HomeMy WebLinkAboutCHANGE ORDER - BID - 5952 SPRING CANYON COMMUNITY PARK (16)1@ 001/002
06/06/2006 TIIE 13:48 FAX 970 221 6586 CITY OF FT COLLINS CLRS
06/05/2006 10:54 9706696411 ECI
06/05/ 000 VON U9; Q2 FAX 070 221 6588 CITY OF FP COLLINS CLRS
CHANGE ORDER NO, 113
PROJECT TMP-: SPRING CANYON COMPAUNITY PARK
CONTRACTOR: ECI
PROJECT NUMBER: S"I
PURCHASE ORDER NO.: 6602274
OtSCR1PTION. Ormkside Pavinlon stablunvan
1. Reason For change: stabilize subgfade udder creakelde pavillion, plam mod reslroom
2. DOWPEOn Of Change: gVer mmonvate 1' under south end of Plexe and rmKne Sm of dry
material over entire ams (1.545340), haul Mt@rial provided by City
and arowdllnatdll 6° Minus material 0500 bnC1$13.20Ronm$1ag00)
0/1
3. Change in Contract Cmt: us,140.00
4. Change in Contract Time: 0 Days
TOTAL APPROVED CHANGE ORDER
TOTAL PENDING CHANGE ORDER
TOTAL THIS CHANGE ORDER
TOTAL % OF ORIGINAL CONTRACT, THLS CA_
TOTAL % OF ORIGINAL CONTRACT, ALL C.O.•S
ADJUSTED CONTRACT COST
PAGE 02/07
2002/007
ACCEPTED BY:
DATE:
Contract ed ReAresentalire
ACCEPTED BY:
DATE; �•
Project Manager
REVIEWED BY:
DATE:
TWO:
APPRQVEO BY: DATE:
rM e:
APPROVI=d BY:
Purchasing Agwd aver 30,000 DATE.,
rx my clerk Archhd
Cuntrncicr EVdwr
Prolet: F-11a FLE'd1og"
06/06/2006 TUE 13:48 FAX 970 221 6588 CITY OF FT COLLINS CLRS
86/85/2886 18:54 9706696411 ECI
nag0!ZOp6 X"jq na:p2 FAT 979 0.2,1 ARAA r:TTY t1P FT COLr,INS rltt3
rM A nm rr, nu tv� V p W—YLmsr -13at,
i«.st-21tit.- DOOM 4n"QUL5
Protect: 9ptNnp Cgnyon Cse,a,,,m1 . purl.
OwrAr: City ofl?ort Collins Perky A Raerawion
To: 90 Site Construction 112gmt
Requested by: Ted Johnson
Autbo*edby Kathleenl3emdiet
0 002/002
PAGE 03/07
R00,1t007
Please famish ohango iA 9MUS t sum for thr chaltge in work described below. Do M order mi:tarial or otm say watlr vn l
approval is T¢eotvcd, &ery $fort will be made ro i x0gante tr& dove into the wok wlthow q�sclirg the do bwa date.
Dssollpt]on of Piapased lG1tapge8
:tr11041it
Per CTL's recommendations dated r q% (Part 1)
tamer -excavate T Of meteriat under South area! remove G' of dry meterkd over entire W340.00
area
Haul crushed c namta materfal and crowd 1n i,500 Ton fnrsfnbilLEoflw iaffils.Mi TnA M N=
TOTAL 52 IML00
ECI 9lre Coadroear M�.e , a�reet fi changet1m work dnser%ed alcove for the change in prliee 4114N7r bdow. x have
am shed a breakdown which lists all cost$ of labor, tnAhmiahs taxecy weriMd, profit, and all other changes and/or chatgp
imwoived. $Jggature of the Conft=r iodimMs his agreement bm+writh, incluft arty adjmt mea in the Contmet gum or
Conh'act Tltm.
Tht Cnnrreef Time will ba p4 CiZSllre by a Dr{yg
No change in Contract Sam (rsival if m craze)
ADZ)10 the Conb'act Sum 5 29AML00
DEDUCT rmm the Contmot sum $
Ibis information slmll bo valid for thirty (30)
CONTRACTOR'S
APPROVED DY OWNER:
ltom the date of signature below.
DAWk 5123i2005
DATE: -
Acmpead ohanga to Work reguwr wrlr Wrnatuded in afrrrwe formal change order. DU NUT bell for this ehmrge waft afem,11
ehcrr„gt. girder has been exeexted by allpertlrs ACoepramcs is direottdn ro proceed wkh the work deaoribad hw&,,L Not,,did