HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 27038JUL-10-2006 MON 02:35 PM CFC ENG. FAX NO, 9702216378 P. 03 Change Order Form Engineering Department PROJECT TITLE! Mason Street Transporation Corridor PROJECT NUMBER: 30621900.6 (Bid #5932) CONTRACTOR: Mountain Constructors (PO #5506704) CHANGE ORDER NUMBER: 4 _ _. _ _ .- -w .........w w 1. Reason for change. 2. Description of change. 3, Change'in contract cost. 4. Change in contract time. 18,2. See attached sheet for detail. 3, The contract cost will increase by $ 6,240,00 4. There will be no change in contract time. ORIGINAL CONTRACT COST $1,392,915.11 TOTAL APPROVED CHANGE ORDERS $20,361.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $6.240.00 TOTAL % OF THIS CHANGE ORDER 0.45% TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST $1,419,516.11 (Assuming all change orders approved) ACCEPTED BY: SUBMITTED BY: APPROVED BY: APPROVED BY: cc: Purchasing Accounting Contractor Project File DATE: 0/ /1d 4 6 Project Engineer DATE: DATE: (Purchasing Agent over $30,000) Eneineering Deportment - 281 North College Avenue • P.O. Box 590 - Fort Collins, CO 80522-0580 - (970) 221-6605 JUL-10-2006 MON 02:35 PM CFC ENG, FAX NO. 9702216378 P. 04 CHANGE ORDER - 4 Project 5893 - Mason Street/Harmony RoadiSpring Creek Bike/Pedestrian Trail SUMMARY OF 7WK Dumar Concrete Co. Price adjustment for using only San Deigo Buff colored concrete at the enhanced crosswalks. - See attached submittal - TOTAL S6,*An .00 REASON FOR CHANGE We decided to save cost on the installation of the enhanced crosswalks at the roadway crossings at Swallow Road by simplifying the design to incorporate San Deigo Buff colored concrete poured monolithically with 2' stamped edging_ The price per yard was reduced by $18 and was adjusted from $96/SYto $78/SY. This item is paid ae a change order and not being paid on Pay Application V. WHEN PO 7ED Posted to Pay Estimate # 7