HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 27145JUL-21-2006 FRI 09i16 AM CFO ENG, FAX N0, 970221637B P. 05 '0P i., Change Order Form Eayieeadng Department PROJECT TITLE: Timberline Rd. Widening Project PROJECT NUMBER; 30623270.6 (bid #5954) CONTRACTOR'. Connell Resources, Ina (PO #6601742) CHANGE ORDER NUMBER: 4 n preparing cnango orders snow in Order a5 separate numpered paragrapns the tollowing: 1. Reasonfor change. 2. Description of change, 3. Change in contract cost. 4, Change in contract time. 1 &2. Soe attached sheet for detail, 3. The contract cost will increase by $6,233,00 4. There will be no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C,p. "A OF ORIGINAL, CONTRACT ADJUSTED CONTRACT COST (A.vsuming all change orders approved) ACCEPTED BY: ACCEPTED BY: REVIEWED BY: APPROVED BY: 0.12Y 1.919e $5,277,645,27 694,887ZO $0.00 $8,233.00 $5,9i9,565.B7 DATE; '] )ATE: 7 17 QG —,/J<r t -1 L� ATE: (Engineer) fJ DATE 7 r' apartment a det) APPROVED BY: _ _ DATE: (Purchasing Agent over $30.000) cc. contractor Purchasnp Project Ric JUL-21-2006 FRI 09:16 AM CFO ENG, FAX NO, 9702216378 P. 06 CHANGE ORDER NO.4 TIMBPRLINE ROAD WIDENING PROJECT • INTERM SUMMARY OF WORK Connell Resources Inc. Surveying Additions to the project Additional Concrete See attached submittal Item esign Change Unit 1 $1 Unit 1 Total connen rcasouross Inc. twamonai surveying i IS 2,127.50$ 2127.50 TOTAL _ $ 0!233.00 REASON FOR CHANGE Mix Design change on Concrete to a heavier strength Surveyors had to restake several areas for traffic pole locations, Electric. WHEN PORTED Posted to Pay Estimate No.4