SUBGRADE INVESTIGATION
AND PAVEMENT DESIGN
BOBCAT RIDGE PROJECT
8429 WEST COUNTY ROAD 32C
LARIMER COUNTY, COLORADO
Prepared for:
CITY OF FORT COLLINS
OPERATION SERVICES
117 North Mason Street
P. O. Box 580
Fort Collins, Colorado 80521
Attention: Mr. Steve White
Facilities Project Manager
Project No. FC03550-135
September 21, 2005
4001 Automation Way I Unit 2011 Fort Collins, Colorado 80525
Telephone:970-206-9455 Fax:970-206-9441
IF
change considerably, we should be contacted to review the recommendations.
We believe the geotechnical services for this project were performed in a
manner consistent with that level of care and skill ordinarily used by members of
the profession in the locality of the project. No warranty, express or implied, is
made. If we can be of further service in discussing the contents of this report, or
in the analyses of the proposed pavement systems from a geotechnical point of
view, please call.
CTL I THOMPSON, INC.
CITY OF FORT COLLINS OPERATION SERVICES 8
BOBCAT RIDGE PROJECT
CTL I T PROJECT NO. FC03550-135
S:\FC03550.000\135\2. Reports\R1\1FC03550-135.rpt.doc
8
g
g
i
SCALE: 1" = 200'
CITY OF FORT COLLINS
BOBCAT RIDGE PROJECT
CTL I T PROJECT NO. FC03550-135
o
EXISTING
HOUSE n
VICINITY MAP
(MASONVILLE AREA)
NO SCALE
COON
�OAO'12C
INDICATES APPROXIMATE LOCATION
OF EXPLORATORY BORING
Locations of
Exploratory
Borings
FIGURE 1
S-1
S-2 S-3 S-4 S-5
El.5430
El.5423 El.5414 El.5424 El.5419
--
5,435
5,435--:
12/12
5,425
10/12
5,425-4 �
Lu
-
w
11112
LL
zo-
50/0
15/12
�:
10l12
o
50/9
--1w
/12
w
W
5,415
50/4 8/12
5,4151
ff..7/12_1/12
_
J
�
I
5,405
5,40
LEGEND:
SAND, CLAYEY, LOOSE TO MEDIUM DENSE, SLIGHTLY MOIST TO MOIST, DARK BROWN,
REDDISH BROWN (SC)
SANDSTONE, MEDIUM HARD, SLIGHTLY CEMENTED, SLIGHTLY MOIST, REDDISH BROWN
(BEDROCK)
SANDSTONE, VERY HARD, CEMENTED, SLIGHTLY MOIST, REDDISH BROWN, GRAY
(BEDROCK)
DRIVE SAMPLE. THE SYMBOL 12/12 INDICATES 12 BLOWS OF A 140-POUND HAMMER
FALLING 30 INCHES WERE REQUIRED TO DRIVE A 2.5-INCH O.D. SAMPLER 12 INCHES.
BULK SAMPLE FROM AUGER CUTTINGS.
INDICATES FINISHED GROUND SURFACE ELEVATION.
NOTES:
1. THE BORINGS WERE DRILLED ON AUGUST 30, 2005, USING 4-INCH DIAMETER
CONTINUOUS -FLIGHT AUGER AND A TRUCK -MOUNTED DRILL RIG.
2. BORING ELEVATIONS ARE APPROXIMATE AND WERE FROM A TOPOGAPHIC PLAN
FURNISHED BY THE CLIENT.
3. THESE LOGS ARE SUBJECT TO THE EXPLANATIONS, LIMITATIONS AND CONCLUSIONS IN
THIS REPORT.
SUMMARY LOGS OF EXPLORATORY BORINGS
CITY OF FORT COLLINS
BOBCAT RIDGE PROJECT FIGURE 2
CTL I T PROJECT NO. FC03550-135
HYDROMETER ANALYSIS
SIEVE ANALYSIS
25 HR,
7 HR. TIME READINGS
U S. STANDARD SERIES CLEAR SQUARE OPENINGS
45 MIN.
15 MIN. 60 MIN. 19 MIN. 4 MIN, 1 MIN. '200
'100 '50 *40 '30 '16 '10 '8 '4 3/8" 3/4" 1 IN, 3" 5"6" 8"
100
0
go
10
BO
..
:. -.- _ �_ 20
70
�-
__..:� _.- :___ -_ -_ 30 i
-.. _.
60
-- -- 40
z
40
60
30
70
20
so
10 CLASSIFICATION: A-6
D -- - -- - - _ = GROUP INDEX: 2 ,�,
.001 0.002 005 009 019 .037 .074 .149 .297 .590 1,19 2.0 2,38 4.76 9.52 19.1 36A 76.2 127 200
0.42 152
DIAMETER OF PARTICLE IN MILLIMETERS
Sample of SAND, CLAYEY (SC)
From S-2 FROM 0 TO 5 FEET
GRAVEL 3 % SAND 53 %
SILT & CLAY 44 % LIQUID LIMIT 27 %
PLASTICITY INDEX 11 %
HYDROMETER ANALYSIS SIEVE ANALYSIS
25 HR. 7 HR. TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS
45 MIN. 15 MIN. 60 MIN. 19 MIN. 4 MIN. 1 MIN. '200 *100 *50 *40 '30 *16 *10 '8 '4 3/8" 314" 1X" 3" 5"6" 8"
100 0
10
so
20
oe
30
w
_ _. .. { _ ..
. 40
r
50
50
z
40
60
i
30
70
20
80
AASHTO CLASSIFICATION: A-24
o
90
GROUP INDEX: 01100
D
..�
001 0 002
005 009 019 037 074 149 297 590 1.19 2.0 2.30 4.76 9.52 19.1 36.1 76.2 127
200
042 152
DIAMETER OF PARTICLE IN MILLIMETERS
Sample of SAND, CLAYEY (SC)
From S-4 FROM 0 TO 5 FEET
CTL I T PROJECT NO. FC03550-135
GRAVEL 1 % SAND 64 %
SILT & CLAY 35 % LIQUID LIMIT 30 %
PLASTICITY INDEX 12 %
Gradation
Test Results FIGURE 3
Ir
TABLE 1
ir
BORING
DEPTH
FEET
NATURAL
MOISTUR
0
NATURAL
DRY
DENSITY
PCF
ATTERBERG
LIMITS
PASSING
NO. 200
SIEVE
SOIL TYPE
LIQUID
LIMIT
PLASTICITY
INDEX
S-2
0-5
1 4.1
1
1 27
1 11
1 44
SAND, CLAYEY SC
S-3
4
1 15.5
1 109
1
1
1
ISAND, CLAYEY SC
S-4
0-5
1 8.0
1
1 30
1 12
1 35
SAND, CLAYEY SC
CTL I T PROJECT NO. FC03550-135 Page 1 of 1
APPENDIX A
RIGID PAVEMENT
DESIGN CALCULATION
CITY OF FORT COLLINS OPERATION SERVICES
BOBCAT RIDGE PROJECT
CTL I T PROJECT NO. FC03550-135
SAFC03550.000\135\2. Reports\R1\FC03550-135.rpt.doc
....
• • :N1 103WAY14 u ► k A • ►
Project: FC03550-135
Location: BOBCAT RIDGE
What is the Design ESAL ?
What is the Reliability ?
What is the Serviceability Loss ?
What is the Concrete Elastic Modulus ?
What is the Concrete Modulus of Rupture ?
What is the Drainage Factor ?
What is the Standard Deviation ?
What is the Load Transfer Coefficient ?
What is the R-value ?
Computed Resilient Modulus =
If R is not available, Input Resilient Modulus =
DESIGN RESILIENT MODULUS =
Design Slab Thickness is
psi
DSi
asi
psi
3si
nches
IF
APPENDIX B
CONSTRUCTION CHECKLIST
CITY OF FORT COLLINS OPERATION SERVICES
BOBCAT RIDGE PROJECT
CTL I T PROJECT NO. FC03550-135
S:\FC03550.000\135\2. Reports\R1\FC03550-135.rpt.doc
IF
CONSTRUCTION CHECKLIST
The construction procedure of the pavement system is as important as the
quality of the materials. Inadequate compaction of the subgrade is often the
reason for early pavement failure, resulting in pavement instability, rutting,
cracking, settlement and heave. We recommend the proposed pavement be
constructed in the following manner.
PREPARATION
Subgrade Preparation
> Subgrade shall be stripped of organic matter, scarified, moisture
treated, and compacted.
> Utility trenches and all subsequently placed fill shall also be
compacted and tested prior to paving.
> Final grading of the subgrade should be carefully controlled so the
design cross -slope is maintained and low spots in the subgrade that
could trap water are eliminated.
Granular Soils (A-2-4 and A-4)
> Soils shall be moisture treated to within 2% of optimum moisture
content.
> Soils shall be compacted to at least 95% of maximum standard
Proctor dry density (ASTM D 698, AASHTO T 99).
Cohesive Soils (A-6 to A-7-6)
> Soils shall be moisture treated between optimum and 3% above
optimum moisture content.
> Soils shall be compacted to at least 95% of maximum standard
Proctor dry density (ASTM D 698, AASHTO T 99).
Proof Testing
> After final subgrade elevation has been reached and the subgrade
compacted, the area shall be proof -rolled with a pneumatic -tired
vehicle loaded to at least 18 kips per axle.
> Subgrade that is pumping or deforming shall be scarified, moisture
conditioned, and tested.
> If areas of very soft or wet Subgrade are found, the material shall be
sub -excavated and replaced with approved on -site or import
material, moisture conditioned, compacted and tested.
CITY OF FORT COLLINS OPERATION SERVICES Appendix B-1
BOBCAT RIDGE PROJECT
CTL I T PROJECT NO. FC03550-135
S:\FC03550.000\135\2. Reports\R11FC03550-135.rpt.doc
Construction Observation
Where soft, yielding subgrade is encountered, the excavation shall
be inspected by a representative of CTL I Thompson, Inc.
CTL I Thompson shall be notified and tests taken to confirm the
subgrade meets the specifications.
CURB AND GUTTER
Curb and gutter shall be backfilled and compacted to reduce the
potential of heave or settlement that would cause water to pond
adjacent to the pavement.
Compaction shall be in accordance with Section 203.11 of the State
of Colorado Standard Specifications for Road and Bridge
Construction and the City of Longmont specifications.
An asphalt cement tack coat should be applied to the curb,
subgrade and all joints at a rate of not more than 0.10 gallon per
square yard. The tack should be applied at a temperature between
800 F and 1300 F and allowed to cure for % hour prior to paving.
CITY OF FORT COLLINS OPERATION SERVICES Appendix B-2
BOBCAT RIDGE PROJECT
CTL I T PROJECT NO. FC03550-135
S:\FC03550.000\135\2. Reports\R1\FC03550-135.rpt.doc
IF
TABLE OF CONTENTS
SCOPE...........................................................................................................................1
SUMMARY OF CONCLUSIONS....................................................................................1
SITECONDITIONS........................................................................................................1
PROPOSED CONSTRUCTION...................................................................................... 2
INVESTIGATION............................................................................................................ 2
SUBSURFACE...............................................................................................................3
LABORATORY INVESTIGATION.................................................................................. 3
SUBGRADE PREPARATION.........................................................................................4
SOLUBLESULFATES...................................................................................................5
PAVEMENT DESIGN.....................................................................................................5
PAVEMENT MATERIALS.............................................................................................. 6
CONSTRUCTION DETAILS...........................................................................................7
LIMITATIONS................................................................................................................. 7
FIGURE 1 - LOCATIONS OF EXPLORATORY BORINGS
FIGURE 2 - SUMMARY LOGS OF EXPLORATORY BORINGS
FIGURE 3 - GRADATION TEST RESULTS
TABLE 1 - SUMMARY OF LABORATORY TEST RESULTS
APPENDIX A -RIGID PAVEMENT DESIGN CALCULATION
APPENDIX B - CONSTRUCTION CHECKLIST
APPENDIX C - GUIDELINE MAINTENANCE RECOMMENDATIONS
CITY OF FORT COLLINS OPERATION SERVICES
BOBCAT RIDGE PROJECT
CTL I T PROJECT NO. FC03550-135
S:\FC03550.000\135\2. Reports\R1\FC03550-135.rpt.doc
u
APPENDIX C
GUIDELINE MAINTENANCE RECOMMENDATIONS
CITY OF FORT COLLINS OPERATION SERVICES
BOBCAT RIDGE PROJECT
CTL I T PROJECT NO. FC03550-135
S:\FC03550.000\135\2. Reports\R1\FC03550-135.rpt.doc
MAINTENANCE RECOMMENDATIONS FOR RIGID PAVEMENTS it
High traffic volumes create pavement rutting and smooth, polished
surfaces. Preventive maintenance treatments will typically preserve the original
or existing pavement by providing a protective seal and improving skid resistance
through a new wearing course.
1. Annual Preventive Maintenance
a. Visual pavement evaluations should be performed each spring or
fall.
b. Reports documenting the progress of distress should be kept
current to provide information of effective times to apply preventive
maintenance.
C. Crack sealing should be performed annually as new cracks appear.
2. 4 to 8 Year Preventive Maintenance
a. The owner should budget for a preventive treatment at approximate
intervals of 4 to 8 years to reduce joint deterioration.
b. Typical preventive maintenance for rigid pavements include
patching, crack sealing and joint cleaning and sealing.
C. Where joint sealants are missing or distressed, resealing is
mandatory.
3. 15 to 20 Year Corrective Maintenance
a. Corrective maintenance for rigid pavements includes patching and
slab replacement to correct subgrade failures, edge damage and
material failure.
b. Asphalt concrete overlays may be required at 15 to 20 year intervals
to improve the structural capacity of the pavement.
CITY OF FORT COLLINS OPERATION SERVICES C-1
BOBCAT RIDGE PROJECT
CTL I T PROJECT NO. FC03550-135
S:\FC03550.000\135\2. Reports\R1\FC03550-135.rpt.doc
CTLITHOMPSON
CTL I Thompson, Inc.
1971 Westl2th Avenue
Denver, Colorado 80204
Phone:303-825-0777
Fax:303-825-4252
CTL I Thompson, Inc.
5240 Mark Dabling Blvd.
Colorado Springs, CO 80918
Phone:719-528-8300
Fax;719-528-5362
CTL I Thompson, Inc.
234 Center Drive
Glenwood Springs, CO 81601
Phone:970-945-2809
Fax: 970-945-7411
CTL I Thompson, Inc.
375 E. Horsetooth Road
The Shores Office Park
Building 3, Suite 100
Ft. Collins, Colorado 80525
Phone:970-206-9455
Fax: 970-206-9441
CTLIThompson, Inc.
4718 N. Elizabeth Street
Suite C-2
Pueblo, Colorado 81008
Phone:719-595-1287
Fax:719-595-1292
CTLIThompson Texas, LLC
10575 Newkirk Street
Suite 780
Dallas, Texas 75220
Phone:972-831-1111
Fax:972-831-0800
CTL I Thompson Texas, LLC
2600 McHale Court, Suite 180
Austin, Texas 78758
Phone:512-832-8883
Fax:512-832-8886
Commercial Testing
Laboratories, Inc.
22 Lipan Street
Denver, Colorado 80223
Phone:303-825-0777
Fax:303-893-1568
SCOPE
This report presents the results of our subgrade investigation and
pavement design for the parking lot at the proposed Bobcat Ridge Project located
at 8429 West County Road 32C in Larimer County, Colorado. This investigation
was to identify the type of subgrade soils under the proposed parking lot and to
send design pavement alternatives for paving the parking area.
Our report includes a description of the subgrade soils penetrated by our
exploratory borings, laboratory test results, recommended alternative pavement
sections and construction and materials guidelines.
SUMMARY OF CONCLUSIONS
1. Our borings penetrated 4 feet to 6 feet of loose to medium dense,
clayey sands over nil to 4 feet of hard, slightly cemented sandstone
underlain by very hard, cemented sandstone at 6 feet and 8 feet.
Ground water was not encountered in the borings.
2. The subgrade soils have excellent subgrade support characteristics.
3. A minimum Portland cement concrete section of 5 inches is
recommended for paving the handicapped parking spaces.
SITE CONDITIONS
The Bobcat Ridge Project is a large natural area, owned and operated by
the City of Fort Collins. The parking lot addressed in this report is located in the
natural area approximately 1 mile southwest of Masonville, Colorado at 8429 West
County Road 32C.
The natural area covers 2,600 acres, situated on the steeply sloping eastern
side of Green Ridge. A small creek bounds the northeastern side of the property.
The Horsetooth Supply Canal crosses the southeast corner of the property and
enters an inverted siphon to cross Buffman Canyon. Vegetation consists mainly
CITY OF FORT COLLINS OPERATION SERVICES 1
BOBCAT RIDGE PROJECT
CTL I T PROJECT NO. FC03550-135
S1FC03550.000\135\2. Reports\Rt\FC03550-135.rpt.doo
IF
of low grasses and bushes. Historically the property was used to graze cattle with
some irrigated pasture.
The location of the proposed parking lot is currently a intermitant drainage
swell that crosses the site from west to east. Corrals and various outbuildings are
on the north side of the drainage. The drainage is fenced into several "dry lots"
for cattle operations. A few sandstone outcrops were visible along the sides of
the drainage, upstream from the proposed parking lot.
PROPOSED CONSTRUCTION
A parking lot will be placed along the north side of the drainage swell. The
entrance to the parking lot will be on the north side of the drainage swell right off
of County Road 32C. We understand the parking lot will be generally U-shaped
and will exit onto the existing access road for the Horsetooth Supply Canal on the
south side of the drainage. The swell will be piped under the parking lot on the
west side to create a parking area for longer vehicles such as pick-ups with horse
trailers. Where the swell is not piped it will be shifted to the south approximately
50 feet to 100 feet. Borrow soils for fill under the parking lot will come from the
excavation needed to shift the alignment of the drainage. We understand that the
majority of the parking lot and roads will be surfaced with gravel and that the
handicapped parking stalls will be surfaced with concrete pavement
INVESTIGATION
Subsoils were investigated by drilling five exploratory borings. Two
borings (S-1 and S-2) were drilled to 10 feet in the area of proposed fill, generally
in the west portion of the parking area, 1 boring (S-3) was drilled to 5 feet in the
area were the parking lot was approximately at the existing grade, and 2 borings
were drilled to 5 feet in the proposed borrow area. The boring locations are
shown on Figure 1.
CITY OF FORT COLLINS OPERATION SERVICES 2
BOBCAT RIDGE PROJECT
CTL I T PROJECT NO. FC03550-135
S:\FC03550.000\135\2. Reports\R1\FC03550-135.rpt.doc
The borings were drilled with a truck -mounted drill rig using 6-inch
diameter continuous flight augers. Soils were sampled by driving a California
sampler with a 140-pound hammer falling 30 inches and by collecting bulk
samples from the auger cuttings.
SUBSURFACE
Our borings in the area of proposed fill penetrated 4 feet to 6 feet of
medium dense, clayey sands over nil to 4 feet of hard, slightly cemented
sandstone over very hard cemented sandstone at 6 feet and 8 feet. Our 5-foot
borings penetrated loose to medium dense, clayey sands throughout the depth
explored. The clayey sands were slightly moist. Ground water was not
encountered in the borings. Summary logs of the borings, including results of
field penetration resistance tests, are shown on Figure 2.
LABORATORY INVESTIGATION
The laboratory investigation for the pavement subgrade soils was designed
to provide index properties, swell/consolidation characteristics, and subgrade
support values for those soils that influence the pavement design.
Index properties of the soils sampled were measured and the soils were
classified according to AASHTO and the Unified Soil Classification System. The
soils classified as A-6 and A-2-6 according to the AASHTO classification. The
soils classified as clayey sands (SC) according to the Unified Soil Classification
System. The samples had group indices ranging from 0 to 2.
The samples tested had liquid limits ranging from 27 percent to 30 percent
and plasticity indices from 11 percent to 12 percent. The samples had 35 percent
to 44 percent silt and clay -sized particles (passing the No. 200 sieve). Laboratory
test results are presented on Figure 3 and summarized in Table I.
3
CITY OF FORT COLLINS OPERATION SERVICES
BOBCAT RIDGE PROJECT
CTL I T PROJECT NO. FC03550-135
S:\FC03550.000\135\2. Reports\R1\FC03550-135.rpt.doc
SUBGRADE PREPARATION
Subgrade immediately below the pavement section should be scarified a
minimum of 12 inches deep, moisture conditioned to between 2 percent below and
2 percent above optimum moisture content and compacted to at least 95 percent
of standard maximum dry density (ASTM D 698). Scarification and re -compaction
of the upper 12 inches of subgrade soils should occur as close to the time of
pavement construction as possible. The final subgrade surface must be protected
from freezing and from excessive drying or wetting until such time as the
pavement section is constructed.
On -site soils substantially free of trash, debris, organics or other
deleterious materials are suitable for use as fill. Imported fill should consist of
soils with properties similar or better than the on -site soils. Samples of the
proposed fill should be submitted to our office for approval prior to importing to
the site. All fill should be placed in 8 inch maximum loose lifts, moisture
conditioned to between 2 percent below and 2 percent above optimum moisture
content and compacted to at least 95 percent of standard maximum dry density
(ASTM D 698). A representative of our firm should observe placement and test
compaction of fill.
Proper grading and drainage and maintaining moisture contents near
optimum will be critical to avoid excessive deflections, rutting and pumping of the
roadway during subgrade preparation. If moisture and density cannot be
sufficiently controlled during subgrade preparation and stabilization is required,
stabilization by removal and replacement or stabilization using geotextile fabrics
and/or imported granular and rock materials may be used. For isolated or small
areas requiring stabilization, removal and replacement or "crowding" angular,
coarse aggregate into the subgrade may be effective.
CITY OF FORT COLLINS OPERATION SERVICES 4
BOBCAT RIDGE PROJECT
CTL I T PROJECT NO. FC03550-135
S:\FC03550.000\135\2. Reports\R1\FC03550-135.rpt.doc
SOLUBLE SULFATES
Water-soluble sulfate (SO4) concentrations were measured in a sample of
the near -surface subgrade soils to determine the risk of exposure to sulfate attack
where portland cement concrete is used. The soluble sulfate concentration was
below the detectable limit. These results indicate Class 0 (formerly "negligible")
and Class I (formally "moderate") exposure to sulfate attack on concrete (e.g. curb
and gutter or pavements) according to the American Concrete Institute (ACI).
According to the Portland Cement Association criteria, Type I cement can be used
in concrete exposed to these soils.
PAVEMENT DESIGN
We used the Group Index design method. Based upon our experience we
believe that a group index of 0 to 2 is equivalent to an R-value of 30. We have
assumed an equivalent daily load application (EDLA) of 5, which corresponds to
an equivalent single axle load (ESAL) of 36,500. These values are typical of
single-family residential parking or a residential two-lane road. We have further
assumed a minimum 28-day compressive strength for the Portland cement
concrete of 4000 pounds per square inch (psi).
Using the traffic loading assumed, we calculated a minimum required
Portland cement concrete thickness of 5 inches. The pavement should be placed
directly upon the prepared subgrade as specified in the above "Subgrade
Preparation" section. It is possible that departmental or other regulations might
specify a thicker section. We can provide a flexible pavement section design
upon request. The pavement section calculation worksheet is included as
Appendix A.
If subgrade stabilization due to soft or loose soils is required,
overexcavation and replacement with coarse, granular soil such as pit run gravel,
use of geotextiles or geogrids, or chemical stabilization such as fly ash typically
perform well in soil environments similar to those we encountered at this site.
CITY OF FORT COLLINS OPERATION SERVICES 5
BOBCAT RIDGE PROJECT
CTL I T PROJECT NO. FC03550-135
S:\FC03550.000\135\2. Reports\Rt\FC03550-135.rpt.doc
Chemical stabilization techniques have weather and temperature limitations that
should be considered.
PAVEMENT MATERIALS
Material properties and construction criteria for the pavement are
provided below. These criteria were developed from analysis of the field and
laboratory data, our experience and City of Fort Collins requirements. If the
materials cannot meet these recommendations, then the pavement design should
be reevaluated based upon available materials. All materials and construction
requirements of the City of Fort Collins should be followed. All materials planned
for construction should be submitted and the applicable laboratory tests
performed to verify compliance with the specifications.
Portland Cement Concrete (PCC)
1. Portland cement concrete should have a minimum compressive
strength of 4,000 psi at 28 days and a minimum modulus of rupture
(flexural strength) of 600 psi. A job mix design is recommended and
periodic checks on the job site should be made to verify compliance
with specifications.
2. Portland cement should be Type I and should conform to ASTM C
150.
3. In hot weather conditions Portland cement concrete should be
placed in accordance with ACI 305R.
4. In cold weather conditions Portland cement concrete should be
placed in accordance with ACI 306R.
5. Curing procedures should be implemented, as necessary, to protect
the pavement against moisture loss, rapid temperature change,
freezing, and mechanical injury.
6. Construction joints, including longitudinal joints and transverse
joints, should be formed during construction or sawed after the
concrete has begun to set, but prior to uncontrolled cracking.
7. All joints should be properly sealed using a rod back-up and
approved epoxy sealant.
CITY OF FORT COLLINS OPERATION SERVICES 6
BOBCAT RIDGE PROJECT
CTL I T PROJECT NO. FC03550-135
S:\FC03550.000\135\2. Reports\R1\FC03550-135.rpt.doc
IF
8. Traffic should not be allowed on the pavement until it has properly
cured and achieved at least 80 percent of the design strength, with
saw joints already cut.
9. Placement of Portland cement concrete should be observed and
tested by a representative of our firm. Placement should not
commence until the subgrade is properly prepared and tested.
CONSTRUCTION DETAILS
The design of a pavement system is as much a function of the quality of
the paving materials and construction as the support characteristics of the
subgrade. The construction materials are assumed to possess sufficient quality
as reflected by the strength coefficients used in the flexible pavement design
calculations. These strength coefficients were developed through research and
experience to simulate expected material of good quality, as explained herein.
During construction careful attention should be paid to the following details:
• Placement and compaction of trench backfill.
• Compaction at curb lines and around manholes and water valves.
• Excavation of completed pavements for utility construction and
repair.
• Design slopes of the adjacent ground and pavement to rapidly
remove water from the pavement surface.
LIMITATIONS
The pavement and construction recommendations are based upon our
field observation and testing, and minimum traffic levels usually assumed for
typical single-family residential parking or a two lane residential road and the
AASHTO design methods.
The design procedures were formulated to provide sections with adequate
structural strength. Routine maintenance, such as sealing and repair of cracks, is
necessary to achieve the long-term life of a pavement system. If the design and
construction recommendations cannot be followed, or anticipated traffic loads
CITY OF FORT COLLINS OPERATION SERVICES 7
BOBCAT RIDGE PROJECT
CTL I T PROJECT NO. FC03550-135
SAFC03550.000\135\2. Reports\R1\FC03550-135.rpt.doc