HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 26591MAY-05-2006 FRI 10:45 AM CFO ENG, FAX NO. 9702216378 P. Ol Change Order Form Engloeerial Departmeat PROJECT TITLE: Mason Street Transporation Corridor PROJECT NUMBER: 30521900.6 (Bid #5932) CONTRACTOR: Mountain Constructors (PO #5506704) CHANGE ORDER NUMBER: 2 n preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change. 2. Description of change. 3. Change'in contract cost. 4. Change in contract time- 1 &2. See attached sheet for detail. 3. The contract cost will increase by $ 1,195.00 4. There will be no change in contract time. ORIGINAL CONTRACT COST $1,392,915.11 TOTAL APPROVED CHANGE ORDERS $9,141.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $1,195.00 TOTAL % OF THIS CHANGE ORDER 0.09% TOTAL C.O. % OF ORIGINAL CONTRACT 0,74% ADJUSTED CONTRACT COST $1,403,251.11 (Assuming all changeorders approved) ACCEPTED BY: (/t/l "^ �' � DATE: 5114 104P Cont�raaJct r Representative �n SUBMITTED BY: /att� �t DATE; - p"' Project Engineer APPROVED BY: PATE: QW Engi eering Project Manager APPROVED BY: cc: Purchasing Accounting Contractor Pr6jact File DATE: (Purchasing Agent over $30,000) Aa..arhroent - 291 North Cotlene Avenuc - P.O. Box 580 • Fort Collins, CO 90522-05aO - (570) 221-6605 MAY-05-2006 FRI 10 : 46 AM CFO ENG, FAX NO, 9702216378 P. 02 n,wIDPiY•':,�,; my . �,... „ : � 4.,, a W +r .'T 'Y?rrT/� ': .J/]�_� _^yM. ti.-...�..�.y ..,.��.. `w .�����w��n.�M�;� +,tly, � ��y���yy tiii�l� Y.. "�M'�"Wip �"i �1 tiu6�r�/L.hJ,i11111wr... y'�• �rt ��'i�y�N �"'�w"Ki�"gt'miJ�I'.1 Project 5693 - Mason 5treettKarmony Road/Spring Creek Rike►Pedestrion Trail Mountain Constructors Flowfill was used to backfill a shallow 18" RCP Pie Crossing on Bay Farm Road at STA 504+87 - $oe attached submittal - Item Quani Unit $/UnVJ Total Superintendent-1 2 HR $45.00 $90,00 Laborers-2 4 HP $40,00 $160.00 Flowable Fill 10.5 CY $90.00 $945,00 TOTAL $1,195.00 ,.* `•Vela: '.:�'1 The design grade of the 18" RCP pipe was in conflict with an existing 24" walermain. It did not provide the necessary 1 B" cover that COFC Water Utility Dept. required. In order to safely correct the conflict, It was decided to place the 18" RCP within 2 feet of the roadway surface and use flow fill to backfill the pipe crossing. The bottom of the flowfilled trench is 17" above the 24" watermain and the top of the 18" RCP pipe is 18" from the roadway surface. '.�11�`iui �hY ti.�Y,>• �: A.�YY.ey�Y„tl. ^�t:r4y"�^t ` M A,.. M • yi� Posted to Pay Estimate 0 5