HomeMy WebLinkAboutRESPONSE - BID - 5982 SUBSTATION LIGHTNING TOWER (2)SECTION 00300
BID FORM
PROJECT: 5982 Substation Tower Installation
City of Fort Collins
PURCHASING DIVISION
215 NORTH MASON STREET, 2= FLOOR, FORT COLLINS
June 27, 2006 - 2:00 P.M. (OUR CLOCK)
1. In compliance with your Invitation to Bid dated
6 27 06 and subject to all conditions thereof, the undersigned
a or oration Limited Li -ability Company, Partnership, Joint Venture, or
Sole Proprietor) authorized to do business in the State of Colorado
hereby proposes to furnish and do everything required by the Contract
Documents to which this refers for the construction of all items listed
on the following Bid Schedule or Bid Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this
proposal is made in good faith, without collusion or connection with any
other person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the
Invitation to Bid and instructions to Bidders, the Agreement, the
detailed Specifications, and the Drawings pertaining to the Work to be
done, all of which have been examined by the undersigned.
3. Accompanying this Bid is a certified or cashier's check r standard Bid
bond in the sum of ***Five Percent of the Bid Amount*** - -_
($_ ***5% of Bid Amount ) in accordance with the Invitation To Bid
and Instructions to Bidders_
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (1 5 ) calendar days from the date when the written notice of the
award of t h e contract is delivered to him at the address given on this
Bid. The name and address of the corporate surety with which the Bidder
proposes to furnish the s ecified performance nd payment bonds is as
follows: The Cincinnatti Insurance Gaompany
5. All the various phases of Work enumerated in the Contract Documents with
their indi v idual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by
the CONTRAC TOR under one of the items listed in the Bid Schedule,
irrespective of whether it i s named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the contract Documents.
7/96 Section 00300 Page 1
30�� �-7 91�
21. What are the limits of your public liability? DETAIL
;PP at achPd copy of CprtifiratP of 1iahi1ityy
What company?
22. What are your company's bonding limitations? $20,000,000
23. The undersigned hereby authorizes and requests any person, firm or
corporation to furnish any information requested by the OWNER in
verification of the recital comprising this Statement of Bidder's
Qualifications.
Dated at ChEyinne, WY this 27th day of June 1 20_Q.(>
Addison Constnirti on Cn
Name of Bi e
By* —o M11 AIM
Title: Lois A. Blaser, Vice President
State of Wyoming
County of
Laramie
Lois A. Blaser being duly sworn deposes
is Vise President of Addison Construction Co. and
(name of organization)
the answers to the foregoing questions and all statements
are true and correct.
Subscribed and sworn to before me this 27th day of
June 2006.
Notary Public
Linda L. Wille
My commission expires
7/96
March 14, 2009
and says that she
that
therein contained
E:ED
RY PUBLICTATE OFYONINGAR. 1/, 2009
Section 0CD420 Page 3
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
performing over 15% of the contract.
ITEM
**NONE**
SUBCONTRACTOR
**NONE**
7/96 Section 00430 Page 1
ADDISON CONSTRUCTION COMPANY
SI'BSTATIO\S-DISTRIBL'I�ION 1I.V. AND E.H.V.
1526 Horse Creek Road
Chevenne. NVY 82009-9338
(307)638-1538 (307)778-851 VFAX
e-mail: addison'd:millect.coil,
CITY OF FORT COLLINS
BID NUMBER 5982
SUBSTATION LIGHTNING TOWER INSTALLATION
ATTACHMENTS
Attachment 1: Projects Recently Completed
Attachment 2: Major Equipment Available for Project
Attachment 3: Resumes: Gary D. Bindert, President
Toby J. Krug, Secretary Treasurer
Michael M. Kaiser, Superintendent
Keith E. Steele, Superintendent
Attachment 4: Certificate of Liability
ADDISON CONSTRUCTION COMPANY
SUBST_,TIO\S-DISTRIBUTION H.V.:Atill E.H.V.
1526 Horse Creek Road
Cheyenne, WY 82009-9338
(307)638-1538 (307)778-8513JFAX
e-mail: addisonid.millect.com
CITY OF FORT COLLINS
BID NUMBER 5982
SUBSTATION LIGHTNING TOWER INSTALLATIONS
RECENTLY COMPLETED PROJECTS
PROJECT NAME
APPROXIMATE
AMOUNT
DATE
COMPLETE
Winchester Substation
$511941000
March-04
East Bismarck Substation
$1X62000
May-04
Whiterock Substation, Stage 01
$13840,000
November-04
Playas Substation
$913,000
March-05
Silver Saddle Substation
$1;021,000
April-05
Test Strack Substation, Stage 01
$1,728,000
May-05
Casa Grande Substation, Stage 03
$59700
May-05
Ward Delivery Substation
$2035000
November-05
Silver Saddle Switching Station
$81300
March-06
Addison Equipment Rental Rates
Unit Year Description Hour Day Month
523
1984
JOHN DEERE LOADER BACKJi0E 51�F555D
$74.00
$594.00
N/A
524
1999
FORD TRACTOR LOADER BACKHO
$74.00
$594.00
WA
525
1990
CASE BACKHOE 580K
$74.OD
$594.00
WA
912
1995
ELECTRIC PIPE BENDER ET-E-666TL
$14.00
$106.00
N/A
572
2003
BOBCAT TRENCH COMPACTOR
$20.00
$159.00
N/A
472
1994
INGERSOLL-RAND AIR COMPRESSOR
$24.00
$191.00
N/A
473
1995
SULLIVAN AIR COMPRESSOR D210058
$22.00
$175.00
N/A
474
1990
GRIMMER SCHMIDT AIR COMPRESSOR 195 CFM DIE
$25.00
$201.00
N/A
918
1989
GRIMMER SCHMIDT AIR COMPRESSOR
$23.00
$186.00
N/A
919
1986
INGERSOLL-RAND AIR COMPRESSOR
$23.00
$186.00
WA
140
1997
LINK -BELT ROUGH TERRAIN CRANE
$175.00
$1400.00
NIA
543
1980
P & H OMEGA 18T CRANE
$106.00
$848.00
WA
455
1982
NATIONAL656 CRANE W/FORD LN8000 (#131)
$95.00
$763.00
WA
456
1992
MANITEX 30T W/FORD LNT8000 (#135)
$138.00
$1102.00
N/A
133
2003
TEREX RS60100 CRANEW/FORD STERLING (#071)
$138.00
$1102.00
N/A
142
2003
TEREX RS60100 CRANE W/FORD STERLING 7501 (#074)
$138.00
$1102.00
NIA
462
1970
TEXOMA EARTH AUGER ON MACK MH613 (#003)
$212.00
$1696.00
N/A
461
1983
TEXOMA 70D-60 EARTH AUGER ON KENWORTH (#125)
$265.00
$2120.00
N/A
4W
2003
TEXOMA 650 EARTH AUGER ON STERLING ACTERRA (#073)
$265.00
$2120.00
N/A
517
1998
BOBCAT EXCAVATOR 320
$24.00
$191.00
WA
519
1996
BOBCAT EXCAVATOR M320
$37.00
$292.00
N/A
522
2003
BOBCAT MINI -EXCAVATOR 322 W/BUCKET
$24.00
$191.00
N/A
526
2003
BOBCAT MINI -EXCAVATOR, 322
$24.00
$191.00
N/A
530
1979
LULL FORKLIFT W/LOADER 844
$.52.00
$408.00
N/A
531
1984
LULL FORKLIFT 844TT
$58.00
$466.00
N/A
532
1980
PETTIBONE FORKLIFT EXTENDO B-66
$45.00
$350.00
N/A
533
1%5
LULL FORKLIFT 844TT34
$58.00
$466.00
N/A
535
1955
LULL FORKLIFT 844
$58.00
$466.00
N/A
536
2000
LULL FORKLIFT 1044C-54
$69.00
$551.00
N/A
537
2003
JLG GRADALL FORKLIFT G9-43A
$69.00
$551.00
N/A
190
1996
PJT GOOSENECK DUAL TANDEM TRAILER
$27.00
$212.00
N/A
195
1995
24 FRONTIER GOOSENECK TRAILER
$27.00
$212.00
N/A
197
1996
24' FRONTIER GOOSENECK TRAILER
$27.00
$212.00
N/A
453
1968
ELLIOT ECE50 HIGH REACH 45' ON FORD LN8000 (#120)
$74.00
$594.00
NIA
llollflat..1mic 26, 2006 Page S c!F3
L%nit Year DescriptionHouir Dap Month
501
1997
NEW HOLLAND SKID LOADER LX865
$33.00
$250.00
N/A
504
19M
NEW HOLLAND SKID LOADER LX865
$37.00
$292.00
N/A
505
1992
NEW HOLLAND SKID LOADER L785
$27.00
$212.00
N/A
506
2003
BOBCAT SKID LOADER W 74" BUCKET S250
$37.00
$292.00
N/A
507
2003
BOBCAT SKID STEER LOADER, S250
$37.00
$292.00
N/A
510
2000
BOBCAT LOADER 873H
$37.00
$292.00
N/A
514
2003
BOBCAT SKIDSTEER LOADER S250
$37.00
$292.00
WA
518
1998
MELROE BOBCAT 873
$37•00
$292•00
N/A
921
1998
BOBCAT LOADER/TRENCHER LT204
$27.00
$212.00
N/A
143
2000
TEREX MANUFT TB60
$80.00
$636.00
WA
144
19W
SIMON MANLIFT MP60
$5E3.00
$465.00
N/A
145
1992
SIMON MANLIFT AT40C
$60.00
$551.00
N/A
146
1989
SIMON MANLIFTAT60C
$60.00
$551.00
N/A
147
1997
SIMON MANLIFT AT60C
$74.00
$594.00
N/A
148
1997
SIMON MANLIFT AT60C
$74.00
$594.00
N/A
150
1996
GENIE MANLIFT S-80 W/80' BOOM
$100.00
$848.00
N/A
161
2002
GENIE MANLIFT S-40
80.001
640.00
N/A
162
2004
SKYJACK MANUFT 25.29
60.00
480.00
N/A
163
1997
TEREX MANUFT TB60 (Diesel)
$60.00
$480.00
N/A
164
1998
TEREX MANUFT TB60 (Gas)
$60.00
$480.00
N/A
010
2002
GMC ENVOY
$7.50
$58.00
$1261.00
011
2003
FORD F350 SUPER DUTY
$10.00
$90.00
$1950.00
021
2002
FORD F150 SUPER CAB
$10.00
$74.00
$1611.00
002
2003
FORD F350 CREW CAB -FLAT BED
$12.00
$90.00
$1950.00
017
20M
DODGE RAM 25M
$10.00
$90.00
$100.00
020
2004
FORD F150 CREW CAB PICKUP
$1CIA)
$74.00
$1611.00
014
2002
GMC SI ERRA- ONE TON FLAT BED
$10.00
$90.00
$1950.00
004
2003
DODGE 3500
$10.00
$90.00
$1950.00
016
2001
FORD F350-ONE TON FLAT BED
$12.00
$90.00
$1950.00
006
2001
FORD F150 SUPER CAB
$11 .00
$80.00
$1723.00
650
2001
DEUTSCH PIPE COMPRESSION UNIT & 2 HEADS
$47.00
$371.00
N/A
910
1995
BROCK HYDRAULIC 100 TON PRESS
$34.00
$265.00
N/A
911
1980
BROCK HYDRAULIC 100 TON PRESS
$34.00
$265.00
N/A
176
1994
PULLER TENSIONER PT-2766-B-T
$45.00
$350.00
N/A
053
1984
GMC VANDURA OIL VAN
$90.00
$721.00
N/A
920
1960
TANKER
$34.00
$265.00
N/A
160
1983
FRUEHAUF TOOL VAN
N/A
N/A
$3530.00
-
.11anday Ame 26, 20116 Page qf'3
Unit Year Description Nora r Da}' Month
159
1977
HOBBS 45' TRAILER
WA
WA
$3530.00
193
1964
KENT TRAILER TOOL VAN
WA
N/A
$3530.00
192
1993
FREUHAUF TRAILER STORAGE VAN
WA
N/A
$3530.00
156
1984
MATLOCK TOOL VAN
WA
WA
$3763.00
184
1976
21' DITCH WITCH TRENCHER TRAILER
$27.00
$212.00
WA
191
2000
TRAVALONG GOOSENECK TRAILER
$21.00
$159.00
WA
198
1998
26 BUCK HIGH DECK TRAILER
$27.00
$212.00
N/A
199
1999
W JET C DROPDECK TRAILER
$4200
$339.00
N/A
200
I
W FONTAINE DROPDECK TRAILER
$42.00
$339.00
N/A
202
1979
8 X 24 DESIGN SPACE OFFICE TRAILER
$2.00
$17.00
$350.00
903
1987
23' DITCH WITCH TRENCHER TRAILER BWT14
$1 .4.00
$106.00
WA
905
1958
WIRE TRAILER
$Z0.00
$159.00
N/A
511
1981
DITCH WITCH TRENCHER 6510
$5 5.00
$466.00
N/A
512
1998
DITCH WITCH TRENCHER 3500
$48.00
$382.00
N/A
513
1998
DITCH WITCH TRENCHER 3500
$48.00
$382.00
WA
515
1988
DITCH WITCH BASIC MODEL 4010
$58.00
$466.00
N/A
516
19931
DITCH WITCH TRENCHER 3500
$37.00
$292.00
N/A
O50
1971
FORD F700 2T DUMP TRUCK
$53.00
$424.00
N/A
115
2000
KENWORTH W900L SEMI -TRACTOR
$69.00
$551.00
N/A
117
1997
KENWORTH W900L-SEMI TRACTOR
$69.00
$551.00
WA
119
1987
INTER NATIONAL -SEMI TRACTOR
$69.00
$551.00
WA
922
2000
POLARIS RANGER 6X6 A99RF50AA
$Z0.00
$159.00
N/A
923
2006
BOBCAT 2200 4-WHEELER
$2:0.00
$159.00
WA
924
2006
BOBCAT 2200 4-WHEELER
$20.00
$159.00
N/A
151
1981
TRAILMOBILE VAN
$7-4.00
$594.00
WA
158
1975
TRAILKAOBILE 46 STORAGE VAN
N/A
N/A
$350.00
061
1999
STERLING WATER TRK, MODEL L7501
$1 �4.00
$110.00
$2332.00
621
1996
HOBART WELDER P216G
$1 45.00
$127.00
WA
907
1999
MILLER WELDER 903.567
$1 95.00
$127.00
WA
908
1990
HOBART WELDER W/LEADS
$1 6.00
$127.00
N/A
909
1991
MILLER WELDER W/LEADS 20OLE
$1 45.00
$127.00
WA
914
1993
WELDER/PLASMA CUTTER PCXSOSS
$2-0.00
$170.00
N/A
171
1981
MILLER WELDER TRAILER 55D (#405)
$2-1.00
$159.OD
WA
.. •�#'-.'ur S +�'i4..: �u `. .a �h �S':::. �:6.�a..�� � .:. .«. w P.:...: .hnr �...". lam. �':t t R.v>:::. q. �.-.._ v ....
1lnridat..txrae <h. 1(t(lfe Pa,e 3 u 3
RESUME OF
GARY D. BINDERT, President
Gary D. Bindert began working for Addison Construction Co. in May 1971 on Job #17, the
F.L. Blair Substation, Addison Construction CO.'s first million dollar job. Mr. Bindert is a
native of South Dakota, and Substation was being built about four (4) miles from his home
in Gary, South Dakota. Mr. Bindert steadily progressed from laborer and carpenter status to
superintendent after having worked in the business for only two years. The first job
performed under his supervision was Job #28 for the City of Loveland, Colorado. This was
a $340,000.00 labor contract for a new substation and a switching station. Listed below are
some of the major jobs he has supervised:
Job #41 Sioux City Substation, Stage 09
New 345kV Substation with Extensive 230,161 and 69kV Modifications
Sioux City, Iowa
U. S. Bureau of Reclamation
Job #45 Victory Hill Substation
New 230/115kV Substation, Scottsbluff, Nebraska
Nebraska Public Power District
Job #50 Alpine Switching Station
New 115kV Switching Station, Alpine, Wyoming
Lower Valley Power & Light, Inc.
Job #55 Stegall Substation
New 345/230kV Substation, Stegall, Nebraska
Basin Electric Power Cooperative
This project was approximately 1'/z years in duration.
Job #62 Hayden Substation, Stage 03
230kV Addition to Existing Substation, Hayden, Colorado
Western Area Power Administration
This work was performed in an energized station.
Resume of Gary D. Bindert
Page 2
Job #65 Ault Substation, Stage 03
345/230kv Substation Modifications, Ault, Colorado
Western Area Power Administration
This work was also done in an energized station.
Following Job #65, Ault Substation, Stage 03, Mr. Bindert moved into the Cheyenne office
to accept a managerial position in the fall of 1981. His experience in the field, doing all
voltages from 12.47kV to 345kV has been of tremendous help to him iii his present position.
His duties include estimating jobs, procurement of materials, making decisions regarding
staffing of projects with both men and equipment, and regular visits to the projects in
operation. Under his guidance, the company has enjoyed an excellent reputation and has
been operated very efficiently.
Additional information gladly will be furnished upon request.
RESUME OF
TOBY I KRUG
Mr. Toby J. Krug has been employed by Addison Construction Co. since October of 1996.
From 1977 through September 1996, Mr. Krug was a Civil Engineering Technician,
Construction Division, Western Area Power Administration, Department of Energy,
Loveland, Colorado, administering A/E and construction and supply contracts.
Mr. Krug has extensive knowledge in contract administration, office engineering and field
construction of high voltage transmission systems. He has proven ability to independently
administer numerous concurrent contracts; anticipate and evaluate contract extra work
items, provide punctual, accurate invoicing for fast turnaround of progress payments, and
employ computerized tracking of required data submittals.
7. The undersigned Bidder hereby acknowledges
1 through 1
BID SCHEDULES
receipt of Addenda No.
BID SCHEDULE A - HARMONY SUBSTATION LIGHTNING FIST
ITEM NO.
DESCRIPTION
EST.QTY
UNIT
UNIT PRICE
TOTAL
1
Mobilization, Insurance,
Bonds
1
LS
$
2,269
22269
2
3
Drilled pier excavation
Spoil
1
1
LS
LS
1,180
590
1 180
590
4
Concrete pier foundation
1
LS
4.571
4,571
5
Lightning mast materials
1
LS
10 030
10 030
6
Lightning mast installation
1
LS
2.950
2 950
7
Site restoration, Aggregate
surface replacement, Final
grading.
1
LS
11770
1,770
Subtotal Bid Schedule A
23.360
BID SCHEDULE B - OVERLAND TRAIL SUBSTATION LIGHTNING MAST
ITEM NO.
DESCRIPTION
EST.QTY
UNIT
UNIT PRICE
TOTAL
1
Mobilization, Insurance,
Bonds
1
LS
2 269
21269
2
Drilled pier excavation
1
LS
1,180
1 180
3
Spoil
1
LS
590
590
4
Concrete pier foundation
1
LS
4.571
4,571
5
Lightning mast materials
1
LS
10,030
10 030
6
Lightning mast installation
1
LS
2,950
2 950
7
Site restoration, Aggregate
surface replacement, Final
grading.
1
LS
1,770
1 12770
Subtotal Bid Schedule B
1 23 360
BID SCHEDULE C - LINDEN SUBSTATION LIGHTNING MAST
ITEM NO.
DESCRIPTION
EST.QTY
UNIT
UNIT PRICE
TOTAL
1
Mobilization, Insurance,
Bonds
1
Ls
$ 2,269
$ 2,269
2
Excavat ion
1
LS
$
$ 1,180
3
Spoil
1
LS
$ 1 590
$ 590
4
Structural fill
1
LS
$ 1.180
$ 1.180
5
Structure backfill
1
LS
$ 2 950
$ 2 950
6
Concrete spread footing
foundat ion
1
LS
$ 59782
$ 5,782
7
Lightning mast materials
1
LS
$
$ 101030
8
Lightning mast installation
1
LS
$ 2 L250 j
$ 2.95H
9
Site restoration, Aggregate
1
LS
$ 1.7701
$ 1,770
7/96 Section 00300 Page 2
RESUME OF
MICE AEL M. KAISER, Superintendent
Mr. Michael Kaiser is returning to Addison Construction Co. after working for Reiman
Corp., of Cheyenne, Wyoming, from June of 1993 through February of 2002. During that
time Mr. Kaiser supervised bridge and highway construction projects.
Mr. Kaiser was employed by Addison Construction from June 1981 through May 1993. His
first project with Addison was the Leeds Substation Project in Devil's Lake, North Dakota.
Below is a list of the projects on which he worked. He worked in the capacity of laborer,
form setter, operator, electrician, lineman and foreman through June 1986.
Job #64 Archer Substation, Stage 05
Substation Addition, Cheyenne, Wyoming
Western Area Power Administration
Job #67 Leeds Substation, Stage 04
Substation Addition, Devil's Lake, North Dakota
Western Area Power Administration
Job #71 Poudre Substation, Stage 04
Substation Addition, Fort Collins, Colorado
Western Area Power Administration
Job #72 Teckla Substation
New 230/69 kV Substation, Wright, Wyoming
Tri-County Electric Association
Job #75 Dawson County Substation, Stage 04
Subsstation Addition, Glendive, Montana
Western Area Power Administration
Job # 78 Yellowtail Dam Bypass
Switchyard, Glendive, Montana
Bureau of Reclamation
Job #79 Lanes Creek Substation
New Substation, Near Alpine Junction, Wyoming
Lower Valley Power & Light, Inc.
Job #81 Thermopolis Substation, Stage 05
115 kV Addition, Thermopolis, Woming
Western Area Power Administration
Resume of Michael Kaiser
Page 2
Job #83 Gila Substation, Stage 05A
Substation Addition, Yuma, Arizona
Western Area Power Administration
Job #86 White Substation, Stage 01
New 345/115 kV Substation, Brookings, South Dakota
Western Area Power Administration
Job #88 Weleetka Substation
Substation Modifications, Weleetka, Oklahoma
Southwestern Power Administration
Job #91 Rooks California Substation
New Substation, Rangely, Colorado
Moon Lake Electric Association
Job #92 Wildhorse Substation
115/24.9 kV Substation, Oshkosh, Nebraska
Wheat Belt Public Power District
Job #112 Butterfield/ San Rafael Substations
Two 230 kV Substations, Benson, Arizona
Arizona Electric Power Cooperative
Job #115 Springfield Main Bus
116 kV Substation, Springfield, Missouri
Southwestern Power Administration
In July 1986, Mr. Kaiser moved up to the position of supervisor. Following is a list of the
projects he supervised for Addison Construction Co. through May 1993.
Job #97 Clay Substation
161 kV Substation, Springfield, Missouri
City Utilities of Springfield
Job #101 Stegall Substation, Stage 04
230/115 kV Substation Addition, Stegall, Nebraska
Western Area Power Administration
Job #103 Warren Substation, Stage 01
115/13.8 Substation, Cheyenne, Wyoming
Western Area Power Administration
Resume of Michael Kaiser
Page 3
Job #108 Oregon Basin Substation
230 kV Substation, Cody, Wyoming
Pacific Power & Light Company
Job #111 Russell Hunt Substation
69 kV Substation, Pryor, Oklahoma
Grand River Dam Authority
Job #120 Stockton Substation
161 kV Substation Addition, Stockton, Missouri
KAMO Electric Cooperative, Inc.
Job #130 Lost Hills Substation
New Substation, Lost Hills, California
Chevron
Job #131 West/East/Harvard Substations
New Substations, Loveland, Colorado
Platte River Power Authority
Job #134 Miracle Mile Substation
New Substation, Alcova, Wyoming
Western Area Power Administration
Job #135 Waste Tech Services Substation
New Substation, Kimball, Nebraska
Rural Electric Company
Job #146 Substations 1249 and 1281
New Substations, Omaha, Nebraska
Omaha Public Power District
Job #149 McGrew Substation, Stage 02
Substation Addition, McGrew, Nebraska
Western Area Power Administration
Job #150 Tupelo Line Bay Addtion
Substation Addition, Tupelo, Oklahoma
Southwestem Power Administration
Job #152 Kennett Substation Transfer and Bus Tie Bay Addition
Substation Addition, Kennett, Missouri
Southwestern Power Administration
Resume of Michael Kaiser
Page 4
Job #156 Norton Substation
161/69 kV Substation, Springfield, Missouri
City Utilities of Springfield
Following is a list of projects Mr. Kaiser has supervised for Addison Construction Co.
since his return in 2002.
Job #269 Cherokee Substation
230/115kV Auto Transformer Replacement, Denver, Colorado
Xcel Energy Services
Job #278 Terry Street Substation, Stage 01
Foundation Removal, Longmont, Colorado
Platte River Power Authority
Job #279 Midway Substation
Breaker Foundation Replacement, Fountain, Colorado
Western Area Power Administration
Job #280 Rinn Valley Substation Expansion
115kV Substation Addition, Firestone, Colorado
United Power, Inc.
Job #285 Lamar PSCo Switching Station
New 230kV Switching Station, Lamar, CO
Xcel Energy (Public Service of Colorado)
Job #288 Boyd Substation
Addition of I I5kV Breaker and Switch, Loveland, CO
Platte River Power Authority
Job #289 Teckla Substation
230kV Substation Addition, Wright, WY
Powder River Energy Corporation
Job 291 Whiterock Substation
New 115kV Substation
Western Area Power Administration, Loveland, CO
Job #295A Dixon Creek Substation
Metering Addition, Fort Collins, CO
Platte River Power Authority
Resume of Michael Kaiser
Page 5
Job #29513 Longmont Substation
Metering Addition, Longmont, CO
Platte River Power Authority
Job #295C Loveland West Substation
Metering Addition, Loveland, CO
Platte River Power Authority
Job #305 Wray Substation, Stage 02
Additions to I I5kV Substation, Wray, CO
Western Area Power Administration
Job #309 Silver Saddle Substation
New 230kV Substation, Commerce City, CO
United Power, Inc.
Job #310 Terry Street, Longmont Northwest and Fordham Additions
Additions to Existing 1 lkV Substations, Longmont, CO
Platte River Power Authority
Job #318 Silver Saddle Substation
Construct 230kV Three -breaker -ring Switching Station,
Commerce City, CO
Xcel Energy Service, Inc.
Mr. Michael Kaiser has an excellent safety record. He has proven his capability to handle
all phases of electrical substation construction. Additional information will be gladly
furnished upon request.
RESUME OF
KEITH E. STEELE, Superintendent
Mr. Keith Steele has had extensive experience as a superintendent, laborer, operator,
lineman, foreman, and truck driver on both new substations and additions to substations
ranging from 69 kV to 345 kV.
PROFESSIONAL EXPERIENCE
RICHARDS AND ASSOCIATES 1979-1982
Position Held: Laborer
1979 - Addition to Archer Substation, 345 kV, Cheyenne, WY
1980 - New 69 kV Substation, Oxford, Mississippi
Position Held: Foreman
1980 - Addition and New 230 kV Substation, Brush, Colorado
1981 - New 69 kV Substation, Columbus, Mississippi
Position Held: Operator
1981 - New 69 kV Substation, Monahan, Texas
Position Held: Lineman
1982 - New 69 kV Substation, Sebastion, Florida
CITY OF FC>RT MORGAN 1981
Position Helcl: Laborer
7200 and 12.4 Hot Line Work, Fort Morgan, Colorado
SEAWARD CONSTRUCTION 1982-1983
Position Held : Lineman
1982 - New 115 kV Substation, Jacksonville, Florida
1983 - Two New 69 kV Substations, Kingsland, Georgia
ADDISON CONSTRUCTION CO. 1983-1984 and 1987-PRESENT
Resume of Keith Steele
Page 2
Following are some of the projects Mr. Steele bas worked on for Addison
Construction Co.:
Job # 78 Yellowtail Dam Bypass
230-115 kV Addition, Yellowtail, Montana
Bureau of Reclamation
Job # 79 Lanes Creek Substation
New Substation, Soda Springs, Idaho
Lower Valley Power & Light, Inc.
Job # 81 Thermopolis Substation, Stage 05
115 kV Addition, Thermopolis, Wyoming
Western Area Power Administration
Job # 83 Gila Substation, Stage 05
115 kV Addition, Yuma, Arizona
Western Area Power Administration
Job #103 Warren Substation, Stage 01
New 115 kV Substation, Cheyenne, Wyoming
Western Area Power Administration
Job #104 Huron Foundation Replacement
115 kV Addition, Huron, South Dakota
Western Area Power Administration
Job #111 Russell Hunt Substation
New 69 kV Substation, Pryor, Oklahoma
Grand River Dam Authority
Job #121 Talty and Rose Hill Stations
New 69 kV Substation, Terrell, Texas
Kaufman County Electric Coop
Job #132 Oregon Basin Addition
69 kV Addition, Cody, Wyoming
Pacific Power & Light Co.
Job #133 Locust Grove and Todds Tavern
Addition & New 115 kV Substation, Fredericksburg, Virginia
Rappahannock Electric Coop
Resume of Keith Steele
Page 3
Job #136 Roseville Substation, Stage 02
230 kV Addition, Roseville, California
Western Area Power Administration
Job #141 Ripple Substation
New 69 kV Substation, Wellington, Colorado
Poudre Valley REA
Job #146 Substations 1249 and 1281
Two new 161 kV Substations, Omaha, Nebraska
Omaha Public Power District
Job #147 James River Power Station
161 kV Addition, Springfield, Missouri
City Utility of Springfield
Job #150 Tupelo Line Bay Addition
69 kV Addition, Tupelo, Oklahoma
Southwestern Power Administration
Job #224 Mosca Substation
New 69 kV Substation, Mosca, Colorado
Public Service Company of Colorado
Job #233 Elsie, Red Willow Creek & Blackwood Creek Substations
115 kV Substations, Perkins County, Nebraska
Midwest Electric Cooperative
Job #238 Sioux City No. 2 Substation Stage 03
345 kV Substation Addition, Sioux City, Iowa
Western Area Power Administration
Job #239 Morris and Patton Substations
1 15/13.2 kV Substations, Scott City and Garden City, Kansas
Wheatland Electric Cooperative, Inc.
Job #251 Bivins/North Linden Substations
69/12.5kV Substation Additions, Linden, Texas
Bowie -Cass Electric Cooperative, Inc.
Job #256 Peeetz Substation
1 15kV Addition, Peetz Colorado
Kcel Energy Services (Public Service of Colorado)
Resume of Keith Steele
Page 4
Job #259 Grenora Substation Building
Service Building and Control Wiring, Grenora, North Dakota
Upper Missouri G & T Elecrtric Cooperative
Job #263 Estancia Substation
New I I5kV Substation, Estancia, New Mexico
Tri-State Generation & Transmission Association, Inc.
Job #264 Teckla Substation Addition
69kV Addition, Wright, WY
Powder River Energy Corporation
Job #294 Winchester Substation
New 345kV and 230kV Substations, Benson, Arizona
Southwestern Transmission Cooperative, Inc.
Job #314 Ward Delivery Substation
Upgrade 230kV Substation, Bismarck, North Dakot
Capital Electric Cooperative
The following projects have been completed under Mr. Steele's supervision:
Job #152 Kennett Substation Transformer and Bus Tie Bay Addition
161-69 kV Addition, Kennett, Missouri
Southwestern Power Administration
Job #158 Waste -Tech Substation, Phase I
34.5 kV Addition, Kimball, Nebraska
Rural Electric Company
Job #168 Akron Substation, Stage 02
115kV Addition, Akron, Colorado
Western Area Power Administration
Job #178 Fort Morgan North Substation
8z I I5kV Transmission Line, Fort Morgan, Colorado
Morgan County Rural Electric Association
Job #180 North Cody Substation, Stage 04
Addition to Existing Substation, Cody, Wyoming
Western Area Power Administration
Resume of Keith Steele
Page 5
Job #181 Bridgeport Substation
Modification to 12.47 kV Area, Bridgeport, Nebraska
Western Area Power Administration
Job #184 Stegall Substation
Reactor Replacement, Scottsbluff, Nebraska
western Area Power Administration
Job #187 Dallas Creek Substation
115/25 kV Substation, Ridgeway, Colorado
San Miguel Power Association, Inc.
Job # 201 Substation No. 5
34.5/12.47 kV Substation, Torrrington, Wyoming
Town of Torrington
Job # 204 Ponnequin Substation
115 kV Substation, Weld County, Colorado
Public Service Company of Colorado
Job # 205 Black Canyon
Switchyard Disconnect Switch Replacement, Gem County, Idaho
Bureau of Reclamation
Job # 212 115kV Capacitor Addition Projects
Additions to Existing Substations, Larimer County, Colorado
Platte River Power Authority
Job # 213 Russellville and Elbert Substations
12.5kV/69kV Substations, Douglas and Elbert Counties, Colorado
Mountain View Electric Association
Job # 221 Harmony Substation
230 kV Additions, Fort Collins, Colorado
Platte River Power Authority
Job #258 Wable Rock and Norfork Substations
69kV Disconnect Switch Replacements, Branson, 1\4issouri, Norfork,
Arkansas
Southwestern Power Administration
Job #270 Socorro Substation
1 15 kV Substation and Approach Spans, Socorro, New Mexico
T'ri-State Generation and Transmission Association, Inc.
surface replacement, Final
grading.
1$289701
Subtotal Sid Schedule C
28,701
TOTAL PRICE (BID SCHEDULE A, B, AND C).
**Seventy five thousand four lrmdred twenty one dollars** ($ 75 421 )•
(Use Words) (Use Figures)
9. PRICES
The foregoing prices shall include all labor, materials, transportation,
shoring, removal, dewatering, overhead, profit, insurance, etc., to cover
the complete Work in place of the several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the
Bid or change quantities at his sole discretion without affecting the
Agreement or prices of any item so long as the deletion or change does
not exceed twenty-five percent (25%) of the total Agreement Price.
RESPECTFULLY SUBMITTED:
Addison Construction Co.
COMP Y
O (/t 06/27/06
Signature Lois A. Blaser Date
Vice President
Title
License Number (If Applicable)
(Seal - if Bid 's by corpo tion)
Attest
ddr s X a 1 6 Horse Creek Road
Cheyenne, WY 82009-9338
Telephone (307) 638-1538
State of Incorporation - Wyoming
7/96 Section 00300 Page
Resume of Keith Steele
Page 6
Job #274 Hernandez Substation Modification
69 & 115 kV Breaker Additions, Espanola, New Mexico
Tri-State Generation and Transmission Association, hic.
Job #282 San Luis Valley Substation Foundations
Concrete Foundations for Transformer Addition, Alamosa, Colorado
Xcel Energy Services
Job #292 Poplar Bluff, Carthage, and Springfield Substations
Install Replacement Disconnect Switches, Poplar Bluff, Carthage and
Springfield, Missouri
Southwestern Power Administration
Job #300 Foidel Creek Switching Station
230kV Switching Station, Steamboat Springs, Colorado
Xcel Energy Services
Job #305 Wray Substation, Stage 02
Install Switches, Recolosers, and disconnect Switches, Wray, Colorado
Western Area Power Administration
Job #308 Playas Substation
Addition of 115/69kV Transformer, Playas, New Mexico
Tri-State Generation and Transmission Association, Inc.
Job #312 Sam Rayburn Switching Station
Replace cable at existing substation, Jasper, Texas
Southwestern Power Administration
Job #318 Silver Saddle Substation
Construct 230kV Three -breaker -ring Switching Station,
Commerce City, CO
Xcel Energy Service, Inc.
Mr. Steele is experienced in all phases of substation construction. Additional information
will be gladly furnished upon request.
WORD CERTIFICATE OF LIABILITY INSURANCE DATE IMWDDIYYYY)
9-13-05
NICER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
er Rosacker-McCue 3 Huston ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
W Koenig St ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
Sox 1228
id blend NE 68802 INSURERS AFFORDING COVERAGE NAIC N
RED Addison Construction Co. INSURER A: CNA Insurance
1526 Horse Creek Road INSURER B:
Cheyenne INY 82009
IFRA(SF V
E POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING
IY REQUIREMENT, TERM OR CONDITION OF. ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
IY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
ILICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
POLICY NUMBER
POLICY EFFECTIVE
POLICY EXPIRATION
LIMBS
GENERAL LIABILITYI
X COMMERCIAL GENERAL LIABILIT-Y
CLAIMS MADE I`XJ OCCUR
C207973684
� 10-1-05
10-1.06
EACH OCCURRENCE
$ 1,000,000
PRE IMISPRIE&AGMIUMBIL— DAMAGE TO RENTED
s 300 000
MED EXP Oft OM
S 5,01111)
PERSONAL a ADV INJURY
S 1 000 o00
GENERAL AGGREGATE
$ 2,000,000
GEN'L AGGREGATE
LIMIT APPLIES PER:
PRODUCTS - COMP/OP AGG
s 000 000
X POLICY
PRO-
F-1 LOC
AUTOMOBILE
X
j X
X
LIABILITY
. ANY AUTO
ALL OWNED AUTOS
I SCHEDULED AUTOS
I HIRED AUTOS
!NON -OWNED AUTOS
I
C2079736977
I
11a1-0s
i
1a1.O6
COMBINED SINGLE LIMIT
(Eeacdda'U
S 1,000,000
BODILY INJURY
(Per peredn)
f
BODILY INJURY
(Per scadenn
a
I
F--I
I
PROPERTY DAMAGE
(Per accident)
S
GARAGE LIABILITY
AUTO ONLY - EA ACCIDENT
f
OTHER THAN EA ACC
AUTO ONLY: AGG
S _
ANY AUTO
i
f
EXCESSIUMBRELLA LIABILITY
x OCCUR _ _ j CLAIMS MADE
C2079736929
10-1-05
1a1.06
EACH OCCURRENCE
S 5 O00 000
AGGREGATE
f 5 1108 0w
f
1
i
f
H—
DEDUCTIBLE
f
x RETENTION f 10 OOO
NORKERS COMPENSATION AND
VVC STATLL X OTH
MPLOYERV LIABILITY
NY PROPRIETOWPARTNER/EXECUTNE
FFK;ERIMEMBER EXCLUDED?
WC27936882
10-1-05
10-1-06
E.L. EACH ACCIDENT
f S00 000
E.L. DISEASE - EA EMPLOYEE
f 5010 000
E.L. DISEASE - POLICY LIMIT
f 500 000
THER
Installation Floater $5,000,000
ontractors Equipment
C2079736848 110-1-05
i
10.1-06 I
Leased/Rented Equip $150,000
$2 500 deductible
MON OF OPERATIONS / LOCATIONS I VEHICLES / EXCLUSIONS ADDED BY ENDORSEMENT / SPECIAL PROVISIONS
FICATE HOLDER
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION
DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 30 DAYS WRITTEN
NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, SUr FAILURE TO DO SO SHALL
IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR
AUTHORIZED REPRESENTATIVE
CORPORATION
.� s6 �a a� ti d �a• y >a Y
ADDISON CONSTRUCTION CO.
1526 HORSE CREEK ROAD
CHEYENNE, WY 82009-9338
(307) 638-1538
TO;CITY OF FORT COLLINS
PURCHASING DIVISION
215 N. MASON ST., 2ND FLOOR
FORT COLLINS, CO 80524
NCLOSED
Lightning Tower
tallation
imber:5982
SECTION 00400
SUPPLEMENTS TO BID FORMS
00410 Bid Bond
00420 Statement of Bidder's Qualifications
00430 Schedule of Subcontractors
7/96 Section 00410 Page 1
SECTION 00410
BID BOND
KNOW ALL MEN BY THESE PRESENTS', th t the undereignnd
as Principal, and _ The_.Cincinnatfi1tisurance ompa* s surety, are
hereby !field and firmly bound unto the City of Fort Coll tns, Cg_� rado, as
OWNER, in the sum of 5 ***Five 5% per cent � amount �x forthe
payment of which, well and truly to be made, we hereby jointly and severally
bind ourselvee., successors, and assigns.
THE CONDITION of this obligation is such that whereas the Qrincipal has
submitted to the City of Fort Collins, Colorado the accompaa ying Bid and
hereby made a part hereof to enter into a Construction Agree =rent for the
Construction of Fort Collins Frojer_t, 5982 Substation big2htning Tower
Installation.
NOW THEREFORE,
(a) If said Bid shall be rejected, or
(b) If said Bid shall be accepted and the Principal shalt execute and deliver
a Contract in the: form of Contract attached hereto (properly completed in
accordance with said laid) and shall furnish a BOND for ibis faithful
performance of said Contract, and for payment of all persorzs performing
labor or furnishing materials in connection therewith, and Shall in all
other respects perform the Agreement craated by the acceptance of said
Bid, then this obligation shall be void; otherwise the same shall remain
in force and effect, it being expressly understood and agreed Lhat the
liability of the Surety for any and all claims hereunder shall, in no
event, exceed tie penal amount of this obligation as heroin sr tared.
The Surety, for value received, hereby stipulates and agrees a that the
obligations of said Surety and its BOND shall he in no way impaired or
affected by any extension of the time within which the OWNER may accept such
Bid; and said Surety does hereby waive notice of any such nxtensiorA .
surety Companies executing bonds must be ouLhorized to transact business in
the State of Colorado and be accepted by the OWNER.
7/96
Section 00410 Page 2
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands
and seals this _.thday of June _, 20Q6 and such of them as are
corporations have caused their corporate seals to be hereto atf lxed and these
presents to be signed by their proper officers, the day and yoar first set
forth abovo.
PRYNCXFAL BURSTS
Vame: Addison` Construction Co. The Cincinnati Insurance company
?address: 1526 Horse Creek Road
I/ CheChe enne WY 82009f Ivy:
Title:
ATTEST:
Dy
'
R 4i
wy
PO Box 145496
ncinna 45250
ZLefl
By, —
Title: At rney in fact
(SEAL)
7/96 Section 00410 Page 3
,006•x,.; ,,
3
eR
'x
THE CINCINNATI INSURANCE COMPANY
Fairfield, Ohio
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That THE CINCINNATI INSURANCE COMPANY, a corporation organized under the laws
of the State of Ohio, and having its principal office in the City of Fairfield, Ohio, does hereby constitute and appoint
Mark A. McCue; Gary Rosacker; Jay C. Huston and/or Deanne E. Gosda
Of Grand Island, Nebraska its true and lawful Attorney(s)-in-Fact to sign, execute,
seal, and deliver on its behalf as Surety, and as its act and deed, any and all bonds, policies, undertakings, or other like instruments,
as follows: Any such obligations in the United States, up to
Twenty Million and-No/100 Dollars ($20,000,000.00).
This appointment is made under and by authority of the following resolution passed by the Board of Directors of said Company
at a meeting held in the principal office of the Company, a quorum being present and voting, on the 6th day of December, 1958,
which resolution is still in effect:
"RESOLVED, that the President or any Vice President be hereby authorized, and empowered to appoint Attorneys -in -Fact of
the Company to execute any and all bonds, policies, undertakings, or other like instruments on behalf of the Corporation,
and may authorize any officer or any such Attorney -in -Fact to affix the corporate seal; and may with or without cause
modify or revoke any such appointment or authority. Any such writings so executed by such Attorneys -in -Fact shall be
binding upon the Company as if they had been duly executed and acknowledged by the regularly elected officers of the
Company."
"RESOLVED, that the signature of the President or a Vice President and the seal of the Company may be affixed by
facsimile on any power of attorney granted, and the signature of the Secretary and Treasurer and the seal of the Company
may be affixed by facsimile to any certificate of any such power of certificate bearing such facsimile signature and seal
shall be valid and binding on the Company. Any such power so executed and sealed shall, with respect to any bond or
undertaking to which it is attached, continue to be valid and binding on the Company."
IN WITNESS WHEREOF, THE CINCINNATI INSURANCE COMPANY has caused these presents to be sealed with its corporate
seal, duly attested by its Senior Vice President or Vice President this 16th day of August, 2004.
THE CINC ATI INSURAJNCE COMPANY
STATE OF OHIO ) as:
COUNTY OF BUTLER ) Th0 s H. Kelly
Vice President
On this 16th day of August, 2004 before me came the above -named Senior Vice President or
Vice President of THE CINCINNATI INSURANCE COMPANY, to me personally known to be the officer described herein; and
acknowledged that the seal affixed to the preceding instrument is the corporate seal of said Company and the corporate seal and the
signature of the officer were duly affixed and subscribed to said instrument by the authority and direction of said corporation.
JAMS METZ
Notary Public, Stale of Otllo
My Commission DOW 01-31-M
I the undersigned Secretary or Assistant Secretary of THE CINCINNATI INSURANC CO PANY, hereby certify that the above is
the Original Power of Attorney issued by said Company, and do hereby further certify that the said Power of Attorney is still in full
force and effect.
GIVEN under my hand and seal of said Company at Fairfield, Ohio. `
this day of
BN-1417 (3/03) d4id Hartkemeier
Assistant Secretary
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and
comprehensive. This statement must be notarized. If necessary, questions may
be answered on separate attached sheets. The Bidder may submit any additional
information he desires.
1. Name of Bidder: Addison Construction Co.
2. Permanent main office address: 1526 Horse Creek Rd., Cheyenne, WY 82009-9338
3. When organized: January 1. 1965
4. If a corporation, where incorporated: Wyoming
5. How many years have you been engaged in the contracting business
under your present firm or trade name? Forty one years
6. Contracts on hand: (Schedule these, showing the amount of each
contract and the appropriate anticipated dates of completion.)
7.
General character of Work performed by your company:
Construction of Electrical Substations
8. Have you ever failed to complete any Work awarded to you? NO
If so, where and why?
9M
Have your ever defaulted on a contract? NO
If so, where and why?
10. Are you debarred by any government agency? NO
If yes list agency name.
7/96
Section 00420 Page 1
11. List the more important projects recently completed by your company,
stating the approximate cost of each, and the month and year completed,
location and type of construction.
See attached list
12. List your major equipment available for this contract.
See attached list
13. Experience in construction Work similar in importance t o this
project:
me or
_Lightning Tower Insgtallationproject.
14. Background and experience of the principal members of your organization,
including officers:
See attached resumes for President Gary D. Bindert, Sec retary Treasurer
Toby J. Krug and Superintendents Mike Kaiser and Keith Steele.
15. Credit available: $ sae l ank Reference below
16. Bank reference: Rob Kilian 1st Interstate Bank, (401 W. 19th St.),
P.O. Box 1710, Cheyenne, WY 82003 Phone633-8400
17. Will you, upon request, fill out a detailed financial statement and
furnish any other information that may be required by the OWNER?
Yes
18. Are you licensed as a General CONTRACTOR? NZA
If yes, in what city, county and state? What
class, license and numbers?
19. Do you anticipate subcontracting Work under this
Contract? No
If yes, wha t percent of total contract?
and to whom?
20. Are any lawsuits pending against you or your firm at this time? NO
IF yes, DETAIL
7/96 Section 00 -420 Page 2