HomeMy WebLinkAboutCHANGE ORDER - BID - 5952 SPRING CANYON COMMUNITY PARK (15)06/06/2006 TUE 15:15 FAX
970 221 6586 CITYOF FT COLLINSeIINS CLRS
PAGE 04/07
E�ool/002
a5l05/2006 10:54 9706696411
oeiorlsona Mott aa:eA FAX 074 sal 558e CITY OF FT COLLINS Cus
CIIANGI= mlq
PROJECT TITLE:
SPRING CANY014 COMMUNITY PARK
CONTRACTOR:
ECI
PROJECT NUMBER:
sm
PURCHASE ORDER NO-'
6602274
DESCRIPTION:
Cr94wFde Pavilliod *AblltrMon hauling
t. Resson ter change:
haul orvshod concrete
2. Pos.rbn of C,hango!
„-
9onrs w,n et 13.20n�� = zea�c
3. Chanpa in Contract Out $28,400.00
4. Change 1A Cw9rart Time: a Dep
TOTAL APPROVED CHANGE ORDER 8o7.Bb
TOTAL PENDING ONAN416 OROFR 1 O
TOTAL THIS CHANGE ORDER
TOTAL % OF ORIGINAL CONTRACT, THIS C.O. p,
TOTAL % Of ORIGINAL r'ONWAnr, A1.1 r,n �C 0.1616
AI)JUSTED CONTRACT CM 11,5 s,48o sa
(Assuming oN dmWe.ofdefs approtrad)
ACCEPTED
Conhaa $
ACCEPTED
Prajeet Mani
REVIEWED 4Y:
Tice;
APRROVED stir:
Title:
APPROV90 BY:
PUKhaaing Agent over $30,000
x cay Clerk ATdAed
cwwww Eipmver
aroizr.. NE. Pttrdexln%
DATEt OF
"
DATC:6rs"• 04
DATE
DATE:
DATE,
06/06/2006 TUE 15:16 FAX 970 221 6586 CITY OF FT COLLINS CLRS
06/05/2006 10:54 9706696411 ECI
011/08/2006 MON 09:02 FAI 970 .711 6686 CITY OF FT COLLINS C"1.173
CHANGE 7N WORKREQULST "13b"
hritiation Data. f1N;8/i006
project: 9priag canyon Community Perk
ovwr; C12y efFort Collin Parks & Recreaft
Te: ECI Site CowtMeiion Mgmt
Rcquested by: Ted 7almsan
Autbnrized hy. Kafhlecn ReaMiar
IM002/002
PAGE 05/07
1@005/007
Please 0=611 oltaoge M eeefraut wm fer `¢e a)*W is work 11090nInd bolo v. Do act ordiermatetial Or gW=y Welk saW
a�rbvai to readved F,ti+ery e�Porr will $e made ro iMcorpprare thrr ebaf;�e tfuo flJd �kwkhotrt r�ecting the cnerra�t dace.
Daseription of PfgXw d Cnanges
amwunt
Per CT129 recommendeflo ns meted 512?JF0W (Part 2)
NmUI crushed conrna0 material and crowd In 2,000 Ten fbrstabifrrafion 0$13-201Tom $26�d00,00
TOTAL 9rZed00.a0
Wt elk doaeenrelien Mime ,. 89MM to change the wotk de` Abed ,bane hn' fbe ehnnire to price shorn WOW. t have
attached a brakdmm v4dob lisle all costa ofJR130 r. materials, UM; overbeadr profit, and all other changes and/or dhargea
inv IWA. Sipatm of the Contractor indicate his agrssow t hemwith, inclirdirtg arty acyWMMnt in the Cottttad Sum or
Contract Time.
The Contest Tote will be ao ehan& by 3 D".
No change in Conrwt Sum geiei.l erne dd W)
ADD to thu Caarnact Sam $ Z Qp0
DEDUCT fhem Cie Ceattttiat Stint S
'Phis lafartnatioq doll bo valid fOrthlrty (90) ealoadar
CONTR,A.CCOWS SIGNATURE
APPROVED BY OWNER:
f[ a the date of suns# below.
ro
DATE: 50/2W
DA,TM I� • fit' ' 'Ile
AooWed aha►q;e to work raquati will bdinalvdcd ill of dwt forrnai a iuW order; DO NUT b111 jbr this change anti[ a forerol
change orrlar hrze hrun r evnnad by ell nnr NRe 1yfp rypr p it dlrM. inn rn mnrrg�i wlrh lteq }nk e+c<�t15Nd },, ,r„ N. nt valid