Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 5952 SPRING CANYON COMMUNITY PARK (19)06/26/2006 MON 12:25 FAX 970 221 6586 CITY OF FT COLLINS CLRS 1@001/002 06/22/2006 13:59 5709696411 ECI PAGE 02/03 00/21/2008.MM 13:30 FA% M 221 6500 CITY OF PT COLLINS CLR9 (M 0021003 CKANGN ORDER NO. #6 PROJECT TITLE: SPRING CANYON COMMUNITY PARK CONTRACTOR: rcl PROJECT NUMBER: 5952 PVRCHA8E ORDER NO,: 6611171T4 DESCRIPTION: Uownsize Inline 6o Junior size 1. Reason for change: value englneering of Inlina rink 2. OescripBen of Change: reduce rink. add add'h9cnal carrrt fe walk_ rwmrnra 73 H of 12"tI P delete shrubs, mulch, fabric and drip stem, add aged, CRO 3, Change in Contract Cost (M,397.61 ) A. Change In Gbntraet Time: O days TOTAL, APPROVED CHANGE ORDER TOTAL PENDING CHANGE ORDER TOTAL IM CHANGE ORDER TOTAL % OF ORIGINAL GONTRA[:T THis o.o. TOTAL % OF ORIGINAL CONTRACT, ALL 0.0.19 ADJUSTED CONTRACT COST ACCEPTOb &Y: Contractor's Roo ACCVT6D W. Protect Manager REVIEWED IM Me: APPROVE.]r BY: Tice: APPROVED RY: Purohasing Aaent over MAO ee; Cat Clark Archhad Contactor Engineer Prolect Flip Purchasing sae 38T.61 .0. 1 # DATE: DATE1001--4* ^_ DATE: BATS: DATE 06/26/2006 MON 12:25 FAX 970 221 6586 CITY OF FT COLLINS CLRS 06/21/2006 11:33 9706696411 ECI 0 002/002 PAGE 02/02 Initiation Date: 51n/20% CHANGE IN WORK RIQUES1''Al6r (Revised) Project: Spring Canyon Community Park Owner: City of Fort Collins Parks & Recreation To: Ted Johnson, ECI Requested by: Russell lee Authorized by: please tunish Change in conum sutn for the cbmMe iA work descn"bed below. Do not order material or And any work until approval is received. Every e, ffmi will be made to incorporate this change into the work without effecting the Contract data $ (17,540,60) $ 165.20 $ (2,144.01) 5 - $ (2,756,00) $ (31060.00) $ (180.00) $ 117.80 TOTAL, $ (25,397AI) xca aahnsoe. Eci , agrees to change the work deco far the change i1D Rce shown below. I have attached a breakdown wh iah lists all coos of labor, materials, taxes, overhead, profit, and all other changes and/or charges involved. Signature of the Contractor indicetes his agreement herewith, including any 4 astomd In the Contract Soto or Contract Time. The Contract Time will be by Days. No change In Contract SUM Onffial if no change) ADD to the Contrast Sum S ABDUCT ti om the Cotttraet 5um $ (25,397.61) This ittfnrmation shall be valid for thirty (30) CONTMCTOWS APPROVED BY OWNER: days from the date of signature below. to DATE: G DATU: ,Accepted chwW a in work request will be included in a jkwa formal change order. DO NOT bill far this change mail a formal change order has been executes' by all parties. Acceptance is direction to proceed with the work deteribed herein. Nol valid unkms signed by the owner and the Contractor.