Loading...
HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 26708MAY-18-2006 THU 06:48 AM CFC ENG, FAX NO, 9702216378 P, 01 Change Order Form Ci1t5+of Fort Collins Saglneering Depardnent PROJECT TITLE: Timberline Rd. Widening Project PROJECT NUMBER: 30623270.6 (Bid #5954) CONTRACTOR: Connell Resources, Inc. (PO #6601742) C(1ANGE ORDER NUMBER: 2 n preparing Change orders s oW in order as separa a numbered paragrap 5 e following: 1. Reason -for Change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1&2, See attached sheet for detail. 3. The contract cost will increase by $26.330.00 4. There will be 15 additional days added to the contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % OF ORIGINAL CONTRACT ADJUSTED CONTRACT COST (Assuming all chango orders approved) 0.48% 1.08% $5,277,546, 27 $31,547.00 $0.00 $25,330.00 $5,334,522.27 ACCEPTED BY: � Repre aRie DATE: ACCEPTED. : (Cont r DATE: (Project Man r) REVIEWED BY: �! —� —DATE: 1 %' V IC7 - _ _ (Engineer) APPROVED BY: ]] J _ G J�, DATR:_�? .,..,. Department Head (JX APPROVED BY: _ DATE: (Purchasing Agent over $30,000) m: contrector ' PurchofAr)o ProjW File ?At Nnrth [ nneve Avenue - P.O. Box 590 - Fort Collinsi CO 80522-0580 • (970) 2214605 MAY-18-2006 THU 06:49 AM CFO ENG, FAX NO. 9702216378 P, 02 '�iwy" u'� .'Cjy�...y,�tn.-a.y. •r MrL^I 'Y wti ucoe�'�.:.m.""�::.Me.Y.,°�!�i::.iiif...�?�a.. TIMBERLINE ROAD WIDENING PROJECT - INTERM Connell Resources Inc, Additional Pile Driving Quantities for Spring Creak Bridge Additional Water and Sewer Work Additional Work in Pond #11 Additional Fencing ® Risk Removal Building Sea attached submittal Item Unit $1Unit Total Connell Resources Inc.Plle DHAN 218 S 35,00 $ 7.630.00 Connell R"ourcos Inc. Tre Area Drain Pipe together ® Bath landscaping 1 S 1.000.00 $ 11000.00 Connoll Resources Inc, Installed New Ring and Cover on Irrigation Manhole 1 $ 300.00 $ 300.00 Connell Resources Inc. Meter Pit @ Bath Garden Center 1 $ 4.400.00 $ 4.400.00 Connell Resources Inc Fence Q Risk Removal 1 $ 700.00 $ 700.00 Connell Resources Inc. Relocate Irrigation Lim ® Tree Farm 1 $ 1,t100.00 S 1.600.00 Connell Rosources Inc. Relocate Curb Stop Q Jdmscds Water Servlce 1 $ 700.00 LS 700.00 Connell Resources Inc. Concrete & Trash Removal Pond 11 1 g 7,900.00 $ 7,900.00 Connell Resources Inc. Hydrant Relocate 1 $ 1.000.00 $ 1,000,00 Connell Resources Inc. Lower Hydrant 1 $ 100.00 $ 100.00 Connell Resources Inc- Additional Work Days to Cuitract 15 Day TOTAL S 25.330.00 ttF11 M FOR CIUM E' Initial Pile Depths were considered from elevation of 4WS Ft Tap of the abutment elevation to be 4908.5 Ft. and top of pier elevation to be 4896.5 Ft. Thus a difference of 21.50 Ft, and 11.50 Ft respectively. With 18 piles each the total LF estimated was 594 Ft @ $34.000 is equal to $57.24/1-F. This price includes mobilization on the pile machine as wall as pile tuts. These costs are therefore not included In the additional pile driving cost. Actual length of the pile driving is $12 FT. Thus a differ6nce of 218 Ft. Several items Hera addressed at Bath Landscaping the were not shown on the approved plans and specifications, Installed Form at Risk Removal to protect the business from dust and large rocks generated by the construction. Unexpected concrete and trash buried in the area of Pond 11 that was dug out and removed from the site. Added 15 additional days to the contract for all 0f the extra work that was placed upon the contractor. Posted to Pay Estimate No, 2