HomeMy WebLinkAboutRESPONSE - BID - 5982 SUBSTATION LIGHTNING TOWER (2)SECTION 00300 BID FORM PROJECT: 5982 Substation Tower Installation City of Fort Collins PURCHASING DIVISION 215 NORTH MASON STREET, 2= FLOOR, FORT COLLINS June 27, 2006 - 2:00 P.M. (OUR CLOCK) 1. In compliance with your Invitation to Bid dated 6 27 06 and subject to all conditions thereof, the undersigned a or oration Limited Li -ability Company, Partnership, Joint Venture, or Sole Proprietor) authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3. Accompanying this Bid is a certified or cashier's check r standard Bid bond in the sum of ***Five Percent of the Bid Amount*** - -_ ($_ ***5% of Bid Amount ) in accordance with the Invitation To Bid and Instructions to Bidders_ 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (1 5 ) calendar days from the date when the written notice of the award of t h e contract is delivered to him at the address given on this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the s ecified performance nd payment bonds is as follows: The Cincinnatti Insurance Gaompany 5. All the various phases of Work enumerated in the Contract Documents with their indi v idual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRAC TOR under one of the items listed in the Bid Schedule, irrespective of whether it i s named in said list. 6. Payment for Work performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the contract Documents. 7/96 Section 00300 Page 1 30�� �-7 91� 21. What are the limits of your public liability? DETAIL ;PP at achPd copy of CprtifiratP of 1iahi1ityy What company? 22. What are your company's bonding limitations? $20,000,000 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. Dated at ChEyinne, WY this 27th day of June 1 20_Q.(> Addison Constnirti on Cn Name of Bi e By* —o M11 AIM Title: Lois A. Blaser, Vice President State of Wyoming County of Laramie Lois A. Blaser being duly sworn deposes is Vise President of Addison Construction Co. and (name of organization) the answers to the foregoing questions and all statements are true and correct. Subscribed and sworn to before me this 27th day of June 2006. Notary Public Linda L. Wille My commission expires 7/96 March 14, 2009 and says that she that therein contained E:ED RY PUBLICTATE OFYONINGAR. 1/, 2009 Section 0CD420 Page 3 SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 15% of the contract. ITEM **NONE** SUBCONTRACTOR **NONE** 7/96 Section 00430 Page 1 ADDISON CONSTRUCTION COMPANY SI'BSTATIO\S-DISTRIBL'I�ION 1I.V. AND E.H.V. 1526 Horse Creek Road Chevenne. NVY 82009-9338 (307)638-1538 (307)778-851 VFAX e-mail: addison'd:millect.coil, CITY OF FORT COLLINS BID NUMBER 5982 SUBSTATION LIGHTNING TOWER INSTALLATION ATTACHMENTS Attachment 1: Projects Recently Completed Attachment 2: Major Equipment Available for Project Attachment 3: Resumes: Gary D. Bindert, President Toby J. Krug, Secretary Treasurer Michael M. Kaiser, Superintendent Keith E. Steele, Superintendent Attachment 4: Certificate of Liability ADDISON CONSTRUCTION COMPANY SUBST_,TIO\S-DISTRIBUTION H.V.:Atill E.H.V. 1526 Horse Creek Road Cheyenne, WY 82009-9338 (307)638-1538 (307)778-8513JFAX e-mail: addisonid.millect.com CITY OF FORT COLLINS BID NUMBER 5982 SUBSTATION LIGHTNING TOWER INSTALLATIONS RECENTLY COMPLETED PROJECTS PROJECT NAME APPROXIMATE AMOUNT DATE COMPLETE Winchester Substation $511941000 March-04 East Bismarck Substation $1X62000 May-04 Whiterock Substation, Stage 01 $13840,000 November-04 Playas Substation $913,000 March-05 Silver Saddle Substation $1;021,000 April-05 Test Strack Substation, Stage 01 $1,728,000 May-05 Casa Grande Substation, Stage 03 $59700 May-05 Ward Delivery Substation $2035000 November-05 Silver Saddle Switching Station $81300 March-06 Addison Equipment Rental Rates Unit Year Description Hour Day Month 523 1984 JOHN DEERE LOADER BACKJi0E 51�F555D $74.00 $594.00 N/A 524 1999 FORD TRACTOR LOADER BACKHO $74.00 $594.00 WA 525 1990 CASE BACKHOE 580K $74.OD $594.00 WA 912 1995 ELECTRIC PIPE BENDER ET-E-666TL $14.00 $106.00 N/A 572 2003 BOBCAT TRENCH COMPACTOR $20.00 $159.00 N/A 472 1994 INGERSOLL-RAND AIR COMPRESSOR $24.00 $191.00 N/A 473 1995 SULLIVAN AIR COMPRESSOR D210058 $22.00 $175.00 N/A 474 1990 GRIMMER SCHMIDT AIR COMPRESSOR 195 CFM DIE $25.00 $201.00 N/A 918 1989 GRIMMER SCHMIDT AIR COMPRESSOR $23.00 $186.00 N/A 919 1986 INGERSOLL-RAND AIR COMPRESSOR $23.00 $186.00 WA 140 1997 LINK -BELT ROUGH TERRAIN CRANE $175.00 $1400.00 NIA 543 1980 P & H OMEGA 18T CRANE $106.00 $848.00 WA 455 1982 NATIONAL656 CRANE W/FORD LN8000 (#131) $95.00 $763.00 WA 456 1992 MANITEX 30T W/FORD LNT8000 (#135) $138.00 $1102.00 N/A 133 2003 TEREX RS60100 CRANEW/FORD STERLING (#071) $138.00 $1102.00 N/A 142 2003 TEREX RS60100 CRANE W/FORD STERLING 7501 (#074) $138.00 $1102.00 NIA 462 1970 TEXOMA EARTH AUGER ON MACK MH613 (#003) $212.00 $1696.00 N/A 461 1983 TEXOMA 70D-60 EARTH AUGER ON KENWORTH (#125) $265.00 $2120.00 N/A 4W 2003 TEXOMA 650 EARTH AUGER ON STERLING ACTERRA (#073) $265.00 $2120.00 N/A 517 1998 BOBCAT EXCAVATOR 320 $24.00 $191.00 WA 519 1996 BOBCAT EXCAVATOR M320 $37.00 $292.00 N/A 522 2003 BOBCAT MINI -EXCAVATOR 322 W/BUCKET $24.00 $191.00 N/A 526 2003 BOBCAT MINI -EXCAVATOR, 322 $24.00 $191.00 N/A 530 1979 LULL FORKLIFT W/LOADER 844 $.52.00 $408.00 N/A 531 1984 LULL FORKLIFT 844TT $58.00 $466.00 N/A 532 1980 PETTIBONE FORKLIFT EXTENDO B-66 $45.00 $350.00 N/A 533 1%5 LULL FORKLIFT 844TT34 $58.00 $466.00 N/A 535 1955 LULL FORKLIFT 844 $58.00 $466.00 N/A 536 2000 LULL FORKLIFT 1044C-54 $69.00 $551.00 N/A 537 2003 JLG GRADALL FORKLIFT G9-43A $69.00 $551.00 N/A 190 1996 PJT GOOSENECK DUAL TANDEM TRAILER $27.00 $212.00 N/A 195 1995 24 FRONTIER GOOSENECK TRAILER $27.00 $212.00 N/A 197 1996 24' FRONTIER GOOSENECK TRAILER $27.00 $212.00 N/A 453 1968 ELLIOT ECE50 HIGH REACH 45' ON FORD LN8000 (#120) $74.00 $594.00 NIA llollflat..1mic 26, 2006 Page S c!F3 L%nit Year DescriptionHouir Dap Month 501 1997 NEW HOLLAND SKID LOADER LX865 $33.00 $250.00 N/A 504 19M NEW HOLLAND SKID LOADER LX865 $37.00 $292.00 N/A 505 1992 NEW HOLLAND SKID LOADER L785 $27.00 $212.00 N/A 506 2003 BOBCAT SKID LOADER W 74" BUCKET S250 $37.00 $292.00 N/A 507 2003 BOBCAT SKID STEER LOADER, S250 $37.00 $292.00 N/A 510 2000 BOBCAT LOADER 873H $37.00 $292.00 N/A 514 2003 BOBCAT SKIDSTEER LOADER S250 $37.00 $292.00 WA 518 1998 MELROE BOBCAT 873 $37•00 $292•00 N/A 921 1998 BOBCAT LOADER/TRENCHER LT204 $27.00 $212.00 N/A 143 2000 TEREX MANUFT TB60 $80.00 $636.00 WA 144 19W SIMON MANLIFT MP60 $5E3.00 $465.00 N/A 145 1992 SIMON MANLIFT AT40C $60.00 $551.00 N/A 146 1989 SIMON MANLIFTAT60C $60.00 $551.00 N/A 147 1997 SIMON MANLIFT AT60C $74.00 $594.00 N/A 148 1997 SIMON MANLIFT AT60C $74.00 $594.00 N/A 150 1996 GENIE MANLIFT S-80 W/80' BOOM $100.00 $848.00 N/A 161 2002 GENIE MANLIFT S-40 80.001 640.00 N/A 162 2004 SKYJACK MANUFT 25.29 60.00 480.00 N/A 163 1997 TEREX MANUFT TB60 (Diesel) $60.00 $480.00 N/A 164 1998 TEREX MANUFT TB60 (Gas) $60.00 $480.00 N/A 010 2002 GMC ENVOY $7.50 $58.00 $1261.00 011 2003 FORD F350 SUPER DUTY $10.00 $90.00 $1950.00 021 2002 FORD F150 SUPER CAB $10.00 $74.00 $1611.00 002 2003 FORD F350 CREW CAB -FLAT BED $12.00 $90.00 $1950.00 017 20M DODGE RAM 25M $10.00 $90.00 $100.00 020 2004 FORD F150 CREW CAB PICKUP $1CIA) $74.00 $1611.00 014 2002 GMC SI ERRA- ONE TON FLAT BED $10.00 $90.00 $1950.00 004 2003 DODGE 3500 $10.00 $90.00 $1950.00 016 2001 FORD F350-ONE TON FLAT BED $12.00 $90.00 $1950.00 006 2001 FORD F150 SUPER CAB $11 .00 $80.00 $1723.00 650 2001 DEUTSCH PIPE COMPRESSION UNIT & 2 HEADS $47.00 $371.00 N/A 910 1995 BROCK HYDRAULIC 100 TON PRESS $34.00 $265.00 N/A 911 1980 BROCK HYDRAULIC 100 TON PRESS $34.00 $265.00 N/A 176 1994 PULLER TENSIONER PT-2766-B-T $45.00 $350.00 N/A 053 1984 GMC VANDURA OIL VAN $90.00 $721.00 N/A 920 1960 TANKER $34.00 $265.00 N/A 160 1983 FRUEHAUF TOOL VAN N/A N/A $3530.00 - .11anday Ame 26, 20116 Page qf'3 Unit Year Description Nora r Da}' Month 159 1977 HOBBS 45' TRAILER WA WA $3530.00 193 1964 KENT TRAILER TOOL VAN WA N/A $3530.00 192 1993 FREUHAUF TRAILER STORAGE VAN WA N/A $3530.00 156 1984 MATLOCK TOOL VAN WA WA $3763.00 184 1976 21' DITCH WITCH TRENCHER TRAILER $27.00 $212.00 WA 191 2000 TRAVALONG GOOSENECK TRAILER $21.00 $159.00 WA 198 1998 26 BUCK HIGH DECK TRAILER $27.00 $212.00 N/A 199 1999 W JET C DROPDECK TRAILER $4200 $339.00 N/A 200 I W FONTAINE DROPDECK TRAILER $42.00 $339.00 N/A 202 1979 8 X 24 DESIGN SPACE OFFICE TRAILER $2.00 $17.00 $350.00 903 1987 23' DITCH WITCH TRENCHER TRAILER BWT14 $1 .4.00 $106.00 WA 905 1958 WIRE TRAILER $Z0.00 $159.00 N/A 511 1981 DITCH WITCH TRENCHER 6510 $5 5.00 $466.00 N/A 512 1998 DITCH WITCH TRENCHER 3500 $48.00 $382.00 N/A 513 1998 DITCH WITCH TRENCHER 3500 $48.00 $382.00 WA 515 1988 DITCH WITCH BASIC MODEL 4010 $58.00 $466.00 N/A 516 19931 DITCH WITCH TRENCHER 3500 $37.00 $292.00 N/A O50 1971 FORD F700 2T DUMP TRUCK $53.00 $424.00 N/A 115 2000 KENWORTH W900L SEMI -TRACTOR $69.00 $551.00 N/A 117 1997 KENWORTH W900L-SEMI TRACTOR $69.00 $551.00 WA 119 1987 INTER NATIONAL -SEMI TRACTOR $69.00 $551.00 WA 922 2000 POLARIS RANGER 6X6 A99RF50AA $Z0.00 $159.00 N/A 923 2006 BOBCAT 2200 4-WHEELER $2:0.00 $159.00 WA 924 2006 BOBCAT 2200 4-WHEELER $20.00 $159.00 N/A 151 1981 TRAILMOBILE VAN $7-4.00 $594.00 WA 158 1975 TRAILKAOBILE 46 STORAGE VAN N/A N/A $350.00 061 1999 STERLING WATER TRK, MODEL L7501 $1 �4.00 $110.00 $2332.00 621 1996 HOBART WELDER P216G $1 45.00 $127.00 WA 907 1999 MILLER WELDER 903.567 $1 95.00 $127.00 WA 908 1990 HOBART WELDER W/LEADS $1 6.00 $127.00 N/A 909 1991 MILLER WELDER W/LEADS 20OLE $1 45.00 $127.00 WA 914 1993 WELDER/PLASMA CUTTER PCXSOSS $2-0.00 $170.00 N/A 171 1981 MILLER WELDER TRAILER 55D (#405) $2-1.00 $159.OD WA .. •�#'-.'ur S +�'i4..: �u `. .a �h �S':::. �:6.�a..�� � .:. .«. w P.:...: .hnr �...". lam. �':t t R.v>:::. q. �.-.._ v .... 1lnridat..txrae <h. 1(t(lfe Pa,e 3 u 3 RESUME OF GARY D. BINDERT, President Gary D. Bindert began working for Addison Construction Co. in May 1971 on Job #17, the F.L. Blair Substation, Addison Construction CO.'s first million dollar job. Mr. Bindert is a native of South Dakota, and Substation was being built about four (4) miles from his home in Gary, South Dakota. Mr. Bindert steadily progressed from laborer and carpenter status to superintendent after having worked in the business for only two years. The first job performed under his supervision was Job #28 for the City of Loveland, Colorado. This was a $340,000.00 labor contract for a new substation and a switching station. Listed below are some of the major jobs he has supervised: Job #41 Sioux City Substation, Stage 09 New 345kV Substation with Extensive 230,161 and 69kV Modifications Sioux City, Iowa U. S. Bureau of Reclamation Job #45 Victory Hill Substation New 230/115kV Substation, Scottsbluff, Nebraska Nebraska Public Power District Job #50 Alpine Switching Station New 115kV Switching Station, Alpine, Wyoming Lower Valley Power & Light, Inc. Job #55 Stegall Substation New 345/230kV Substation, Stegall, Nebraska Basin Electric Power Cooperative This project was approximately 1'/z years in duration. Job #62 Hayden Substation, Stage 03 230kV Addition to Existing Substation, Hayden, Colorado Western Area Power Administration This work was performed in an energized station. Resume of Gary D. Bindert Page 2 Job #65 Ault Substation, Stage 03 345/230kv Substation Modifications, Ault, Colorado Western Area Power Administration This work was also done in an energized station. Following Job #65, Ault Substation, Stage 03, Mr. Bindert moved into the Cheyenne office to accept a managerial position in the fall of 1981. His experience in the field, doing all voltages from 12.47kV to 345kV has been of tremendous help to him iii his present position. His duties include estimating jobs, procurement of materials, making decisions regarding staffing of projects with both men and equipment, and regular visits to the projects in operation. Under his guidance, the company has enjoyed an excellent reputation and has been operated very efficiently. Additional information gladly will be furnished upon request. RESUME OF TOBY I KRUG Mr. Toby J. Krug has been employed by Addison Construction Co. since October of 1996. From 1977 through September 1996, Mr. Krug was a Civil Engineering Technician, Construction Division, Western Area Power Administration, Department of Energy, Loveland, Colorado, administering A/E and construction and supply contracts. Mr. Krug has extensive knowledge in contract administration, office engineering and field construction of high voltage transmission systems. He has proven ability to independently administer numerous concurrent contracts; anticipate and evaluate contract extra work items, provide punctual, accurate invoicing for fast turnaround of progress payments, and employ computerized tracking of required data submittals. 7. The undersigned Bidder hereby acknowledges 1 through 1 BID SCHEDULES receipt of Addenda No. BID SCHEDULE A - HARMONY SUBSTATION LIGHTNING FIST ITEM NO. DESCRIPTION EST.QTY UNIT UNIT PRICE TOTAL 1 Mobilization, Insurance, Bonds 1 LS $ 2,269 22269 2 3 Drilled pier excavation Spoil 1 1 LS LS 1,180 590 1 180 590 4 Concrete pier foundation 1 LS 4.571 4,571 5 Lightning mast materials 1 LS 10 030 10 030 6 Lightning mast installation 1 LS 2.950 2 950 7 Site restoration, Aggregate surface replacement, Final grading. 1 LS 11770 1,770 Subtotal Bid Schedule A 23.360 BID SCHEDULE B - OVERLAND TRAIL SUBSTATION LIGHTNING MAST ITEM NO. DESCRIPTION EST.QTY UNIT UNIT PRICE TOTAL 1 Mobilization, Insurance, Bonds 1 LS 2 269 21269 2 Drilled pier excavation 1 LS 1,180 1 180 3 Spoil 1 LS 590 590 4 Concrete pier foundation 1 LS 4.571 4,571 5 Lightning mast materials 1 LS 10,030 10 030 6 Lightning mast installation 1 LS 2,950 2 950 7 Site restoration, Aggregate surface replacement, Final grading. 1 LS 1,770 1 12770 Subtotal Bid Schedule B 1 23 360 BID SCHEDULE C - LINDEN SUBSTATION LIGHTNING MAST ITEM NO. DESCRIPTION EST.QTY UNIT UNIT PRICE TOTAL 1 Mobilization, Insurance, Bonds 1 Ls $ 2,269 $ 2,269 2 Excavat ion 1 LS $ $ 1,180 3 Spoil 1 LS $ 1 590 $ 590 4 Structural fill 1 LS $ 1.180 $ 1.180 5 Structure backfill 1 LS $ 2 950 $ 2 950 6 Concrete spread footing foundat ion 1 LS $ 59782 $ 5,782 7 Lightning mast materials 1 LS $ $ 101030 8 Lightning mast installation 1 LS $ 2 L250 j $ 2.95H 9 Site restoration, Aggregate 1 LS $ 1.7701 $ 1,770 7/96 Section 00300 Page 2 RESUME OF MICE AEL M. KAISER, Superintendent Mr. Michael Kaiser is returning to Addison Construction Co. after working for Reiman Corp., of Cheyenne, Wyoming, from June of 1993 through February of 2002. During that time Mr. Kaiser supervised bridge and highway construction projects. Mr. Kaiser was employed by Addison Construction from June 1981 through May 1993. His first project with Addison was the Leeds Substation Project in Devil's Lake, North Dakota. Below is a list of the projects on which he worked. He worked in the capacity of laborer, form setter, operator, electrician, lineman and foreman through June 1986. Job #64 Archer Substation, Stage 05 Substation Addition, Cheyenne, Wyoming Western Area Power Administration Job #67 Leeds Substation, Stage 04 Substation Addition, Devil's Lake, North Dakota Western Area Power Administration Job #71 Poudre Substation, Stage 04 Substation Addition, Fort Collins, Colorado Western Area Power Administration Job #72 Teckla Substation New 230/69 kV Substation, Wright, Wyoming Tri-County Electric Association Job #75 Dawson County Substation, Stage 04 Subsstation Addition, Glendive, Montana Western Area Power Administration Job # 78 Yellowtail Dam Bypass Switchyard, Glendive, Montana Bureau of Reclamation Job #79 Lanes Creek Substation New Substation, Near Alpine Junction, Wyoming Lower Valley Power & Light, Inc. Job #81 Thermopolis Substation, Stage 05 115 kV Addition, Thermopolis, Woming Western Area Power Administration Resume of Michael Kaiser Page 2 Job #83 Gila Substation, Stage 05A Substation Addition, Yuma, Arizona Western Area Power Administration Job #86 White Substation, Stage 01 New 345/115 kV Substation, Brookings, South Dakota Western Area Power Administration Job #88 Weleetka Substation Substation Modifications, Weleetka, Oklahoma Southwestern Power Administration Job #91 Rooks California Substation New Substation, Rangely, Colorado Moon Lake Electric Association Job #92 Wildhorse Substation 115/24.9 kV Substation, Oshkosh, Nebraska Wheat Belt Public Power District Job #112 Butterfield/ San Rafael Substations Two 230 kV Substations, Benson, Arizona Arizona Electric Power Cooperative Job #115 Springfield Main Bus 116 kV Substation, Springfield, Missouri Southwestern Power Administration In July 1986, Mr. Kaiser moved up to the position of supervisor. Following is a list of the projects he supervised for Addison Construction Co. through May 1993. Job #97 Clay Substation 161 kV Substation, Springfield, Missouri City Utilities of Springfield Job #101 Stegall Substation, Stage 04 230/115 kV Substation Addition, Stegall, Nebraska Western Area Power Administration Job #103 Warren Substation, Stage 01 115/13.8 Substation, Cheyenne, Wyoming Western Area Power Administration Resume of Michael Kaiser Page 3 Job #108 Oregon Basin Substation 230 kV Substation, Cody, Wyoming Pacific Power & Light Company Job #111 Russell Hunt Substation 69 kV Substation, Pryor, Oklahoma Grand River Dam Authority Job #120 Stockton Substation 161 kV Substation Addition, Stockton, Missouri KAMO Electric Cooperative, Inc. Job #130 Lost Hills Substation New Substation, Lost Hills, California Chevron Job #131 West/East/Harvard Substations New Substations, Loveland, Colorado Platte River Power Authority Job #134 Miracle Mile Substation New Substation, Alcova, Wyoming Western Area Power Administration Job #135 Waste Tech Services Substation New Substation, Kimball, Nebraska Rural Electric Company Job #146 Substations 1249 and 1281 New Substations, Omaha, Nebraska Omaha Public Power District Job #149 McGrew Substation, Stage 02 Substation Addition, McGrew, Nebraska Western Area Power Administration Job #150 Tupelo Line Bay Addtion Substation Addition, Tupelo, Oklahoma Southwestem Power Administration Job #152 Kennett Substation Transfer and Bus Tie Bay Addition Substation Addition, Kennett, Missouri Southwestern Power Administration Resume of Michael Kaiser Page 4 Job #156 Norton Substation 161/69 kV Substation, Springfield, Missouri City Utilities of Springfield Following is a list of projects Mr. Kaiser has supervised for Addison Construction Co. since his return in 2002. Job #269 Cherokee Substation 230/115kV Auto Transformer Replacement, Denver, Colorado Xcel Energy Services Job #278 Terry Street Substation, Stage 01 Foundation Removal, Longmont, Colorado Platte River Power Authority Job #279 Midway Substation Breaker Foundation Replacement, Fountain, Colorado Western Area Power Administration Job #280 Rinn Valley Substation Expansion 115kV Substation Addition, Firestone, Colorado United Power, Inc. Job #285 Lamar PSCo Switching Station New 230kV Switching Station, Lamar, CO Xcel Energy (Public Service of Colorado) Job #288 Boyd Substation Addition of I I5kV Breaker and Switch, Loveland, CO Platte River Power Authority Job #289 Teckla Substation 230kV Substation Addition, Wright, WY Powder River Energy Corporation Job 291 Whiterock Substation New 115kV Substation Western Area Power Administration, Loveland, CO Job #295A Dixon Creek Substation Metering Addition, Fort Collins, CO Platte River Power Authority Resume of Michael Kaiser Page 5 Job #29513 Longmont Substation Metering Addition, Longmont, CO Platte River Power Authority Job #295C Loveland West Substation Metering Addition, Loveland, CO Platte River Power Authority Job #305 Wray Substation, Stage 02 Additions to I I5kV Substation, Wray, CO Western Area Power Administration Job #309 Silver Saddle Substation New 230kV Substation, Commerce City, CO United Power, Inc. Job #310 Terry Street, Longmont Northwest and Fordham Additions Additions to Existing 1 lkV Substations, Longmont, CO Platte River Power Authority Job #318 Silver Saddle Substation Construct 230kV Three -breaker -ring Switching Station, Commerce City, CO Xcel Energy Service, Inc. Mr. Michael Kaiser has an excellent safety record. He has proven his capability to handle all phases of electrical substation construction. Additional information will be gladly furnished upon request. RESUME OF KEITH E. STEELE, Superintendent Mr. Keith Steele has had extensive experience as a superintendent, laborer, operator, lineman, foreman, and truck driver on both new substations and additions to substations ranging from 69 kV to 345 kV. PROFESSIONAL EXPERIENCE RICHARDS AND ASSOCIATES 1979-1982 Position Held: Laborer 1979 - Addition to Archer Substation, 345 kV, Cheyenne, WY 1980 - New 69 kV Substation, Oxford, Mississippi Position Held: Foreman 1980 - Addition and New 230 kV Substation, Brush, Colorado 1981 - New 69 kV Substation, Columbus, Mississippi Position Held: Operator 1981 - New 69 kV Substation, Monahan, Texas Position Held: Lineman 1982 - New 69 kV Substation, Sebastion, Florida CITY OF FC>RT MORGAN 1981 Position Helcl: Laborer 7200 and 12.4 Hot Line Work, Fort Morgan, Colorado SEAWARD CONSTRUCTION 1982-1983 Position Held : Lineman 1982 - New 115 kV Substation, Jacksonville, Florida 1983 - Two New 69 kV Substations, Kingsland, Georgia ADDISON CONSTRUCTION CO. 1983-1984 and 1987-PRESENT Resume of Keith Steele Page 2 Following are some of the projects Mr. Steele bas worked on for Addison Construction Co.: Job # 78 Yellowtail Dam Bypass 230-115 kV Addition, Yellowtail, Montana Bureau of Reclamation Job # 79 Lanes Creek Substation New Substation, Soda Springs, Idaho Lower Valley Power & Light, Inc. Job # 81 Thermopolis Substation, Stage 05 115 kV Addition, Thermopolis, Wyoming Western Area Power Administration Job # 83 Gila Substation, Stage 05 115 kV Addition, Yuma, Arizona Western Area Power Administration Job #103 Warren Substation, Stage 01 New 115 kV Substation, Cheyenne, Wyoming Western Area Power Administration Job #104 Huron Foundation Replacement 115 kV Addition, Huron, South Dakota Western Area Power Administration Job #111 Russell Hunt Substation New 69 kV Substation, Pryor, Oklahoma Grand River Dam Authority Job #121 Talty and Rose Hill Stations New 69 kV Substation, Terrell, Texas Kaufman County Electric Coop Job #132 Oregon Basin Addition 69 kV Addition, Cody, Wyoming Pacific Power & Light Co. Job #133 Locust Grove and Todds Tavern Addition & New 115 kV Substation, Fredericksburg, Virginia Rappahannock Electric Coop Resume of Keith Steele Page 3 Job #136 Roseville Substation, Stage 02 230 kV Addition, Roseville, California Western Area Power Administration Job #141 Ripple Substation New 69 kV Substation, Wellington, Colorado Poudre Valley REA Job #146 Substations 1249 and 1281 Two new 161 kV Substations, Omaha, Nebraska Omaha Public Power District Job #147 James River Power Station 161 kV Addition, Springfield, Missouri City Utility of Springfield Job #150 Tupelo Line Bay Addition 69 kV Addition, Tupelo, Oklahoma Southwestern Power Administration Job #224 Mosca Substation New 69 kV Substation, Mosca, Colorado Public Service Company of Colorado Job #233 Elsie, Red Willow Creek & Blackwood Creek Substations 115 kV Substations, Perkins County, Nebraska Midwest Electric Cooperative Job #238 Sioux City No. 2 Substation Stage 03 345 kV Substation Addition, Sioux City, Iowa Western Area Power Administration Job #239 Morris and Patton Substations 1 15/13.2 kV Substations, Scott City and Garden City, Kansas Wheatland Electric Cooperative, Inc. Job #251 Bivins/North Linden Substations 69/12.5kV Substation Additions, Linden, Texas Bowie -Cass Electric Cooperative, Inc. Job #256 Peeetz Substation 1 15kV Addition, Peetz Colorado Kcel Energy Services (Public Service of Colorado) Resume of Keith Steele Page 4 Job #259 Grenora Substation Building Service Building and Control Wiring, Grenora, North Dakota Upper Missouri G & T Elecrtric Cooperative Job #263 Estancia Substation New I I5kV Substation, Estancia, New Mexico Tri-State Generation & Transmission Association, Inc. Job #264 Teckla Substation Addition 69kV Addition, Wright, WY Powder River Energy Corporation Job #294 Winchester Substation New 345kV and 230kV Substations, Benson, Arizona Southwestern Transmission Cooperative, Inc. Job #314 Ward Delivery Substation Upgrade 230kV Substation, Bismarck, North Dakot Capital Electric Cooperative The following projects have been completed under Mr. Steele's supervision: Job #152 Kennett Substation Transformer and Bus Tie Bay Addition 161-69 kV Addition, Kennett, Missouri Southwestern Power Administration Job #158 Waste -Tech Substation, Phase I 34.5 kV Addition, Kimball, Nebraska Rural Electric Company Job #168 Akron Substation, Stage 02 115kV Addition, Akron, Colorado Western Area Power Administration Job #178 Fort Morgan North Substation 8z I I5kV Transmission Line, Fort Morgan, Colorado Morgan County Rural Electric Association Job #180 North Cody Substation, Stage 04 Addition to Existing Substation, Cody, Wyoming Western Area Power Administration Resume of Keith Steele Page 5 Job #181 Bridgeport Substation Modification to 12.47 kV Area, Bridgeport, Nebraska Western Area Power Administration Job #184 Stegall Substation Reactor Replacement, Scottsbluff, Nebraska western Area Power Administration Job #187 Dallas Creek Substation 115/25 kV Substation, Ridgeway, Colorado San Miguel Power Association, Inc. Job # 201 Substation No. 5 34.5/12.47 kV Substation, Torrrington, Wyoming Town of Torrington Job # 204 Ponnequin Substation 115 kV Substation, Weld County, Colorado Public Service Company of Colorado Job # 205 Black Canyon Switchyard Disconnect Switch Replacement, Gem County, Idaho Bureau of Reclamation Job # 212 115kV Capacitor Addition Projects Additions to Existing Substations, Larimer County, Colorado Platte River Power Authority Job # 213 Russellville and Elbert Substations 12.5kV/69kV Substations, Douglas and Elbert Counties, Colorado Mountain View Electric Association Job # 221 Harmony Substation 230 kV Additions, Fort Collins, Colorado Platte River Power Authority Job #258 Wable Rock and Norfork Substations 69kV Disconnect Switch Replacements, Branson, 1\4issouri, Norfork, Arkansas Southwestern Power Administration Job #270 Socorro Substation 1 15 kV Substation and Approach Spans, Socorro, New Mexico T'ri-State Generation and Transmission Association, Inc. surface replacement, Final grading. 1$289701 Subtotal Sid Schedule C 28,701 TOTAL PRICE (BID SCHEDULE A, B, AND C). **Seventy five thousand four lrmdred twenty one dollars** ($ 75 421 )• (Use Words) (Use Figures) 9. PRICES The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (25%) of the total Agreement Price. RESPECTFULLY SUBMITTED: Addison Construction Co. COMP Y O (/t 06/27/06 Signature Lois A. Blaser Date Vice President Title License Number (If Applicable) (Seal - if Bid 's by corpo tion) Attest ddr s X a 1 6 Horse Creek Road Cheyenne, WY 82009-9338 Telephone (307) 638-1538 State of Incorporation - Wyoming 7/96 Section 00300 Page Resume of Keith Steele Page 6 Job #274 Hernandez Substation Modification 69 & 115 kV Breaker Additions, Espanola, New Mexico Tri-State Generation and Transmission Association, hic. Job #282 San Luis Valley Substation Foundations Concrete Foundations for Transformer Addition, Alamosa, Colorado Xcel Energy Services Job #292 Poplar Bluff, Carthage, and Springfield Substations Install Replacement Disconnect Switches, Poplar Bluff, Carthage and Springfield, Missouri Southwestern Power Administration Job #300 Foidel Creek Switching Station 230kV Switching Station, Steamboat Springs, Colorado Xcel Energy Services Job #305 Wray Substation, Stage 02 Install Switches, Recolosers, and disconnect Switches, Wray, Colorado Western Area Power Administration Job #308 Playas Substation Addition of 115/69kV Transformer, Playas, New Mexico Tri-State Generation and Transmission Association, Inc. Job #312 Sam Rayburn Switching Station Replace cable at existing substation, Jasper, Texas Southwestern Power Administration Job #318 Silver Saddle Substation Construct 230kV Three -breaker -ring Switching Station, Commerce City, CO Xcel Energy Service, Inc. Mr. Steele is experienced in all phases of substation construction. Additional information will be gladly furnished upon request. WORD CERTIFICATE OF LIABILITY INSURANCE DATE IMWDDIYYYY) 9-13-05 NICER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION er Rosacker-McCue 3 Huston ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR W Koenig St ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Sox 1228 id blend NE 68802 INSURERS AFFORDING COVERAGE NAIC N RED Addison Construction Co. INSURER A: CNA Insurance 1526 Horse Creek Road INSURER B: Cheyenne INY 82009 IFRA(SF V E POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING IY REQUIREMENT, TERM OR CONDITION OF. ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR IY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH ILICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION LIMBS GENERAL LIABILITYI X COMMERCIAL GENERAL LIABILIT-Y CLAIMS MADE I`XJ OCCUR C207973684 � 10-1-05 10-1.06 EACH OCCURRENCE $ 1,000,000 PRE IMISPRIE&AGMIUMBIL— DAMAGE TO RENTED s 300 000 MED EXP Oft OM S 5,01111) PERSONAL a ADV INJURY S 1 000 o00 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG s 000 000 X POLICY PRO- F-1 LOC AUTOMOBILE X j X X LIABILITY . ANY AUTO ALL OWNED AUTOS I SCHEDULED AUTOS I HIRED AUTOS !NON -OWNED AUTOS I C2079736977 I 11a1-0s i 1a1.O6 COMBINED SINGLE LIMIT (Eeacdda'U S 1,000,000 BODILY INJURY (Per peredn) f BODILY INJURY (Per scadenn a I F--I I PROPERTY DAMAGE (Per accident) S GARAGE LIABILITY AUTO ONLY - EA ACCIDENT f OTHER THAN EA ACC AUTO ONLY: AGG S _ ANY AUTO i f EXCESSIUMBRELLA LIABILITY x OCCUR _ _ j CLAIMS MADE C2079736929 10-1-05 1a1.06 EACH OCCURRENCE S 5 O00 000 AGGREGATE f 5 1108 0w f 1 i f H— DEDUCTIBLE f x RETENTION f 10 OOO NORKERS COMPENSATION AND VVC STATLL X OTH MPLOYERV LIABILITY NY PROPRIETOWPARTNER/EXECUTNE FFK;ERIMEMBER EXCLUDED? WC27936882 10-1-05 10-1-06 E.L. EACH ACCIDENT f S00 000 E.L. DISEASE - EA EMPLOYEE f 5010 000 E.L. DISEASE - POLICY LIMIT f 500 000 THER Installation Floater $5,000,000 ontractors Equipment C2079736848 110-1-05 i 10.1-06 I Leased/Rented Equip $150,000 $2 500 deductible MON OF OPERATIONS / LOCATIONS I VEHICLES / EXCLUSIONS ADDED BY ENDORSEMENT / SPECIAL PROVISIONS FICATE HOLDER SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, SUr FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR AUTHORIZED REPRESENTATIVE CORPORATION .� s6 �a a� ti d �a• y >a Y ADDISON CONSTRUCTION CO. 1526 HORSE CREEK ROAD CHEYENNE, WY 82009-9338 (307) 638-1538 TO;CITY OF FORT COLLINS PURCHASING DIVISION 215 N. MASON ST., 2ND FLOOR FORT COLLINS, CO 80524 NCLOSED Lightning Tower tallation imber:5982 SECTION 00400 SUPPLEMENTS TO BID FORMS 00410 Bid Bond 00420 Statement of Bidder's Qualifications 00430 Schedule of Subcontractors 7/96 Section 00410 Page 1 SECTION 00410 BID BOND KNOW ALL MEN BY THESE PRESENTS', th t the undereignnd as Principal, and _ The_.Cincinnatfi1tisurance ompa* s surety, are hereby !field and firmly bound unto the City of Fort Coll tns, Cg_� rado, as OWNER, in the sum of 5 ***Five 5% per cent � amount �x forthe payment of which, well and truly to be made, we hereby jointly and severally bind ourselvee., successors, and assigns. THE CONDITION of this obligation is such that whereas the Qrincipal has submitted to the City of Fort Collins, Colorado the accompaa ying Bid and hereby made a part hereof to enter into a Construction Agree =rent for the Construction of Fort Collins Frojer_t, 5982 Substation big2htning Tower Installation. NOW THEREFORE, (a) If said Bid shall be rejected, or (b) If said Bid shall be accepted and the Principal shalt execute and deliver a Contract in the: form of Contract attached hereto (properly completed in accordance with said laid) and shall furnish a BOND for ibis faithful performance of said Contract, and for payment of all persorzs performing labor or furnishing materials in connection therewith, and Shall in all other respects perform the Agreement craated by the acceptance of said Bid, then this obligation shall be void; otherwise the same shall remain in force and effect, it being expressly understood and agreed Lhat the liability of the Surety for any and all claims hereunder shall, in no event, exceed tie penal amount of this obligation as heroin sr tared. The Surety, for value received, hereby stipulates and agrees a that the obligations of said Surety and its BOND shall he in no way impaired or affected by any extension of the time within which the OWNER may accept such Bid; and said Surety does hereby waive notice of any such nxtensiorA . surety Companies executing bonds must be ouLhorized to transact business in the State of Colorado and be accepted by the OWNER. 7/96 Section 00410 Page 2 IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals this _.thday of June _, 20Q6 and such of them as are corporations have caused their corporate seals to be hereto atf lxed and these presents to be signed by their proper officers, the day and yoar first set forth abovo. PRYNCXFAL BURSTS Vame: Addison` Construction Co. The Cincinnati Insurance company ?address: 1526 Horse Creek Road I/ CheChe enne WY 82009f Ivy: Title: ATTEST: Dy ' R 4i wy PO Box 145496 ncinna 45250 ZLefl By, — Title: At rney in fact (SEAL) 7/96 Section 00410 Page 3 ,006•x,.; ,, 3 eR 'x THE CINCINNATI INSURANCE COMPANY Fairfield, Ohio POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That THE CINCINNATI INSURANCE COMPANY, a corporation organized under the laws of the State of Ohio, and having its principal office in the City of Fairfield, Ohio, does hereby constitute and appoint Mark A. McCue; Gary Rosacker; Jay C. Huston and/or Deanne E. Gosda Of Grand Island, Nebraska its true and lawful Attorney(s)-in-Fact to sign, execute, seal, and deliver on its behalf as Surety, and as its act and deed, any and all bonds, policies, undertakings, or other like instruments, as follows: Any such obligations in the United States, up to Twenty Million and-No/100 Dollars ($20,000,000.00). This appointment is made under and by authority of the following resolution passed by the Board of Directors of said Company at a meeting held in the principal office of the Company, a quorum being present and voting, on the 6th day of December, 1958, which resolution is still in effect: "RESOLVED, that the President or any Vice President be hereby authorized, and empowered to appoint Attorneys -in -Fact of the Company to execute any and all bonds, policies, undertakings, or other like instruments on behalf of the Corporation, and may authorize any officer or any such Attorney -in -Fact to affix the corporate seal; and may with or without cause modify or revoke any such appointment or authority. Any such writings so executed by such Attorneys -in -Fact shall be binding upon the Company as if they had been duly executed and acknowledged by the regularly elected officers of the Company." "RESOLVED, that the signature of the President or a Vice President and the seal of the Company may be affixed by facsimile on any power of attorney granted, and the signature of the Secretary and Treasurer and the seal of the Company may be affixed by facsimile to any certificate of any such power of certificate bearing such facsimile signature and seal shall be valid and binding on the Company. Any such power so executed and sealed shall, with respect to any bond or undertaking to which it is attached, continue to be valid and binding on the Company." IN WITNESS WHEREOF, THE CINCINNATI INSURANCE COMPANY has caused these presents to be sealed with its corporate seal, duly attested by its Senior Vice President or Vice President this 16th day of August, 2004. THE CINC ATI INSURAJNCE COMPANY STATE OF OHIO ) as: COUNTY OF BUTLER ) Th0 s H. Kelly Vice President On this 16th day of August, 2004 before me came the above -named Senior Vice President or Vice President of THE CINCINNATI INSURANCE COMPANY, to me personally known to be the officer described herein; and acknowledged that the seal affixed to the preceding instrument is the corporate seal of said Company and the corporate seal and the signature of the officer were duly affixed and subscribed to said instrument by the authority and direction of said corporation. JAMS METZ Notary Public, Stale of Otllo My Commission DOW 01-31-M I the undersigned Secretary or Assistant Secretary of THE CINCINNATI INSURANC CO PANY, hereby certify that the above is the Original Power of Attorney issued by said Company, and do hereby further certify that the said Power of Attorney is still in full force and effect. GIVEN under my hand and seal of said Company at Fairfield, Ohio. ` this day of BN-1417 (3/03) d4id Hartkemeier Assistant Secretary SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: Addison Construction Co. 2. Permanent main office address: 1526 Horse Creek Rd., Cheyenne, WY 82009-9338 3. When organized: January 1. 1965 4. If a corporation, where incorporated: Wyoming 5. How many years have you been engaged in the contracting business under your present firm or trade name? Forty one years 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) 7. General character of Work performed by your company: Construction of Electrical Substations 8. Have you ever failed to complete any Work awarded to you? NO If so, where and why? 9M Have your ever defaulted on a contract? NO If so, where and why? 10. Are you debarred by any government agency? NO If yes list agency name. 7/96 Section 00420 Page 1 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. See attached list 12. List your major equipment available for this contract. See attached list 13. Experience in construction Work similar in importance t o this project: me or _Lightning Tower Insgtallationproject. 14. Background and experience of the principal members of your organization, including officers: See attached resumes for President Gary D. Bindert, Sec retary Treasurer Toby J. Krug and Superintendents Mike Kaiser and Keith Steele. 15. Credit available: $ sae l ank Reference below 16. Bank reference: Rob Kilian 1st Interstate Bank, (401 W. 19th St.), P.O. Box 1710, Cheyenne, WY 82003 Phone633-8400 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? Yes 18. Are you licensed as a General CONTRACTOR? NZA If yes, in what city, county and state? What class, license and numbers? 19. Do you anticipate subcontracting Work under this Contract? No If yes, wha t percent of total contract? and to whom? 20. Are any lawsuits pending against you or your firm at this time? NO IF yes, DETAIL 7/96 Section 00 -420 Page 2