HomeMy WebLinkAboutRESPONSE - BID - 5978 DIRECTIONAL BORING CONTRACTORBid #5978
Bid Schedule
Linear feet and pot holes are an arbitrary number for bid purposes only. The City reserves the right
to award in the best interest of the City, either by linear foot or total cost and to enter in to a
separate agreement for potholing.
Directional Boring $ 3 - v /Linear Foot X 185F
With one 2" Conduit
Directional Boring $ `' L'' /Linear Foot X 185F =
With two 2" Conduits
Directional boring $ " /Linear Foot X 185LF =
With one 3" conduit
Directional boring $ '' /Linear Foot X 15OLF =
With two 3" conduit
Pot holing $ 3 . ? /Pot hole X 20 locations =
Total Cost $
Total$
Total$
Total$
Total $ Y • c G
Total $ ; .
Firm Name
(Are you a corporation, DBA, Partnership, LLC, PC)
Signature W
PRINTED NAME t:o;
Title
Address
Phone/Fax
SA WO January 2005