SECTION 00300
BID FORM
11. List the more important projects recently completed by your company,
stating the approximate cost of each, and the month and year completed,
location and type of construction.
Please refer to the attached information
12. List your major equipment available for this contract.
_track excavator, 928 loader, backhoes, bobcats, motor grader, grading tractor,
dump truck, concrete pump, water truck, telescoping fork lift
13. Experience in construction Work similar in importance to this
project:
Please refer to the attached information
14. Background and experience of the principal members of your organization,
including officers:
Please refer to the attached information
15. Credit available: $ 250.000.
16. Bank reference: Loran Emmons, Chase Bank, Loveland
17. Will you, upon request, fill out a detailed financial statement and
furnish any other information that may be required by the OWNER?
18. Are you licensed as a General CONTRACTOR? yes
If yes, in what city, county and state? Fort Collins, others What
class, license and numbers? #B-6
19. Do you anticipate subcontracting Work under this
Contract? yes
If yes, what percent of total contract? Please refer to section 430
and to whom?
20. Are any lawsuits pending against you or your firm at this time? no
IF yes, DETAIL
7/96 Section 00420 Page 2
21
22
What are the limits of your public liability? DETAIL
2 million plus 1 million umbrella
What company? Travelers, agent: Flood & Peterson
What are your company's bonding limitations? 1.5 million
23. The undersigned
corporation to
verification of
Qualifications.
Dated at Loveland
hereby authorizes and requests any person, firm or
furnish any information requested by the OWNER in
the recital comprising this Statement of Bidder's
this 7th day of
G.L.Hoff Company
Name o Bid
By:
Title: Miriam T. Hoff, Secretary Treasurer
State of Colorado
County of Larimer
2006.
Miriam T. Hoff being duly sworn deposes and says that he
is Sec. Treas. of G.L. Hoff Company and that
(name of organization)
the answers to the foregoing questions and all statements therein contained
are true and correct.
Subscribed and sworn to before me this day of
Q�,jZ , 2049,0.
L- lotary Public
My commission expires 12—/,� - 07
7/96
Section 00420 Page 3
G.L. Hoff Company
2005 Projects
Associated Thermoforming Re -grind Addition Phase I
This Design -Build project included planning, engineering and.
architectural work for the expansion of the Associated Thermoforming
Inc. facility. The scope included site work, paving, structural concrete,
interior remodeling for specialized equipment installation, electrical,
mechanical and construction of a pre-engineered metal building.
Owner: Associated Thermoforming, Inc.
765 Second Street
Berthoud, CO 80513
Contact: John Nix, President, 970-532-2000
Contract: $411,000.
Completion: August, 2005
North Taft Avenue Culvert Extension
The extension of the existing aluminum arch pipe culvert at the Greeley -
Loveland Canal at Taft Avenue was completed to allow for road widening
at Taft Avenue for the City of Loveland. The project included site work,
excavation, demolition of portion of existing bridge, structural fill, rip rap,
concrete washout structure, concrete wall, railing and seeding.
Owner: City of Loveland
500 East 3`d Street
Loveland, CO 80537
Contact: Ross, W. Shaw, Engineering Division
970-962-2627
Contract: $1451000.
Completion: March 2005
Houston Gardens Pump Station
Construction of a non -potable irrigation pump station including
demolition, site work, concrete, masonry pump building, pump system,
water line and surveying.
Owner: City of Greeley
1000 Tenth Street
Greeley, CO 80631
Contact: Phil Carter, 970-371-3727
City of Greeley Water System Manager
Contract: $194,531.
Completion: June 2005
8u` Avenue Trench Train
Construction of a new trench drain system along 400 lineal feet of Bch
Avenue for the City of Greeley. The scope of work included excavation,
structural and site concrete, and asphalt repair.
Owner: City of Greeley
1000 Tenth Street
Greeley, CO 80631
Contact: Joe Marcisofsky, 970-336-4124
City of Greeley Public Works Department
Contract: $67,584.00
Completion: March, 2005
Loveland Sports Park
Subcontract for the concrete bleachers, stairs, retaining walls and the skate
board facility in the park. The scope of work included structural concrete,
concrete and shotcrete for in -ground skate board park area.
Contact: Ted Johnson, 970-669-6291, Project Manager
ECI Site Construction Management, Inc.
Contract: $198,400.
Completion: September, 2005
USDA Crops Research Lab Phase III
Subcontracted and portion of this project. Our scope included the
demolition of the existing greenhouse building as well as the sitework,
excavation, concrete foundation, site concrete work, and asphalt paving
for the new greenhouse facility.
General Contractor: Flintco/ CNII
Contact: Al Pflueger, Project Manager
Phone: 530-510-0945
Email: apflueger@flintco.com
Contract: $3105553.18
Change Orders: Nine: $65,684.18
Own Forces: 86%
Completion: October, 2002
LakeMacIntosh, Phase H
Project included construction of a pedestrian trail, bridge abutments,
fences, concrete boat ramps, and installation of pre-engineered pedestrian
bridges. Work included grading, drainage improvements, concrete
flatwork, aggregate boat launch areas, site furnishings, signage and
seeding.
Owner: City of Longmont
1100 S. Sherman Street,
Longmont, CO
Contact: Dan Wolford, project manager, 303-774-4691
Superintendent of Open Space and Trails
3001 State Highway #119
Longmont, CO 80502
Contract: $287,021.20
Completion: February, 2006
Bellvue Nurse Basin Repair/Pond Dredge
Pond dredging, pipe replacement, valve replacement, concrete and metal
restoration for the DOW fish hatchery.
Owner: State of Colorado
Division of Wildlife
6060 Broadway
Denver, CO 80216
Contact: Kay Sinclair, project engineer, 970-416-3330
Division of Wildlife
317 West Prospect Road, Fort Collins, 80526
Contract: $123,914.15
Completion: February, 2006
G.L. Hoff Company
Construction Experience
Gregory L. Hoff, President and Construction Manager
For the past thirty five years, Greg has been involved with all aspects of construction.
Greg established G.L. Hoff Company in 1984. Serving as president and project
superintendent, Greg is a driving force in the company.
Graduating from Northeastern Junior College in 1972 with a degree in Civil Engineering,
his early work included surveying and architectural design and drafting. He has held a Class
B Commercial Contractor's License with the City of Fort Collins since 1976. Currently,
Greg is a licensed contractor in the cities of Loveland, Fort Collins, Longmont and Boulder.
Beginning in 1984, Greg established G.L. Hoff Company, a commercial general contracting
company which specializes in all types of commercial construction including site work,
excavation, structural concrete, and commercial buildings. As president and construction
superintendent for G.L. Hoff Company, Greg supervises a wide variety of projects
including, schools, churches, city and government projects, city park developments, as well
as many light industrial and concrete construction jobs. Greg oversees project scheduling,
review of construction procedures and specifications, monitors quality control and safety
enforcement on job sites. As president and construction supervisor, Greg works closely
with project owners, architects and engineers throughout the project.
Greg is an active member of the Loveland construction community. He has volunteered his
time to the Loveland Construction Advisory Board for over 15 years. While serving as
Chairman of this Board, the city adopted licensing for contractors. He also served on a
review committee to study the International Building Code prior to its adoption by the City
of Loveland Building Department.
Joel S. Reger, Estimator and Project Manager
Joel has a Bachelor of Science Degree in Construction Management from Colorado State
University and seventeen years experience in the construction field. He has continued his
education with estimating seminars including training with American Building Company's
estimating Access workshop and Master Builder Computer System. He is also an active
member of the Sigma Lambda Chi honorary national construction fraternity.
During the past fifteen years, as the chief estimator with G.L. Hoff Company, Joel has
compiled bids and development estimates for projects valued at up to five million dollars.
As chief estimator, he directs the project bidding process as well as the review of
specifications. He also works directly with project management, coordinating proposal
requests and change orders with the architect or owner, overseeing material orders to insure
that the project is completed in a timely manner and according to specifications. Joel is an
important and effective member of every Design -Build project with G.L. Hoff Company.
He works closely with the owner and architect to understand project goals and provide
detailed project budgets and construction options to meet the owner's needs.
Patrick R. Norris, Estimator/Project Manager
Pat brings thirty years of construction experience to his position as estimator and project
manager. His background includes experience with residential, commercial and industrial
construction. Pat began his career as a carpenter, form setter and equipment operator.
With 18 years working as a field foreman, he has a broad understanding of building methods
and materials as well as site safety and personnel management. His knowledge of
construction has enabled Pat to be an effective estimator and project manager. During the
past 7 years, Pat has bid and managed projects valued up to $500,000.
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
performing over 150 of the contract.
ITEM
7/96
SUBCONTRACTOR
Section 00430 Page 1
a.
SECTION 00300
BID FORM
PROJECT: Bid 5971 Pedestrian Bridges
Place Fort Collins, April 7, 2006
Date
1. In compliance with your Invitation to Bid dated
3-15-2p06 and subject to all conditions thereof, the undersigned
a (Corporation, Limited Liability Company, Partnership, Joint Venture, or
Sole Proprietor) authorized to do business in the State of Colorado
hereby proposes to furnish and do everything required by the Contract
Documents to which this refers for the construction of all items listed
on the following Bid Schedule or Bid Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this
proposal is made in good faith, without collusion or connection with any
other person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the
Invitation to Bid and Instructions to Bidders, the Agreement, the
detailed Specifications, and the Drawings pertaining to the Work to be
done, all of which have been examined by the undersigned.
3. Accompanying this Bid is a certified or cashier's check or standard Bid
bond in the sum of 5% of Bid amount
($ ) in accordance with the Invitation To Bid
and Instructions to Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award of the contract is delivered to him at the address given on this
Bid. The name and address of the corporate surety with which the Bidder
proposes to furnish the specified performance and payment bonds is as
follows: Employers Mutual Companies, PO Box 370010, Denver, CO 80237
5. All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by
the CONTRACTOR under one of the items listed in the Bid Schedule,
irrespective of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No.
through
7/96 Section 00300 Page 1
8. BIDSCHEDULE
00330
CiN of Fun Collins
Pedestrian Bridges
Item No.
Description
Unit
Contract
Quantity
Estimated Cost
Unit Cost
Total
206.01
Structure Excavation
C.Y.
50
$ 40.40
$ 2,020.00
206.02
Free Draining Fill (No. 57 Aggregate) (C.I.P.)
Ton
100
$ 35.92
$ 3,592.00
420.01
Geotextile (Drainage) (ClassA)
S.Y.
75
$ 14.00
$ 1,050.00
509.01
Steel Abutment, 6-Foot, Installed
Each
4
$ 4956.00
$ 19,824.00
509.02
Steel Abutment, 8-Foot, Installed
Each
2
$ 5044.00
$ 10,088.00
552.01
Helix Pier, Installed
Each
14
$ 1570.00
$ 21,980.00
614.03
Channelizing Barrels
Per Day Per Each
150
$ 1 . 30
$ 195.00
614.04
Type 1 Barricade Without Light
Per Day Per Each
150
$ 1.30
$ 195.00
614.07
Size A Sign With Stand
Per Day Per Each
50
$ 3.85
$ 192.50
614.08
Size B Sign With Stand
Per Day Per Each
10
$ 6.45
$ 64.50
614.11
Cone With Reflective Strip
Per Day Per Each
200
$ 1.30
$ 260.00
614.12
Safety Fence
Per Day Per Roll
10
$ 6.45
$ 64.50
614.13
Light - Steady Bum
Per Day Per Each
15
$ 1.30
$ 19.50
614.14
Light - Flashing
Per Day Per Each
15
$ 1.30
$ 19.50
614.15
Advance Warning Flashing - or Sequencing Arrow Panel
Per Day Per Each
10
$ 100.00
$ 1,000.00
614.16
Traffic Control Supervisor
Per Day
3
$ 490.00
$ 1,470.00
614.17
Traffic Control Supervisor
Per Hour
50
$ 58.00
S 2,900.00
614.18
Flagging
Per Hour
50
$ 29.00
$ 1,450.00
625.01
Construction Surveying
Lump Sum
1
$ 2537.00
$ 2,537.00
628.01
Pedestrian Bridge - 45' x 6' Laporte (East)
Each
1
S 25 984.00
S 25,984.00
628.02
Pedestrian Bridge - 30' x 6' Laporte ( West)
Each
I
$ 19 914;: 00
$ 19,914.00
628.03
Pedestrian Bridge -40'x 8'Mulberry
Each
]
IS 26770.00
Is 26,770.00
TOTAL COST s141,589.50
The City of Fort Collins reserves the right to authorize future orders from this bid for a period of five years after date of award. Annual renewals and
pricing changes shall be negotiated by and agreed to by both parties.
One hundred forty one thousand five hun$ol�gan$ighty nine do.11ar6t and-fiftyca�nts.
Sinned Address 1815 West 12th Street
Company G f C p q Loveland, CO 80537
Phone/Fax 970-669-3255, 970-663-1566
Check One:
Individual Doing Business in Company Name
Corporation
Partnership
C:\DOCUME-I\cpattem\LOCALS-1\Temp\Bid Tab.xls Page lof 1
J
9. PRICES
7/96
The foregoing prices shall include all labor, materials, transportation,
shoring, removal, dewatering, overhead, profit, insurance, etc., to cover
the complete Work in place of the several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the
Bid or change quantities at his sole discretion without affecting the
Agreement or prices of any item so long as the deletion or change does
not exceed twenty-five percent (250) of the total Agreement Price.
—TDate p
#B-6
License Number (If Applicable)
Address PO Box 7448
Loveland, CO 80537
Telephone 970-669-3255
Section 00300 Page 3
SECTION 00400
SUPPLEMENTS TO BID FORMS
00410 Bid Bond
00420 Statement of Bidder's Qualifications
00430 Schedule of Subcontractors
7/96 Section 00410 Page 1
- EC T ION ca!i'a 10
610 BOND
G. L. Hoff Company
KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned
as Principal, and Employers Mutual -Casualty Company as Surety, are
hereby held and firmly bound unto the City of Fort Collins, Colorado, as
OWNER, in the sum of $ Five percemt (5%) of the total amount of bid -- for the
payment of which, well and truly to be made, we hereby jointly and severally
bind oursE:).vE>s, c;uccessor.s, and as:xigns.
:.H4: CONDi1'TC)N of .h.is �bl gation is luoh that whereas the PrLnc i. gal !-1a:,
submitted to t:,e City_,t F'or�t Collins, CoIorado the accompan}in, Bid and
aereby made a part hereof to enter into a Construction Agreement for the
<:onstruction of Fort Collins Project., Bid 5971 Pedestrian Bridges.
NOW THEREFORE,
(a If said Bid shall be rejected, or
(b) 'If said Bid shall be accepted and the Principal shall execute and deliver.
a Contract in the form of Contract attached hereto (properly completed in
auc,-.,, anQe witO said ]aid) and shall Furnish a SOND tc,r his
pe Y'.urniance of Said Contract, and for paymor.Z: of all }persons p..:'oryn1n
Libor o:c furnishing waterialS In c':,fine•(:tjoa therewith, Z.-Ind hall :i..l ?715.
other respects perform the Agreement created by the acceptance of said
Bid, then this obligation shall be void; otherwise the same shall remai.r.
in force and effect, it being expressly understood and agreed that the
liability of the Surety for any and all claims hereunder shall, in no
event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the
obligations of said Surety and its BOND shall. be in no way impaired or
affected by any extension of the time within which the OWNER may accept such
Eid. .and .said Surety does hereby waive notice of any such exti:�.ls;��r
=Oty `-OliipaniCe$ ?XE i.ULYiIi) t)fJild3 Il:yt ne iuzhokil,e•.1 t:•f
tile State n:: Colorado and be accepted b=r the OWN M.
1/96
Section 00410 Page 2
IN WITNESS WHEREOF', the Principal and thcr Surety have hereunto set theirhangs
and seals this 7th day of April___._.___ 2006, and such of them as are
corporations have caused their corporate seals to be hereto affixed and these
Presents to be signed by their proper officers, the clay and year first set
forth above,.
PRINCIPAL SURETY
Nam. r G. L. Hoff Company _ Employers,..Mutual__,_Casual
;l�iress: 1815 W. 12th St. P.O. Box 370010
Loveland, CO 80537 Denver, CO 80237
Hy, Bv:
i ..,
iA.
tie: ��6r�fjG�✓ "i ._e t Darlene Krings, -..,._ _.. ..J. .. -. ....... _. w
h` 'u
tSEAL)
Section 0041,0 Page 3
No Text
N
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and
comprehensive. This statement must be notarized. If necessary, questions may
be answered on separate attached sheets. The Bidder may submit any additional
information he desires.
1. Name of Bidder: G.L. Hoff Company
2. Permanent main office address: 1815 WEst 12th Street, Loveland, CO 80537
3. When organized: January 1984
4. If a corporation, where incorporated: Colorado (1989)
5. How many years have you been engaged in the contracting business
under your present firm or trade name? 22 years
6. Contracts on hand: (Schedule these, showing the amount of each
contract and the appropriate anticipated dates of completion.)
Greeley REcreation Center Pavers: $28,521. May, 2006
Loveland Splash Park: $196,691. June, 2006
7. General character of Work performed by your company:
Commercial general contractor: we complete sitework, concrete, carpentry,
project management and utilities with our own forces.
8. Have you ever failed to complete any Work awarded to you? no
If so, where and why?
0
Have your ever defaulted on a contract?
If so, where and why?
10. Are you debarred by any government agency?
If yes list agency name.
7/96
no
Section 00420 Page 1