Loading...
HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 27143JUL-21-2006 FRI 09:15 AM CFO EKG, FAX N0, 9702216378 F. 02 Change Order Form PROJECT TITLE; 2006 Street Maintenance Program PROJECT NUMBER: 320200 (Concrete Project- Bid #5847) CONTRACTOR: ' Vogel Concrete (PO #6601601) CHANGE ORDER NUMBER: 1 n preparing'change orders show to order as separate numbered paragrapAS the TD110Wing 1. Reason for change. 2. Description of chango. 3. Change in contract cost, 4. Change in contract time. 1,92. See attached invoice for details 3, The contract cost will increase by $5,678.88 4. Three (3) days will be added to the contract time. ORIGINAL CONTRACT COST $1,491,976.37 TOTAL APPROVED CHANGE ORDERS $0,00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $5,078.B8 TOTAL. % OF THIS CHANGE ORDER 0.38% TOTAL 0,0. % OF ORIGINAL CONTRACT 0.38% ADJUSTED CONTRACT COST $1,497,655.25 ACCEPTED BY: �Gl,ljDATE:l (Contractor's Representativ REVIEWED BY: APPROVED BY: - C (Project APPROVED BY: �� APPROVED BY: . APPROVED BY: co: purchasing Actnimting Contractor rrgjbGt File (Project Manager Capital Projects) DATE: - ��. DATE: _ DATE: -7 DATE: (Department Head) (Purchasing Agent over $30,000) DATE: SL MaiN. $d,820,31 Capital Projects SS52.$7 3UL-21-2006 FRI 09:16 AM CFO ENG. FAX NO. 9702216378 P. 03 Change Order No.: 1 Date: 7/19/2006 2006 Concrete Project Vogel Concrete Bid No. 5847 1. Reason For Change: a. An unique sidewalk chase and pipe connection was necessary to facilitate proper drainage the southeast comer of Mason & Laurel, b. There Is n0 line item for rosetting existing povors, c. The planting bed at Lee's Cyclerywaa redesigned after forms were set at the direction of the City. d. Sprinkler modification was necessary related to new concrete installations and repairs. Additional concrete work was necessary related to the Arthur Ditch pro)ett. - C "b t9-L 2. Description Of Change: a. Pay for additional work at tlme and materials rated. b. Pay to reset existing pavers adjacent to City concrete repairs at [role and materials rates. c. Pay for labor necessary to reset the forms at Lee's Cyclery at time and materials rates. d_ Pay for labor necessary to repair sprinklers at time and materials rates. o. Pay for additional work at time and materials rates. 3. Change In Contract Amount: Itom Qty Unit Unit Cost Total Cost a. Southeast Corner of Mason & Laurel - Sidewalk Chase Construction Fiowfill-around pipe 8 CY $ 58,00 $ 464.00 Flowfill Labor 2 HR $ 40.00 $ 80.00 Pipe Fittings 1 LS $ 60,50 $ 60,50 Pipe Labor 16 HR $ 40,00 S 720.00 #5 Rebar 8 EA $ 9.50 $ 76.00 Rebar Labor 4 HR $ 40,00 $ 160.00 $ 1.560.50 b. 112 West Laurel 100 1.0 Sand 1 LS $ 8.40 $ 8.40 Labor 5 HR $ 40.00 $ 200.00 412 West Laurel 60 LB Sand 1 LS $ 3.00 $ 3.00 Labor 2.5 HR $ 40.00 $ 100.00 c. Lee's Cyclery - Ramp Redesign Labor d. Irrigation Labor & Materials 100-200 Block - South Side 6/14 Labor BH 4 Materials 619 Labor 6/6 Labor 618 Materials W Materials 617 Labor Laurel & Mason 616 Labor 617 Labor Mason to Howes 6/5 Materials 615 Labor 6/2 Materials 612 Labor 5/31 Materials ' 5/31 Labor $ 311.40 12 HR $ 50.00 $ 600.00 0.5 HR $ 48.00 $ 456.00 1 L5 $ 46.91 $ 46.91 7.75 HR S 48.00 $ 372.00 5 HR $ 48.00 $ 240.00 1 LS $ 5.14 $ 5.14 1 $ 132,71 $ 132,71 9 $ *,W $ 432.00 8 HR $ 46.00 $ 384.00 1 HR $ 48.00 $ 40,00 1 LS $ 96.17 $ 96.17 6.75 HR $ 48,00 $ 324,00 1 LS $ 89,65 $ 89.65 6 HR $ 4840 $ 288.00 1 LS $ 100.40 $ 100.40 4 FIR $ 48.00 $ 192.00 H:\p,rn.plPROJECTS\2006\Concrete\06 Monthly Pay Estimate $ 3,206.98 1 of 2 JUL-21-2006 FRI 09:16 AM CFO ENG, FAX N0, 9702216378 P• 04 2006 Concrete Project Vogel Concrete Bid No. 5847 e, Laurel & Meldrum -Arthur Ditch Project 608.29 6" Flatwork - Romove & Replace 110.5 S.F. $ 6.00 $ 663.00 Materials 1 LS $ 69.57 $ 69.$7 Labor 3 HR $ 40.00 $ 120.00 $ 52-57 TOTAL CHANGE IN CONTRACT AMOUNT $ 5,678-38 Street Maintenance $ 4,826,31 Capital Projects $ 852.57 4. Change In Contract Time $ 5,678.68 a. Three days are added to the contract, b. There is no change in contract time. c. There Is no change in contract time. d. There is no change in contract time. e. There is no change in contract time. TOTAL CHANGE IN CONTRACT TIMF, 3 pays H:\p.m.p1PROJECTS\2006\Concrete\06 Monthly Pay Estimate 2 of 2