the policy or policies, but the property
insurance shall not be cancelled or permitted to lapse on
account of any such partial use or occupancy.
ARTICLE 6—CONTRACTOR'S
RESPONSIBILITIES
Supervision and Superintendence:
6.1. CONTRACTOR shall supervise, inspect and
direct the Work competently and efficiently, devoting
such attention thereto and applying such skills and
expertise as may be necessary to perform the Work in
accordance with the Contract Documents.
CONTRACTOR shall be solely responsible for the means,
methods, techniques, sequences and procedures of
construction, but CONTRACTOR shall not be responsible
for the negligence of others in the design or specification
of a speck means, method, technique, sequence or
procedure of construction which is shown or indicated in
and expressly required by the Contract Documents.
CONTRACTOR shall be responsible to see that the
completed Work complies accurately with the Contract
Documents.
6.2. CONTRACTOR shall keep on the Work at all
times during its progress a competent resident
superintendent, who shall not be replaced without written
notice to OWNER and ENGINEER except under
extraordinary circumstances. The superintendent will be
CONTRACTOR's representative at the site and shall have
authority to act on behalf of CONTRACTOR All
communications to the superintendent shall be as binding
as if given to CONTRACTOR.
Labor, Materials and Equipment:
6.3. CONTRACTOR shall provide competent,
suitably qualified personnel to survey, lay out and
construct the Work as required by the Contract
Documents. CONTRACTOR shall at all times maintain
good discipline and order at the site. Except as otherwise
required for the safety or protection of persons or the
Work or property at the site or adjacent thereto, and
except as otherwise indicated in the Contract Documents,
all Work at the site shall be performed during regular
working hours and CONTRACTOR will not permit
overtime work or the performance of Work on Saturday,
Sunday or any legal holiday without OWNER'.s written
consent given after prior written notice to ENGINEER.
CONTRACTOR shall submit requests to the ENGINEER
no less than 48 hours in advance of any Work to be
performed on Saturday, Sunday Holidays or outside the
Regular Working Hours.
6.4. Unless otherwise specified in the General
Requirements, CONTRACTOR shall famish and assume
full responsibility for all materials, equipment, labor,
transportation, construction equipment and machinery,
tools, appliances, fuel, power, light, heat, telephone, water,
sanitary facilities, temporary facilities and all other
facilities and incidentals necessary for the furnishing,
performance, testing, start-up and completion of the Work.
6.4-1. Purchasing Restrictions: CONTRACTOR
must comply with the City's purchasing restrictions A
cOpV of the resolutions are available for review in the
offices of the purchasing and Risk Management
Division or the City Clerk's office.
6.4.2. Cement Restrictions City of Fort Collins
Resolution 91-121 requires that suppliers and producers
of cement or products containing cement to certify that
the cement was not made in cement kilns that bum
hazardous waste as a fuel.
6.5. All materials and equipment shall be of good
quality and new, except as otherwise provided in the
Contract Documents. All warranties and guarantees
specifically called for by the Specifications shall expressly
nun to the benefit of OWNER. If required by ENGINEER,
CONTRACTOR shall furnish satisfactory evidence
(including reports of required tests) as to the kind and
quality of materials and equipment. All materials and
equipment shall be applied, installed, connected, erected,
used, cleaned and conditioned in accordance with
instructions of the applicable Supplier, except as otherwise
provided in the Contract Documents.
Progress Schedule:
6.6. CONTRACTOR shall adhere to the progress
schedule established in accordance with paragraph 2.9 as it
may be adjusted liom time to time as provided below:
6.6.1. CONTRACTOR shall submit to ENGINEER
for acceptance (to the extent indicated in
paragraph 2.9) proposed adjustments in the progress
schedule that will not change the Contract Times (or
Milestones). Such adjustments will conform generally
to the progress schedule then in effect and additionally
will comply with any provisions of the General
Requirements applicable thereto.
6.6.2. proposed adjustments in the progress schedule
that will change the Contract Times (or Milestones)
shall be submitted in accordance with the requirements
of paragraph 12 1. Such adjustments may only be
made by a Change Order or Written Amendment in
accordance with Article 12.
6.7. Substitutes and "Or-F,qual"Items:
6.7 1. Whenever an item of material or equipment is
specified or described in the Contract Documents by
using the name of a proprietary item or the name of a
particular Supplier, the specification or description is
intended to establish the type, function and quality
required. Unless the specification or description
I EJCDCGE[N•ERAL CONDITIONS 1910-8 0990 Edition)
V CITV OF FORT COLLINS MODIFICATIONS (REV 4/1000)
contains or is followed by words reading that no like,
equivalent or "or -equal" item or no substitution is
permitted, other items of material or equipment or
material or equipment of other Suppliers may be
accepted by ENGINEER under the following
circumstances:
6.7.1.1. 'Or-F,qual": If in ENGINEER's sole
discretion an item of material or equipment
proposed by CONTRACTOR is functionally
equal to that named and sufficiently similar so that
no change in related Work will be required, it may
be considered by ENGINEER as an "or -equal"
item, in which case review and approval of the
proposed item may, in ENGINEER's sole
discretion, be accomplished without compliance
with some or all of the requirements for
acceptance of proposed substitute items.
6.7.1.2. Substitute Items.• If in ENGINEER's sole
discretion an item of material or equipment
proposed by CONTRACTOR does not qualify as
an "or -equal" item under subparagraph 6.7.1.1, it
will be considered a proposed substitute item.
CONTRACTOR shall submit sufficient
information as provided below to allow
ENGINEER to determine that the item of material
or equipment proposed is essentially equivalent to
that named and an acceptable substitute therefor.
The procedure for review by the ENGINEER will
include the following as supplemented in the
General Requirements and as ENGINEER may
decide is appropriate under the circumstances.
Requests for review of proposed substitute items
of material or equipment will not be accepted by
ENGINEER from anyone other than
CONTRACTOR If CONTRACTOR wishes to
furnish or use a substitute item of material or
equipment, CONTRACTOR shall first make
written application to ENGINEER for acceptance
thereof, certifying that the proposed substitute will
perform adequately the functions and achieve the
results called for by the general design, be similar
in substance to that specified and be suited to the
same use as that specified. The application will
state the extent, if any, to which the evaluation
and acceptance of the proposed substitute will
prejudice CONTRACTOR's achievement of
Substantial Completion on time, whether or not
acceptance of the substitute for use in the Work
will require a change in any of the Contract
Documents (or in the provisions of any other
direct contract with OWNER for work on the
project) to adapt the design to the proposed
substitute and whether or not incorporation or use
of the substitute in connection with the Work is
subject to payment of any license fee or royalty.
All variations of the proposed suhstitute from that
specified will be identified in the application and
available maintenance, repair and replacement
service will be indicated The application will
also contain an itemized estimate of all costs or
credits that will result directly or indirectly from
acceptance of such substitute, including costs of
redesign and claims of other contractors affected
by the resulting change, all of which will be
CONTRACTOR shall perform not less than 20
considered by ENGINEER in evaluating the
percent of the Work with its own forces (that is
proposed substitute. ENGINEER may require
without subcoritmcting). The 20 percent requirement
CONTRACTOR to furnish additional data about
shall be understood to refer to the Work the value of
the proposed substitute.
which totals not less than 20 percent of the Contract
Price__ .
6.7.1.3. COA(MCTOR's Expense: All data to be
provided by CONTRACTOR in support of any
6.8.2. If;'^ ementary-Cgrxlitions Bidding
proposed "or -equal" or substitute item will be at
Documents require the identity of certain
CONTRACTOR'sexpense.
Subcontractors, Suppliers or other persons or
organizations (including those who are to furnish the
6.7.2. Substitute Construction Methods or
principal items of materials or equipment) to be
Procedures: If a specific means, method, technique,
submitted to OWNER i- ada ce -the--speetfted
sequence or procedure of construction is shown or
date prior to the Effective Date of the Agreement for
indicated in and expressly required by the Contract
acceptance by OWNER and FNGINEER—an"
Documents, CONTRACTOR may furnish or utilize a
CONTRAGTOR has bmitted-a hgt—t pea - ,
substitute means, method technique, sequence or
aensniimne ::.:th •h
procedure of construction acceptable to ENGINEER.
OWNER's or ENGINEER's acceptance (either in
CONTRACTOR shall submit sufficient information to
writing or by failing to make written objection thereto
allow ENGINEER, in ENGINEER's sole discretion, to
by the date indicated for acceptance or objection in
determine that the substitute proposed is equivalent to
the bidding documents or the Contract Documents) of
that expressly called for by the Contract Documents.
any such SubeonVncter, on or
The procedure for review by ENGINEER will be
similar to that provided in subparagraph 6.7.1.2.
basis -ef--reasenablet-object'
6.7.3. Engineers Evaluation: ENGINEER will be
in--wNeh ease 'zo^*'TTRAGTOR—'-4I-� b 4t--an
eeeptable substitute,--f}ie-,Gontraet--P ee- •� ill b
allowed a reasonable time within which to evaluate
adjusted by the dii]erenee in the cost measioned by
each proposal or submittal made pursuant to
such substitution and - appropriate Charge OF
�pY "N'vav--`�rmgv
paragraphs 6.7.1.2 and 6.7.2. ENGINEER will be the
will be issued Written ,,,,.,a..,,..,�-signed will
, will
sole judge of acceptability. No "or -equal" or
constitute a condition of the Contract requiring, the
substitute will be ordered, installed or utilized without
use of the named subcontractors, suppliers or other
ENGINEER's prior written acceptance which will be
persons or organization on the Work unless prior
evidenced by either a Change Order or an approved
written approval is obtained from OWNER and
Shop Drawing. OWNER may require
ENGINEER No acceptance by OWNER or
CONTRACTOR to furnish at CONTRACTOR's
ENGINEER of any such Subcontractor, Supplier or
expense a special performance guarantee or other
other person or organization shall constitute a waiver
surety with respect to any "or -equal" or substitute.
of any right of OWNER or ENGINEER to reject
ENGINEER will record time required by
defective Work.
ENGINEER and ENGINEER's Consultants in
evaluating substitutes proposed or submitted by
6_9.
CONTRACTOR pursuant to paragraphs 6.7.1 2 and
6.7.2 and in making changes in the Contract
6.9.1. CONTRACTOR shall be fully responsible to
Documents (or in the provisions of any other direct
OWNER and ENGINEER for all acts and omissions
contract with OWNER for work on the Project)
of the Subcontractors, Suppliers and other persons
occasioned thereby. Whether or not ENGINEER
and organizations performing or furnishing any of the
accepts a substitute item so proposed or submitted by
Work under a direct or indirect contract with
CONTRACTOR, CONTRACTOR shall reimburse
CONTRACTOR just as CONTRACTOR is
OWNER for the charges of ENGINEER and
responsible for CONTRACTOR's own acts and
ENGINEER's Consultants for evaluating each such
omissions. Nothing in the Contract Documents shall
proposed substitute item.
create for the benefit of any such Subcontractor,
6_S. Concerning Subcontractors, Suppliers and
Supplier or other person or organization any
contractual relationship between OWNER or
Others:
ENGINEER and any such Subcontractor, Supplier or
other person or organization, nor shall it create any
6.8.1. CONTRACTOR shall not employ any
obligation on the part of OWNER or ENGINEER to
Subcontractor, Supplier or other person or organization
pay or to see to the payment of any moneys due any
(including those acceptable to OWNER and
such Subcontractor, Supplier or other person or
ENGINEER as indicated in paragraph 6.8.2), whether
organization except as may otherwise be required by
initially or as a substitute, against whom OWNER or
Laws and Regulations. OWNER or ENGINEER may
ENGINEER may have reasonable objection.
furnish to any subcontractor, supplier or other N on
CONTRACTOR shall not be required to employ any
or organization evidence of amounts paid to
Subcontractor, Supplier or other person or organization
CONTRACTOR in accordance with
to furnish or perform any of the Work against whom
CONTRACTOR'S "Applications for Payment"
CONTRACTOR has reasonable objection.
EJCDC GENERAL CONDIFONS 1910,8 (1990 E(Htim) 13
wi CITY OF FORT COLLINS MIODIFICA'rIONS (REV V2000)
iil,;TRUCTI(;N.'� la) tiit�DFRS
PEFMF-�' TLPP:S
7-imb used in 11mme TnsLiauc tionn -c
RAdors whi-h I e
inu I w
tan r ii (�" I _ Con'ii I iolis ,'f 1 1--,,
'() ks t 1 11 (- t 1 o r I :(,rnl ia
I � I,,. i ,
tea. ) ti ilv,,, the meanings a s a i oned
t n I hc in in t lip .Ter ,v
I al Anryll 1 i Au H .
he I c,mv "R i Wet" mega w one who OAK
t 3 a Hid to 1�:
rII it � 11, 1 from
ont
I ;.if fit ride - , VAY) allbrili 1 S a Bid tP Hi
idc-r. The terms ":',a(
s, 11 F I i ip I
means the lowest, cittalified, re son.
and i r s I-, o n., i v,�
t: ': f I,-,,
Cori 1) q s n s 01 0 W N E R ' s evalu,rtIoI
as . � � r I, L r " I f t - - r� 1 ii
If] I !� l' III
The term r? j d d i n it Do(--inill:ln
,-4" in lodes I tic V
in"" t I I
I 1v 1 t anon Rid, i iis t- ru (:t otis t K
B L We i s the MA
WT Oka ni,
I of ( C I I I- L L t T- C) (-: I tille I I t l" 1 in :: 1"Ud
i I I u a I L AAMAJ 1 1 7
" tu 1 r 1 )) 1 t a
recoil-!_ " L --, 1,
F ':F ,,Jlll)ll-�
1. '.,mp t Pt s of Bidding Flo, uments
jnav be ob t a iIYA 1
v s t i I W 1 n W
rl it —on to ?id. .Jo nal i a I Se',
S w i l I be ,sued.
- P I tinct
iio(* ljir lit s rra`_I h- l'Xam-. rtF,-,d at the 1
1 (l r s hirint i t i in
he lnviit ,)[I
iui Dor'um(--[As
sft I I t be ti'�p I Lk
',I -r""I Flids;
lie I L (ATTAR nor Tinq i nom assumes
any o sparsibilt --%,
v 0 l
�isir ti rp t if -iris -Su I t i nq Arkri, the
e (it
kq
1) 1 C) p n Sal
�e-t
nw —d"
in /l 3�) ni I I :, i.
ill I trllll np'rL 1, fllihLI
MAP nol 1()-"IP
0
t r) rms �: ;o ,iil -" f C I t t
1'ot a, Or cr
1 [1 r'l I in,-,, ()t '." I It
69 CONTRACTOR shall be solely responsible
for scheduling and coordinating the Work of
Subcontractors, Suppliers and other persons and
organizations performing or furnishing any of the
Work under a direct or indirect contract with
CONTRACTOR CONTRACTOR shall require all
Subcontractors, Suppliers and such other persons and
organizations performing or furnishing any of the
Work to communicate with the ENGINEER through
CONTRACTOR.
6.10. The divisions and sections of the Specifications and
the identifications of any Drawings shall not control
CONTRACTOR in dividing the Work among
Subcontractors or Suppliers or delineating the Work to be
performed by any specific trade.
6.11. All Work performed for CONTRACTOR by a
Subcontractor or Supplier will be pursuant to an
appropriate agreement between CONTRACTOR and the
Subcontractor or Supplier which specifically binds the
Subcontractor or Supplier to the applicable terns and
conditions of the Contract Documents for the benefit of
OWNER and ENGINEER.
ts--witl��Sabaster-er�Fapplier--wlio-is-listed-as-an
additional
peHy-insurance provided --in
paragraphs `�T.7—the---agreentan-between--the
CONTRACTOR and the S1-1b00MM0t0F or Su*ieF will
wntai;. previsiem whereby-the3ubesnteaeter-er-&tpp}ier
Il -- st (l o�A. �D CONTDAGTOP
fla'r`�va--air-rsr�o v6"vrtv�o
;DER—�'$ F�onsul ants and All ether
the I.Ver�k. if the itisteers aRysuch polioieS Fequire
Patent Fees and Royalties:
6.12. CONTRACTOR shall pay all license fees and
royalties and assume all costs incident to the use in the
performance of the Work or the incorporation in the Work
of any invention, design, process, product or device which
is the subject of patent rights or copyrights held by others.
If a particular invention, design, process, product or device
is specified in the Contract Documents for use in the
performance of the Work and if to the actual knowledge of
OWNER or ENGINEER its use is subject to patent rights
or copyrights calling for the payment of any license fee or
royalty to others, the existence of such rights shall be
disclosed by OWNER in the Contract Documents. To the
fullest extent permitted by Laws and Regulations,
CONTRACTOR shall indemnify and hold harmless
OWNER, ENGINEER, ENGINEER's Consultants and the
officers, directors. employees, agents and other consultants
of each and any of them from and against all claims, costs,
losses and damages arising out of or resulting from any
infringement of patent rights or copyrights incident to the
use in the performance of die Work or resulting from the
incorporation in the Work of any invention, design,
process, product or device not specified in the Contract
Documents.
EJCDCGENERAL CONDITIONS 1910-8 (1990 EdiLiai)
14
wl CITY OF FORT COLLINS MODIFICATIONS (REV 4,2000)
Permits:
6.13. Unless otherwise provided in the Supplementary
Conditions, CONTRACTOR shall obtain and pay for all
construction permits and licenses. OWNER shall assist
CONTRACTOR, when necessary, in obtaining such
permits and licenses. CONTRACTOR shall pay all
governmental charges and inspection fees necessary for
the prosecution of the Work, which are applicable at the
time of opening of Bids, or, if there are no Bids, on the
Effective Date of the Agreement. CONTRACTOR shall
pay all charges of utility owners for connections to the
Work, and OWNER shall pay all charges of such utility
owners for capital costs related thereto such as plant
investment fees.
6.14. Laws and Regulations:
6.14.1. CONTRACTOR shall give all notices and
comply with all Laws and Regulations applicable to
furnishing and performance of the Work. Except
where otherwise expressly required by applicable
Laws and Regulations, neither OWNER nor
ENGINEER shall be responsible for monitoring
CONTRACTOR's compliance with any Laws or
Regulations.
6.14.2. If CONTRACTOR performs any Work
knowing or having reason to know that it is contrary
to Laws or Regulations, CONTRACTOR shall bear
all claims, costs, losses and damages caused by,
arising out of or resulting therefrom; however, it shall
not be CONTRACTORS primary responsibility to
make certain that the Specifications and Drawings are
in accordance with Laws and Regulations, but this
shall not relieve CONTRACTOR of
CONTRACTOR'S obligations under paragraph 3.3.2.
Taxes
6,15. CONTRACTOR shall pay all sales, consumer,
use and other similar taxes required to be paid by
CONTRACTOR in accordance with the Laws and
Regulations of the place of the Project which are
applicable during the performance of the Work.
6.15.1. OWNER is exempt from Colorado State and
local sales and use taxes on materials to be
permanently incorporated into the project. Said taxes
shall not be included in the Contract Price.
Address:
Colorado Department of Revenue
State Capital Annex
1375 Sherman Street
Denver, Colorado, 80261
Sales and Use 'faxes for the State of Colorado
Regional Transportation District (RTD) and certain
Colorado counties are collected by the State of
Colorado and are included in the Certification of
Extra tion.
All applicable Sales and Use Taxes (including State
collected taxes), on any items other than construction
and building materials physically incorporated into the
Droject are to be paid by CONTRACTOR and are to
be included in appropriate bid items.
Use of Premises:
6,16. CONTRACTOR shall confine construction
equipment, the storage of materials and equipment and the
operations of workers to the site and land and areas
identified in and permitted by the Contract Documents and
other land and areas permitted by Laws and Regulations,
rights -of -way, permits and easements, and shall not
unreasonably encumber the premises with construction
equipment or other materials or equipment.
CONTRACTOR shall assume full responsibility for any
damage to any such land or area, or to the owner or
occupant thereof or of any adjacent land or areas, resulting
from the performance of the Work. Should any claim be
made by any such owner or occupant because of the
performance of the Work, CONTRACTOR shall promptly
settle with such other party by negotiation or otherwise
resolve the claim by arbitration or other dispute resolution
proceeding or at law. CONTRACTOR shall, to the fullest
extent permitted by Laws and Regulations, indemnify and
hold harmless OWNER, ENGINEER ENGINEER's
Consultant and anyone directly or indirectly employed by
any of them from and against all claims, costs, losses and
damages arising out of or resulting from any claim or
action, legal or equitable, brought by any such owner or
occupant against OWNER, ENGINEER or any other party
indemnified hereunder to the extent caused by or based
upon CONTRACTOR's performance of the Work.
6.17. During the progress of the Work, CONTRACTOR
shall keep the premises free from accumulations of waste
materials, rubbish and other debris resulting from the
Work. At the completion of the Work CONTRACTOR
shall remove all waste materials, rubbish and debris from
and about the premises as well as all tools, appliances,
construction equipment and machinery and surplus
materials. CONTRACTOR shall leave the site clean and
ready for occupancy by OWNER at Substantial
Completion of the Work. CONTRACTOR ShIIII restore to
original condition all property not designated for alteration
by the Contract Documents.
6.18. CONTRACTOR shall not load nor permit any part
of any structure to be loaded in any manner that will
endanger the structure, nor. shall CONTRACTOR subject
any part of the Work or adjacent property to stresses or
pressures that will endanger it.
Record Documents:
FJCDC GENERAL CONDITTONS 1910-8 (1990 Ediliai)
w/ CITY OF FORT COLLINS MODIFICATIONS iRFV,I/2000)
6.19. CONTRACTOR shall maintain in a safe place at
the site one record copy of all Drawings, Specifications,
Addenda, Written Amendments, Change Orders, Work
Change Directives, Field Orders and written
interpretations and clarifications (issued pursuant to
paragraph 9.4) in good order and annotated to show all
changes made during construction. These record
documents together with all approved Samples and a
counterpart of all approved Shop Drawings will be
available to ENGINEER for reference. Upon completion
of the Work, and prior to release of final payment, these
record documents, Samples and Shop Drawings will be
delivered to ENGINEER for OWNER.
Safety and Protection:
6.20. CONTRACTOR shall be responsible for
initiating, maintaining and supervising all safety
precautions and programs in connection with the Work.
CONTRACTOR shall take all necessary precautions for
the safety oi, and shall provide the necessary protection to
prevent damage, injury or loss to:
6.20.1. all persons on the Work site or who may be
affected by the Work,
6.20.2. all the Work and materials and equipment to
be incorporated therein, whether in storage on or off
the site, and
6.20.3. other property at the site or adjacent thereto,
including trees, shrubs, lawns, walks, pavements,
roadways, structures, utilities and Underground
Facilities not designated for removal, relocation or
replacement in the course of construction.
CONTRACTOR shall comply with all applicable Laws
and Regulations of any public body having jurisdiction for
safety of persons or property or to protect them from
damage, injury or loss; and shall erect and maintain all
necessary safeguards for such safety and protection.
CONTRACTOR shall notify owners of adjacent property
and of Underground Facilities and utility owners when
prosecution of the Work may affect them, and shall
cooperate with them in the protection, removal, relocation
and replacement of their property. All damage, injury or
loss to any property referred to in paragraphs 6.20.2 or
6.20.3 caused, directly or indirectly, in whole or in part, by
CONTRACTOR any Subcontractor, Supplier or any
other person or organization directly or indirectly
employed by any of them to perform or furnish any of the
Work or anyone for whose acts any of them may be liable,
shall be remedied by CONTRACTOR (except damage or
loss attributable to the fault of Drawings or Specifications
or to the acts or omissions of OWNER or ENGINEER or
ENGINEER's Consultant or anyone employed by any of
them or anyone for whose acts any of them may be liable,
and not attributable, directly or indirectly, in whole or in
part, to the fault or negligence of CONTRACTOR or any
Subcontractor, Supplier or other person or organization
directly or indirectly employed by any of them).
CONTRACTOR's duties and responsibilities for the safety
and protection of the Work shall continue until such time
as all the Work is completed and ENGINEER has issued a
15
notice to OWNER and CONTRACTOR in accordance
with paragraph 14.13 that the Work is acceptable (except as
otherwise expressly provided in connection with
Substantial Completion).
6.21. Safety Representative:
CONTRACTOR shall designate a qualified and
experienced safety representative at the site whose duties
and responsibilities shall be the prevention of accidents and
the maintaining and supervising of safety precautions and
programs.
Hazard Communication Programs:
6.22. CONTRACTOR shall be responsible for
coordinating any exchange of material safety data sheets or
other hazard communication information required to be
made available to or exchanged between or among
employers at the site in accordance with Laws or
Regulations.
Emergencies:
6.23. In emergencies affecting the safety or protection of
persons or the Work or property at the site or adjacent
thereto, CONTRACTOR, without special instruction or
authorization from OWNER or ENGINEER, is obligated to
act to prevent threatened damage, injury or loss.
CONTRACTOR shall give ENGINEER prompt written
notice if CONTRACTOR believes that any significant
changes in the Work or variations from the Contract
Documents have been caused thereby. If ENGINEER
determines that a change in the Contract Documents is
required because of the action taken by CONTRACTOR in
response to such an emergency, a Work Change Directive
or Change Order will be issued to document the
consequences of such action.
6.24. Shop Drawings and Samples:
6.24.1. CONTRACTOR shall submit Shop Drawings
to ENGINEER for review and approval in accordance
with the accepted schedule of Shop Drawings and
Sample submittals (see paragraph 2.9). All submittals
will be identified as ENGINEER may require and in
the number of copies specified in the General
Requirements. The data shown on the Shop Drawings
will be complete with respect to quantities,
dimensions, specified performance and design criteria,
materials and similar data to show ENGINEER the
materials and equipment CONTRACTOR proposes to
provide and to enable ENGINEER to review the
information for the limited purposes required by
paragraph 6.26.
624 CONTRACTOR shall also submit Samples to
ENGINEER for review and approval in accordance
with said accepted schedule of Shop Drawings and
Sample submittals. Each Sample will be identified
clearly as to material, Supplier, pertinent data such as
catalog numbers and the use for which intended and
otherwise as ENGINEER may require to enable
ENGINEER to review the submittal for the limited
ESCDC GENERAL CONDITIONS 1910-8 (1990 E(itim)
16 wI CITY OF FORT COLLINS MODIFICATIONS (REV 42000)
purposes required by paragraph6.26. The numbers
of each Sample to be submitted will be as specified in
the Specifications.
6.25. Submittal Procedures:
6.25.1. Before submitting each Shop Drawing or
Sample, CONTRACTOR shall have determined and
verified:
6.25.1.1. all field measurements, quantities,
dimensions, specified performance criteria,
installation requirements, materials, catalog
numbers and similar information with respect
thereto,
6.25.1.2. all materials with respect to intended
use, fabrication, shipping, handling, storage,
assembly and installation pertaining to the
performance of the Work, and
625.1.3. all information relative to
CONTRACTOR's sole responsibilities in respect
of means, methods, techniques, sequences and
procedures of construction and safety precautions
and programs incident thereto.
CONTRACTOR shall also have reviewed and
coordinated each Shop Drawing or Sample with other
Shop Drawings and Samples and with the
requirements of the Work and the Contract
Documents.
6.25.2. Each submittal will bear a stamp or specific
written indication that CONTRACTOR has satisfied
CONTRACTOR's obligations under the Contract
Documents with respect to CONTRACTOR's review
and approval of that submittal.
6.25.3. At the time of each submission,
CONTRACTOR shall give ENGINEER specific
written notice of such variations, if any, that the Shop
Drawing or Sample submitted may have from the
requirements of the Contract Documents, such notice
to be in a written communication separate from the
submittal; and, in addition, shall cause a specific
notation to be made on each Shop ]hawing and
Sample submitted to ENGINEER for review and
approval of each such variation.
6.26. ENGINEER will review and approve Shop
Drawings and Samples in accordance with the schedule of
Shop Drawings and Sample submittals accepted by
ENGINEER as required by paragraph 29. FNGINEER's
review and approval will be only to determine if the items
covered by the submittals will, after installation or
incorporation in the Work, conform to the information
given in the Contract Documents and be compatible with
the design concept of the completed Project as a
functioning whole as indicated by the Contract
Documents. ENGINEER's review and approval will not
extend to means, methods, techniques, sequences or
procedures of construction (except where a particular
means, method, technique, sequence or procedure of
construction is specifically and expressly called for by the
Contract Documents) or to safety precautions or programs
incident thereto. The review and approval of a separate
item as such will not indicate approval of the assembly in
which the item functions. CONTRACTOR shall make
corrections required by ENGINEER, and shall return the
required number of corrected copies of Shop Drawings and
submit as required new Samples for review and approval.
CONTRACTOR shall direct specific attention in writing to
revisions other than the corrections called for by
ENGINEER on previous submittals.
6.27. ENGINEER's review and approval of Shop
Drawings or Samples shall not relieve CONTRACTOR
from responsibility for any variation from the requirements
of the Contract Documents unless CONTRACTOR has in
writing called ENGINEEWs attention to each such
variation at the time of submission as required by
paragraph 6.25.3 and ENGINEER has given written
approval of each such variation by a specific written
notation thereof incorporated in or accompanying the Shop
Drawing or Sample approval; nor will any approval by
ENGINEER relieve CONTRACTOR from responsibility
for complying with the requirements of paragraph 6.25.1.
6.28. Where a Shop Drawing or Sample is required by
the Contract Documents or the schedule of Shop Drawing
and Sample submissions accepted by ENGINEER as
required by paragraph2.9, any related Work performed
prior to ENGINEER's review and approval of the pertinent
submittal will be at the sole expense and responsibility of
CONTRACTOR.
Continuing the Work:
6.29. CONTRACTOR shall carry on the Work and
adhere to the progress schedule during all disputes or
disagreements with OWNER. No Work shall be delayed or
postponed pending resolution of any disputes or
disagreements, except as permitted by paragraph 15.5 or as
OWNER and CONTRACTOR may otherwise agree in
writing.
6.30. CONTR4CTOR's General Warranty and
Guarantee:
6.30.1. CONTRACTOR warrants and guarantees to
OWNER, ENGINEER and ENGINEERS Consultants
that all Work will be in accordance with the Contract
Documents and will not be defective.
CONTRACTORs warranty and guarantee hereunder
excludes defects or damage caused by:
630.1.1. abuse, modification or improper
maintenance or operation by persons other than
CONTRACTOR, Subcontractors or Suppliers, or
6.30.1.2. normal wear and tear under normal
usage.
6.30.2 CONTRACTOR's obligation to perform and
complete the Work in accordance with the Contract
Documents shall be absolute None of the following
will constitute an acceptance of Work that is not in
EICDC. GENERAL CONDITIONS 1910-8 (1990E(btim)
w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000)
accordance with the Contract Documents or a release
of CONTRACTOR's obligation to perform the Work
in accordance with the Contract Documents:
6.30.2.1. observations by ENGINEER;
6.30.2.2. recommendation of any progress or
Final payment by ENGINEER;
6.30.2.1 the issuance of a certificate of
Substantial Completion or any payment by
OWNER to CONTRACTOR under the Contract
Documents,
6.30.2.4. use or occupancy of the Work or any
part thereof by OWNER;
6.30.25. any acceptance by OWNER or any
failure to do so,
6.30.2.6. any review and approval of a Shop
Drawing or Sample submittal or the issuance of a
notice of acceptability by ENGINEER pursuant
to paragraph 14.13;
6.30.2.7. any inspection, test or approval by
others, or
6.30.2.8. any correction of defective Work by
OWNER.
Indemnification:
6.31. To the fullest extent permitted by Laws and
Regulations, CONTRACTOR shall indemnify and hold
harmless OWNER, ENGINEER, ENGINEEWs
Consultants and the officers, directors, employees, agents
and other consultants of each and any of them from and
against all claims, costs, losses and damages (including,
but not limited to, all tees and charges of engineers,
architects, attorneys and other professionals and all court
or arbitration or other dispute resolution costs) caused by,
arising out of or resulting from the performance of the
Work, provided that any such claim, cost, loss or damage:
(i) is attributable to bodily injury, sickness, disease or
death, or to injury to or destruction of tangible property
(other than the Work itself), including the loss of use
resulting therefrom, and (ii) is caused in whole or in part
by any negligent act or omission of CONTRACTOR, any
Subcontractor, any Supplier, any person or organization
directly or indirectly employed by any of them to perform
or furnish any of the Work or anyone for whose acts any
of them may be liable, regardless of whether or not caused
in part by any negligence or omission of a person or entity
indemnified hereunder or whether liability is imposed
upon such indemnified party by Laws and Regulations
regardless of the negligence of any such person or entity.
632. In any and all claims against OWNER or
ENGINEER or any of their respective consultants, agents,
officers, directors or employees by any employee (or the
survivor or personal representative of such employee) of
CONTRACTOR, any Subcontractor, any Supplier, any
person or organization directly or indirectly employed by
17
any of them to perform or furnish any of the Work or
anyone for whose acts any of them may be liable, the
indemnification obligation under paragraph 6.31 shall not
be limited in any way by arty limitation on the amours or
type of damages, compensation or benefits payable by or
for CONTRACTOR or any such Subcontractor, Supplier or
other person or organization under workerscompensation
acts, disability benefit acts or other employee benefit acts.
6.33. The indemnification obligations of
CONTRACTOR under paragraph 6.31 shall not extend to
the liability of ENGINEER and ENGINEER's Consultants,
officers, directors, employees or agents caused by the
professional negligence, errors or omissions of any of them.
Survival of obligations:
6.34. All representations, indemnifications, warranties
and guarantees made in, required by or given in accordance
with the Contract Documents, as well as all continuing
obligations indicated in the Contract Documents, will
survive final payment, completion and acceptance of the
Work and termination or completion of the Agreement.
ARTICLE 7--OTIIER WORK
Related Work at Site:
7.1. OWNER may perform other work related to the
Project at the site by OWNER's own forces, or let other
direct contracts therefor which shall contain General
Conditions similar to these, or have other work performed
by utility owners. If the fact that such other work is to be
performed was not noted in the Contract Documents, then:
(i) written notice thereof will be given to CONTRACTOR
prior to starting any such other work and
(it) CONTRACTOR may make a claim therefor as
provided in Articles 11 and 12 if CONTRACTOR believes
that such performance will involve additional expense to
CONTRACTOR or requires additional time and the parties
are unable to agree as to the amount or extent thereof.
7.2. CONTRACTOR shall afford each other contractor
who is a party to such a direct contract and each utility
owner (and OWNER, if OWNER is performing the
additional work with OWNER's employees) proper and
safe access to the site and a reasonable opportunity for the
introduction and storage of materials and equipment and
the execution of such other work and shall properly connect
and coordinate the Work with theirs. Unless otherwise
provided in the Contract Documents, CONTRACTOR
shall do all cutting, fitting and patching of the Work that
may be required to make its several parts come together
properly and integrate with such other work.
CONTRACTOR shall not endanger any work of others by
cutting, excavating or otherwise altering their work and
will only cut or alter their work with the written consent of
ENGINEER and the others whose work will be affected.
The duties and responsibilities of CONTRACTOR under
this paragraph are for the benefit of such utility owners and
other contractors to the extent that there are comparable
1 EICDC GENERAL CONDITIONS 1910-8 (1990 Edition)
w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000)
provisions for the benefit of CONTRACTOR in said
direct contracts between OWNER and such utility owners
and other contractors.
7.3. If the proper execution or results of any part of
CONTRACTOR's Work depends upon work performed
by others under this Article 7, CONTRACTOR shall
inspect such other work and promptly report to
ENGINEER in writing any delays, defects or deficiencies
in such other work that render it unavailable or unsuitable
for the proper execution and results of CONTRACTOR's
Work. CONTRACTOR's failure so to report will
constitute an acceptance of such other work as fit and
proper for integration with CONTRACTOR's Work
except for latent or nonapparent defects and deficiencies
in such other work.
Coordination:
7.4. If OWNER contracts with others for the
performance of other work on the Project at the site, the
following will be set forth in Supplementary Conditions:
7.4.1. the person, firm or corporation who will have
authority and responsibility for coordination of the
activities among the various prime contractors will be
identified;
7.4.2. the specific matters to be covered by such
authority and responsibility will be itemized; and
7.4.3. the extent of such authority and
responsibilities will be provided.
Unless otherwise provided in the Supplementary
Conditions, OWNER shall have sole authority and
responsibility in respect of such coordination.
ARTICLE 8—OWNER'S RESPONSIBILITIES
8.1. Except as otherwise provided in these General
Conditions, OWNER shall issue all communications to
CONTRACT OR through ENGINEER.
8.2. In case of termination of the employment of
ENGINEER, OWNER shall appoint an engineer against
whose status under the Contract Documents shall be that
of the former ENGINEER
8.3. OWNER shall furnish the data required of
OWNER under the Contract Documents promptly and
shall make payments to CONTRACTOR promptly when
they are due as provided in paragraphs 14.4 and 14.13.
8A OWNER's duties in respect of providing lands
and easements and providing engineering surveys to
establish reference points are set forth in paragraphs 4 1
and 4.4. Paragraph 4.2 refers to OWNER's identifying
and making available to CONTRACTOR copies of
reports of explorations and tests of subsurface conditions
at the site and drawings of physical conditions in existing
structures at or contiguous to the site that have been utilized
by ENGINEER in preparing the Contract Documents.
&3. (Alin.i-.-1R 's-responsibilitiesn_espest ef pumhasing
IbAh in paragraphs 5.5 thraug 540.
8.6. OWNER is obligated to execute Change Orders as
indicated in paragraph 10.4.
8.7. OWNER's responsibility in respect of certain
inspections, tests and approvals is set forth in
paragraph 13.4.
8.8. In connection with 01ANE.R's right to stop Work or
suspend Work, see paragraphs 13. 10 and 15.1.
Paragraph 15.2 deals with OWNER's right to terminate
services of CONTRACTOR under certain circumstances.
8.9. The OWNER shall not supervise, direct or have
control or authority over, nor be responsible for,
CONTRACTOR's means, methods, techniques, sequences
or procedures of construction or the safety precautions and
programs incident thereto, or for any failure of
CONTRACTOR to comply with Laws and Regulations
applicable to the furnishing or performance of the Work.
OWNER will not be responsible for CONTRACTOR's
failure to perform or famish the Work in accordance with
the Contract Documents.
8-10—�'�i.^�� a.:ai�e€-undiscloseA
.'Asbestos, PGBr, Petroleum, I€atsrdous Wasto or
set c)_a.:_ ...,_..,._aph n S.
ARTICLE 9--ENGINEER'S STATUS DURING
CONSTRUCTION
09W R'sRepresentative:
9.1. ENGINEER will be OWNER's representative
during the construction period. The duties and
responsibilities and the limitations of authority of
ENGINEER as OWNER's representative during
construction are set forth in the Contract Documents and
shall not be extended without written consent of OWNER
and ENGINEER.
i:sits to Site:
9.2. ENGINEER will make visits to the site at intervals
appropriate to the various stages of construction as
ENGINEER deems necessary in order to observe as an
experienced and qualified design professional the progress
ESCDC GENERAL CONDITIONS 1910-5 (1990 E61im )
w/ CITY OF FORT COLLINS MODIFICATIONS (REV 42000)
that has been made and the quality of the various aspects
of CONTRACTOR's executed Work Based on
information obtained during such visits and observations,
ENGINEER will endeavor for the benefit of OWNER to
determine, in general, if the Work is proceeding in
accordance with the Contract Documents. ENGINEER
will not be required to make exhaustive or continuous on -
site inspections to check the quality or quantity of the
Work. ENGINEER's efforts will be directed toward
providing for OWNER a greater degree of confidence that
the completed Work will conform generally to the
Contract Documents. On the basis of such visits and on -
site observations, ENGINEER will keep OWNER
informed of the progress of the Work and will endeavor to
guard OWNER against defective Work. ENGINEER's
visits and on -site observations are subject to all the
limitations on ENGINEER's authority and responsibility
set forth in paragraph 9.13, and particularly, but without
limitation, during or as a result of ENGINEER's on -site
visits or observations of CONTRACTOR's Work
ENGINEER will not supervise, direct, control or have
authority over or be responsible for CONTRACTOR's
means, methods, techniques, sequences or procedures of
construction, or the safety precautions and programs
incident thereto, or for any failure of CONTRACTOR to
comply with Laws and Regulations applicable to the
famishing or performance of the Work.
Project Representative:
9.3. If OWNER and ENGINEER agree, ENGINEER
will furnish a Resident Project Representative to assist
ENGINEER in providing more continuous observation of
the Work. The responsibilities and authority and
limitations thereon of any such Resident Project
Representative and assistants will be as provided in
paragraphs 9.3 and 9.13 and in lementary
Conditions of these General Conditions. If OWNER
designates another representative or agent to represent
OWNER at the site who is not ENGINEERSs Consultant,
agent or employee, the responsibilities and authority and
limitations thereon of such other person will be as
provided in L`. S, ppiem� -^ Ems; para¢aoh 9.3
9 3 1 The Representative's dealings in matters
pertaining to the on -site work will, in general, be with
the ENGINEER and CONTRACTOR But the
Representative will keen the OWNER properly
advised about such matters. The Representative's
dealings with subcontractors will only be through or
with the full knowledge and approval of the
CONTRACTOR.
932 Duties and RespQmibilities Representative
will:
9.3.2.1. Schedules - Review the -progress
schedule and other schedules prepared by the
CONTRACTOR and consult with the
ENGINEER concerning acceptability.
9.3.2.2. Conferences and Meeting - Attend
mee with the CONTRACTOR such as
preconstruction conferences, progress meetings
and other lob conferences and Drepare and
circulate copies of minutes of meetings.
9.3.2.3. Liaison
9.3.2.3,1. Serve as ENGINEER'S liaison
with CONTRACTOR, working principally
ftough CONTRACTORS superintendent to
assist the CONTRACTOR in understanding
the Contract Documents.
9.3.2.3.2. Assist in obtaining from OWNER
additional details or information, when
required, for proper execution of the Work.
9.3.2.3.3. Advise the ENGINEER and
CONTRACTOR of the commencement of
any Work requiring a Shop Drawing or
sample submission if the submission has not
been approved by the ENGINEER
93.2.4.Review of Work, Rejection of Defective
Work, Inspections and Tests -
9.3.2.4.1. Conduct on -site observations of
the Work in progress to assist the ENGINEER
in determining that the Work is proceeding in
accordance with the Contract Documents.
9 3 2 4 3 Accompany visitirtf inspectors
representing public or other agencies having
jurisdiction over the Project record the results
of these inspections and report to the
ENGINEER.
9.3 2.5. Interpretation of Contract
Documents._ Regort to ENGINEER when
clarifications and interpretations of the Contract
Documents are needed and transmit to
CONTRACTOR clarification and interpretation
of the Contract Documents_as issued by the
ENGINEER.
9.3.2.6. Modifications Consider and
evaluate CONTRACTORS suggestions for
20 EJCDC GENERAL CONDITIONS 1910-3 0990 Editien)
w/ CITY OF FORT COLLINS MODIFICATIONS (REV 42000)
modification in Drawings or Specifications and
report these recommendations to ENGINEER
Accurately transmit to CONTRACTOR
decisions issued by the ENGINEER
9.3.2.7. Records,
9.3.1.8. Reports.
9.3.2.8.1. Furnish ENGINEER periodic
reports, as required, of the progress of the
Work and of the CONTRACTORS
compliance with the progress schedule and
schedule of shop Drawing and sample
submittals.
9.3.2.8.2. Consult with ENGINEER in
advance of scheduling major tests
inspections or start of important phases of the
Work.
9 3 2 8.3. Draft proposed Change Orders
and Work Directive Change,% obtaining
backup material from the CONTRACTOR
and recommend to ENGINEER Change
Orders- Work Directivz Changes and field
orders.
9.3.2.8.4. Report immediatelv to
ENGINEER and OWNER the occurrence of
anv accident
9 3 , 9 Payment Requests Review applications
for payment with CONTRACTOR for compliance
with the established procedure for their
submission and forward with recommendation to
ENGINEER noting particularly the relationship of
the payment requested to the schedule of values.
work completed and materials and equipment
delivered at the site but not incorporated in the
Work.
9.3.2.10_ Completion
9.3.2.10.1. Before ENGINEER issues a
Certificate of Substantial Completion, submit
to CONTRACTOR a list of observed items
requiring, correction or completion.
9.3.2.10.2. Conduct final inspection in the
company of the ENGINEER OWNER and
CONTRACTOR and preuare a final list of
items to be corrected or completed.
9.3.2.10.3. Observe that all items on the
final list have been corrected or completed and
make recommendations to ENGINEER
concerning acceptance.
9.3.3. Limitation of Authority: The Representative shall
not:
9.3.3.1. Authorize any deviations from the
Contract Documents or accept any substitute
materials or equipment, unless authorized by the
ENGINEER.
9.3.3.2. Exceed limitations of ENGINEER'S
authority asset forth in the Contract Documents
9.3.3.3. Undertake any of the responsibilities
of the CONTRACTOR. Subcontractors. or
CONTRACTOR'S superintendent
93.3.4. Advise on, or issue directions relative
to, or assume control over any aspect of the
means methods, techniques sequences or
procedures for construction unless such is
specifically called for in the Contract Documents
93.3.5. Advise on or issue directions
re ag rding or assume control over safely
precautions and programs in connections with the
Work.
9 3 3 6 Accept Shop Drawui= or sample
submittals from anyone other than the
CONTRACTOR
9.3.3.7. Authorize OIVNER to occupy e
Work in whole or in part
9.3.E_8. Participate in specialized tided or
laboratory tests or inspections conducted by others
except as , specifically-authorizedby the
ENGINEER.
Clarifications and Interpretations:
9.4. ENGINEER will issue with reasonable promptness
such written clarifications or interpretations of the
ESCDC GENERAL CONDM ONS 1910-8 090 Edition)
w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4/2000)
requirements of the Contract Documents (in the form of
Drawings or otherwise) as ENGINEER may determine
necessary, which shall be consistent with the intent of and
reasonably inferable from the Contract Documents. Such
written clarifications and interpretations will be binding on
OWNER and CONTRACTOR If OWNER or
CONTRACTOR believes that a written clarification or
interpretation justifies an adjustment in the Contract Price
or the Contract Times and the parties are unable to agree
to the amount or extent thereof, if any, OWNER or
CONTRACTOR may make a written claim therefor as
provided in Article 11 or Article 12.
Authorized Variations in Work:
9.5. ENGINEER may authorize minor variations in
the Work from the requirements of the Contract
Documents which do not involve an adjustment in the
Contract Price or the Contract Times and are compatible
with the design concept of the completed Project as a
functioning whole as indicated by the Contract
Documents. These may be accomplished by a Field Order
and will be binding on OWNER and also on
CONTRACTOR who shall perform the Work involved
promptly. If OWNER or CONTRACTOR believes that a
Field Order justifies an adjustment in the Contract Price or
the Contract Times and the parties are unable to agree as
to the amount or extent thereof, OWNER or
CONTRACTOR may make a written claim therefor as
provided in Article 11 or 12.
Rejecdng Defective Work:
9.6. ENGINEER will have authority to disapprove or
reject Work which ENGINEER believes to be defective,
or that ENGINEER believes will not produce a completed
Project that conforms to the Contract Documents or that
will prejudice the integrity of the design concept of the
completed Project as a functioning whole as indicated by
the Contract Documents. ENGINEER will also have
authority to require special inspection or testing of the
Work as provided in paragraph 13.9, whether or not the
Work is fabricated, installed or completed.
Shop Drawings, Change Orders and Payments
9.7. In connection with ENGINEER's authority as to
Shop Drawings and Samples, see paragraphs 6.24 through
6.28 inclusive.
9.8. In connection with ENGINEER's authority as to
Change Orders, see Articles 10, 11, and 12.
99. In connection with ENGWEER's authority as to
Applications for Payment, see Article 14.
Determinations for Unit Prices
9.10. ENGINEER will determine the actual quantities
and classifications of Unit Price Work performed by
CONTRACTOR. ENGINEER will review with
CONTRACTOR the ENGINEER's preliminary
determinations on such matters before rendering a written
decision thereon (by recommendation of an Application
^l
for Payment or otherwise). ENGINEER'S written decision
thereon will be final and binding upon OWNER and
CONTRACTOR, unless, within ten days after the date of
any such decision, either OWNER or CONTRACTOR
delivers to the other and to ENGINEER written notice of
intention to appeal from ENGINEER'S decision and: (i) an
appeal from ENGINEER's decision is taken within the time
limits and in accordance with the procedures set forth in
Exhibit GC -A, "Dispute Resolution Agreement", entered
into between OWNER and CONTRACTOR pursuant to
Article 16, or (ii) if no such Dispute Resolution Agreement
has been entered into, a formal proceeding is instituted by
the appealing party in a fonun of competent jurisdiction to
exercise such rights or remedies as the appealing party may
have with respect to FNGINEER's decision, unless
otherwise agreed in writing by OWNER and
CONTRACTOR. Such appeal will riot be subject to the
procedures of paragraph 9.11.
Decisions on Disputes.
9.11. ENGINEER will be the initial interpreter of the
requirements of the Contract Documents and judge of the
acceptability of the Work thereunder. Claims, disputes and
other matters relating to the acceptability of the Work or
the interpretation of the requirements of the Contract
Documents pertaining to the performance and furnishing of
the Work and claims under Articles 1 i and 12 in respect of
changes in the Contract Price or Contract Times will be
referred initially to ENGINEER in writing with a request
for a formal decision in accordance with this paragraph.
Written notice of each such claim, dispute or other matter
will be delivered by the claimant to ENGINEER and the
other party to the Agreement promptly (but in no event
later than thirty days) after the start of the occurrence or
event giving rise thereto, and written supporting data will
be submitted to ENGINEER and the other party within
sixty days after the start of such occurrence or event unless
ENGINEER allows an additional period of time for the
submission of additional or more accurate data in support
of such claim, dispute or other matter. The opposing party
shall submit any response to ENGINEER and the claimant
within thirty days after receipt of the claimant's last
submittal (unless ENGINEER allows additional time).
ENGINEER will render a formal decision in writing within
thirty days alter receipt of the opposing party's submittal, if
any, in accordance with this paragraph ENGINEER's
written decision on such claim, dispute or other matter will
be final and binding upon OWNER and CONTRACTOR
unless: (i) an appeal from ENGINEER's decision is taken
within the time limits and in accordance with the
procedures set forth in EXHIBIT GC -A, "Dispute
Resolution Agreement", entered into between OWNER and
CONTRACTOR pursuant to Article 16, or (ii) if no such
Dispute Resolution Agreement has been entered into, a
written notice of intention to appeal from ENGINEER's
written decision is delivered by OWNER or
CONTRACTOR to the other and to ENGINEER within
thirty days after the date of such decision and a formal
proceeding is instituted by the appealing party in a forum of
competent jurisdiction to exercise such rights or remedies
as the appealing party may have with respect to such claim,
dispute or other matter in accordance with applicable Laws
and Regulations within sixty days of the date of such
22 EJCDC GENERAL CONDITIONS 1910-8 (1990 Editiah
w,' CLTY OF FORT COLLINS MODIFICATIONS (REV 4/2000)
decision, unless otherwise agreed in writing by OWNER
and CONTRACTOR.
9.12. When functioning as interpreter and judge under
paragraphs 9.10 and 9.11, ENGINEER will not show
partiality to OWNER or CONTRACTOR and will not be
liable in connection with any interpretation or decision
rendered in good faith in such capacity. The rendering of
a decision by ENGINEER pursuant to paragraphs 9.10 or
9.11 with respect to any such claim, dispute or other
matter (except any which have been waived by the making
or acceptance of final payment as provided in
paragraph 14.15) will be a condition precedent to any
exercise by OWNER or CONTRACTOR of such rights or
remedies as either may otherwise have under the Contract
Documents or by Laws or Regulations in respect of any
such claim, dispute or other matter pumua t to,^ tiele�'6.
9.13. Limitations on ENGINEER's Authority and
Responsibilities.
9.13.1. Neither F.NGINEER's authority or
responsibility under this Article 9 or under any other
provision of the Contract Documents nor any decision
made by ENGINEER in good faith either to exercise
or not exercise such authority or responsibility or the
undertaking, exercise or performance of any authority
or responsibility by ENGINEER shall create, impose
or give rise to any duty owed by ENGINEER to
CONTRACTOR, any Subcontractor, any Supplier,
any other person or organization, or to any surety for
or employee or agent of any of them.
9.13.2. ENGINEER will not supervise, direct,
control or have authority over or be responsible for
CONTRACTOR's means, methods, techniques,
sequences or procedures of construction, or the safety
precautions and programs incident thereto, or for any
failure of CONTRACTOR to comply with Laws and
Regulations applicable to the furnishing or
performance of the Work. ENGINEER will not be
responsible for CONTRACTOR's failure to perform
or furnish the Work in accordance with the Contract
Documents.
9.13.3. ENGINEER will not be responsible for the
acts or omissions of CONTRACTOR or of any
Subcontractor, any Supplier, or of any other person or
organization performing or furnishing any of the
Work.
9.13.4. ENGINEER's review of the final Application
for Payment and accompanying documentation and
all maintenance and operating instructions, schedules,
guarantees, Bonds and certificates of inspection, tests
and approvals and other documentation required to be
delivered by paragraph 14.12 will only be to
determine generally that their content complies with
the requirements of, and in the case of ewrtificntes of
inspections, tests and approvals that the results
certified indicate compliance with, the Contract
Documents.
9.13.5. The limitations upon authority and
responsibility set forth in this paragraph 9.13 shall also
apply to ENGINEER's Consultants, Resident Project
Representative and assistants.
ARTICLE 10—CHANGES IN THE WORK
10.1. Without invalidating the Agreement and without
notice to any surety, OWNER may, at any time or from
time to time, order additions, deletions or revisions in the
Work. Such additions, deletions or revisions will be
authorized by a Written Amendment, a Change Order, or a
Work Change Directive. Upon receipt of any such
document, CONTRACTOR shall promptly proceed with
the Work involved which will be performed under the
applicable conditions of the Contract Documents (except as
otherwise specifically provided).
10.2. If OWNER and CONTRACTOR are unable to
agree as to the extent, if any, of an adjustment in the
Contract Rice or an adjustment of the Contract Times that
should be allowed as a result of a Work Change Directive,
a claim may be made therefor as provided in Article 11 or
Article 12.
10.3. CONTRACTOR shall not be entitled to an increase
in the Contract Rice or an extension of the Contract Times
with respect to any Work performed that is not required by
the Contract Documents as amended, modified and
supplemented as provided in paragraphs 3.5 and 3.6, except
in the case of an emergency as provided in paragraph 6.23
or in the case of uncovering Work as provided in
paragraph 13.9.
10.4. OWNER and CONTRACTOR shall execute
appropriate Change Orders recommended by ENGINEER
(or Written Amendments) covering:
10.4.1. changes in the Work which are (i) ordered
by OWNER pursuant to paragraph 10.1, (it) required
because of acceptance of defective Work under
paragraph 13.13 or correcting defective Work under
paragraph 13.14, or (iii) agreed to by the parties,
10.42 changes in the Contract Rice or Contract
Times which are agreed to by the parties, and
10.4.3. changes in the Contract Rice or Contract
Times which embodv the substance of any written
decision rendered by ENGINEER pursuant to
paragraph 9.111
provided that, in lieu of executing any such Change Order,
an appeal may be taken from any such decision in
accordance with the provisions of the Contract Documents
and applicable Laws and Regulations, but during any such
appeal, CONTRACTOR shall carry on the Work and
adhere to the progress schedule as provided in
paragraph 6.29.
10.5. If notice of any change affecting the general scope
of the Work or the provisions of the Contract Documents
EJCDC GENERAL CONDITIONS 191M (1990 E(hum)
WICITY OF FORT COLLINS MODIFICATIONS (REV 4/2000)
(including, but not limited to, Contract Price or Contract
Times) is required by the provisions of any Bond to be
given to a surety, the giving of any such notice will be
CONTRACTOR's responsibility, and the amount of each
applicable Bond will be adjusted accordingly
ARTICLE 11—CHANGE OF CONTRACT PRICE
11.1. The Contract Price constitutes the total
compensation (subject to authorized adjustments) payable
to CONTRACTOR for performing the Work. All duties,
responsibilities and obligations assigned to or undertaken
by CONTRACTOR shall be at CONTRACTOR's expense
without change in the Contract Price.
112. The Contract Price may only be changed by a
Change Order or by a Written Amendment. Any claim
for an adjustment in the Contract Rice shall be based on
written notice delivered by the party making the claim to
the other party and to ENGINEER promptly (but in no
event later than thirty days) after the start of the
occurrence or event giving rise to the claim and stating the
general nature of the claim. Notice of the amount of the
claim with supporting data shall be delivered within sixty
days after the start of such occurrence or event (unless
ENGINEER allows additional time for claimant to submit
additional or more accurate data in support of the claim)
and shall be accompanied by claimant's written statement
that the adjustment claimed covers all known amounts to
which the claimant is entitled as a result of said
occurrence or event. All claims for adjustment in the
Contract Rice shall be determined by ENGINEER in
accordance with paragraph9.11 if OWNER and
CONTRACTOR cannot otherwise agree on the amount
involved. No claim for an adjustment in the Contract
Rice will be valid if not submitted in accordance with this
paragraph 11.2.
11.3. The value of any Work covered by a Change
Order or of any claim for an adjustment in the Contract
Price will be determined as follows:
113.1. where the Work involved is covered by unit
prices contained in the Contract Documents, by
application of such unit prices to the quantities of the
items involved (subject to the provisions of
23
1_d�i Tc (- P with Slion 1F oI the Code of If-
t
I ins in dc- t o rin-i I i nq whether a 1) 1 a, It- I t re spoi I s i L) I -
t if( T
all1 1 be cori; I iero,J: i I The ability, "Ip" r i L y and 11011 n
tI hiK
- t r In t 11�� Co�'It Li"t or p ro 2-i de t I I e - I -,, i , (-, s I e, cp I I L
t
1, "1 1- r nav pprtnrm the 'ont-II o i ) r ct v . d c, L_hp')
I t 1 Ill t
niv he 1 Lino sped f i SA 1v j t 1 1 : t din I ay hT lit -I
-II c
! I, ter, integrity, leputainion, jivi,julprK , p_XpeLiorl('(_ '<I"
I i 1 a rc 1,
I Kv Kidder, "A; the quality_ n - - W, 1) 1 vide r ' s Derwrin tn.,-
r T) I '�L ma;
( --I -- I l� t �� -1 1 Iz e L -es, (-,; 15 ) fhe nr: /j -)-is a I, d o x - s L i I I 'I , � -) n It
) L L I' (- I , \ "' 1 :1"
i ( 1,1 , L with Laws and ordinances uplat in'-j to the i7 o n t ra l-: t
r L I
t 'Lc sIlrf ii i('11n-Y of 1_11'_ -, i t-1,111 i c t I n,s;.IL_es t 11, t ability
I 'I t
I , c: t r cr nt t b o - In n In r a o - of prcr If- t lle service,
'LV a L 1 bi 1 i t "i in-i adapt a I I i 1 i t L the 11a t I i -11 -1 C I r I 1 3 ,
I t
na t I i (I I a r I I S o I- R q il I . red, t I I e abi I I ty ofthe brdder lo
t 1 1
- r- I iian(o and service Lnr t.hn If I h r subject of t nc
r-(nt r,i, I I.
I other C I rr:u-rst,i! ic'es wh 1 --!I affect I lie bilbbcL
t)ci not if if
o I -1:t .
I Each Bidder in () y be requi red to show that he I 1 -1 s 11 1 1
1) - Tn
o t n (-) just A a Lms are parAtin I against such W�)r k
L i i
cv t t_i , I um a Kidder who I on any of her );%'(,_..
f' I I
I niq o, i r rij s -,bi I itv 7o perform ,L I ill,Lc''C this G9ork.
4 ljc F_ iI(: i(- r shall a11 be j n lei a a I on I hfPei tr"I nt-'Irl
r t r W-1 cit L 1-1 e City or in t I,(- p-tyriont- of cj n y t Ivy's,
r
nor. I- s d I I e to t lit, City.
I i'ln T I 0t Ilt P A," T 1 C U N1 F N T c; f J P
I t is the resporisii i I i I y I, n a t 1(� I-
I ex I ITtine th.e C c) I I L r , I :t it t
anti ..aria. I,Aasplf Won I ocv cql A i _-II tltrt rf, i it: 1
me rrvss cat perfOrntnii1- the ie o -- k rnt- I a r
ll I
1 , A" On ira I o�_di 100q, �t :1 V lq _-W, t 110 1; n I f - t
i I i
r Ill I mar n� I n 1 1 1 :1[' Ip
t
I[,! src t1 1 no w I v in
L oI I i
L CL 1. i iL-L t r r if [It t.
-ctirI t' .c,n : : -" I:] I t t, L til
The s I br, 'In L 1 t' i I i': r
if r I- i I, t
I h if K it lonit hp K";: 1 r1c 1, 1
[nit-1it-, i furr,is iirui 11, _') - �: i I I 1" the I , !It t
f I
paragraphs 11.9.1 through 11.9.3, inclusive);
11.3 where the Work involved is not covered by
unit prices contained in the Contract Documents, by a
mutually agreed payment basis, including lump sum
(which may include an allowance for overhead and
profit not necessarily in accordance with
paragraph 11.6.2);
11.3.3. where the Work involved is not covered by unit
prices contained in the Contract Documents and
agreement to a lump sum is not reached under
paragraph 11.3.2, on the basis of the Cost of the Work
(determined as provided in paragraphs 11.4 and 11.5)
plus a CONTRACTORS fee for overhead and profit
(determined as provided in paragraph 11.6).
Cost of the Work•
11.4. The term Cost of the Work means the sum of all
costs necessarily incurred and paid by CONTRACTOR in
the proper performance of the Work. Except as otherwise
may be agreed to in writing by OWNER, such costs shall
be in amounts no higher than those prevailing in the
locality of the Project, shall include only the following
items and shall not include any of the costs itemized in
paragraph 11.5:
11.4.1. Payroll costs for employees in the direct
employ of CONTRACTOR in the performance of the
Work under schedules of job classifications agreed
upon by OWNER and CONTRACTOR. Such
employees shall include without limitation
superintendents, foremen and other personnel
employed full-time at the site. Payroll costs for
employees not employed full-time on the Work shall
be apportioned on the basis of their time spent on the
Work. Payroll costs shall inducts, }wt-net be limited tq
salaries and wages plus the cost of fringe benefits
which shall include social security contributions,
unemployment, excise and payroll taxes, workers'
compensation, health end -retirement benefits. bonttses,
applicable thereto.
The expenses of performing Work after regular
working hours, on Saturday, Sunday or legal holidays,
shall be included in the above to the extent authorized
by OWNER.
11.42. Cost of all materials and equipment furnished
and incorporated in the Work, including costs of
transportation and storage thereof. and Suppliers' field
services required in connection therewith. All cash
discounts shall accrue to CONTRACTOR unless
OWNER deposits funds with CONTRACTOR with
which to make payments, in which case the cash
discounts shall accrue to OWNER. All trade
discounts, rebates and refunds and returns from sale of
surplus materials and equipment shall accrue to
OWNER, and CONTRACTOR shall make provisions
so that they may be obtained.
11.4.3. Payments made by CONTRACTOR to the
Subcontractors for Work performed or furr shed by
Subcontractors. If required by OWNER,
�4 EJCDCGENERAL CONDITI ONS1910-3(1990F(itim)
w/ CITY OF FORT COLLINS MODIFICATIONS (REV 4l2000)
CONTRACTOR shall obtain competitive bids from
Subcontractors acceptable to OWNER and
CONTRACTOR and shall deliver such bids to
OWNER who will then determine, with the advice of
ENGINEER, which bids, if any, will be accepted. If
any subcontract provides that the Subcontractor is to
be paid on the basis of Cost of the Work plus a fee,
the Subcontractor's Cost of the Work and fee shall be
determined in the same manner as CONTRACTOR's
Cost of the Work and fee as provided in
paragraphs 11.4, 11.5, 11.6 and 11.7. All
subcontracts shall be subject to the other provisions of
the Contract Documents insofar as applicable.
I I.4.4. Costs of special consultants (including but
not limited to engineers, architects, testing
laboratories, surveyors, attorneys and accountants)
employed for services specifically related to the
Work.
11.4.5. Supplemental costs including the following:
11.4.5.1. The proportion of necessary
transportation, travel and subsistence expenses of
CONTRACTOR's employees incurred in
discharge of duties connected with the Work.
11.4.5.2. Cost, including transportation and
maintenance, of all materials, supplies,
equipment, machinery, appliances, office and
temporary facilities at the site and hand tools not
owned by the workers, which are consumed in the
Performance of the Work, and cost less market
value of such items used but not consumed which
remain the property of CONTRACTOR.
11.4.53. Rentals of all construction
equipment and machinery and the parts thereof
whether rented from CONTRACTOR or others in
accordance with rental agreements approved by
OWNF,R with the advice of ENGINEER and the
costs of transportation, loading, unloading,
installation, dismantling and removal thereof —all
in accordance with terms of said rental
agreements. The rental of any such equipment,
machinery or parts shall cease when the use
thereof is no longer necessary for the Work.
11 A.5A. Sales, consumer, use or similar taxes
related to the Work, and for which
CONTRACTOR is liable, imposed by Laws and
Regulations.
11.4.55. Deposits lost for causes other than
negligence of CONTRACTOR, any
Subcontractor or anyone directly or indirectly
employed by any of them or for whose acts any
of them may, be liable, and royalty payments and
fees for permits and licenses.
11.4.5.6. Losses and damages (and related
expenses) caused by damage to the Work, not
compensated by insurance or otherwise, sustained
by CONTRACTOR in connection with the
Performance and furnishing of the Work (except
losses and damages within the deductible amounts
of property insurance established by OWNER in
accordance with paragraph 5.9), provided they
have resulted from causes other than the
negligence of CONTRACTOR, any
Subcontractor, or anyone directly or indirectly
employed by any of them or for whose acts atry of
them may be liable. Such losses shall include
settlements made with the written consent and
approval of OWNER. No such losses, damages
and expenses shall be included in the Cost of the
Work for the purpose of determining
CONTRACTOR's fee. If, however, any such loss
or damage requires reconstruction and
CONTRACTOR is placed in charge thereof,
CONTRACTOR shall be paid for services a fee
proportionate to that stated in paragraph 11.6.2.
11.4.5.7. The cost of utilities, fuel and sanitary
facilities at the site.
11.4.5.8, Minor expenses such as telegrams,
long distance telephone calls, telephone service at
the site, expressage and similar petty cash items in
connection with the Work.
11.4.5.9. Cost of premiums for additional Bonds
and insurance required because of changes in the
Work.
11.5. The term Cost of the Work shall not include any of
the following:
11.5.1. Payroll costs and other compensation of
CONTRACTOR's officers, executives, principals (of
partnership and sole proprietorships), general managers,
engineers, architects, estimators, attorneys, auditors,
accountants, purchasing and contracting agents,
expediters, timekeepers, clerks and other personnel
employed by CONTRACTOR whether at the site or in
CONTRACTOR's principal or a branch office for
general administration of the Work and not specifically
included in the agreed upon schedule of job
classifications referred to in paragraph 11.4.1 or
specifically covered by paragraph 11.4.4-all of which
are to be considered administrative costs covered by the
CONTRACTOR's fee.
11.5.2. Expenses of CONTRACTOR's principal and
branch offices other than CONTRACTOR's office at.
the site.
11.5.3. Any part of CONTRACTOR's capital
expenses, including interest on CONTRACTOR'S
capital employed for the Work and charges against
CONTRACTOR for delinquent payments.
11.5.4. Cost of premiums for all Bonds and for all
insurance whether or not CONTRACTOR is required
by the. Contract Documents to purchase and maintain
the same (except for the cost of premiums covered by
subparagraph 11.45 4 above).
EJCDC GENERAL CONDITIONS 1910-8 (1990 Etltim)
w/ CITY OF FORT COLLINS MODIFICATIONS (REV 1/2000)
11.5.5. Costs due to the negligence of
CONTRACTOR, any Subcontractor, or anyone
directly or indirectly employed by any of them or for
whose acts any of them may be liable, including but
not limited to, the correction of &fective Work,
disposal of materials or equipment wrongly supplied
and making good any damage to property.
11.5.6. Other overhead or general expense costs of
any kind and the costs of any item not specifically and
expressly included in paragraph 11.4.
11.6. The CONTRACTOR's fee allowed to
CONTRACTOR for overhead and profit shall be
determined as follows:
11.6.1. a mutually acceptable fixed fee; or
11.6.2. if a fixed fee is not agreed upon, then a fee
based on the following percentages of the various
portions of the Cost of the Work:
11.6.2.1. for costs incurred under
paragraphs 11Al and 11.4.2, the
CONTRACTOR's fee shall be fifteen percent;
11.6.2.2, for costs incurred under
paragraph 11.4.3, the CONTRACTOR's fee shall
be five percent;
11.6.2.3. where one or more tiers of
subcontracts are on the basis of Cost of the Work
plus a fee and no fixed fee is agreed upon, the
intent of paragraphs 11.4.1, 11.4.2, 11.4.3 and
11.6.2 is that the Subcontractor who actually
performs or furnishes the Work, at whatever tier,
will be paid a fee of fifteen percent of the costs
incurred by such Subcontractor under paragraphs
11.4.] and 11.4.2 and that any higher tier
Subcontractor and CONTRACTOR will each be
paid a fez of n ape �n a�the�tmount -paid 40
theme"- ertier-,SubeentraeteF to be negotiated
in good faith with the OWNER but not to exceed
five percent of the amount paid to the next lower
tier Subcontractor.
11.62.4. no fee shall be payable on the basis
of costs itemized under paragraphs 11.4.4, 11.4.5
and 11.5;
11.6.2.5. the amount of credit to be allowed
by CONTRACTOR to OWNER for any change
which results in a net decrease in cost will be the
amount of the actual net decrease in cost plus a
deduction in CONFRACTOR's fee by an amount
equal to five percent of such net decrease; and
11.62.6. when both additions and credits are
involved in any one change, the adjustment in
CONTRACTOR's fee shall be computed on the
basis of the net change in accordance with
paragraphs 11.6.2.1 through 11.62.5, inclusive.
11.7. Whenever the cast of any Work is to be
25
determined pursuant to paragraphs 1 l.4 and 11.5,
CONTRACTOR will establish and maintain records
thereof in accordance with generally accepted accounting
practices and submit in form acceptable to ENGINEER an
itemized cost breakdown together with supporting data.
Cash Allowances.
11.8. It is understood that CONTRACTOR has included
in the Contract Price all allowances so named in the
Contract Documents and shall cause the Work so covered
to be furnished and performed for such sums as may be
acceptable to OWNER and ENGINEER. CONTRACTOR
agrees that:
11.8.1. the allowances include the cost to
CONTRACTOR (less any applicable trade discounts)
of materials and equipment required by the allowances
to be delivered at the site, and all applicable taxes, and
11.8.2. CONTRACTOR's costs for unloading and
handling on the site, labor, installation costs, overhead,
profit and other expenses contemplated for the
allowances have been included in the Contract Price
and not in the allowances and no demand for
additional payment on account of any of the foregoing
will be valid.
Prior to final payment, an appropriate Change Order will be
issued as recommended by ENGINEER to reflect actual
amounts due CONTRACTOR on account of Work covered
by allowances, and the Contract Price shall be
correspondingly adjusted.
11.9. Unit Price Work.-
11.9.1. Where the Contract Documents provide that all
or part of the Work is to be Unit Price Work, initially
the Contract Price will be deemed to include for all
Unit Price Work an amount equal to the sum of the
established unit prices for each separately identified
item of Unit Price Work tunes the estimated quantity
of each item as indicated in the Agreement. The
estimated quantities of items of Unit Price Work are
not guaranteed and are solely for the purpose of
comparison of Bids and determining an initial Contract
Price. Determinations of the actual quantities and
classifications of Unit Price Work performed by
CONTRACTOR will be made by ENGINEER in
accordance with paragraph 9.10.
11.9.2. Each unit price will be deemed to include an
amount considered by CONTRACTOR to be adequate
to cover CONTRACTOR's overhead and profit for
each separately identified item.
11.9.3.OWNER or CONTRACTOR may make a
claim for an adjustment in the Contract Price in
accordance with Article 11 if.
11.9.3.1. the quantity of any item of Unit Price
Work performed by CONTRACTOR differs
materially and significantly from the estimated
quantity of such item indicated in the Agreement;
EJCDC GENERAL CONDITIONS 1910-8 (1990 Editiap
26 w/ CITY OF FORT COLLINS MODIFICATIONS (REV 42000)
and
11.9.3.2. there is no corresponding adjustment
with respect to any other item of Work; and
11.9.3.3. if CONTRACTOR believes that
CONTRACTOR is entitled to an increase in
Contract Price as a result of having incurred
additional expense or OWNER believes that
OWNER is entitled to a decrease in Contract Price
and the parties are unable to agree as to the
amount of any such increase or decrease.
11.9.3.4. CONTRACTOR acknowledges that
the OWNER has the ri hg t to add or delete items in
the Bid or change quantities at OWNER'S sole
discretion without affecting the Contract Price of
any remaining item so long as the deletion or
addition does not exceed twenty-five Wrcent of
the original total Contract Price.
ARTICLE 12--CHANGE OF CONTRACT TIMES
12.1. The Contract Times (or Milestones) may only be
changed by a Change Order or a Written Amendment.
Any claim for an adjustment of the Contract Times (or
Milestones) shall be based on written notice delivered by
the party making the claim to the other party and to
ENGINEER promptly (but in no event later than thirty
days) after the occurrence of the event giving rise to the
claim and stating the general nature of the claim. Notice
of the extent of the claim with supporting data shall be
delivered within sixty days after such occurrence (unless
ENGINEER allows additional time to ascertain more
accurate data in support of the claim) and shall be
accompanied by the claimants written statement that the
adjustment claimed is the entire adjustment to which the
claimant has reason to believe it is entitled as a result of
the occurrence of said event. All claims for adjustment in
the Contract Times (or Milestones) shall be determined by
ENGINEER in accordance with paragraph 9.11 if
OWNER and CONTRACTOR cannot otherwise agree.
No claim for an adjustment in the Contract Times (or
Milestones) will be valid if not submitted in accordance
with the requirements of this paragraph 12.1.
12.2. All time limits stated in the Contract Documents
are of the essence of the Agreement.
12.3, Where CONTRACTOR is prevented from
completing any part of the Work within the Contract
Times (or Milestones) due to delay beyond the control of
CONTRACTOR, the Contract Times (or Milestones) will
be extended in an amount equal to time lost due to such
delay if a claim is made therefor as provided in
Paragraph 12.1. Delays beyond the control of
CONTRACTOR shall include, but not be limited to, acts
or neglect by OWNER, acts or neglect of utility owners or
other contractors performing other work as contemplated
by Article7, fires, floods, epidemics, abnormal weather
conditions or acts of God. Delays attributable to and
within the control of a Subcontractor or Supplier shall be
deemed to be delays within the control of CONTRACTOR.
12.4. Where CONTRACTOR is prevented from
completing any part of the Work within the Contract Times
(or Milestones) due to delay beyond the control of both
OWNER and CONTRACTOR, an extension of the
Contract Times (or Milestones) in an amount equal to the
time lost due to such delay shall be CONTRACTOR's sole
and exclusive remedy for such delay. In no event shall
OWNER be liable to CONTRACTOR, any Subcontractor,
any Supplier, any other person or organization, or to any
surety for or employee or agent of any of them, for
damages arising out of or resulting from (i) delays caused
by or within the control of the CONTRACTOR, or
(ii) delays beyond the control of both parties including but
not limited to, fires, floods, epidemics abnormal weather
conditions, acts of God or acts or neglect by utility owners
or other contractors performing other work as contemplated
by Article 7.
ARTICLE 13--TESTS AND INSPECTIONS;
CORRECTION, REMOVAL OR ACCEPTANCE OF
DEFECTIVE WORK
13.1. Notice of Defects:
Prompt notice of all defective Work of which OWNER or
ENGINEER have actual knowledge will be given to
CONTRACTOR All defective Work may be rejected,
corrected or accepted as provided in this Article 13.
Access to Work:
13.2. OWNER ENGINEER ENGINEER's Consultants,
other representatives and personnel of OWNER
independent testing laboratories and governmental agencies
with jurisdictional interests will have access to the Work at
reasonable -times for their observation, inspecting and
testing. CONTRACTOR shall provide them proper and
safe conditions for such access and advise them of
CONTRACTOR's site safety procedures and programs so
that they may comply therewith as applicable.
Tests and Inspections
13.3. CONTRACTOR shall give ENGINEER timely
notice of readiness of the Work for all required inspections,
tests or approvals, and shall cooperate with inspection and
testing personnel to facilitate required inspections or tests.
13A. OWNER shall employ and pay for the services of
an independent testing laboratory to perform all
inspections, tests, or approvals required by the Contract
Documents except:
13,4.1, for inspections, tests or approvals covered
by paragraph 13.5 below,
1342. that costs incurred in connection with tests
or inspections conducted pursuantto paragraph 139
EJCDC GENERAL CONDITIONS 1910-8 (1990 Editiai)
w/ CITY OF FORT COLLINS MODIFICATIONS (REV 41200g)
below shall be paid as provided in said
paragraph 13.9; and
13.4.3. as otherwise specifically provided in the
Contract Documents.
13.5. If Laws or Regulations of any public body having
jurisdiction require any Work (or part thereof) specifically
to be inspected, tested or approved by an employee or
other representative of such public body, CONTRACTOR
shall assume full responsibility for arranging and
obtaining such inspections, tests or approvals, pay all costs
in connection therewith, and furnish ENGINEER the
required certificates of inspection, or approval.
CONTRACTOR shall also be responsible for arranging
and obtaining and shall pay all costs in connection with
any inspections, tests or approvals required for OWNEIes
and ENGINEER'S acceptance of materials or equipment to
be incorporated in the Work, or of materials, mix designs,
or equipment submitted for approval prior to
CONTRACTOR's purchase thereof for incorporation in
the Work.
13.6. If any Work (or the work of others) that is to be
inspected, tested or approved is covered by
CONTRACTOR without written concurrence of
ENGINEER, it must, if requested by ENGINEER, be
uncovered for observation.
13.7. Uncovering Work as provided in paragraph 13.6
shall be at CONTRACTOR's expense unless
CONTRACTOR has given ENGINEER timely notice of
CONTRACTOR's intention to cover the same and
ENGINEER has not acted with reasonable promptness in
response to such notice.
Uncovering Work.
13.8. If any Work is covered contrary to the written
request of ENGINEER it must, if requested by
ENGINEER, be uncovered for ENGINEER's observation
and replaced at CONTRACTOR's expense.
13.9. If ENGINEER considers it necessary or advisable
that covered Work be observed by ENGINEER or
inspected or tested by others, CONTRACTOR at
ENGINEER's request, shall uncover, expose or otherwise
make available for observation, inspection or testing as
ENGINEER may, require, that portionof the Work in
question, furnishing all necessary labor, material and
equipment. If it is found that such Work is defective,
CONTRACTOR shall pay all clanns, costs, losses and
damages caused by, arising out of or resulting from such
uncovering, exposure, observation, inspection and testing
and of satisfactory replacement or reconstruction,
(including but not limited to all costs of repair or
replacement of work of others); and OWNER shall be
entitled to an appropriate decrease in the Contract Price,
and, if the parties are unable to agree as to the amount
thereof, may make a claim therefor as provided in
Article I If, however, such Work is not found to be
defective, CONTRACTOR shall be allowed an increase in
the Ccmtract Price or an extension of the Contract Times
(or Milestones), or both, directly attributable to such
27
uncovering, exposure, observation, inspection, testing,
replacement and reconstruction; and, if die parties are
unable to agree as to the amount or extent thereof,
CONTRACTOR may make a claim therefor as provided in
Articles 11 and 12.
OWNER May Stop the Work:
13.10. If the Work is defective, or CONTRACTOR fails
to supply sufficient skilled workers or suitable materials or
equipment, or fails to furnish or perform the Work in such a
way that the completed Work will conform to the Contract
Documents, OWNER may order CONTRACTOR to stop
the Work, or any portion thereof, until the cause for such
order has been eliminated; however, this right of OWNER
to stop the Work shall not give rise to any duty on the part
of OWNER to exercise this right for the benefit of
CONTRACTOR or any surety or other party.
Correction or Removal of Defective Work:
13.11. If required by ENGINEER, CONTRACTOR shall
promptly, as directed either correct all defective Work,
whether or not fabricated installed or completed, or, if the
Work has been rejected by ENGINEER, remove it from the
site and replace it with Work that is not defective.
CONTRACTOR shall pay all claims, costs, losses and
damages caused by or resulting from such correction or
removal (including but not limited to all casts of repair or
replacement of work of others).
13.12. Correction Period:
13.12.1.If within one year two years after the date of
Substantial Completion or such longer period of time as
may be prescribed by Laws or Regulations or by the
terms of any applicable special guarantee required by
the Contract Documents or by any specific provision of
the Contract Documents, any Work is found to be
defective, CONTRACTOR shall promptly, without cost
to OWNER and in accordance with OWNER'S written
instructions: (i) correct such defective Work, or, if it has
been rejected by OWNER, remove it from the site and
replace it with Work that is not defective, and (it)
satisfactorily correct or remove and replace any damage
to other Work or the work of others resulting therefrom.
If CONTRACTOR does not promptly comply with the
terms of such instructions, or in an emergency where
delay would cause serious risk of loss or damage,
OWNER may have the defective Work corrected or the
rejected Work removed and replaced, and all claims,
costs, losses and damages caused by or resulting from
such removal and replacement (including but not
limited to all costs of repair or replacement of work of
others) will be paid by CONTRACTOR.
13.12.2.In special circumstances where a particular
item of equipmentis placed in continuous service
before Substantial Completion of all the Work, the
correction period for that item may start to run from an
earlier date if so provided in the Specifications or by
W'rilten Amendment.
13.123. Where defective Work (and damage to other
28 EICDC GENERAL CONDITIONS I9tO-8 p990ECitiaQ
w/ CITY OF FORT COLLINS MODIFICATIONS IREV 420001
Work resulting therefrom) has been corrected,
removed or replaced under this paragraph 13.12, the
correction period hereunder with respect to such Work
will be extended for an additional period of eve yeas
two years after such correction or removal and
replacement has been satisfactorily completed.
Acceptance of Defective Work:
13.13. If, instead of requiring correction or removal and
replacement of defective Work, OWNER (anti, prior to
ENGINEER's recommendation of final payment, also
ENGINEER) prefers to accept it, OWNER may do so.
CONTRACTOR shall pay all claims, costs, losses and
damages attributable to OWNER's evaluation of and
determination to accept such defective Work (such costs to
be approved by ENGINEER as to reasonableness). If any
such acceptance occurs prior to ENGINEER'S
recommendation of final payment, a Change Order will be
issued incorporating the necessary revisions in the
Contract Documents with respect to the Work; and
OWNER shall be entitled to an appropriate decrease in the
Contract Price, and, if the parties are unable to agree as to
the amount thereof, OWNER may make a claitn therefor
as provided in Article IL If the acceptance occurs after
such recommendation, an appropriate amount will be paid
by CONTRACTOR to OWNER.
OWNER May Correct Defective Work:
13.14. If CONTRACTOR fads within a reasonable time
after written notice from ENGINEER to correct defectrve
Work or to remove and replace rejected Work as required
by ENGINEER in accordance with paragraph 13.11, or if
CONTRACTOR fails to perform the Work in accordance
with the Contract Documents, or if CONTRACTOR fails
to comply with any other provision of the Contract
Documents, OWNER may, after seven days written
notice to CONTRACTOR, correct and remedy any such
deficiency. In exercising the rights and remedies under
this paragraph OWNER shall proceed expeditiously. In
connection with such corrective and remedial action,
OWNER may exclude CONTRACTOR from all or part of
the site, take possession of all or part of the Work, and
suspend CONTRACTOR's services related thereto, take
possession of CONTRACTOR'S tools, appliances,
construction equipment and machinery at the site and
incorporate in the Work all materials and equipment
stored at the site or for which OWNER has paid
CONTRACTOR but which are stored elsewhere.
CONTRACTOR shall allow OWNER, OWNER'S
representatives, agents and employees, OWNER's other
contractors and ENGINEER and E1NGfNEER's
Consultants access to the site to enable OWNER to
exercise the rights and remedies under this paragraph. All
claims, costs, losses and damages incurred or sustained by
OWNER in exercising such rights and remedies will be
charged against CONTRACTOR and a Change Order will
be issued incorporating the necessary revisions in the
Contract Documents with respect to the Work, and
OWNER shall be entitled to an appropriate decrease in the
Contract Price, and, if the parties are unable to agree as to
the amount thereof, OWNER may make a claun therefor
as provided in Article 11. Such claims, costs, losses and
damages will include but not be limited to all costs of
repair or replacement of work of others destroyed or
damaged by correction, removal or replacement of
CONTRACTOR's defective Work. CONTRACTOR shall
not be allowed an extension of the Contract Times (or
Milestones) because of any delay in performance of the
Work attributable to the exercise by OWNER of OWNER's
rights and remedies hereunder.
ARTICLE 14--PAYMENTS TO CONTRACTOR AND
COMPLETION
Schedule of Values:
14.1. The schedule of values established as provided in
paragraph 2.9 will serve as the basis for progress payments
and will be incorporated into a form of Application for
Payment acceptable to ENGINEER. Progress payments on
account of Unit Price Work will be based on the number of
units completed.
Application for Progress Payment.
14.2. At least twenty days before the date established for
each progress payment (but not more often than once a
month). CONTRACTOR shall submit to ENGINEER for
review an Application for Payment filled out and signed by
CONTRACTOR covering the Work completed as of the
date of the Application and accompanied by such
supporting documentation as is required by the Contract
Documents, If payment is requested on the basis of
materials and equipment not incorporated in the Work but
delivered and suitably stored at the site or at another
location agreed to in writing, the Application for Payment
shall also be accompanied by a bill of sale, invoice or other
documentation warranting that OWNER has received the
materials and equipment free and clear of all Liens and
evidence that the materials and equipment are covered by
appropriate property insurance and other arrangements to
protect OWNER's interest therein, all of which will be
satisfactory to OWNER. The amount of retainage with
respect to progress payments will be as stipulated in the
Agreement. Any funds that are withheld by the OWNER
shall not be subject to substitution by the CONTRACTOR
with securities or any arrangements involving an escrow or
custodianship By executing the application for )rayment
form the CONTRACTOR expressly waives his right to the
benefits of Colorado Revised Statutes Section 24-91-101
et sea.
CONTR-ICTOR's Warranty of Title.
14.3. CONTRACTOR warrants and guarantees that title
to all Work materials and equipment covered by any
Application for Payment, whether incorporated in the
Project or not, will pass to OWNER no later than the time
of payment free and clear of all Liens.
Review of Applicatimis for Progress Payment:
14.4. ENGINEER will, within ten days after receipt of
each Application for Payment, either indicate in writing a
EICDC GENERAL CONDITIONS 1910-8 (199(iEdition)
w/ CITY OF FORT COLLINS MODIFICATIONS (REV,12000)
recommendation of payment and present the Application
to OWNER, or return the Application to CONTRACTOR
indicating in writing ENGINEER's reasons for refusing to
recommend payment. In the latter case, CONTRACTOR
may make the necessary corrections and resubmit the
Application. Ten days after presentation of the
Application for Payment to OWNER with ENGINEER's
recommendation, the amount recommended will (subject
to the provisions of the last sentence of paragraph 14.7)
become due and when due will be paid by OWNER to
CONTRACTOR
14.5. ENGIN.EER's recommendation of any payment
requested in an Application for Payment will constitute a
representation by ENGINEER to OWNER, based on
ENGINEER's on -site observations of the executed Work
as an experienced and qualified design professional and on
ENGINEER's review of the Application for Payment and
the accompanying data and schedules, that to the best of
ENGINEER's knowledge, information and belief:
14.5A. the Work has progressed to the point
indicated,
14.5.2. the quality of the Work is generally in
accordance with the Contract Documents (subject to
an evaluation of the Work as a functioning whole
prior to or upon Substantial Completion, to the results
of any subsequent tests called for in the Contract
Documents, to a final determination of quantities and
classifications for Unit Price Work under
paragraph 9.10, and to any other qualifications stated
in the recommendation), and
14.5.3. the conditions precedent to
CONTRACTOR's being entitled to such payment
appear to have been fulfilled insofar as it is
ENGINEER's responsibility to observe the Work.
However, by recommending any such payment
ENGINEER will not thereby be deemed to have
represented that: (i) exhaustive or continuous on -site
inspections have been made to check the quality or the
quantity of the Work beyond the responsibilities
specifically assigned to ENGINEER in the Contract
Documents or (ii) that there may not be other matters or
issues between the parties that might entitle
CONTRACTOR to be paid additionally by OWNER or
entitle OWNER to withhold payment to CONTRACTOR.
14.6. ENGINE,ER's recommendation of any payment,
including final payment, shall not mean that ENGINEER
is responsible for CONTRACTOR's means, methods,
techniques, sequences or procedures of construction, or
the safety precautions and programs incident thereto, or
for any failure of CONTRACTOR to comply with Laws
and Regulations applicable to the famishing or
performance of Work, or for any failure of
CONTRACTOR to perform or furnish Work in
accordance with the Contract Docmnents.
14.7. ENGINEER may refuse to recommend the whole
or any part of any payment if, in ENGINEER's opinion, it
would be incorrect to make the representations to
29
OWNER referred to in paragraph 14.5. ENGINEER may
also refuse to recommend any such payment, or, because of
subsequently discovered evidence or the results of
subsequent inspections or tests, nullify any such payment
previously recommended, to such extent as may be
necessary in ENGINEER's opinion to protect OWNER
from loss because:
14.7.1. the Work is defective, or completed Work has
been damaged requiring correction or replacement,
14.7'2. the Contract Price has been reduced by
Written Amendment or Change Order,
14.7.3. OWNER has been required to correct
defective Work or complete Work in accordance with
paragraph 13.14, or
14.7.4. ENGINEER has actual knowledge of the
occurrence of any of the events enumerated in
paragraphs 15.2.1 through 15.2.4 inclusive.
OWNER may refuse to make payment of the full amount
recommended by ENGINEER because:
14.7.5. claims have been made against OWNER on
account of CONTRACTOR's performance or furnishing
of the Work,
14.7.6. Liens have been filed in connection with the
Work, except where CONTRACTOR has delivered a
specific Bond satisfactory to OWNER to secure the
satisfaction and discharge of such Liens,
14.7.7. there are other items entitling OWNER to a set-
off against the amount recommended or
14.7.8. OWNER has actual knowledge of the
occurrence of any of the events enumerated in
paragraphs 14.7.1 through 14.7.3 or paragraphs 15.2.1
through 15.2.4 inclusive;
but OWNER must give CONTRACTOR immediate
written notice (with a copy to ENGINEER) stating the
reasons for such action and promptly pay CONTRACTOR
the amount so withheld or any adjustment thereto agreed
to by OWNER and CONTRACTOR, when
CONTRACTOR corrects to OWNER's satisfaction the
reasons for such action
Substantial Completion:
14.8. When CONTRACTOR considers the entire Work
ready for its intended use CONTRACTOR shall notify,
OWNER and ENGINEER in writing that the entire Work
is substantially complete (except for items specifically
listed by CONTRACTOR as incomplete) and request that
ENGINEER issue a certificate of Substantial Completion.
Within a reasonable time thereafter, OWNER,
CONTRACTOR and ENGINEER shall make an inspection
of the Work to detennine the status of completion. If
ENGINEER does not consider the Work substantially
complete, ENGINEER will notify CONTRACTOR in
writing giving the reasons therefor. If ENGINEER
EICDCGENFRAL CONDITIONS 1910-S Q990 Edition)
30 w/CITY OF FORT COLLINS MODIFICATIONS(REV,I2000)
considers the Work substantially complete, ENGINEER
will prepare and deliver to OWNER a tentative certificate
of Substantial Completion which shall fix the date of
Substantial Completion. There shall be attached to the
certificate a tentative list of items to be completed or
corrected before final payment. OWNER shall have seven
days after receipt of the tentative certificate during which
to make written objection to ENGINEER as to arty
provisions of the certificate or attached list. If, after
considering such objections, ENGINEER concludes that
the Work is not substantially complete, ENGINEER will
within fourteen days after submission of the tentative
certificate to OWNER notify CONTRACTOR in writing,
stating the reasons therefor. If, after consideration of
OWNER's objections, ENGINEER considers the Work
substantially complete, ENGINEER will within said
fourteen days execute and deliver to OWNER and
CONTRACTOR a definitive certificate of Substantial
Completion (with a revised tentative list of items to be
completed or corrected) reflecting such changes from the
tentative certificate as ENGINEER believes justified after
consideration of any objections from OWNER. At the
time of delivery of the tentative certificate of Substantial
Completion ENGINEER will deliver to OWNER and
CONTRACTOR a written recommendation as to division
of responsibilities pending final payment between
OWNER and CONTRACTOR with respect to security,
operation, safety, maintenance, heat, utilities, insurance
and warranties and guarantees. Unless OWNER and
CONTRACTOR agree otherwise in writing and so inform
ENGINEER in writing prior to ENGINEER's issuing the
definitive certificate of Substantial Completion,
ENGINEER's aforesaid recommendation will be binding
on OWNER and CONTRACTOR until final payment.
14.9. OWNER shall have the right to exclude
CONTRACTOR from the Work after the date of
Substantial Completiori, but OWNER shall allow
CONTRACTOR reasonable access to complete or correct
items on the tentative list.
Partial Utilization:
14.10. Use by OWNER at OWNER's option of any
substantially completed part of the Work, which: (i) has
specifically been identified in the Contract Documents, or
(n) OWNER, ENGINEER and CONTRACTOR agree
constitutes a separately functioning and usable part of the
Work that can be used by OWNER for its intended
purpose without significant interference with
CONTRACTOR's performance of the remainder of the
Work, may be accomplished prior to Substantial
Completion of all the Work subject to the following:
14.10.1.OWNER at any time may request
CONTRACTOR in writing to permit OWNER to use
any such part of the Work which OWNER believes to
be ready for its intended use and substantially
complete. If CONTRACTOR agrees that such part of
the Work is substantially complete, CONTRACTOR
will certify to OWNER and ENGINEER that such
part of the Work is substantially complete and request
ENGINEER to issue a certificate of Substantial
Completion for that part of the Work.
CONTRACTOR at any time may notify OWNER and
ENGINEER in writing that CONTRACTOR considers
any such part of the Work ready for its intended use
and substantially complete and request ENGINEER to
issue a certificate of Substantial Completion for that
part of the Work. Within a reasonable time after either
such request, OWNER, CONTRACTOR and
ENGINEER shall make an inspection of that part of
the Work to determine its status of completion. If
ENGINEER does not consider that part of the Work to
be substantially complete, ENGINEER will notify
OWNER and CONTRACTOR in writing giving the
reasons therefor. If ENGINEER considers that part of
the Work to be substantially complete, the provisions
of paragraphs 14.8 and 149 will apply with respect to
certification of Substantial Completion of that part of
the Work and the division of responsibility in respect
thereof and access thereto.
14.10.2. No occupancy or separate operation of part
of the Work will be accomplished prior to compliance
with the requirements of paragraph 5.15 in respect of
property insurance.
Final Inspection:
14.11. Upon written notice from CONTRACTOR that the
entire Work or an agreed portion thereof is complete,
ENGINEER will make a final inspection with OWNER
and CONTRACTOR and will notify CONTRACTOR in
writing of all particulars in which this inspection reveals
that the Work is incomplete or defective. CONTRACTOR
shall immediately take such measures as are necessary to
complete such work or remedy such deficiencies.
Final Application for Payment:
14.12. After CONTRACTOR has completed all such
corrections to the satisfaction of ENGINEER and delivered
in accordance with the Contract Documents all
maintenance and operating instructions, schedules,
guarantees, Bonds, certificates or other evidence of
insurance required by paragraph 5.4, certificates of
Inspection, marked -up record documents (as provided in
paragraph 6.19) and other documents, CONTRACTOR
may make application for final payment following the
procedure for progress payments. The final Application for
Payment shall be accompanied (except as previously
delivered) by: (i) all documentation called for in the
Contract Documents, including but not limited to the
evidence of insurance required by subparagraph5.4.13,
(ii) consent of the surety, if any, to final payment, and
(iii) complete and legally effective releases or waivers
(satisfactory to OWNER) of all Liens arising out of or tiled
in connection with the Work. In lieu of such releases or
waivers of Liens and as approved by OWNER,
CONTRACTOR may furnish receipts or releases in full
and affidavit of CONTRACTOR that: (i) the releases and
receipts include all labor, services, material and equipment
for which a Lien could be filed, and (ii) all payrolls,
material and equipment bills, and other indebtedness
connected with the Work for which OWNER or OWNER'S
property might in any way be responsible have been paid or
otherwise satisfied. If any Subcontractor or Supplier fails
to furnish such a release or receipt in full,
CONTRACTOR may furnish a Bond or other collateral
satisfactory to OWNER to indemnify OWNER against
any Lien Releases or waivers of liens and the consent of
the surety to finalize Payment are to be submitted on
forms conforming to the format of the OWNER'S standard
forms bound in the Proiect manual.
Final Payment and Acceptance:
14.13. If, on the basis of ENGINEER's observation of
the Work during construction and final inspection, and
ENGINEER's review of the final Application for Payment
and accompanying documentation as required by the
Contract Documents, ENGINEER is satisfied that the
Work has been completed and CONTRACTOR's other
obligations under the Contract Documents have been
fulfilled, ENGINEER will, within ten days after receipt of
the final Application for Payment, indicate in writing
ENGINEER's recommendation of payment and present
the Application to OWNER for payment. At the same
time ENGINEER will also give written notice to OWNER
and CONTRACTOR that the Work is acceptable subject
to the provisions of paragraph 14.15. Otherwise,
ENGINEER will return the Application to
CONTRACTOR, indicating in writing the reasons for
refusing to recommend final payment, in which case
CONTRACTOR shall make the necessary corrections and
resubmit the Application. Thirty days after presentation to
OWNER of the Application and accompanying
documentation, in appropriate form and substance and
with ENGINEER's recommendation and notice of
acceptability, the amount recommended by ENGINEER
will become due and will be paid by OWNER to
CONTRACTOR subject to paragraph 17.6.2 of these
General Conditions.
14.14. If, through no fault of CONTRACTOR, final
completion of the Work is significantly delayed and if
ENGINEER so confirms, OWNER shall, upon receipt of
CONTRACTOR's final Application for Payment and
recommendation of ENGINEER, and without terminating
the Agreement, make payment of the balance due for that
portion of the Work fully completed and accepted. If the
remaining balance to be held by OWNER for Work not
fully completed or corrected is less than the retainage
stipulated in the Agreement, and if Bonds have been
furnished as required in paragraph 5.1, the written consent
of the surety to the payment of the balance due for that
portion of the Work fully completed and accepted shall be
submitted by CONTRACTOR to ENGINEER with the
Application for such payment. Such payment shall be
made under the terms and conditions governing final
payment, except that it shall not constitute a waiver of
claims.
Waiver of Claims:
14.15. The making and acceptance of final payment will
constitute:
14.15.1. a waiver of all claims by OWNER against
CONTRACTOR, except claims arising from
unsettled Liens, from defective Work appearing after
EJCDC GENERAL CONDITIONS 1910-8 (1990 E(fition) 31
w/ CITY OF FORT COLLINS MODIFICATIONS (REV V2000)
final inspection pursuant to paragraph 14.11, from
failure to comply with the Contract Documents or the
terms of any special guarantees specified therein, or
from CONTRACTOR's continuing obligations under
the Contract Documents, and
14.15.2. A waiver of all claims by CONTRACTOR
against OWNER other than those previously made in
writing and still unsettled.
ARTICLE 15--SUSPENSION OF WORK AND
TERMINATION
OWNER May Suspend Work:
15.1. At any time and without cause, OWNER may
suspend the Work or any portion thereof for a period of not
more than ninety days by notice in writing to
CONTRACTOR and ENGINEER which will fix the date
on which Work will be resumed. CONTRACTOR shall
resume the Work on the date so fixed. CONTRACTOR
shall be allowed an adjustment in the Contract Price or an
extension of the Contract Times, or both, directly
attributable to any such suspension if CONTRACTOR
makes an approved claim therefor as provided in
Articles 11 and 12.
OWNER Mav Terminate:
15.2. Upon the occurrence of any one or more of the
following events:
15.2.1. if CONTRACTOR persistently fails to perform
the Work in accordance with the Contract Documents
(including but not limited to, failure to supply sufficient
skilled workers or suitable materials or equipment or
failure to adhere to the progress schedule established
under paragraph2.9 as adjusted from time to time
pursuant to paragraph 6.6),
15.2.2. if CONTRACTOR disregards Laws or
Regulations of any public body having jurisdiction;
15.2.3. if CONTRACTOR disregards the authority of
ENGINEER, or
15.2.4. if CONTRACTOR otherwise violates in any
substantial way any provisions of the Contract
Documents,
OWNER may, after giving CONTRACTOR (and the
surety, if any) seven days' written notice and to the extent
permitted by Laws and Regulations, terminate the services
of CONTRACTOR, exclude CONTRACTOR from the site
and take possession of the Work and of all
CONTRACTOR's tools, appliances, construction
equipment and machinery at the site and use the same to
the full extent they could be used by CONTRACTOR
(without liability to CONTRACTOR for trespass or
conversion), incorporate in the Work all materials and
equipment stored at the site or for which OWNER has paid
E]CDC GENERAL CONDITIONS 1910-8 (1990 Editiai)
32 w/ CITY OF FORT COLLINS MODIFICATIONS (REV 42000)
CONTRACTOR but which are stored elsewhere, and
finish the Work as OWNER may deem expedient. In such
case CONTRACTOR shall not be entitled to receive any
further payment until the Work is finished If the unpaid
balance of the Contract Price exceeds all claims, casts,
losses and damages sustained by OWNER arising out of
or resulting from completing the Work such excess will be
paid to CONTRACTOR If such claims, costs, lasses and
damages exceed such unpaid balance, CONTRACTOR
shall pay the difference to OWNER. Such claims, casts,
losses and damages incurred by OWNER will be reviewed
by ENGINEER as to their reasonableness and when so
approved by ENGINEER incorporated in a Change Order;
provided that when exercising any rights or remedies
under this paragraph OWNER shall not be required to
obtain the lowest price for the Work performed.
15.3. Where CONTRACTOR's services have been so
terminated by OWNER, the termination will not affect
any rights or remedies of OWNER against
CONTRACTOR then existing or which may thereafter
accrue. Arry retention or payment of moneys due
CONTRACTOR by OWNER will not release
CONTRACTOR from liability.
15.4. Upon seven days' written notice to
CONTRACTOR and ENGINEER, OWNER may,
without cause and without prejudice to any other right or
remedy of OWNER, elect to terminate the Agreement. In
such case, CONTRACTOR shall be paid (without
duplication of any items):
15.4.1. for completed and acceptable Work executed
in accordance with the Contract Documents prior to
the effective date of termination, including fair and
reasonable sums for overhead and profit on such
Work:
15.4.2. for expenses sustained prior to the effective
date of termination in performing services and
furnishing labor, materials or equipment as required
by the Contract Documents in connection with
uncompleted Work, plus fair and reasonable sums for
overhead and profit on such expenses,
15.4.3. for all claims, costs, losses and damages
incurred in settlement of terminated contracts with
Subcontractors, Suppliers and others, and
15.4.4. for reasonable expenses directly attributable
to termination.
CONTRACTOR shall not be paid on account of loss of
anticipated profits or revenue or other economic loss
arising out of or resulting from such termination.
CONTR4CTOR May Stop Work or Terminate:
155. If, through no act or fault of CONTRACTOR, the
Work is suspended for a period of more than ninety days
by OWNER or under an order of court or other public
authority, or ENGINEER fails to act on any Application
for Payment within thirty days after it is submitted or
OWNER fails for thirty days to pay CONTRACTOR any
sum finally determined to be due, then CONTRACTOR
may, upon seven days' written notice to OWNER and
ENGINEER, and provided OWNER or ENGINEER do not
remedy such suspension or failure within that time,
terminate the Agreement and recover from OWNER
payment on the same terms as provided in paragraph 15.4.
In lieu of terminating the Agreement and without prejudice
to any other right or remedy, if ENGINEER has failed to
act on an Application for Payment within thirty days after it
is submitted, or OWNER has failed for thirty days to pay
CONTRACTOR any sum finally determined to be due,
CONTRACTOR may upon seven days' written notice to
OWNER and ENGINEER stop the Work until payment of
all such amounts due CONTRACTOR, including interest
thereon. The provisions of this paragraph 15.5 are not
intended to preclude CONTRACTOR from making claim
under Articles I I and 12 for an increase in Contract Price
or Contract Times or otherwise for expenses or damage
directly attributable to CONTRACTOR's stopping Work as
permitted by this paragraph.
ARTICLE 16—DISPUTE RESOLUTION
If and to the extent that OWNER and CONTRACTOR
have agreed on the method and procedure for resolving
disputes between them that may arise under this
Agreement, such dispute resolution method and procedure,
if any, shall be as set forth in Exhibit GC -A, "Dispute
Resolution Agreement", to be attached hereto and made a
part hereof. If no such agreement on the method and
procedure for resolving such disputes has been reached,
and subject to the provisions of paragraphs 9.10, 9.11 and
9.12, OWNER and CONTRACTOR may exercise such
rights or remedies as either may otherwise have under the
Contract Documents or by Laws or Regulations in respect
of any dispute.
ARTICLE 17—MISCELLANEOUS
Giving Notice:
17.1. Whenever any provision of the Contract
Documents requires the giving of written notice, it will be
deemed to have been validly given if delivered in person to
the individual or to a member of the firm, or to an officer of
the corporation for whom it is intended, or if delivered at or
sentby registered or certified mail, postage prepaid to the
last business address known to the giver of the notice.
17.2. Computation of Time:
172.1. When any period of thmc is referred to in the
Contract Documents by clays, it will be computed to
exclude the first and include the last day of such
period. If the last day of any such period falls on a
Saturday or Sunday or on a day made a legal holiday
by the law of the applicable jurisdiction, such day will
be omitted from the computation.
EICDC GENERAL CONUITIONS 1910-8 (1990 Edim)
WI CITY OF FORT COLLINS MODIFICATIONS (REV V2000 )
1722. A calendar day of twenty-four hours measured
from midnight to the next midnight will constitute a
day.
Notice of Claim:
17.3. Should OWNER or CONTRACTOR sutler injury
or damage to person or property because of any error,
omission or act of the other party or of any of the other
parry's employees or agents or others for whose acts the
other party is legally liable, claim will be made in writing
to the other party within a reasonable time of the first
observance of such injury or damage. The provisions of
this paragraph 17.3 shall not be construed as a substitute
for or a waiver of the provisions of any applicable statute
of limitations or repose.Cumukdve Remedies:
17.4. The duties and obligations imposed by these
General Conditions and the rights and remedies available
hereunder to the parties hereto, and, in particular but
without limitation, the warranties, guarantees and
obligations imposed upon CONTRACTOR by
paragraphs 6.12, 6.16, 6.30, 6.31, 6.32, 13.1, 13.12, 13.14,
14.3 and 15.2 and all of the rights and remedies available
to OWNER and ENGINEER thereunder, are in addition
to, and are not to be construed in any way as a limitation
of, any rights and remedies available to any or all of them
which are otherwise imposed or available by Laws or
Regulations by special warranty or guarantee or by other
provisions of the Contract Documents, and the provisions
of this paragraph will be as effective as if repeated
specifically in the Contract Documents in connection with
each particular duty, obligation, right and remedy to which
they apply.
Professional Fees and Court Costslncluded:
17.5. Whenever reference is made to "claims, costs,
losses and damages", it shall include in each case, but not
be lunited to, all fees and charges of engineers, architects,
attorneys and other professionals and all court or
arbitration or other dispute resolution costs
17.6. The laws of the State of Colorado apply to this
Agreement. Reference to two pertinent Colorado statutes
are as follows
IT6.2- If a claim is filed. OWNER is required by
law (CRS 38-26-107) to withhold from all payments to
CONTRACTOR sufficient funds to insure the
lxrvment of all claims for labor, materials, team hire
sustenance, provisions, provender, or other supplies
used or consumed by CONTRACTOR or his
33