Loading...
HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 2665205/11/2006 THU 10:00 FAX 970 221 6586 CITY OF FT COLLINS CLRS a 001/001 u5i 004/20061 10 O10 FA.X 07U 221 BOSS CITYcOF FPGCOLLINS CLRS 9002 oo2io11 CHANGE ORDER NO. #8 PROJECT TITLE: Old. Town Alleyways CONTRACTOR Technology construalors PRQJECT NUMBER: 5912 PURCHASE ORDER NO.; 9702uaA283 DESCRIPTION: RepaW west entrance to Trimble 1, Reason for change: change of drain pipe material, remove railing east end of Trmble, anchor pc fs in both alleys, modify, 2 inlet gnafes, move existing glsct*al boxes down wall at Tenney, additional work and submittal delays 2. DesaroWn of Change: change of drain plea nwlxrW, remove railing east and Of Trimble, anchor pats in both alleys, modify 2 Inlet grates, move existing eleetrlorat boxes down wall at Tenney, additional work (trash compactor service, lower elaotrlo, pot anchors -13 days) and submittal delays (string lights, gates -28 days) belays at Trimble additional work for pot artchors and misc Ro (6 days) & subrrirttal delays (17 days) S. Changa in Contract Cost: $e,W,00 V1 �� 610 w 4. Change in Contract Timac 41 days to Tenney & 23 days to Trimble TOTAL APPROVED CHANGE ORDER Soo 777,46 TOTAL, PENDING CHANGE ORDER 30.00 TDTAL THIS CHANGE ORDER st3 56 TOTAL % OF ORIGINAL CONTRACT, THIS C,O. 49 TOTAL. % OF ORIGINAL CONTRACT, ALL C,O•'s 6. % ADJUBTED CONTRACT COST (Assuming all change Ofrde�n *PpMed) .� ACCEPTED BY: G[���_ DATE: z ' ' 00 ContrmtotS Representative J,f ACCEPTED Project Mans REVIEWED BY: Thiel APPROVED BY: Title: APPROvED BY: Purchaaing Agent over $30,000 CM Clip cim Architect ovAnt of mWear Project Fite Puraly"v DATE 4-O 4� DATS! DATE: DATE: