Loading...
HomeMy WebLinkAboutCORRESPONDENCE - GENERAL CORRESPONDENCE - DAVIS BACONWAIS Document Retrieval Page I of 4 GENERAL DECISION: CO20030008 06/03/2005 C08 Date: June 3, 2005 General Decision Number: CO20030008 06/03/2005 Superseded General Decision Number: C0020008 State: Colorado Construction Type: Building County: Larimer County in Colorado. BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories) Modification Number Publication Date 0 06/13/2003 1 08/15/2003 2 09/19/2003 3 10/03/2003 4 01/16/2004 5 02/20/2004 6 05/14/2004 7 06/18/2004 8 07/23/2004 9 08/20/2004 10 09/17/2004 11 01/07/2005 12 O1/14/2005 13 02/04/2005 14 03/04/2005 15 05/06/2005 16 06/03/2005 * ASBE0028-001 03/01/2005 Rates Fringes Asbestos Workers/Insulator (Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems)..-- .... ...... —$ 19.62 9.33 --------------------------------------------------------------- CARP1001-001 05/01/2005 Rates Fringes Carpenter (Including Formbuilding and Metal Stud Work) ........ $ 22.70 7.99 ---------------------------------------------------------------- * CARP2834-001 05/08/2005 Rates Fringes n http: //frwebgate. access.gpo.gov/cgi-binlgetdoc.cgi?dbnaTne=Davis-Bacon&docid=CO20... 08/04/2005 WAIS Document Retrieval Page 2 of 4 Millwright .....................$ 24.42 9.03 ---------------------------------------------------------------- FLEC0068-009 01/01/2005 Rates Fringes Electrician (Including Low Voltage Wiring and Installation of Communications Systems, Security Systems, Telephones, and Temperature Controls) ....... $ 28.91 10.19 ---------------------------------------------------------------- * ELEV0025-002 01/O1/2005 Rates Fringes Elevator Constructor ........... $ 30.275 12.015 3 FOOTNOTE: a. Employer contributes 8% of basic hourly rate for over 5 years' service and 6% basic hourly rate for 6 months' to 5 years' service as Vacation Pay Credit. SEVEN PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans Day; Thanksgiving Day; Friday after Thanksgiving Day; and Christmas Day. ---------------------------------------------------------------- IRON0024-001 08/01/2002 Rates Fringes Ironworker, Structural ......... $ 22.00 5.85 ---------------------------------------------------------------- PAIN0930-001 07/01/2004 Rates Fringes Glazier ........................$ 25.85 6.70 ---------------------------------------------------------------- * PLAS0577-001 05/01/2005 Rates Fringes Cement Mason/Concrete Finisher.$ 22.76 7.15 --------------- — ----------------------------------------------- PLUM0003-001 07/01/2004 Rates Fringes Plumber (Excluding HVAC work) ....... $ 28.02 8.23 ----------------------------------------------------- —--------- PLUM0208-001 07/01/2004 Rates Fringes Pipefitter http://frwebgate.access.gpo.gov/cgi-bin/getdoc.c2i?dbname=Davis-Baconkrincid=CO?0 nxmannna WAIS Document Retrieval Page 3 of 4 (Including HVAC pipe) ....... $ 27.97 8.33 ---------------------------------------------------------------- SHEE0009-001 0710112003 Rates Fringes Sheet metal worker (Includes HVAC duct and installation of HVAC systems) ....................$ 26.59 9.70 --------------------------------------------------------------- SUCO2001-015 12/20/2001 Rates Fringes Laborer Common ......................$ 9.56 2.36 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which weldiAg is incidental. --------------------------------------------------------------- Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. WAGE DETERMINATION APPEALS PROCESS l.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis -Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: http://frwebgate.access.gpo.gov/cgi-binJgetdoc.cgi?dbname=Davis-Bacon&docid=CO?0 09m4000'; WAIS Document Retrieval Page 4 of 4 Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, ' etc.) that the requester considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION http://frwebgate.access. gpo. gov/cgi-bin/getdoc, cgi?dbname=Davis-Bacon&docid=CO20... 08/04/2005 listed on the wage determination for the applicable classification. If the Administrator of the Wage and Hour Division of the U.S. Department of Labor determines that a different practice prevails for the applicable apprentice classification, fringes shall be paid in accordance with that determination. In the event the Bureau of Apprenticeship and Training, or a State Apprenticeship Agency recognized by the Bureau, withdraws approval of an apprenticeship program, the contractor will no longer be permitted to utilize apprentices at less than the applicable predetermined rate for the work performed until an acceptable program is approved. (ii) Trainees - Except as provided in 29 CFR 5.16, trainees will not be permitted to work at less than the predetermined rate for the work performed unless they are employed pursuant to and individually registered in a program which has received prior approval, evidenced by formal certification by the U.S. Department of Labor, Employment and Training Administration. The ratio of trainees to journeymen on the job site shall not be greater than permitted under the plan approved by the Employment and Training Administration. Every trainee must be paid at not less than the rate specified in the approved program for the trainee's level of progress, expressed as a percentage of the journeyman hourly rate specified in the applicable wage determination. Trainees shall be paid fringe benefits in accordance with the provisions of the trainee program. If the trainee program does not mention fringe benefits, trainees shall be paid the full amount of fringe benefits listed on the wage determination unless the Administrator of the Wage and Hour Division determines that there is an apprenticeship program associated with the corresponding journeyman wage rate on the wage determination which provides for less than full fringe benefits for apprentices. Any employee listed on the payroll at a trainee rate who is not registered and participating in a training plan approved by the Employment and Training Administration shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any trainee performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. In the event the Employment and Training Administration withdraws approval of a training program, the contractor will no longer be permitted to utilize trainees at less than the applicable predetermined rate for the work performed until an acceptable program is approved. (iii) Equal employment opportunity - The utilization of apprentices, trainees and journeymen under this part shall be in conformity with the equal employment opportunity requirements of Executive Order 1 1 246, as amended, and 29 CFR part 30. (5) Compliance with Copeland Act requirements_- The contractor shall comply with the requirements of 29 CFR part 3, which are incorporated by reference in this contract. (6) Subcontracts - The contractor or subcontractor shall insert in any subcontracts the clauses contained in 29 CFR 5.5(a)(1) through (10) and such other clauses as the Federal Transit Administration may by appropriate instructions require, and also a clause requiring the subcontractors to include these clauses in any lower tier subcontracts. The prime contractor shall be responsible for the compliance by any subcontractor or lower tier subcontractor with all the contract clauses in 29 CFR 5.5. (7) Contract termination: debarment - A breach of the contract clauses in 29 CFR 5.5 may be grounds for termination of the contract, and for debarment as a contractor and a subcontractor as provided in 29 CFR 5.12. (8) Compliance with Davis -Bacon and Related Act requirements - All rulings and interpretations Page 9 of the Davis -Bacon and Related Acts contained in 29 CFR parts 1, 3, and 5 are herein incorporated by reference in this contract. (9) Disputes concerning labor standards - Disputes arising out of the labor standards provisions of this contract shall not be subject to the general disputes clause of this contract. Such disputes shall be resolved in accordance with the procedures of the Department of Labor set forth in 29 CFR parts 5, 6, and 7. Disputes within the meaning of this clause include disputes between the contractor (or any of its subcontractors) and the contracting agency, the U.S. Department of Labor, or the employees or their representatives. (10) Certification of eligibility 0) By entering into this contract, the contractor certifies that neither it (nor he or she) nor any person or firm who has an interest in the contractor's firm is a person or firm ineligible to be awarded Government contracts by virtue of section 3(a) of the Davis -Bacon Act or 29 CFR 5.12(a)(1). (ii) No part of this contract shall be subcontracted to any person or firm ineligible for award of a Government contract by virtue of section 3(a) of the Davis -Bacon Act or 29 CFR 5.12(a)(1). (iii) The penalty for making false statements is prescribed in the U.S. Criminal Code, 18 U.S.C. 1001. CONTRACT WORK HOURS AND SAFETY STANDARDS ACT 40 U.S.C.0 827 -333 (1995) 29 C.F.R.0 5 (1995) 29 C.F.R.01926 (1995) Pursuant to Section 102 (Overtime): (1) Overtime requirements - No contractor or subcontractor contracting for any part of the contract work which may require or involve the employment of laborers or mechanics shall require or permit any such laborer or mechanic in any workweek in which he or she is employed on such work to work in excess of forty hours in such workweek unless such laborer or mechanic receives compensation at a rate not less than one and one-half times the basic rate of pay for all hours worked in excess of forty hours in such workweek. (2) Violation; liability for unpaid wages; liquidated damages - In the event of any violation of the clause set forth in paragraph (1) of this section the contractor and any subcontractor responsible therefor shall be liable for the unpaid wages. In addition, such contractor and subcontractor shall be liable to the United States for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of the clause set forth in paragraph (1) of this section, in the sum of $ 10 for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by the clause set forth in paragraph (1) of this section. (3) Withholding for unpaid wages and liquidated damages - The City of Fort Collins shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the contractor or subcontractor under any such contract or any other Federal contract with the same prime contractor, or any other federally -assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or Page 10