Loading...
HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 26476G 6, 04/18/2006 TUE 15:46 FAX 970 221 6586 CITY OF FT COLLINS CLRS 04/13/00 14:05 FAX 3034310091 T!{CMLOf;Y CONST 04/13/2000 T90 09.40 FAX 270 221 $bad CITY OF 77 COUINS CLItS PROJECT TMR: CONTRACTOR: PROJECT NUMBER: PURCHASE ORDER NO.: DESCRIPTION: 1, Reason for change: CHANGE ORDER NO_S7 Old Town Alk"ays Technology Consb=brs 9972 070236.t9E W Repair rest entrance to Trimble QOOI/001 IM 002 Ito0v00# dastri clarification meter pit instaliatlen, add trash compecter electrical service 2_ Dmcripfion of Change: electrical aerviee; remove canards PvmL, replace cancrete Pvmt. dowel to GX64ng concrete, 2 tP diem steel ballonte, labor to Install meter pit 3. Change In Comiset Cast $9.498.00 4. Change in Contract Time: 4 deye TOTAL APPROVED CHANGE' ORDER 3 948 TOTAL PENDING CHANGE ORDER 0. 0 TOTAL THIS CHANGE ORDER TOTAL A OF ORIGINAL CONTRACT, THIS C.O. TOTAL % ORIGINAL CONTRACT, ALL C.Wa }, AWLISTEOOONTRACTCOST Assuming a0 change or"s eporwed) ACCEPTED BY: DATE IP / 4, COntraal0re Repr ACCEPTED BY: DATE: �7� Projetrl Manager REVIEWED BY: DATE: Tide: APPROVED BY: DATE Tltk: APPROVED BY: DATE: Purchasing Agent over $30,000 ea Olrl 004 kehhoat Conaadur &glmw Prasq Fla Puremana