HomeMy WebLinkAboutCHANGE ORDER - BID - 2005 STREET MAINTENANCE PROGRAMChange Order Form Engineering Department PROJECT TITLE: 2005 Street Maintenance Program PROJECT NUMBER: 320200 (Bid #5839) CONTRACTOR: Lafarge Northern, Inc. (PO #6602526) CHANGE ORDER NUMBER: 1 n preparing cnange oraers snow in oraer as separate numoerea paragraphs the toilowing 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 18,2. See attached sheet for detail. 3. The contract cost will increase by $ 46,535.59 4. There will be no change in contract time. ORIGINAL CONTRACT COST $2,810.339.30 TOTAL APPROVED CHANGE ORDERS $0.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $46,535.59 TOTAL % OF THIS CHANGE ORDER 1.66% TOTAL C.O. % OF ORIGINAL CONTRACT 1.66% ADJUSTED CONTRACT COST $2,856,874.89 (Assuming all change orders approved) ACCEPTED BY: APPROVED BY: APPROVED BY: APPROVED BY: APPROVED BY: - cc: Purchasing Accounting Contractor Project File DATE: y_ /&� )ATE: DATE: 7- Io -Lx DATE: 7" (U - 0 G DATE: L /I $41,914.14 Ped Planning $1,390.90 Street Maint. $3,230.55 Ped Access Engineering Department • 281 North College Avenue • P.O. Boa 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 City of Fort Collins 2006 Asphalt Overlay Project Lafarge North America - Bid No. 5839 Change Order No.: 1 Date: 07/05/2006 1 Reason For Change: a. Patching for 2005 Pedestrian Access work is added to this contract b. Construction of asphalt sidewalk on Lemay, Vine to Lincoln, is added to this contract c. Additional patching was necessary for a bike lane transition to the trail at Cathy Fromme 2 Description Of Change: a. Pay lump sum for asphalt patching b. Pay lump sum for asphalt sidewalk c. Pay lump sum for additional asphalt patching not included in the original contract 3 Change In Contract Amount Riverside - Olive to Smith (Ped Planning) Unit Quantity Unit Price Total Cost Ped Plan 403.50 Patching TON 9.51 $ 83.35 $ 792.66 614.07 Size A Sign with Stand DAY/EA 7.0 $ 1.22 $ 8.54 614.11 Cone with Reflective Strip DAY/EA 20.0 $ 0.60 $ 12.00 614.17 Traffic Control Supervisor HR 1.0 $ 29.80 $ 29.80 614.18 Flagging HR 4.0 $ 20.62 $ 82.48 $ 925.48 Asphalt Patching 1408 1409 1650 Holly Horsetooth & 600 Stuart & 2518 (Ped Access &Street Maintenance) TON Packwood Laporte Way Automation Larkbunting Corriedale Newport Total Units Unit Cost Total Cost Drive Drive 403.50 Patching DAY/EA 19.39 7.48 2.15 5.70 1.60 4.35 3.95 44.62 $ 83.35 $ 3,719.08 614.01 "NO PARKING' Sign with Stand DAY/EA 2.0 8.0 3.0 6.0 2.0 21.00 $ 1.52 $ 31.92 614.04 Type I Barricade Without Light DAY/EA 2.0 4.0 6.0 2.0 14.00 $ 0.60 614.07 Size A Sign with Stand DAY/EA 4.0 4.0 2.0 7.0 6.0 12.0 2.0 37.00 $ 1.22 $ 45.14 614.08 Size B Sign with Stand DAY/EA 2.0 2.00 $ 1.52 614.11 Cone with Reflective Strip HR 6.0 10.0 8.0 25.0 10.0 8.0 4.0 71.00 $ 0.60 $ 42.60 614.17 Traffic Control Supervisor HR 1.0 4.0 2.0 5.0 2.0 4.0 1.0 19.00 $ 29.80 $ 566.20 614.18 Flagging 2.5 2.5 2.5 3.0 10.50 $ 20.62 $ 216.51 $ 4,621.45 Page I of 2 City of Fort Collins 2006 Asphalt Overlay Project Lafarge North America -Bid No. 5839 Change Order No.: 1 Date: 07/05/2006 b. Lemay Sidewalk -Vine to Lincoln (Ped Planning) City Unit Unit Cost Total Cost Time & Materials: Pipe and ditch work, fence removal. See attached Extra Work Sheet. 1 LS $ 9,007.11 $ 9,007.11 203.11 Excavation - General Over 100 cy. 211 C.Y. $ 20.04 $ 4,228.44 203.32 Haul & Replace Recycled Asphalt 28.3 TON $ 8.59 $ 243.10 203.33 Shouldering 4064 L.F. $ 0.54 $ 2,194.56 Material Cost - Road Base 28.3 TON $ 6.00 $ 169.80 403.15 HBP - Grading SX 409.5 TON $ 53.80 $ 22,031.10 614.02 Vertical Panel Without Light 36 DAY/FA $ 0.60 $ 21.60 614.07 Size A Sign with Stand 47 DAY/EA $ 1.22 $ 57.34 614.11 Cone with Reflective Strip 121 DAY/EA $ 0.60 $ 72.60 614.17 Traffic Control Supervisor 14.5 HR $ 29.80 $ 432.10 614.18 Flagging 8 HR $ 20.62 $ 164.96 $ 38,622.71 c. Taft Hill Trail Connection (Ped Plannin 403.50 Patching 27.00 TON $ 83.35 $ 2,250.45 Soil Sterilization 1.00 LS $ 115.50 _$ 115.50 $ 2,365.95 TOTAL CHANGE IN CONTRACT AMOUNT $ 46,535.59 Pedestrian Planning $ 41,914.14 Street Maintenance $ 1,390.90 Ped Access $ 3,230.55 $ 46,535.59 4 Change In Contract Time a. No time will be added or charged for this work b. No time will be added or charged for this work c. No time will be added or charged for this work TOTAL CHANGE IN CONTRACT TIME 0 days Page 2 of 2