CHANGE ORDER NO. #8
PROJECT TITLE: Old. Town Alleyways
CONTRACTOR Technology construalors
PRQJECT NUMBER: 5912
PURCHASE ORDER NO.; 9702uaA283
DESCRIPTION: RepaW west entrance to Trimble
1, Reason for change: change of drain pipe material, remove railing east end of Trmble, anchor pc fs in both
alleys, modify, 2 inlet gnafes, move existing glsct*al boxes down wall at Tenney,
additional work and submittal delays
2. DesaroWn of Change: change of drain plea nwlxrW, remove railing east and Of Trimble,
anchor pats in both alleys, modify 2 Inlet grates, move existing
eleetrlorat boxes down wall at Tenney, additional work (trash
compactor service, lower elaotrlo, pot anchors -13 days) and
submittal delays (string lights, gates -28 days) belays at Trimble
additional work for pot artchors and misc Ro (6 days) & subrrirttal
delays (17 days)
S. Changa in Contract Cost: $e,W,00 V1 �� 610 w
4. Change in Contract Timac 41 days to Tenney & 23 days to Trimble
TOTAL APPROVED CHANGE ORDER Soo 777,46
TOTAL, PENDING CHANGE ORDER 30.00
TDTAL THIS CHANGE ORDER st3 56
TOTAL % OF ORIGINAL CONTRACT, THIS C,O. 49
TOTAL. % OF ORIGINAL CONTRACT, ALL C,O•'s 6. %
ADJUBTED CONTRACT COST
(Assuming all change Ofrde�n *PpMed) .�
ACCEPTED BY: G[���_ DATE: z ' ' 00
ContrmtotS Representative J,f
ACCEPTED
Project Mans
REVIEWED BY:
Thiel
APPROVED BY:
Title:
APPROvED BY:
Purchaaing Agent over $30,000
CM Clip cim Architect
ovAnt of mWear
Project Fite Puraly"v
DATE 4-O 4�
DATS!
DATE:
DATE: