No preview available
HomeMy WebLinkAboutCORRESPONDENCE - BID - 5911 MISCELLANEOUS CONCRETE PROJECT (3)Administrative Services Purchasing Division City of Fort Collins April 13, 2006 Express Concrete, Inc. Attn: Kimberly J. Hoffman, Vice President 5305 S. Ziegler Rd. Fort Collins, CO 80528 Re: Renewal, 5911 Miscellaneous Concrete Project Dear Ms. Hoffman: The City of Fort Collins wishes to extend the agreement term for the above captioned proposal per the existing terms and conditions, and revised bid schedule attached. The term will be extended for one (1) additional year, May 1, 2006 through April 30, 2007. If the renewal is acceptable to your firm, please sign this letter in the space provided and return it to the City of Fort Collins, Purchasing Division, P. O. Box 580, Fort Collins, CO 85022, within the next fifteen days. If this extension is not agreeable with your firm, we ask that you send us a written notice stating that you do not wish to renew the contract and state the reason for non -renewal. Please contact John D. Stephen CPPO, CPPB, Senior Buyer, at (970) 221-6777 if you have questions. Sincerely, J me B. O'Neill II, CPPO, FNIGP Di or of Purchasing and Risk Management f �• eye Z� 0 Signatur Date (Please indicate your desire to renew 5911 by signing this letter and returning it to Purchasing Division within the next fifteen days.) cc: JBO:amm 215 North Mason Street • 2nd Floor • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6775 • FAX (970) 221-6707 SECTION 00330 CITY OF FORT COLLINS BID SCHEDULE MISCELLANEOUS CONCRETE PROJECT BID NO.5911 - 2006 RENEWAL ITEM NO DESCRIPTION UNIT PRICE UNIT ESTIMATED QUANTITY TOTAL COST 202.01 Sawcut Concrete/Asphalt <4" $ 2.17 LF 25 $ 54,25 202.02 Sawcut Concretc/Asphalt 4" <_ 6" $ 2.69 LF 25 $ 67.25 202.03 Sawcut Conerete/Asphalt 6" <_ 8" $ 3.36 LF 25 $ 84.00 202.04 Sawcut Concrete/Asphalt 8" <_ 10" $ 4.65 LF 25 $ 116.25 202.05 Sawcut-Additional l"Depth $ 0,78 LF 25 $ 19.50 202.06 Remove Concrete Sidewalk $ 2.33 SF 1500 $ 3,495.00 202.07 Remove Concrete Curb and Gutter $ 3.52 LF 250 $ 880.00 202.08 Remove Monolithic Curb, Gutter & Sidewalk $ 2.38 SF 250 $ 595.00 202.09 Remove Concrete Driveway/Aprott/Crosspan $ 2.53 SF 750 $ 1,897.50 202.10 Remove Concrete Pavement-10" $ 3.93 SF 500 $ 1,965.00 202.11 Remove Concrete Pavement - Additional 1" Depth $ 0.41 SF 50 $ 20.50 202.12 Reprove Asphalt -6" $ 2.17 SF 250 $ 542.50 202.13 Remove Asphalt - Additional V Depth $ 0.41 Sr 50 $ 20.50 202.14 Remove Inlet $ 542.85 EA 5 $ 2,714.25 202.15 Remove and Haul Driveway Fillets $ 51.70 EA 5 $ 258.50 202.16 Remove Flagstone $ 2.95 SF 100 $ 295.00 203.01 Excavation - General Less Than 50 CY $ 62.00 CY 150 $ 9,300.00 203.02 Excavation - General Over 50 CY $ 56.00 CY 150 $ 8,400.00 203.03 Excavation - Walls Only $ 11.37 CY 100 $ 1,137.00 203.04 Excavation - New Inlet $ 400.00 EA 5 $ 2,000.00 203.05 Borrow - Less than 100 Ton $ 31.00 TON 75 $ 2,325.00 203.06 Borrow - Over 100 Ton $ 26.75 TON 75 $ 2,006.25 210.01 Reset Brick Pavers $ 7.71 1 SF 185 $ 1,426.35 210.02 Adjust Manhole $ 125.00 1 EA 1 10 is 1,250.00 210.03 lAdjustValveBox Is 115.00 1 EA 10 Is 1,150.00 304.01 Aggregate Base Course Is 25.10 1 TON 1 150 IS 3,765.00 403.01 Temporary Asphalt Patching Is 85.44 1 TON 1 100 $ 8.544.00 602.01 Reinforcing Steel Is 0.41 1 LB 1 500 is 205.00 602.02 Reinforcing Steel - Epoxy Coated Is 0.94 1 LB I 500 Is 420.00 604.0t Reconstruct Inlet Deck - Catch Basin (R&R) $ t,028A0 EA 5 $ 5,140.00 604,02 Reconstruct Inlet Deck- Additional Foot Opening(R&R) $ 169.62 LF 10 $ t,696.20 604.03 Reconstruct Curb Inlet Deck - T Opening (R&R) $ 1,696.20 EA 5 $ 8,481,00 604.04 Reconstruct Curb Inlet Deck - Additional Foot Opening (R&R) $ 169.61 LF 10 $ 1,696.20 604.05 Area Inlet $ 1,028.00 EA 5 $ 5.140.00 604.06 Type R Inlet- 5' Opening $ 1,747.60 EA 5 $ 8,738.00 604.07 Type R Inlet - Additional Foot Opening $ 226.16 LF 5 $ 1,130.80 604.08 Combination Type 13 Curb Inlet - Frame, Grate & Adjustable Curb Bonnet (East Jordan Ironworks 7030 or Equivalent) $ 1,490.60 EA 5 $ 7,453.00 604.09 Concrete Sidewalk Culvert $ 355.00 EA 5 $ 1,775.00 604.10 Metal Sidewalk Culvert-2'Opening, 5/8"plate $ 1,175.00 EA 10 $ 11,750.00 604.H Additional Square Foot 5/8" Plate $ 103.40 SF 10 $ 1.034.00 608.01 Driveover Curb, Gutter & 4" Sidewalk $ 19.35 LF 1,000 $ 19,350.00 608.02 Driveover Curb, Gutter & 6" Sidewalk $ 21.50 LF 1,000 $ 21,500.00 608.03 Driveover Curb and Gutter -No Sidewalk is 16.50 1 LF 125 is 2,062.50 Page I of3 SECTION 00330 CITY OF FORT COLLINS BIDSCHEDULE MISCELLANEOUS CONCRETE PROJECT BID NO.5911 -2006 RENEWAL ITEM NO DESCRIPTION UNIT PRICE UNIT ESTIMATED QUANTITY TOTAL COST 608.04 Driveover Curb, Gutter and 6" Drive Approach $ 23.00 LF 200 S 4,600.00 608.05 Vertical Curb, Gutter and 4" Sidewalk $ 21.30 LF 300 $ 6,390.00 608.06 Vertical Curb, Gutter and 6" Sidewalk $ 23.60 LF 100 $ 2,360.00 608.07 Vertical Curb and Gutter - No Sidewalk $ 17.50 LF 500 $ 8,750.00 608.08 Vertical Curb, Gutter and Drive Approach $ 24.25 LF 150 $ 3,637.50 608.09 Vertical Curb, Gutter and 6" Drive Approach - No Sidewalk $ 18.25 LF 75 $ 1,368.75 608.10 Out Fall Curb & Gutter $ 16.60 LF 100 $ 1,660.00 608.11 Hollywood Curb, Gutter and 4" Sidewalk $ 16.00 LF 250 $ 4.000.00 608,12 Hollywood Curb, Gutter and 6" Sidewalk $ 17.00 LF 250 $ 4.2%00 608.13 Hollywood Curb and Gutter - No Sidewalk $ 13.75 LF 75 $ 1,03 L25 609.14 Hollywood Curb, Gutter and Drive Approach $ 17.50 LF 150 $ 2,625.00 608.15 Highback Curb and Gutter - No Sidewalk $ 25.00 LF 500 $ 12,500.00 608.16 Highback Curb, Gutter and Drive Approach $ 27.20 LF 150 $ 4,080.00 608.17 Barrier Curb -6"x 18" $ 20.00 LF 150 $ 3,000.00 608.18 Barrier Curb - Key Way Style $ 23.30 LF 150 $ 3,495.00 608.19 Barrier Curb - Epoxy $ 18.50 LF 150 $ 2,775.00 608.20 Mountable Curb -12"x 18" $ 21.00 LF 150 $ 3,150.00 608.21 Mountable Curb - Key Way Style $ 24.40 LF 150 $ 3,660.00 608.22 Mountable Curb - Epoxy $ 22.20 LF 150 $ 3,330.00 608.23 Pedestrian Access Ramp, Driveover Curb $ 31.50 LF 150 $ 4,725.00 608.24 Pedestrian Access Ramp, Vertical Curb $ 30.50 LF 100 $ 3,050.00 608.25 Pedestrian Access Ramp, Hollywood Curb $ 24.80 LF 150 $ 3,720.00 608.26 Pedestrian Access Ramp, Highback Curb $ 6.10 SF 375 $ 2,287.50 608.27 Truncated Dome Panel $ 40.00 SF 100 $ 4,000.00 608.28 Apron - 8" $ 5.50 SF 500 $ 2,750,00 608.29 Crosspan-8" $ 4.70 SF 750 $ 3,525.00 609.30 Valley Pon -6"Depth $ 6.25 SF 350 $ 2,187.50 608.31 Flatwork - 4" $ 2.70 SF 4,000 $ 10,800.00 608.32 Flatwork-6" $ 3.25 SF 1,500 $ 4,975.00 608.33 Replace Flatwork - 1" Additional Depth $ 0.53 SF 250 $ 132.50 608.34 Concrete Pavement 8" (Joints Sealed) $ 4.68 SF 1,500 $ 7,020.00 608.35 Alley Approach - 8" $ 5.00 LF 100 $ 500.00 608.36 Enhanced Crosswalk - 10" Tile Red $ 10.00 SF 150 $ 1,500.00 608.37 Enhanced Crosswalk - 10" San Diego Buff $ 9.45 SF 150 $ 1,417.50 608.38 Enhanced Crosswalk - 10" Brick Red, Stamped $ 11.90 SF 150 $ 1,785.00 608.39 Colored Trail with Fibermesh - 5" Yosemite Brown $ 4.00 SF 500 $ 2,000.00 608.40 Mow Strip -4"x 12" $ 9.40 LF 500 $ 4,700.00 608.41 Splashblock - 4" Exposed Aggregate $ 5.50 SF 500 $ 2,750.00 608.42 Splashblock - 4" San Diego Buff $ 5.80 SF 500 $ 2,900.00 608.43 Median Cover - 4" San Diego Buff $ 5.80 SF 500 $ 2,900.00 608.44 Fibennesh - Added to Any Item, Additional Charge $ 5.20 LB/CY l00 $ 520,00 608A5 24 Hour High Early Concrete - Added to Any Item, Additional Charge $ 16,65 Cy 50 $ 832.50 608.46 Stamp Pattern - Added to Any Item, Additional Charge $ 2.20 SF 150 $ 330.00 608.47 6" Concrete Bollard $ 77.55 EA 5 $ 387.75 608.48 8" Concrete Bollard $ 93.06 EA 5 $ 465,30 608.49 Flowable Fill $ 61.00 CY 25 $ L525.00 608,50 Non -reinforced Concrete Wall, 8" $ 12.00 SFF 500 $ 6,00000 608,51 Non -reinforced Concrete Footer-8" $ 13.00 SF 225 $ 2925.00 60&52 Concrete Staining/Sealing $ 2.80 SF I50 $ 420.00 608.5-1 Expansion and Sealing $ 4.15 LF 250 $ 1,037.50 009.54 Joint Sealant $ 2.35 LF 100 $ 235.00 Page 2 ot3 SECTION 00330 BID SCHEDULE CITY OF FORT COLLINS MISCELLANEOUS CONCRETE PROJECT BID NO.5911 -2006 RENEWAL IT DESCRIPTION UNIT PRICE UNIT ESTIMATED TOTAL COST NO QUANTITY 608.55 ClassDConcrete Is 99.50 CY 1 20 Is 1,990.00 626.01 1 Mobilization- Invoices Under $500 $ 280.00 1 Lump Sum 25 $ 77000.00 630.01 "NO PARKING" Sign With Stand $ 1.50 Per Day Per Each 375 $ 562.50 630.02 Vertical Panel Without Light $ 0.87 Per Day Per Each 50 $ 43.50 630.03 Channelizing Barrels $ 0.77 Per Day Per Each 50 $ 38.50 630.04 Type 1 Barricade Without Light $ 0.77 Per Day Per Each 750 $ 577.50 630.05 Type 11 Barricade Without Light $ 0.77 Per Day Per Each 20 $ 15.40 630.06 Type III Barricade Without Light $ 3,05 Per Day Per Each 20 $ 61.00 630.07 Size A Sign With Stand $ 1.45 Per Day Per Each 225 $ 326.25 630.08 Size B Sign With Stand $ 1.60 Per Day Per Each 20 $ 32.00 630.09 Size A Specialty Sign - Cost of Manufacturing $ 78.00 Each 2 $ 156.00 630.10 Size B Specialty Sign - Cost of Manufacturing $ 78.00 Each 2 $ 156.00 630.11 Cone With Reflective Strip $ 0.62 Per Day Per Each 375 $ 232.50 630. 12 Safety Fence $ 5.10 Per Day Per Roll 20 $ 102.00 630.13 Light $ 0.51 Per Day Per Each 20 $ 10.20 630.14 Advance Warning Flashing- or Sequencing Arrow Panel $ 71.00 Per Unit Per Day 5 $ 355.00 630.15 Variable Message Board $ 128.50 Per Unit Per Day 10 $ 1,285.00 630.16 Traffic Control Supervisor $ 300.00 Per Day 25 $ 7,500.00 630.17 Traffic Control Supervisor - $ 31.00 Per Hour 100 $ 3,100,00 630.18 Flagging $ 19.00 Per Hour 150 $ 2,950.00 FORCE ACCOUNT LABOR RATES *Materials will carry a 10 % markup from the original Invoice for costs $500 and below, and an 8% markup for invoices greater than $500 *Attach hourly Equipment/Operator rates to be used for Force Account work FAI Laborer $ 21.59 our 15 $ 323.85 FA2 Foreman $ 35.98 Hour 15 $ 539.70 FA3 Finisher $ 29.81 Hour 15 $ 447.15 FA4 Form Setter $ 29.27 Hour 15 $ 424.05 TOTAL COST $ 340,893.95 Three Hundred Forty Thousand, Eight Hundred Ninety Three Signed Company Express Concrete Inc. Check One: Individual Doing Business in Company Name X Corporation Partnership Dollars and Ninety Five Cents, 13ox z 7 32 9 Address Phone/Fax Fort Collins, CO-91)528- 970.225.1287 970.229.0846 Page 3 of