HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 27039JUL-10-2006 MON 02:27 PM CFC ENG, FAX NO. 9702216378 P. 01 Eu0natrtug Departnuut Change Order Form PROJECT TITLE: 2005 Sireet Maintenance Program PROJECT NUMBER; 320200 (Bid 05839) CONTRACTOR: Lafarge Northern, Inc. (PO #66025213) CHANGE ORDER NUMBER: 1 n preparing change orders show in order as separate "MuMuered paragraphs e e owing: 1. Reason for change. 2. Description of change. 3. Change In contract cost. 4, Change in contract time. 1a2. See attached sheet for detail. 3. The contract cost will increase by $ 46,535.69 4. There will be no change In contract time. ORIGINAL CONTRACT COST $2,510,339.30 TOTAL APPROVED CHANGE ORDERS $0100 TOTAL PENDING CHANGE ORDERS $0,00 TOTAL THIS CHANGE ORDER 346,536.59 TOTAL % OF. THIS CHANGE ORDER 1,88% TOTAL C.O. % OF, ORIGINAL CONTRACT 1.66% ADJUSTED CONTRACT COST $2,856,874,89 (Assuming all change orders approved) ACCEPTED BY: DATE: C rectol"s Representa ve _ APPROVED BY: DATE: P t Engineer • Pedestrian Planning APPROVED BY: DATE: fajecl onager - Engfn APPROVED BY'. ,' u DATE r ( - / U - C G Department Head APPROVED BY: g(PLiEng"Agent over $30,000) cc: Pumha6n0 S41,914.14 Fed Planning Accounting $1,39090 Stmet Mamt. Gprus=T $3,230.55 Pad Access Project File City of Fort Collins 2006 Asphalt Overlay Project c Lafarge North America -Rid 'Va. 5839 r- Change Orde: No.: 1 0 Dates 07I05y2D06 rti) C7 CD CM 1 Reason Far Change: 3 a. Patching for 2005 Pedestrian Access work is added to this contract Z h. Consmuclion of asphalt sidewalk on Lemay, Une to Lincoln, is added in this contract c. Additional patching was necessary for a bike lane transition to the trair at Cathy Fromme CD r%) rV Z Description Of Change: -13 a. Pay Jump sum fer asphalt patching -10 h. Pay lump sum for asphalt sidewalk c Pay lump sum For addianal aspha:t palchin3 not incudad in the original contract n-r1 C-3 3 Change In Contract Amount rr7 a. Riverside - Olive to Smith [Pad Planning} Unit Quantity Unit Price Total Cost Pad Plan 403.50 Patching TON 9.51 5 83.35 $ 792.66 614.07 Size A Sign with Stand DAYIEA 7.0 $ 1.22 S 8.54 614.11 Cone with Reflective S1np DAYIEA 20.0 $ 0.60 5 12.00 614.17 Traffic Cmtra° Supervisor HR 1_D $ 29.80 $ 29.80 614.18 Fagging HR 4.0 $ 20.62 S 82AB $ 92548 Asphalt Patch(ng 14118 1469 TON Parkwood 1650 Holly Horsetoolh & 600 Stuart & 2518 {Ped Access R Street Maintenance] Laporte way Automation Larkbunting Comedals Newport Tolal Units Unit Cost Total Cast Drive Drive, 403.50 Patching DAYIEA 1.9.39 TAB 2.15 5.70 160 4.35 3.95 44.62 $ 53.35 $ 3,719.08 614.01 "NO PARKING' Sign Ynih Stand DAYIEA 2.0 8.0 30 6A 2.0 21.00 S 1.52 S 31.92 -r1 614.04 Type I Berncade Without Ligyt DAWEA 2.0 4.0 SA 2.0 14.00 $ 0.6D 9 614.07 We A Sign with Stand DAYlFJI 4.0 4.0 2.0 ZO 6.0 12.0 Z.D 37.00 $ 1.22 $ 45 iq x 614.08 Sze B Sign w111 Stand DAYIEA 2.A 2.00 $ 1.52 Z Cone YAM Reriective Strip HR 6.0 10.D 8.0 25.0 10.0 8.0 4.0 71.00 5 0.60 S 42.60 CD 614.17 Traffic Control Supervisor HR 1.0 4.0 2.0 5.0 2 D 4.0 1.0 19.00 $ 29.80 $ 56fi_20 cc 614.18 Flagging 2-6 2.5 2.5 3.0 10.50 $ 20.62 $ 216.51 0 $ 4,821.45 tv rV rn c�1 CD CD 95 0 ry Page I of) City of Fort Coff as 2,6616 Aspiiaft Overiay Project Lafarge North America -Bid No. 3839 Change Ordar ND: i Dale. 07FOU20M b. Lemay Sidewalk -Vine to Lrncatn (Ped Planning) Qty Unit Unit Cost Total Cost Time 8 Materials: Pipe and 61ch work, fence removal. Seeattachad Extra Work Sheet 1 LS S 9,007.11 $ 9.007.11 203.11 Excavation -General Over 100 cy_ 211 C.Y. $ 20.04 S 4,228.44 203.32 Haul 8 Replace Recycled Asphalt 28.3 TON S 8.59 $ 243-10 203.33 Shouldaricg 4084 L.F. a 0.54 $ 2,194.56 Malerial Cost - Road Base 28.3 TOR $ 6.00 $ 169.80 463.15 H9P-Grading SX 409.5 TON S 53.80 $ 22,031.10 614.02 Vertical Panel Wilbout Light 36 DAYJEA $ 0.60 S 21.60 614.07 StaeASign with Stand 47 DAWEA $ 1.22 S 57.34 614 11 Cane vi+ln Renective, Strip 121 OAYIEA S 0.60 $ 72.60 614.17 Traffic Control Supervisor 14.5 HR S 29.80 $ 432.10 614.15 Flagging 6 HR S 20.62 S 164.96 S 38,622.71 c. Taft Hill Trail Connection (Ped Planning) 403,50 Palch;ng 27.00 TON $ 63.35 $ 2,250.45 So f SlerilizafiDn 1.00 LS S 115.50 S 115.50 S 2.365.95 TOTAL CHANGE IN CONTRACT AMOUNT S 46,635.59 Pedestrian Planning S 41.914.14 Street Maintenance g 1.390.98 Ped Access S 3,230.55 S 46,535.59 4 Change In Contract Tlme a_ No Erne will be added ur charged for tt.is work b. No time will be added OF charged For this work a No lime wrl be added or charged for this work TOTAL CHANGE IN CONTRACT TIME 0 days Page 2 of 2 r-' I 0 rV O O OJ 3 O Z O rV OD fU -O 3 n n l'r7 X O cD O lV lV a70 c� co m "o 0 W