HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 26867Change Order Form Engineering Department PROJECT TITLE: Timberline Rd. Widening Project PROJECT NUMBER: 30523270.6 (Bid #5954) CONTRACTOR: Connell Resources, Inc. (PO #6601742) CHANGE ORDER NUMBER: 3 n preparing change orders snow In oraer as separate numoerea paragrapns ine rollowing 1. Reason. for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1&2. See attached sheet for detail. 3. The contract cost will increase by $37,810,60 4. There will be no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.C. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all change orders approved) ACCEPTED BY: ACCEPTED BY: REVIEWED BY: (Engineer) APPROVED BY: APPROVED BY: cc: Contractor Purchasing Project File 0.72% 1.79% $5,277,645.27 $56,877.00 $0.00 $37,810.60 $6,372,332.87 DATE: (P - i 5 -O(- artment Head) r DATE: / �V 1 © p urc sing Agent ov $30,000)-11 Engineering Department • 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 CHANGE ORDER NO.3 Ins TIMBERLINE ROAD WIDENING PROJECT - INTERM SUMMARY OF WORK Connell Resources Inc. Asphalt Mix Design Change Railroad Crossing Support Pond 5 and 11 Work MSE Block Wall Addition Install Irrigation Service @ Police Facility Building See attached submittal Item Unit $l Unit Total Connell Renounces Inc.Asphak Mix Design Change 386 $ 5.10 $ 1,968.60 Connell Resources Inc. Support At Railroad Crossing 1 $ 750.00 $ 750.00 Connell Resources Inc. Additional Concrete Clear and Grub Costs 1 $ 2,452.00 $ 2,452.00 Connell Resources Inc. Pond 8 Outlet Structure 1 $ 8.200.00 $ 8.200.00 Connell Resources Inc. Tree Removal 1 $ 3,000.00 $ 3,000.00 Connell Resources Inc. Install Irrigation Service 1 $ 1,340.00 $ 1,340.00 Connell Resources Inc. MSE Block Wall Changes 1 $ 5,800.00 $ 5.800.00 Connell Raaourcas Inc. Pond 5 1 $ 6,800.00 $ 6,800.00 Connell Resources Inc. Pond 11 1 $ 7.500.00 $ 7.500.00 TOTAL $ 37,810.60 REASON FOR CHANGE Mix Design change on Concrete to a heavier strength Connell helped RCL Signal Co. with backhoe service and labor Additional Concrete removed from Pond 11 where pond was mis-staked. Add Water Quality Outlet Structure to Pond 8, Added with Police Facility Removed large Cottonwood has where Cargill Irrigation ditch want. Installed an additional 3f4" Irrigation Tap for Police Facility Changed the height of the MSE Wall at Gas Metering Station Regraded Pond 5 after change to Police Facility Plans Regraded Pond 11 after Design era on Intrewest Plans WHEN POSTED Posted to Pay Estimate No. 3