CKANGN ORDER NO. #6
PROJECT TITLE: SPRING CANYON COMMUNITY PARK
CONTRACTOR: rcl
PROJECT NUMBER: 5952
PVRCHA8E ORDER NO,: 6611171T4
DESCRIPTION: Uownsize Inline 6o Junior size
1. Reason for change: value englneering of Inlina rink
2. OescripBen of Change: reduce rink. add add'h9cnal carrrt fe walk_ rwmrnra 73 H of 12"tI P
delete shrubs, mulch, fabric and drip stem, add aged,
CRO
3, Change in Contract Cost (M,397.61 )
A. Change In Gbntraet Time: O days
TOTAL, APPROVED CHANGE ORDER
TOTAL PENDING CHANGE ORDER
TOTAL IM CHANGE ORDER
TOTAL % OF ORIGINAL GONTRA[:T THis o.o.
TOTAL % OF ORIGINAL CONTRACT, ALL 0.0.19
ADJUSTED CONTRACT COST
ACCEPTOb &Y:
Contractor's Roo
ACCVT6D W.
Protect Manager
REVIEWED IM
Me:
APPROVE.]r BY:
Tice:
APPROVED RY:
Purohasing Aaent over MAO
ee; Cat Clark Archhad
Contactor Engineer
Prolect Flip Purchasing
sae 38T.61
.0.
1 #
DATE:
DATE1001--4* ^_
DATE:
BATS:
DATE
06/26/2006 MON 12:25 FAX 970 221 6586 CITY OF FT COLLINS CLRS
06/21/2006 11:33 9706696411
ECI
0 002/002
PAGE 02/02
Initiation Date: 51n/20%
CHANGE IN WORK RIQUES1''Al6r (Revised)
Project: Spring Canyon Community Park
Owner: City of Fort Collins Parks & Recreation
To: Ted Johnson, ECI
Requested by: Russell lee
Authorized by:
please tunish Change in conum sutn for the cbmMe iA work descn"bed below. Do not order material or And any work until
approval is received. Every e, ffmi will be made to incorporate this change into the work without effecting the Contract data
$ (17,540,60)
$ 165.20
$ (2,144.01)
5 -
$ (2,756,00)
$ (31060.00)
$ (180.00)
$ 117.80
TOTAL, $ (25,397AI)
xca aahnsoe. Eci , agrees to change the work deco far the change i1D Rce shown below. I have
attached a breakdown wh iah lists all coos of labor, materials, taxes, overhead, profit, and all other changes and/or charges
involved. Signature of the Contractor indicetes his agreement herewith, including any 4 astomd In the Contract Soto or Contract
Time.
The Contract Time will be by Days.
No change In Contract SUM Onffial if no change)
ADD to the Contrast Sum S
ABDUCT ti om the Cotttraet 5um $ (25,397.61)
This ittfnrmation shall be valid for thirty (30)
CONTMCTOWS
APPROVED BY OWNER:
days from the date of signature below.
to
DATE: G
DATU:
,Accepted chwW a in work request will be included in a jkwa formal change order. DO NOT bill far this change mail a formal
change order has been executes' by all parties. Acceptance is direction to proceed with the work deteribed herein. Nol valid
unkms signed by the owner and the Contractor.