Loading...
HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 27146JUL-21-2006 FRI 09:17 AM CFO ENG, FAX NO. 9702216378 P. 07 iiLy arartcomm &agintrring Department Change Order Form PROJECT TITLE: E. Prospect Rd. Improvements PROJECT NUMBER: 30521700.6 (Bic #5958) CONTRACTOR, DO n Construction, Inc. (PO #0601846 CHANGE ORDER NUMBER: 1 n Reeanna c atii nae ar ecerrs Ph in order as seeara a numbered Daraorac ii s`fhe lollowina: 1. Reason for change. 2. Description of change. 3• Change in contract cost. 4. Change in contract time. 1&2. See attached Sheet for detail. 3. The contract cost will Increase by $19,72430 4. There will be no than a in con ct time._ ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C,O, % OF ORIGINAL CONTRACT ADJUSTED'CONTRACTCOST (Assuming all change orders approved) $3,757,638.35 $19,724.50 0.52% 0.52% $3,777,262.85 ACCEPTED BY: DATE: (Contractor's Representati ACCEPTED BY: . y d DATE: ^ ! L-/ (Project Managerl l f 1 REVIEWED BY: DATE: (E ginear) APPROVED BY: DATE: { �! I ( apartment Head) D APPROVED BY: _ DATE: (Purchasing Agent over $30,000) cc: Conlractor PurOo4og Prajact Filc I_ er^ I - Rern DasuiPlian I Unk ' OuUnfuy + Untf Price (S). 1 Ram Price �57 1 Ouanthy J a nourR (sl I OIY j A�rzaunt �i� CHANGE ORDER NO. T GD-DOi IREMOVE TREES EACH 37.M S2'0 Q7 5250.00 53 $ 13,250.OD 16 S 4,000.00 CO-002 RIPRAP (SPECAU 12-INCH CY 73dA] MIX) 585.00 867 S 73.696,03 129 $ 10,965.OD CO-003 R EMOVE XC EL GAS LINE(6-STEELS LS 0 S - S1,347.50 i S 1,347.50 1 S 1,347.50 C0-004 INSTALL RESTRAINT ON HDPE FORCE MKIN (AS) EACH 0 $ - ST,705.00 2 5 3A72.00 2 $ 3.412 ED CO-005 ADAPTER FROM 14- PVC TO 16' WIDE F0RCE MAIN (AB) EACH 0 $ $2.088.00 2 $ 4,176.00 2 5 4,176.00 C0-006 14`1f.25 BEND LL'lSAEGALUNGS (AB) EACH 0 $1.20400 1 $ 1,204.00 1 $ 1.204.00 CQ-0037 1E--INCH HDPE. DR 11. SO DEGREE ELBOW (EACH) EACH 1 5 1,T00.00 $1,100.CA 2 S 2,200.00 1 $ 1, 100.00 S T9,724.50 c r I ry I CD O CD rn -r1 —o 8