HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 26476G 6,
04/18/2006 TUE 15:46 FAX 970 221 6586 CITY OF FT COLLINS CLRS
04/13/00 14:05 FAX 3034310091 T!{CMLOf;Y CONST
04/13/2000 T90 09.40 FAX 270 221 $bad CITY OF 77 COUINS CLItS
PROJECT TMR:
CONTRACTOR:
PROJECT NUMBER:
PURCHASE ORDER NO.:
DESCRIPTION:
1, Reason for change:
CHANGE ORDER NO_S7
Old Town Alk"ays
Technology Consb=brs
9972
070236.t9E W
Repair rest entrance to Trimble
QOOI/001
IM 002
Ito0v00#
dastri clarification meter pit instaliatlen, add trash compecter electrical service
2_ Dmcripfion of Change: electrical aerviee; remove canards PvmL, replace cancrete Pvmt.
dowel to GX64ng concrete, 2 tP diem steel ballonte, labor to Install
meter pit
3. Change In Comiset Cast $9.498.00
4. Change in Contract Time: 4 deye
TOTAL APPROVED CHANGE' ORDER
3 948
TOTAL PENDING CHANGE ORDER
0. 0
TOTAL THIS CHANGE ORDER
TOTAL A OF ORIGINAL CONTRACT, THIS C.O.
TOTAL % ORIGINAL CONTRACT, ALL C.Wa
},
AWLISTEOOONTRACTCOST
Assuming a0 change or"s eporwed)
ACCEPTED BY:
DATE IP / 4,
COntraal0re Repr
ACCEPTED BY:
DATE:
�7�
Projetrl Manager
REVIEWED BY: DATE:
Tide:
APPROVED BY: DATE
Tltk:
APPROVED BY: DATE:
Purchasing Agent over $30,000
ea Olrl 004 kehhoat
Conaadur &glmw
Prasq Fla Puremana