Loading...
HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 27037JUL-10-2006 MON 02:34 PM CFO ENG, FAX NO, 9702216378 P. 01 r city.-�� r Eaglneertng Department Change Order Form PROJECT TITLE: Mason Street Transporabon Corridor PROJECT NUMBER: 30521900.6 (Bid #5932) CONTRACTOR: Mountain Constructors (PO #5506704) CHANGE QRDER NUMBER: 3 n preparing c ange orders show In order as separa a num ere paragrap s e o owing: 1. Reason for change. 2. Description of change 3. Change in contract cost. 4. Change in contract time. 1 &2, See attached sheet for detail. 3, The contract cost will increase by $ 10,025.00 4. There will be no change in contract time $1,392,915.11 ORIGINAL CONTRACT COST $10,336.00 TOTAL APPROVED CHANGE ORDERS $0,00 TOTAL PENDING CHANGE ORDERS $10,025.00 TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER 0.72% TOTAL C.O. % OF ORIGINAL CONTRACT 1.46% y1,413,276.11 ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED BY: * —DATE: Contra tors presentative BY: DATE: O1— O ~ 0(0 SUBMITTED _. -- Project Engineer 4ManaWQ DATE:Engineering APPROVED BY:�� I Projec APPROVED BY: cc: Purchasing Accounting Contractor Project File DATE: (Purchasing Agent over $30.000) Pr,otneertne Department • 281 NOrdl College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 22t-6605 JUL-10-2006 NON 02:35 PM CFC ENG, FAX NO. 9702216378 P. 02 CHANGE ORDER - 3 Project 5893 - Mason Street/Harmony Road/Spring Crook BikelPadestrian Trail -SUMMAkY OF WORK Mountain constructors Pedestrian Railing at Sherwood Latteral along Bay Farm Road See attached submittal - REASON FOR CHANGE Plans show a detail for this railing but did not include a quantity for the railing. The railing work will consist of removing the existing wooden railing, drilling 4-12"0' caissons, and installing the 36 LF railing as indicated in tho planset. WHEN POSTED -- Posted to Pay tnstimate # r