RESPONSE - BID - 5952 SPRING CANYON COMMUNITY PARK
.0 . Bid 5952 Spring Canyon Community Park ADDENDUM REVISED BID FORM SECTION 00300 — BID FORM PROJECT: 5952 Spring Canyon Community Park Place February 3. 2006 Date 1. In compliance with your Invitation to Bid dated Dec. 14, 2005 and subject to all conditions thereof, the undersigned ECI Site Construction Management, Tnr_ a (Corporation, , er Sale .,_ r____a-_), authorized to do business in the State of Colorado hereby proposes to furnish and do everything required by the Contract Documents to which this refers for the construction of all items listed on the following Bid Schedule or Bid Schedules. 2. The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without collusion or connection with any other person or persons Bidding for the same Work, and that it is made in pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders, the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of which have been examined by the undersigned. 3.. Accompanying this Bid is a certified or cashier's check or standard Bid bond in the sum of 5% of the total bid amnont ($ ) in accordance with the Invitation To Bid and Instructions to Bidders. 4. The undersigned Bidder agrees to execute the Agreement and a Performance Bond and a Payment Bond for the amount of the total of this Bid within fifteen (15) calendar days from the date when the written notice of the award of the contract is delivered to him at the address given on ,this Bid. The name and address of the corporate surety with which the Bidder proposes to furnish the specified performance and payment bonds is as follows: Employers Mutual Casualty Company 5. All the various phases of Work enumerated in the Contract Documents with their individual jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to be performed by the CONTRACTOR under one of the items listed in the Bid Schedule, irrespective of whether it is named in said list. 6. Payment for Work -,performed will be in accordance with the Bid Schedule or Bid Schedules subject to changes as provided in the Contract Documents. "Silly Shower" $ U EA "Baby Long Legs" $ () EA "Water Flower" $ 01M EA "Surface Mounted Launch Pad" $ EA Recirculation System $ LS IRRIGATION ITEM UNIT PRICE Irrigation for Turf (seed or sod) areas less than 10 feet in width $ 1. 14 O SF Irrigation of Turf areas (seed or sod) 10 feet or greater in width $ SF Irrigation of Low Water Use Seed Areas $ 131 SF Irrigation of Riparian Seed Areas $ . 31 SF Irrigation of Wildflower Seed Areas $ q le SF Pop -Up Spray Sprinkler with nozzle - Gear Driven Rotor frN $ -5 S - - EA Pop -Up Spray Sprinkler with nozzle - Impact Rotor $ 1 Z 6 • 00 EA Drip Irrigation - per Shrub, Perennial or Grass in planting bed $ 11 -- JS EA Drip Irrigation - per one Tree in Turf $ 0,S , 9 S EA Sleeve Pipe - 4" $ d S LF Sleeve Pipe - 6" $ . q Q LF Sleeve Pipe - 8" $ ( l0 - CO LF Sleeve Pipe -12" $ j , 115 LF Sleeve Pipe -16" $ 0,]5() LF Isolation Gate Valve Assembly - 3" $ cq 0, CO EA Isolation Gate Valve Assembly - 4" $ q 15 , CO EA Isolation Gate Valve Assembly -6" $ 551), CD F-A Isolation Gate Valve Assembly - 8" r7 $ / q5 t CO EA Isolation Gate Valve Assembly - 12" $ 15 C. 0. (1 D EA. Quick Coupling Valve Assembly $ of (6, CO EA Manual Drain Valve Assembly $ /(D 0. CO EA Remote Control Valve Assembly for Sprinkler Laterals - I" $ o28S 00 EA Remote Control Valve Assembly for Sprinkler Laterals - 1.5" $ 3 (5. CO EA Remote Control Valve Assembly for Sprinkler Laterals - 2" $ 3 (nC . 00 EA Remote Control Valve Assembly for Sprinkler Laterals - 3" $ 510.00 EA Remote Control Valve Assembly for Drip Laterals -1" $ o225 . W EA Flush Cap Assembly $ .2t. 10 EA Mainline Pipe -1.5" $ 3.50 LF Mainline Pipe - 2" $ 44- 00 LF Mainline Pipe - 3" $ 15. t 5 LF Mainline Pipe- 4" $ 6.39 LF Mainline Pipe - 6" $�// , Q LF Mainline Pipe - 8" $ 1q. 6 LF Mainline Pipe -12" $ 3o ,, 55 LF Lateral Pipe -1" $ 1 . p o LF Lateral Pipe -1.25" $ Q.00 LF Lateral Pipe -1.5" $ 0, I `j LF Lateral Pipe -2.5" $ 3. (S LF Lateral Pipe - 3" $ 3 , -70 LF Lateral Pipe - 4" $ 4194q LF Lateral Pipe - 6" $ O 1 `I/� LF LANDSCAPE Finish Grading $ 'bs SF Organic Amendment - Class 2 _. _$._ _ __ __ _7+CO .Cg.. Seed Mix A $ - W SF Seed Mix B $ ' 01 SF Seed Mix C $ .01 SF Seed Mix D $ , 0s SF Sod $ SF Evergreen Tree - #15 container $ 19 5 . QQ EA Evergreen Tree - 6' height $ S0 , _ EA Evergreen Tree - 8' height $ (4q 0 , W EA Evergreen Tree -10' height $ 5 -i d. oD EA Deciduous Canopy Tree -1.5" caliper $ oZq , (� EA Deciduous Canopy Tree - 2" caliper $ Q 1 EA Deciduous Shrub - #1 container $ 1 1 • 0 EA Deciduous Shrub - #5 container �t $ QG - vU EA Evergreen Shrub - #1 container $ Q, S O EA Evergreen Shrub - #5 container $ EA Perennial - 4" pot $ 4, w EA Perennial - #1 container $ EA Ornamental Grass - #1 container $ Willow Stake $ d . EA Porous Grass Paving SF Crusher Fines $ . _,9 SF Weed Barrier $ r5 SF Organic Mulch $ '50 SF Rock Mulch $ , S5 SF Sand $ �W, Co CY Hand weeding of shrubs in Canyon walls $ er 1000 SF MAINTENANCE FACILITY Yard Fence $ -13•00 LF Cantilevered Rolling Gate $ q (/6 . dO EA Gate Opener wl Card Reader $,',:� CJ W ,QQ EA ATHLETIC FACILITIES 10' Chainlink Fence r $ • �� LF B' Chainlink Fence CJJ� $ —(% . cio LF 5' Chainlink Fence $ 3 U . 60 LF Skinned Infield Mix $ ().q rSF Tennis Net Post (Set) $ 900.0C) EA - Tennis Net w/ Center -Strap -and Anchor_ _ _ .. _. _$ _ _. S50 - M . _ . E--A- Windscreen Curtain $ Q.M LF Basketball Post, Backboard and Goal $ )9C).00 EA ZIRBCURB Roller Hockey Rink System $ (a!2, EA Backless Dugout Bench $ % (9 EA Dugout Bench with Back $ /.3W •00 EA Volleyball Post System and Net (I set) $ / dW • 00 EA Horseshoe Equipment (1 set) $ 3W • OO EA SITE FURNISHINGS Picnic Table $ ')a • % CD EA Bench with Back $ EA Backless Bench $ 8 74 2 EA Trash Cans $ 1, qqq. I& EA Bicycle Rack $ 2&2. 06 EA Barbeque $_ / 1 i,1 1 EA Drinking Fountain $ Q. EA Solar Pump $ I h 2q-3, y� EA Parking Stop at Grass Pave Areas $ (P0 - QQ EA MISCELLANEOUS ITEMS 3 Rail Fence with wire mesh $ Q. DO LF Re -setting existing 3 rail fence with new wire mesh $ 8.00 LF 2 Rail Fence $ (0, R5 LF The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering, overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for. Bidder acknowledges that the OWNER has the right to delete items in the Bid or change quantities at his sole discretion without affecting the Agreement or prices of any item so long as the deletion or change does not exceed twenty-five percent (25%) of the total Agreement Price. RESPECTFULLY SUBMITTED: ECT Site Construction Management, Inc. PONTRACTOR 2/3/06 01 g ature Date President Title C1-123 License Number (If Applicable) by corporation) i, Sec. / Tres. Address P.O. Box 2135/2526 E. Hwy 402 Loveland, CO 80539 Telephone (970) 669-6291 Email ted@ecisite.net 7/96 Section 00300 Page 14 SECTION 00430 SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 10% of the contract. ITEM SUBCONTRACTOR (e, (IDA Ncf- [t )don Vallekccce5k IaacAxciry_ 0 lobe d yyx t�-,Tmc. Qck,(4\vJc)ck c),Ncl c kV\� e-S l2 cr„Ar _ r Snc., 0 or�ue � f or, K )'C n,n d. JCACAUX W_, `� r-y oA 13cos , Conc C 2-2 7/96 Section 00430 Page 1 SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS Contractor Qualifications Required Documents To be a qualified Contractor, the Prime Contractor shall submit with their bid the following written documentation for the Owner's review: 1. Cover Letter. A letter on the company letterhead with the following information: a. The letter must be signed by the Owner of the Company or a Company Officer and dated; and b. A statement declaring at least seven (7) complete years of experience in the active performance of similar work (similar work is considered to include, but not limited to, the acquisition and installation of large scale park projects, athletic facilities, skate park construction, buildings of a similar nature to the proposed buildings-, irrigation systems, landscaping) with its own forces and organization as opposed to the use of subcontractors. c. A statement declaring that the company will perform a minimum of 200 of the work, not including purchase of materials, with its own forces and organization, and a list of services that the Prime Contractor will provide; and 2. Company Experience. On a separate sheet, list a project history of the - company's experience as a General Contractor for the seven (7) years declared in item l.b. above, including the following information: • Project name and a brief description of the work performed; and • Beginning and ending date of project; and • Location of project (city, state); and • Monetary amount of project construction budget; and • Owner of project, contact person, valid phone number with area code; and • If applicable, name of Prime Contractor (Client) that the work was performed for/phone number with area code; and • Superintendent must have worked for the Prime Contractor for minimum of one year and preferably on one of the like projects. 3. Resumes. The company shall include up-to-date resumes for the Superintendent(s) and other key personnel that will actually be doing the work which shall include at a minimum a list of similar projects that each person has been involved with, and their role, in the last 4 (four) years; and 4. References. On a separate sheet, References for a total of 5 Municipalities and/or Landscape Architects. References shall information shall include: • Project name and brief description of work performance; and • Location of project (city, state) 7/96 Section 00420 Page 1 All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: ECT Sit- Constriction Management} Tnr. 2. Permanent main office address: 2526 E. Hwy 402 Loveland. CO 80537 3. When organized: 1980 4. If a corporation, where incorporated: State of Colorado 5. How many years have you been engaged in the contracting business under your present firm or trade name? 18 months 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) Broomfield County Commons Open Space $861,316.89 Comnlptp 03/06 Blue Skies Park $1,258.554.86 Complete 03/06 Lowry Sports Complex $3,026,094.05 Complete 04/06 Stapleton - Central Park Playground $1,338,571.00 Complete 04/06 7. General character of Work performed by your company: Horizontal site construction - civil 0 Have you ever failed to complete any Work awarded to you? No If so, where and why? 9. Have your ever defaulted on a contract? If so, where and why? 10 Are you debarred by any government agency? No If yes list agency name._ 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. Loveland Youth Sports Complex $6,756,447.18 Comple a 12105 950 Boyd Take AvP_ Loveland. CO -Construction of a youth sports complex. Broomfield Section 30 Ballfields $10.359.993.93 Complete 11/03 MOO Sheridan Blvd. Broomfield, CO Construction of ballfields, pack buildings, and trails. 12. List your major equipment available for this contract. Case 580 Backhoes, Case 75XT Skidsteers PC300 Excavator, 140G Blade 950G Loader, 4000 gallon water truck, mist. compactors, demo saws and tools. 7/96 Section 00420 Page 2 13. Experience in construction Work similar in importance to this project: Skate park ronstxuctnm. baseball field construction, musco lighting, I and irrigation, landscape boulder placement. restroom buildings, picnic shelters, and trail installation. 14. Background and experience of the principal members of your organization, including officers: estimating, roiect management, and site ronstrui Vice -President Rick Coulter - Tyrears protect management. and superintendent Sec. / Tres. Ted Johnson - 11 years estimating and project managemnt 15. Credit available: $ 750,000.00 16. Bank reference:Hnme State hank , 17. Will you, upon request, fill out a detailed*. financial statement and furnish any other information that may be required by the OWNER? Yes 18. Are you licensed as a General_ CONTRACTOR?Yes If yes, in what city, county and state? see attached What class, license and numbers?see attached -' 19. Do you anticipate subcontracting Work under this Contract? Yes If yes, what percent of total contract? 70% and to whom?Golden Triangle Construction, valleV Treat Land Davalopmeat, and Connell Resources 20. Are any lawsuits pending against you or your firm at this time?No IF yes, DETAIL 21. What are the limits of your public liability? DETAIL T1,000,000- mph eeeuvanee $2,000,000 aggregate What company? St. Paul Travelers 22. What are your company's bonding limitations? Single job limit is in the low 8 figure ranee. Employers Mutual casual,-y has not im osod as upperlimit €er total work program. 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. 7/96 Section 00420 Page 3 Dated at 1:00 pm this 3rd day of February , 2006- to Nan By: Title: President State of Colorado County of 7,arimer Inc. Jay Brian Peterson being duly sworn deposes and says that he is President of ECI Site Construction MQmt, Inc.and that (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this day of -(�bf 20 Notary P i I- QAd My commission expires 7/96 Section 00420 Page 4 Contractor License City of Lafayette License Number: L04-215 Type: Contractors License Expires: 11 /30/2006 City of Fort Collins License Number: C1-123 Type: GC-2 Stories Expires: 3111 /2006 City of Louisville License Number: 03662 Type: General Excavator Expires: 8/18/2006 City of Longmont License Number: D16000023 Type: Contractors License Expires: 6/30/2006 Douglas County License Number: A03008 Type: Contractors License Expires: 1 /31/2006 City and County of Broomfield License Number: A2005-1681 Type: Contractors License Expires: 12/31 /2006 Bid The undersigned Bidder hereby acknowledges receipt of Addenda No. 1 through 6 BID SCHEDULE SCHEDULE1 Provide materials and labor associated with installation, maintenance, start-up and Owner training, as indicated on the drawings and in the Specifications, for each of the following bid items. Owner is responsible for payment of Building Permit application fees, Item #1 Demolition, Temporary Controls, Traffic Control To include all materials complete, in place (such as but not limited to the following: Demolition, Disposal, Protection of Items to Remain, Tree Protection, Removal of existing Dog Park Fence and Re -Installation of Fence/Gates at Temporary Dog Park, Temporary Asphalt Trail), as indicated on the Drawings, and in the Specifications. Lu In Bld Itlsni Irc. I-anascaPe To include all materials complete, in place (such as but not limited to the following: Landscaping, Boulders, Dry -Laid Rock Walls, Crusher Fines, Skinned infield Mix at Baseball Fields, Sand, Grass Paving), as indicated on the Drawings, and in the Specifications. mpg, Lump Sum Price $ 11 Sqq, 0W.C)0 In WritingQ�le-M;ilirm�P�ohk-Y�isRclref� nr\d n��nelci,�-n1ne, r.��nc1 ��r�llnfs Bid Item #3. Irrigation To include all materials complete, in place such as but not limited to the following: Irrigation System, Irrigation Pump Station, as indicated on the Drawings, and in the Specifications. Lump Sum Price $ 1, )4?3t CXx-3: tx) In Writing nne-m; ll�r.n � free -h� �rlr�r9 12#nra n,Y,P hc-y4ok *�NrAAsc nri c &Lr5 Bid Item #4. Park Architecture and Pre -Engineered Structures To include all materials complete, in place (such as, but not limited to the following: 8-Top Pavilions, 4- Top Pavilions, 1-Top Pavilions, Restrooms, Dugout Roofs, Building Perimeter Drains, Utilities located within the structures and within a distance of five feet (5') from their foundations), as indicated on the Drawings, and in the Spec i ications. Lump Sum Price $ In Writing bn0 rnA I l iron L:t it P In a r�-%lb�l�` ►'1(�� Bide Item #5. Maintenance Facility, Outdoor Storage, Maintenance Yard To include all materials complete, in place (such as, but not limited to the following: Maintenance Facility, Outdoor Storage, Bins, Maintenance Yard Perimeter Fence and Gates, Exterior Pavements within the Fenced Yard, Gravel Pavement, Pavement Markings, Signage, Utility service lines, Sand and Oil Interceptor, Related Drainage Improvements, Perimeter Drain, Exterior Lighting for the M1 Lu In - a 11 0 E J E BID BOND ECI Site Construction Management, Inc. KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned as Principal, and Employers Mutual Casualty Company as Surety, a:e hereby held and firmly bound unto the City of Fort Collins, Colorado,a OWTNER, in the sum of $ 5% of total bid for the payment of which, well :r.d truly to be made, we hereby jointly and severally bind ourselves, successor::; and assigns. THE CONDITION of this obligation is such that whereas the Principal iia.s submitted to the City of Fort Collins, Colorado the accompanying Sid and hereby made a part hereof to enter into a Construction Agreement for the construction of Fort Collins Project, 5952 Spring Canyon Community Park. NOW THEREFORE, ls) If saiCl Bid shall be rejected, or (b) if said Bid shall be accepted and the Principal shall execute and deiive:.r a Contract in the form of Contract attached hereto (properly completed ".n accordance with said Bid) and shall furnish a BONA for his fair.hf.l performance of said Contract, and for payment of all persons pertora.i��g labor or furnishing materials in connection therewith, and shall in ;^:.1 other respects perform the Agreement created by the acceptance of Bid, then this obligation shall be void; otherwise the same shall rena'.n ir. force and effect, it being expressly understood and agreed that --,e liability of the Surety for any and all claims hereunder shall, in o event, exceed the penal amount of this obligation as herein stated. The Surety, for value received, hereby stipulates and agrees that :.i.e obligations of said Surety and its BOND shall be in no way i.mpairert ::r affected by any extension .of the time within which the OWNER may accept. ?•+_h ;aid; and said Surety does hereby waive notice of any such extension. Surety Companies executing bonds must be authorized to transact business .En the State of Colorado and be accepted by the OWNER. 7/96 Section 00410 Page 2 W . Y: IN WITNESS WHEREOF, the Principal and the Surety have hereunto se. th0ta-V '-rods and seals this 3rd day of Vabrilark, , 20n&, and such of them �5:c' arc corporations have caused their corporate seals to be hereto affixed and t`less presents to be signed by their proper officers, the day and year first see, forth above. PRINCIPAL SURSTx Name:ECI Site Construction Management, Inc. Employers Mutual Casu<y Company Address: P.O. Box 2135 _ Loveland, CO 80539 Brian Peterson Titl 'Uiesident_ 7/96 , Sec / Tres P.O. Box 370010 Denver, CO 80237 By :( Title: Darlene Krings - Attorney -in -Fact 4. Section 00410 Page 3 THE FACE OF THIS DOCUMENT HAS A COLORED BACKGROUND ON WHITE PAPER • BACK OF THIS DOCUMENT HAS A SIMULATED WATERMARK - HOLD AT AN ANGLE TO VIEW' For,„ 7832 (9/02) "For verification of the authenticity of the Power of Attorney you may call Contractor Qualifications For: Spring Canyon Community Park Bid Number 5952 By: ECI Site Construction Mgmt., Inc. 2526 E. Hwy 402 Loveland, CO 80537 eCMarto9eirn®nt Including Qualifications for ValleyCrest Landscape Development, Inc. ValleyCrest L.nd.c.pe Development SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS Contractor Qualifications Required Documents To be a qualified Contractor, the Prime Contractor shall submit with their bid the following written documentation for the Owner's review: 1. Cover Letter. A letter on the company letterhead with the following information: a. The letter must be signed by the Owner of the Company or a Company Officer and dated; and b. A statement declaring at least seven (7) complete years of experience in the active performance of similar work (similar work is considered to include, but not limited to, the acquisition and installation of large _ scale park projects, athletic facilities, skate park construction, buildings of a similar nature to the proposed buildings-, irrigation systems, landscaping) with its own forces and organization as opposed to I the use of subcontractors. c. A statement declaring that the company will perform a minimum of 200 of the work, not including purchase of materials, with its own forces and organization, and a list of services that the Prime Contractor will provide; and 2. Company Experience. On a separate sheet, list a project history of the -- company's experience as a General Contractor for the seven (7) years declared in item l.b. above, including the following information: -- • Project name and a brief description of the work performed; and • Beginning and ending date of project; and • Location of project (city, state); and -' • Monetary amount of project construction budget; and • Owner of project, contact person, valid phone number with area code; and • If applicable, name of Prime Contractor (Client) that the work was performed for/phone number with area code; and • Superintendent must have worked for the Prime Contractor for minimum of one year and preferably on one of the like projects. 3. Resumes. The company shall include up-to-date resumes for the Superintendents) and other key personnel that will actually be doing the work which shall include at a minimum a list of similar projects that each person has been involved with, and their role, in the last 4 (four) years; and 4. References. On a separate sheet, References for a total of 5 Municipalities and/or Landscape Architects. References shall information shall include: • Project name and brief description of work performance; and • Location of project (city, state) 7/96 Section 00420 Page 2 All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: RCT Site ronstrnrtion Management, Tnr_ 2. Permanent main office address: 2526 E. Hwy402 Loveland, CO 80537 3. When organized: 1980 4. If a corporation, where incorporated: State of Colorado 5. How many years have you been engaged in the contracting business under your present firm or trade name? 18 months 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) Broomfield County Commons Open Space $861,316.89 Complete 03/O6 Blue Skies Park $1,258,554.86 Complete 03/06 Lowry Sports Complex $3,026,094.05 Complete 04/06 Stapleton - Central Park Playground $1,338,571.00 Complete 04/06 7. General character of Work performed by your company: Horizontal site construction - civil 8. Have you ever failed to complete any Work awarded to you? No If so, where and why? 9. Have your ever defaulted on a contract? No If so, where and why? 10 Are you debarred by any government agency? No If yes list agency name. 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. Loveland Youth Sports Complex $6,756,447.1R Complete 12/n5 4Sn Boyd Take Ava_ Loveland. CO Construction of a youth sports complex. Broomfield Section 30 Ballfields $10.359,993.93 Complete 11/03 13000 Sheridan Blvd. Broomfield, CO Construction of ballfields, park buildings, and trails. 12. List your major equipment available -for this contract. Case 580 Backhoes, Case 75XT Skidsteers, PC300 Excavator, 140G Blade, 950G Loader, 4000 gallon water truck, misc. compactors, demo saws and tools. 7/96 Section 00420 Page 2 13. Experience in construction Work similar in importance to this project: Skates park rnnett rnClOTL baseball field construction, mu o lighting. landscape and irrigation, landscape boulder placement re t oom buildings, picnic shelters, and trail installation. 14. Background and experience of the principal members of your organization, including officers: PrPrziAPnf Rrian Petersen - 25�*ears estimating, Proiect management and site constru Vice -President Rick Coulter - 25 years project management and superintendent Sec. / Tres. Ted Johnson - 11 nears estimatine and nroiect mnnnapmnt 15. Credit available: $ 750,000.00 16. Bank_ reference:HnmP SrarP hank 17. Will you, upon request, fill out a detailed'. financial statement and furnish any other information that may be required by the OWNER? Yes 18. Are you licensed as a General_ CONTRACTOR?Yes If yes, in what city, county and state? see attached What class, license and numbers?see attached -- 19. Do you anticipate subcontracting Work under this Contract? Yes If yes, what percent of total contract? 70% and to whom?Golden Triang1P Cnnatriirtinn VnIJP3� r s+- Land Dauelo$maat, &nd Connell Resources 20. Are any lawsuits pending against you or your firm at this time?M, IF yes, DETAIL 21. What are the limits of your public liability? DETAIL $1,000,000 egFh eeearenee $2,000,000 aggregate What company? St. Paul Travelers 22. What are your company's bonding limitations? Single job limit is in the low 8 figure range Employers Mutual Casnalry h-- c-nt-impesed-alaUpPeF limit €er total work program 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. 7/96 Section 00420 Page 3 Dated at 1:00 pm this 3rd ECI Site Construction Management, Inc. Name i e By: Brian WeCerson Titled President State of Colorado County of Larimer day of February , 20D6 . Jay Brian Peterson being duly sworn deposes and says that he is president of ECT Site 6anstsuetlen Mgmt, Ine, and that (name of organization) the answers to the foregoing questions and all statements thereicontained ll are true and correct.`°" S bscribed and 12 / L to bore me this day of Notary Pii15JLic My commission expires 3 7/96 Section 00420 Page 4 Contractor License City of Lafayette License Number: L04-215 Type: Contractors License Expires: 11 /30/2006 City of Fort Collins License Number: C1-123 Type: GC-2 Stories Expires: 3/11 /2006 City of Louisville License Number: 03662 Type: General Excavator Expires: 8/18/2006 City of Longmont License Number: D16000023 Type: Contractors License Expires: 6/30/2006 Douglas County License Number: A03008 Type: Contractors License Expires: 1 /31 /2006 City and County of Broomfield License Number: A2005-1681 Type: Contractors License Expires: 12/31 /2006 Site Construction Management Inc. P 0. 13ox 2155, Loveland, CO 80559 1 Phone; 970-669-6291 - Metro 303-550-7660 - Pax 970-669-64H February 3, 2006 City of Fort Collins Attn: Mr. John Stephen, Senior Buyer 215 North Mason Street Fort Collins, CO 80524 Re: Spring Canyon Community Park Dear Mr. Stephen: Per the requirements of Section 00420 please consider this our "cover letter" for the above mentioned project. ECI began as a landscape and irrigation contractor in 1980. In 1993 our company evolved into a General Contractor specializing in site construction; since that turning point we have been building athletic complexes, sports fields, playgrounds, skate parks, and community parks all along the Front Range. Due to the varied experience of our field staff we are able to self -perform many facets of construction on these projects including elements of landscaping, erosion control installation, area drain lines, sub grade and fine grade work, trails, rockwork, excavation, pump station installation, skatepark construction, and the efficient management of the construction site to mention a few. After meeting with you and realizing your concerns, ECI Site Construction Management, Inc. has entered into an exclusive agreement with Valley Crest Landscape Development, Inc. for the purposes of constructing this project. (Please find attached letter from Jeff Hinners of Valley Crest). Our goal is to provide the highest quality project to the City. In my discussions with Mr. Hinners it was concluded that ECI should be the prime bidder on the project; as we would be managing the bulk of the project this would make the team the most competitive. We know that the City's goal is to get the "best value" for its citizens. ECI has successfully completed in excess of $50,000,000 of similar park projects in the last five years both on time and within budget. Additionally, we have chosen to work exclusively with Valley Crest on this project for the following reasons: 1. On past projects Valley Crest has delivered quality landscape within difficult time constraints; specifically on Broomfield County Commons Park and Douglas County Fairgrounds Regional Park. 2. Valley Crest has established a large presence in Northern Colorado. This presence will assure that they can meet warranty and maintenance concerns for the project. Bid Item #fi. Earthwork and Utilities To include all materials complete, in place (such as but not limited to the following: Site Clearing, Water Control, Earthwork, Erosion Control, Water Utilities, Sanitary Sewer, Storm Sewer, Subdrains, Perimeter Drains, Gravity Irrigation Pipeline, Irrigation Delivery System, Power Distribution and Controls, Telecommunications, Emergency Call Boxes, General Site Lighting, Drop Structures in the Spring Creek Drainage Channel), as indicated on the Drawings, and in the Specifications. Lump Sum Price $ S' 16u, rJ' co -co InWritin.g4hagaz noAVon mze-In�nr\cKfe_a cindc RkkV-SlX AA\dnA__and nLna 04rl?. Bid Item #7. Playground �\'-^nCkCe` 6C1k0."S' To include all materials complete, in place (such as but not limited to the following: Playground Equipment, Safety Surfacing, Shotcrete Sleeping Giant Head/Shoulder and Hand, Sensory/Sound Elements, Aquatic Play Equipment and Recirculation System, Stone and Stainless Steel inlays in Concrete, Sandstone Boulder Wall, Wall at Spray Park), as indicated on the Drawings, and in the Specifications. L In Bid Item N. Athletic Facilities To include all materials complete, in place (such as but not limited to the following: Fencing, Baseball Backstops, Players Benches, Bat Racks, Post -Tension Slabs, Asphalt Court Paving, Concrete Perimeter Beam, Court Surfacing, Pavement Markings, Tennis Equipment, Tennis Practice Wall, Roller Hockey Equipment, Basketball Equipment, Horseshoe Equipment, Volleyball Equipment), as indicated on the Drawings, and in the Specifications. Lump Sum Price $ La a1, LW_ • OU In Writing s( k Mj.e\dre_rA [Ind Qnhr�- �eue� �1�ncn,� ncA r ncJ, hur hALLi Bid Item #9. Skate Park To include all materials complete, in place (such as but not limited to the following: Concrete Paving, Concrete Walls/Structures, Skate Park Rails, Steel Coping), as indicated on the Drawings, and in the S pecifications. Lu In Bid Iti To include all materials complete, in place (such as but not limited to the following: Site Preparation, Base Materials, Structural Fill, Horsetooth Road Improvements, Sidewalks, Trails, Plazas, Driveways, Parking Lot Paving, Dog Park Features, Steps, Concrete Bleachers, Ramps, Handrails, Guard Rails, Spring Creek Bridge, Concrete Walls, Concrete Mow Strips, Wheel Stops at Overflow Parking Lots, Removal of Wood Fence at Temporary Dog Park and Re -Installation at Permanent Dog Park, other Wood Fences), as indicated on the Drawings, and in the Specifications. Lu In 3. Valley Crest has complied, in excess of others, with the safety policies of our company. 4. Valley Crest has the abundant resources to fulfill the goals of the project. ECI has also chosen to bid exclusively with Connell Resources, Inc. due to the complicated manor of the civil construction in addition to the sheer magnitude of the project. They stand alone in terms of resources and in their ability to complete overlot grading, piped utility work, and understanding the site conditions. ECI will be responsible for facilitating the balance of the work on site in addition to project management both on and off site. When awarded this project ECI will self perform the following scopes of construction: • Demolition / Site Preparation • Tree Protection Fencing / Temporary Dog Park Fencing • Erosion Control Installation and Maintenance • Riprap Drainage Work • Subgrade Preparation of All Trails and Walks • Landscape Grading of Berms and "Core Areas" • Infield Mix Installation • Crusher Fines Trail Construction • Turfgrass Paver Installation • Sand Install and Dog Park Complete • Drystack Walls and Boulder Placement • Canyon Wall Installation • Irrigation Point of Connection / Pump Installation and Demolition • Structures Excavation / Overexcavation • Skatepark Subgrade Construction and Coordination • Building Perimeter Drains / Underdrains • Gravel Pavements in Maintenance Yard • Electrical Pole Bases and Pads • Playground Surfacing Preparation, Fibar and Sand Install • Site Furnishings and Athletic Equipment Installation • Management and Coordination of All Trades Thank you for your time and the opportunity to bid the Spring Canyon Community Park project. Please feel free to contact me if you have any questions regarding our company or our bid. Thank yo Ted Johnson, Secretary / Treasurer ECI Site Construction Management, Inc. ECI SITE CONSTRUCTION MANAGEMENT, INC. MAJOR PROJECTS COMPLETED MUNICIPAL PROJECT NAME OWNER ARCHITECT CONTRACT COMPLETION Loveland Youth Sports Complex City of Loveland Design Concepts $ 6,756,447.18 12/06 Loveland, CO 970-962-2451 303-664-5301 Ridge at West Meadows Foothills Park & Recreation Dist. ASCG $ 1,040,633.70 7/05 Littleton, CO 303-409-2304 303-458-5550 South Pointe Park City of Lafayette Design Concepts $ 1,478,785.77 7/05 Lafayette, CO 303-665-5506 303-664-5301 Westerly Creek South Stapleton Redevelopment Mortenson (General Contractor) EDAW $ 708,594.00 11/04 303-295-2511 303-595-4522 Broomfield Tennis Courts Broomfield, CO City and County of Broomfield Donald H. God! & Associates $ 367,936.00 8/04 303438-6250 303-989-2853 Cherry Creek Trail Douglas County, CO Douglas County The Architerra Group $ 447,203.00 11/04 303-663-2064 303-948-0766 St. Vrain Greenway Ph. A Longmont, Cc City of Longmont Design Concepts $ 1,034,715.00 8/04 303-651-8448 303-664-5301 Fairgrounds Regional Park Castle Rock, CO Douglas County Norris Dullea $ 1,804,758.00 5/04 303-663-2064 303-892-1166 Broomfield County Commons Park City and County of Broomfield SportsOne $ 9,977,894.04 11/03 Broomfield, CO 303464-5807 970-392-1616 APS Stadium Aurora, CO Aurora Public Schools Davis Partnership $ 807,100.16 8/03 303-367-3000 303-861-8555 Kittredge Tennis Court Replacement University of Colorado at Boulder Sink Combs Delhlefs $ 1,041,706.00 9/03 Boulder, CO 303-735-3136 303-308-0200 Greenland Open Space Douglas County Government Architerra $ 651,930.24 6/03 Douglas County 303-660-7495 303-948-0766 Valmont Sod Boulder, CO City of Boulder N/A $ 153,165.18 6/03 303-413-7225 Louisville In -Line Rink City of Louisville Design Concepts $ 351,607.82 5/03 Louisville, CO 303-335-4909 303-664-5301 East West Greenway Stapleton Redevelopment Mortenson (General Contractor) EDAW $ 1,257,347.00 8/03 303-295-2511 303-595-4522 ECI SITE CONSTRUCTION MANACaEMENT, INC. MAJOR PROJECTS COMPLETED MUNICIPAL PROJECT NAME OWNER ARCHITECT CONTRACT COMPLETION CSU Transit Center City of Fort Collins Coover-Clark & Associates, P.C. $ 1,892,216.45 12/02 Fort Collins, CO 970-221-6273 303-783-0040 Diamond Valley Sports Complex Town of Windsor Jim Sell Design, Inc. $ 490,535.00 10/02 Windsor, CO 970-674-2444 970-484-1921 Douglas County Entry Signage Douglas County Government Design Concepts $ 93,463.00 10/02 Douglas County 303-470-0140 303-664-5301 Springer Park & Perry Pines Park Douglas County Government Design Concepts $ 63,809.00 10/02 Douglas County 303-470-0140 303-664-5301 Bluffs Regional Park Douglas County Government The Architerra Group $ 637,424 6102 Douglas County 303-663-6226 303-948-0766 East/West Regional Trail Douglas County Government The Architerra Group $ 165,666 8/02 Douglas County 303-663-6226 303-948-0766 Jim Hamm Pond & Nature Area City of Longmont The Norris Dullea Company $ 630,855 6/02 City of Longmont 303-651-8448 303-892-1166 Fossil Creek Park Ph. IA City of Fort Collins BHA Design $ 956,545 5/02 City of Fort Collins 970-221-6618 970-223-7577 Dad Clark Park - Maintenance Highlands Ranch Metro District Shalkey & Team, Inc. $ 7,412 5102 Highlands Ranch Metro. District 303-791-2710 303-820-3340 Highland Heritage Regional Park Entry Sign Douglas County Government Design Concepts $ Douglas County Government 303-470-0140 303-664-5301 61,329 5/02 Aurora Wheel Park City of Aurora ICON Engineering, Inc. $ 1,968,600 5102 City of Aurora 303-739-7179 303-221-0802 Athletic Fields at the Ridge at West Meadows Foothills Park & Recreation Dist. Design One $ 1,426,495 5102 Foothills Park & Recreation District 303-409-2304 303-832-2020 Valmont City Park Ph. I City of Boulder McLaughlin Water Engineers, Inc. $ 2,237,584 5/02 City of Boulder 303-413-7225 303-058-5550 Rock Creek South Recreation Center Superior Metro District No. 2 The Norris Dullea Company $ 2,007,216 5/02 Superior Metro District 303-987-0835 303-892-1166 Fairgrounds Regional Park Playground Douglas County Government Design Concepts $ 87,182 4/02 Douglas County Government 303470-0140 303-664-5301 ECI SITE CONSTRUCTION MANAGEMENT, INC. MAJOR PROJECTS COMPLETED MUNICIPAL PROJECT NAME OWNER ARCHITECT CONTRACT COMPLETION Dad Clark Park Highlands Ranch Metro District Shalkey 8 Team, Inc. $ 700,217 9101 Highlands Ranch Metro. District 303-791-2710 303-820-3340 Metzler Park Town of Castle Rock Carder -Burgess $ 3,350,502 8101 Town of Castle Rock 303-814-7446 303-820-5240 Bingham Lake Douglas County Government The Architema Group $ 218,650 8/01 Douglas County Government 303-470-0140 303-948-0766 Eaton Park City of Boulder City of Boulder $ 152,770 8101 City of Boulder 303413-7228 303413-7228 Bayou Gulch Regional Park Ph. I Douglas County Government Design Concepts $ 291,347 5101 Douglas County Government 303470-0140 303-664-5301 Boulder Skate Park City of Boulder Shapins Associates $ 695,190 12/00 Boulder, CO 303-413-7227 303442-4588 Big Dry Creek Highlands Ranch Metro. District Mundus Bishop Design, Inc. $ 633,963 10/00 Highlands Ranch Metro, District 303-791-2710 303-830-2585 Highland Heritage Regional Park Douglas County Government Design Concepts $ 531,184 9/00 Douglas County Government 303-470-0140 303-664-5301 Challenger Park Phase VIII Douglas County Government Design Concepts $ 171,124 7/00 Parker, CO 303-660-7490 303-6645301 Foothills Community Park City of Boulder Design Concepts $ 1,642,803 7/00 City of Boulder 303-413-7223 303-664-5301 Challenger Park Phase VII Douglas County Government Design Concepts $ 1,181,530 6/00 Parker, CO 303-660-7490 303-665-5313 Cottonwood Glen Park City of Fort Collins City of Fort Collins $ 1,137.277 6100 Fort Collins, CO 970-2215618 970-2215618 Willow Farm Park City of Longmont Design Concepts $ 1,111,036 6100 Longmont, CO 303-651-8448 303-664-5301 Pinery Park Douglas County Government Design Concepts $ 87,813 2/00 Douglas County 303-660-7490 303-664-5301 Bradfield Park City of Boulder Play Environments $ 389,654 4/00 Boulder, CO 303-441-3061 303-682-0854 Challenger Park Phase VI Douglas County Government Design Concepts $ 545,975 3/99 Parker, CO 30A-660-7490 303-664-5301 Redstone Park Highlands Ranch Metro. District Design Concepts $ 3,123,338 9/99 Highlands Ranch Metro. District 303-791-2710 303-664-5301 Community Park in North Boulder City of Boulder Design Concepts $ 1,270,635 10/99 Boulder, CO 303413-7227 303-664-5301 West Woods Park City of Arvada City of Arvada $ 308,231 9/99 Arvada, CO 303-660-1036 303-660-1036 ECI SITE CONSTRUCTION MANAGEMENT Project References __— LOVELAND YOUTH SPORTS PARK OWNER: City o`. Loveland 500 E 3 ' street wavel anc. CO 80537 ,lane! Meisel -Burns ;970! 962-245 ARCHITECT: Design Concepts 211 North Public Road Suite 20G Lafayette, CO 80026 Kurt Mundinc 303) 664-5301 GMP: $6.3 Miiiior START DATE: 08/04 COMPLETION DATE: 0' %06 SCOPE: ECI constructed a Youtr Sports Complex under a CM/GC contract for the City of Lovelard. The project consists of several soccer fields. basketball courts, 2 in -line hockey rinks, skate park, a syrthetic turf charnpionship field, s-nl_iltkuse shelters. r-riaintenance building, pond with aeration system. construction of asphalt parking lots, and martyr other park features. PROJECT MANAGER: Ted Johnson GENERAL SUPERINTENDENT: Rick Coulter PROJECT SUPERINTENDENT: Chad Oieson WHITETAIL PARK (SOUTH POINTE PAR OWNER: City of Lafayette 1290 South Public Road Lafayette, CO 80026 Bill Coleman (303) 665-5506 X3730 CONTRACT AMOUNT: $1,479,022.93 ARCHITECT: Design Concepts 211 North Public Road Lafayette, CO 80026 Ivy Dunlap (303) 664-5301 START DATE: 10/04 COMPLETION DATE: 06/05 PROJECT MANAGER: Ted Johnson PROJECT SUPERINTENDENT: Mike Paetzel f PROJECT LOCATION: 2550 Autumn Ridge Blvd. Lafayette, CO SCOPE: Construction of a neighborhood park including custom picnic shelters, restroom and maintenance building, concrete trails, sandblasted images, playground with water feature, and multi -use fields. FAIRGROUNDS REGIONAL PARK OWNER; Douglas County Government F.O. Box 1390 Castle Rock, CO 80104 Randy Burkhardl i303> 663-6226 CONTRACT AMOUNT: S1.804,7Ec ARCHITECT: Norris Duilea 710 West Colfax Ave. Denver, CO 80204 Josh Orth ,303) 892-1166 START DATE: 06/03 COMPLETION DATE: 1-l134 30JECT SUPERINTENDENT: Bob Cruller 30JECT MANAGER: Ti ,a Connet! uetion of a regional parK including parking lots, ustom and standard picnic shelters, dog park ig, masonry walls, and !aridscaping and PROJECT LOCATION: 410 Fairgrounds Road Castle Rock, CO BROOMFIELD, COUNTY COMMONS PARK (SECTION 30 PARK AND BALLFIELDS OWNER: City and County of Broomfield One DesCombes Drive Broomfield, CO 80020 Melanie Richmond (303) 438-6259 f ARCHITECT: Sports One 2990 29' Street, Suite 1 Greeley, CO 80631 SCOPE: CM/GiC project for the City and County of Broomfielc for the construction of an 80-acre athletic complex along Sheridan Boulevard. Project consists of four multi -field pods connected by concrete and crusher fines trails, picnic shelters, a restroom building and a large multi- use buildina centrally located in an open concrete plaza adjacent to a playground r park area and amphitheater. The project also includes extensive landscaping t and irrigation with special sand ba.secl athletic fields and an artificial turf chamoionshic field Jeff Kroeger — Now with Vignette Studios (970) 472-9125 GMP: $101359,994 START DATE: 10102 COMPLETION DATE„ 111/03 PROJECT MANAGER: Ted Johnson GENERAL SUPERINTENDENT: Rick Coulter PROJECT SUPERINTENDENT: Chad Oleson . wn - � `"' • • `'7 .io7 m* i4s'Kii9P�IP'+ 4*N � •. �` ' � d. � , ,� ti ,m PROJECT LOCATION: 13000 Sheridan Blvd. Broomfield. CC KITTREDGE TENNIS COURT REPLACEMENT OWNER, Unwe, sity of 1:;olorado at Boulder Research Laboratory No. 2 3`d Floor, Office 353 1540 30`' Street Boulder. CO 803109 Kristen Hessen 303) 735-6614 ARCHITECT: Sink Combs Deth{ets 475 Uncoln Street, Suite 100 Denver, CO 80203 Mira Theisen i Lee Sterrett (303) 308-0200 CONTRACT AMOUNT: $1,041.706 START DATE: 02/03 PROJECT SUPERINTENDENT: Ray Gonzales PROJECT MANAGER: Tina Connett PROJECT LOCATION: 527E Table Mesa Drive Boulder, CO In COMPLETION DATE: 09,03 SCOPE: Construction of 12 NCAA competition grade outdoor tennis courts and amenities inciuding site work, a road base parking lot, smal! pavilion, main entry gate.. landscaping and irrigation. it..,,..�..,, t GREENLAND OPEN SPACE TRAIL PROJECT: OWNER: Douglas County Government Div. cf Open Space & Natural Resources 100 Third Street Castle Flock, CO 80104 Cheryl Matthews (303) 6610-7495 ARCHITECT: The Architerra Group 5881 South Deframe Street Littleton, CO 80127 Dean Pearson (303) 948-0766 CONTRACT AMOUNT: $651,930.24 START DATE: 12/02 PROJECT SUPERINTENDENT: Bob Coulter PROJECT MANAGER: Ted Johnson r r. GENERAL MERCHANDISE HARDWARE COMPLETION DATE: 3,03 SCOPE: Construction of an open space ;;rusher fines trails with a trail head consisting of extensive erosion control and a drainage system, concrete sidewalks, road base parking lot, information kiosk, toilet as, and a wood Bid Item #11. Entry Drive Bridge/Trail Underpass To include all materials complete, in place (such as but not limited to the following: Structural Concrete, Stone, Bridge Railing, Signage), as indicated on the Drawings, and in the Specifications. Lump Sum Price $ In WritinaC` Ab � Bid Item #12. Site Furnishings " v To include all materials complete, in place (such as, but not limited to the following: Picnic Tables, Benches, Trash. Cans, Bicycle Racks, Solar Pump, BBQ's, Drinking Fountains), as indicated on the Drawings, and in the Specifications. Lump Sum Price $ 1 Q0 , y UU. OU In Writing- Vv cyVec tQ cj g�xh� n.�sanca 0.r\el �b\kr k\��� dr+2c.1 (�i aLw-s Bid Item #13. 160' Sidewalk extension into Oleander School To include all materials complete, in place (such as but not limited to the following: excavation, compaction, sidewalk construction, backfill, fine grading, soding any disturbed turf areas and the repair of irrigation system and any other existing element damaged during construction), as indicated on the Drawings, and -in the -Specifications. The Contractor -shall coordinate with the owners representative on final walk layout, Lump Sum(�Price $ ('{z)paC)O In Writing Chu(-kr crA�rt�c�c�Q�. hcJ.r�C�.c2d. c`�.tlllCit S TOTAL — BID ITEMS 1 THROUGH 13 Lump Sum Price $ WuU (pW,, pp In Writina /Vi�l()(dD/ M I'V),i ( f 1 V CSU TRANSIT CENTER OWNER: City of Fort Collins 214 N, Hewes Fort C.oIiins. CO 805=1 Steve W mte i9701 221-6273 PROJECT LOCATION: 301 W. Plum Street Fort Co!iins. CO ARCHITECT: Coover-"'!ark & Assoc,ates, P.C. 455 Sherman Street. Suite 20:=, Denver, CO 80203 Carc Coover-Clark (303)783-0040 CONTRACT AMOUNT: $1.892.216.45 START DATE: 05/02 COMPLETION DATE: 8i02 PROJECT SUPERINTENDENT: Chad Oleson PROJECT MANAGER: Ted Johnson SCOPE: F_ast track construction of a bus transit center on the CSU campus. The City of Fort Collins and CSU F a+:.ili.ies Management jointly managed the project. Construction included extensive concrete flatwork, concrete retaining walls with flagstone veneer, masonry entry sign, security gates, site furnishings, asphalt paving, landscaping, custom -fabricated bus shelters, information kiosk, custom signage, and site electrical. This project required upfront value engineering in order to meet the City of Fort Collin,'s budget. ECI .\,as an integral part of this orocess, providing cost effective alternatives to meet the project budget. AURORA i1 HEEL 1='ARK OWNER City of Aurora '5'5 E. ;;IFn7eda Parkway aurora, C0 60012 Mike Miller 303t 7 1,9 7I6,, CONTRACT AMOUNT: $1.968.599.63 ARCHITECT: ICON Engineering, Inc. 8100 South Akron Street, Suite 300 Englewood, CO 80012 Matt Ursetta (30?)221-0802 START DATE: 06100 COMPLETION DATE: 05'02 PRO.IECT SUPERINTENDENT: Mike Paetzel PROJECT MANAGER: It Johnson PROJECT LOCATION: 15802 East liiff Avenue Aurora. CO SCOPE: Construction of an athletic complex that consisted of a shot-crete :--,Kate park, three in -line hockey rinks with associated equipment, group shelter building on a colored ami patterned concrete plaza, concrete trails, site utilities and alectricai, site ei"menmes. fencing, and an asphalt roadway and parking !ot. ATHLETIC FIELDS AT THE RIDGE AT WEST MEADOWS OWNER: Foothills Parks & Recreation District 3624 S. Kipling Parkway Denver, CO 80235 Colin Insley (303) 409-2304 ARCHITECT: DesignOne Consultants, LLC 4627 W 20 Street Rd Greeley, CO 80634 Mike Walker (970) 392-1616 PROJECT COST: $1,426,495START DATE: 06;01 GENERAL SUPERINTENDENT: Rick Coulter PROJECT SUPERINTENDENT: Chad Oleson PROJECT MANAGER: Tina Connett COMPLETION DATE: 2002 SCOPE: Construction of an athletic complex consisting of two ball fields, a multi use field, parking lots and a picnic shelter. Also included in the contract were modifications to an existing detention pond and outlet structure. PROJECT LOCATION: 12819 West Coal Mine Ave. Littleton, CO 80127 RGCK CREEP; SOU* H RECREATION CENTS-R OWNER: Super:or Vle!rc. D:st. No. 2 14'Union Boulevara, Suite 150 Lakewood, CO 80228 Bryan Appleo\� 1303) 494-072 PROJECT LOCATION: 3300 urc:r. Peak .Ave. Suoer,or, CO 80027 ARCHITECT: The Norris Duliea Company 710 West Colfax Avenue Denver. CO 80204 Greg Fischer (303) 892-1166 CONTRACT AMOUNT: $2.007.2' 6 START DATE: 09./00 COMPLETION DATE: 5i01 PROJECT MANAGER: Ted Johnson PROJECT SUPERINTENDENT: Milo Paetzel v SCOPE: Construction of a. 4,000 SF outdoor swimming pool and a 3,000 SF cabana building. The cabana building Incl.--es res7rooms. sr,owers; and locker roorns complimented by timber beam details and extensive sandstone masonry. Site. :;onstrwct!on incluaes a skate park, concrete sidewalks, site utilities. decorative pool fencing, a playground. 2' o chic she.ters, asphalt paving, masonry walls, signage, site !urnishings, site electrical, and landscaping and irrigation :!i ludinc two acres of sodded areas. METZLER RANCI-i COMMUNITY PARK: OVVNER: Towr of Cast'.e Rock 2501 N. %Ncodiancis Blvd. CastiFi t ,ocK. CO 30104 Jett Brauer (303i 814-7446 PROJECT MANAGER: Tina Connett SUPERINTENDENTS: Rick Coulter (>r-iOlf�,nr PROJECT LOCATION: 41 75 Trail Ross Road Castle Rock, CC ARCHITECT: Cardec-Burgess 216 16" Street, Suite I70G Denver, CO 80202. Steve VVilensky (303) 820-5289 F7 PROJECT COST: $3.348.:D8 START DATE: 07'00 COMPLETION DATE: 2001 CONTRACT AMOUNT: $3,385,482 SCOPE: Cc;rnpletion of an existing baseball field complex_ This project required extens!'>e V-ak�le engineemig and design/build construction in order to tie existing construction to new construction while staying within the Town of Castle Rock's budget constraints. This project included the completion of 2 existing baseball, fel s. the addition or 2 new oalifields, 2 post tension concrete roller hockey courts with assccia.ed eq�iipment, stru(,t:;rai :. )ncrete bieacners and wails, asphalt paving, site amenities and a playground. BOULDER SKATE PARK City �,,f Bcuidet 319-8 N', Broadway Bculcfer_ C�C 80304 Dreg, Horton 301 413-7223 CONTRACT AMOUNT: $695. 190.00 ARCHITECT: Shapins Associates 1738 Pearl Street, Suite 200 Boulder, CO 80302 Jerry Shapins (303) 442-4588 START DATE: 04!00 PROJECT SUPERINTENDENT: Mike Paetzel PROJECT MANAGER: Ted Johnson PROJECT LOCATION: 1505 30T" Street ,3ouider, CO COMPLETION DATE: `2100 SCOPE: Construction of �_-. high profile cone+ere skate park .at. `;catt Carpenter Park in Boulder. This project included earthwork, drainage, orna ne-,tai fencing, specialized concrete 'bowls consisting of rebar. coping and Crete, concrete fiatwork. site utilities. masonry w,91ls. and site amenities. Durin construction ECi vvorKed w!th numerous sponsors ?o promote community participation in the project with the C4 of Boulder. CHALLENGER REGIONAL PARK PHASES I — VIII OWNER: Douglas County 100 Third Street Castle Rock. CO 80104 Ron Benson (303) 470-0140 ARCHITECT: Design Concepts 211 North Public Road, Suite 200 Lafayette, CO 80026 Carol Henry (303) 664-5301 rnvuc;%. i ivimv4 ►uizn. Ted Johnson PROJECT SUPERINTENDENTS: Rick Coulter PROJECT LOCATION: Mike PaetzeI 17301 E. Lincoln Ave. Chad Oleson Parker, CO xt, µP ,ii;r"i`R^,. er .pi „ �, � SCOPE: ECI performed as a CM/GC for Douglas County for eight consecutive years to complete the construction of a master planned athletic complex including a restroom/concession building, picnic shelters, three baseball fields and multi -use athletic fields with associated amenities. This project includes earthwork, fencing, concrete flatwork. irrigation, landscaping, site electrical scorers booths. asphalt paving, flagstone paving, extensive masonry seat walls, multi -use courts, a playground and site amenities. FOOTHILLS COMMUNITY PARK PH. IA,IB, IC &-ID OWNER-. City ct Boulder 3198 N1, Broadway Boulder. CC 80304 Maureen Spitzer �303 413-7227 ARCHITECT: Design Concepts 211 North Public Road Lafayette, CC 80026 Rob Layton (303) 664-5301 PROJECT LOCATION: 8`r' and Cherry Street Boulder, CC, PROJECT COST: $2,962,933 START DATE: 38i99 COMPLETION DATE: 7,00 PROJECT MANAGER: t ed Johnsor -- 4i! Pi ases PROJECT SUPERINTENDENTS: Mike Paetzel -All Phases Ray Gonzales --- Phase; iC LANDSCAPING SUPERINTENDENT: Wesley Statkus - 'Phase ID SCOPE: Construction of a phased community park including maintenance facility building with public restrooms and garden storage building. This park also includes earthwork, site utilities, concrate trails and decorative iaiwork. asphalt parking lot, trickle channel and three pools, dumpster enclosure, decorative ornamentai fencirg and artwork two post tension courts. playground and youth fitness area, site furnishings, shade shelter. comrriunity gardens. seed, 12 acres of sod, and a raw water system. OOTTONWOOD GLEN ARK OWNER. City of For; Collins 215 N. Nil asor, Fort (;olli s.. CO 80521 ;raig retemai'i 1070) 221-6618 CONTRACTAMOUNT: $1,134.739 PROJECT LOCATION: 3074 Ovei'aiRd Trail T-ort Coll ns, CO ARCHITECT: The Architects Studio 151 W. Mountain Avenue Fort Collins. CO 8052.4 Glenn Koen (970) 482-8125 START DATE: 05/99 COMPLETION DATE:. PROJECT SUPERINTENDENT: Bob Coulter Landscaping and Irrigation: .John Oatsvah SCOPE: Community park inciuding eartriwork. domestic water service and distribution, sanitary sewer service, restroom building, picnic shelter, irrigation pond with liner, concrete flatwor�, asphalt road, path and parking iot, site dra page. playground, site furnishings, site electrical, nallfield, multi -use court, landscaping. irrigation pump house, wet well and inlet,. and system. Environmental Concerns, Inc. vvas :he general contractor for the restroom building on this Nroject WILLOW FARM PARK OWNER: City 01 Longmont 30011 E. Hwy 119 "-onv,-iont. CO 80504 Paula Fitzgeraid 303) 551-8.448 CONTRACT AMOUNT. $1.112,118 ARCHITECT: Design Concepts 211 N. Public Road Lafayette. CO 80026 Carol Henry (303) 664-5301 START DATE: 04199 COMPLETION DATE: 05,'00 PROJECT MANAGER SUPERINTENDENT: Mike Paetzei Landscaping Superintendent: Ray Gonzales Irrigation Superintendent: Brett Kioberdanz PROJECT LOCATION: 901 South Fordham Street Longmont. CO 80503 SCOPE: Construction of a ' 14-acre coo-nrnunity nark including the Renovation o a 50-year-old barn into *� a picnic sneltpr and restrooms. Site :A;ork inCluder, the s'e amenities, a post f "`" - tension roller hockey rink, basketbal` s, court. multi -use playing fields. concrete walks including decorative concrete `Fature s. 7.000 S.F. playground with �" Y ._ w a hand pump water feature, site lighting, asphalt parking lot, landscaping, irrigation,. picnic shelter and 25 ton pedestrian bridge. This proiect was awarded the Gold Hard Hat Award for Outstanding Landscape Project of 2000. ADDITIONS/DELETIONS Add or subtract the following amounts for the items listed below. Alternate Bid Item #1. Roller Hockey Rink To include all materials complete, in place, as indicated on the Drawings, and in the Specifications. Lump Sum Price $33, nctp . cx:� (subtract) In Writing ane-hundrec, n_ n�A (10knrs cyyl Ynr)%a— Alternate Bid Item #2. Shotcrete Sleeping Giant - Knee and Feet To include all materials complete, in place, as indicated on the Drawings, and in the Specifications. Lump Sum Price $_ (add) .L4: .. •. i h . J. • Alternate Bid Item #3. Sod near Baseball Fields - - - - To include all materials complete, in place, as indicated on the Drawings, and in the Specifications. Lump Sum Price$ I-1, r)M- oo (additional cost vs. seed) In Writing SPuen�een nd ft,\ l \30e,(3�a4-(' \\e_ (10r5 Alternate Bid Item #4. Sod in Dog Park To include all materials complete, in place, as indicated on the Drawings, and in the Specifications. Lump Sum Price $_ iq . `4pn' W ( dditional cost vs. seed) In Writingg; r\pV en -\ApcnA=maM - Ahr-ce ht. r`d twit cu\d SiXh4 clove ar5 Alternate Bid Item #5 Spray Irrigation in Seed Type B, C, D, and E To include all materials complete, in place, as indicated on the Drawings, and in the Specifications including but not limited to valves, heads and piping. Does not include drip irrigation and associated valves and piping, Lump Sum Price $ �. (subtract) In Writing_Lrk.r hL.RAced crack Ai`n 6k h� AA -\,cm -,and anc Five, Vv nrl(&A C)'O L 5 Alternate Bid Item #6 Change Chainlink Fence and Backstops to Class 1 Galvanized Finish To include all materials complete, in place, as indicated on the Drawings, and in the Specifications including but not limited to valves, heads and piping. Does not include drip irrigation and associated valves and piping. Lump Sum Price $ ( 1 o � 1(o CEO; (subtract'- difference in cost for change to galvanized ) uWYIl11�'1:••' .� •� l :WWWWWAPTAWMA - • •: • REDSTONE PARK OWNER: Highlands Ranch Metro District 62 West Plaza Drive Highlands Ranch. CO 80126 Brian Muller (303) 791-2710 ARCHITECT: Design Concepts 211 ,'North Public Road Lafayette, CC) 80026 Carol Henry (303) 664-53,01 SCOPE: Construction of an athletic complex and community park including, earthwork. site utilities, site amenities, site lighting and electrical, 4 lighted baseball/softball fields. 7 soccer/multi-use fields. 8 lighted tennis courts, pond with pumping system, landscaping, 27 acres of irrigation, asphalt parking lot, playground, concrete flatwork and plaza and site masonry. 4 PROJECT LOCATION: 3280 ',1'2 Redstone Park Circle Highlands Ranch, CO PROJECT COST: $3,123,338 START DATE: 05/98 COMPLETION DATE: 1999 PROJECT MANAGER: Rick Coulter PROJECT SUPERINTENDENT: Rick Coulter WESTFIELD PARK City of Fort Collins 214 N. Howes Fort Collins, CO 80521 Craig Foreman (970) 221-6618 CONTRACT AMOUNT: $1,021,493 ARCHITECT: BHA Design, Inc. 4803 Innovation Drive Fort Collins, CO 80525 Roger Sherman (970) 223-7577 START DATE: 02/98 COMPLETION DATE: 10/98 PROJECT MANAGER / SUPERINTENDENT: Bob Coulter _ Landscape and Irrigation Superintendent: n Ray Gonzales .A SCOPE: Park construction including site clearing and demolition, earthwork,_ site utilities, concrete flatwork, crusher fines trail, and cast -in -place concrete wall, irrigation pump and aeration"' _ �^� " system, um house, site electrical and lighting, restrooim building, pavilion, baseball field, playground, site furnishings, irrigation, and landsca in 9 9 p 9 PROJECT LOCATION: 4104 Seneca Street Fort Collins, CO D oi" i -19 1 Key Personnel Rick Coulter, Vice President and General Superintendent Rick has over 20 years experience in the site construction industry, 17 years with ECI, and specializes in project team management, value engineering and Owner/Contractor relations. Rick oversees field operations by conducting routine site visits and attending weekly site meetings. Rick also maintains close one- on - one relationships with all superintendents and project managers. Ted Johnson, Secretary/Treasurer, Lead Estimator and Project Manager Ted is a 1999 graduate of Colorado State University with a B.S. in Construction Management. Ted has worked with ECI since 1997 and is the lead estimator, responsible for project procurement and owner negotiations. Ted also works as a project manager and is familiar with design/build and CM/GC project formats. Ted has a strong background in civil, park, site construction management and project budgeting. Recent Projects: Stapleton — Central Park Playground $1,338,571 Lowry Sports Complex $3,026,094 Loveland Youth Sports Complex $6,756,447 South Pointe Park $1,479,023 St. Wain Greenway Phase VI $1,030,100 APS Stadium $807,100 Broomfield County Commons Park $10,369,694 CSU Transit Center $1,892,216 Valmont Park $2,237,583 PROJECT SUPERINTENDENTS: Mike IPaetzel, Superintendent Mike started with ECI in 1989. He is experienced in all phases of site construction and manages substantial and diverse projects. These projects include skate parks, roller hockey rinks, multi -use buildings, and other complex site elements. Mike is also involved in ECI's safety program and conducts company accident investigations and coordinates field safety management. Relevant Projects: Stapleton - Central Park Playground $1,3338,571 Lowry Sports Complex $3,026,094 South Pointe Park $1,479,023 St. Vrain Greenway Phase VI $1,030,870 APS Stadium $807,100 East West Greenway $1,257,347 Aurora Wheel Park $1,968,600 Foothills Community Park Ph 1 C $1,646,933 Rock Creek Recreation Center $2,007,216 Willow Farm Park $1,111,036 Foothills Community Park Ph 1 A, 1 B $1,258,668 Chad Oleson, Superintendent Chad has over 19 years experience the site construction industry. Chad has worked with ECI since 1994 and has successfully completed large park and public improvement projects. Chad specializes in project infrastructure including site demolition, concrete, grading.. and drainage installation. Relevant Projects: Loveland Youth Sports Complex $6,756,447 Cherry Creek Trail $447,202 Broomfield County Commons Park $10,369,694 Metzler Park $3,348,587 Athletic Fields at the Ridge at West Meadows $1,426,495 John Oatsvall, Superintendent John has more than 7 years of experience with ECI. He has managed the construction of many diverse projects including neighborhood parks, trails, and synthetic turf field drainage and base installation. Relevant Projects Broomfield Open Space $861,317 Broomfield Tennis Courts $341,903 Broomfield County Commons Park — Synthetic Turf Field $553,850 Louisville Inline Rink $361,902 Bluffs Regional Park $637,434 East/West Regional Trail $165,666 e on Management 1. Project Name: Similar Scope: Project Location: Architect: Owner: References Loveland Youth Sports Complex Basketball courts, post -tension hockey rinks, seeded fields, lighting and skate park. 950 Boyd Lake Avenue Loveland, CO Design Concepts — Kurt Munding (303)664-5301 City of Loveland — Janet Miesel-Bums (970)962-2451 2. Project Name: Broomfield County Commons Park Similar Scope: Seeded fields, site shelters, trails. Project Location: 13000 Sheridan Blvd. Broomfield, CO Architect: SportsOne Development — Jeff Kroger Jeff is now with Vignette Studios (970) 472-9125 Owner: City and County of Broomfield — Melanie Richmond (303) 438-6259 or Ronda Jo Ackerman -Alford (303) 464-5807 3. Project Name: Athletic Fields at the Ridge at West Meadows Similar Scope: Ballfields, asphalt paving, site utilities. Project Location: 12819 West Coal Mine Ave. Littleton, CO Architect: DesignOne Consultants, LLC — Mike Walker (970) 392-1616 Owner: Foothills Parks & Recreation District — Colin Insley (303)409-2304 4. Project Name: Douglas County Fairgrounds Regional Park Similar Scope: Outdoor field lighting and Ballfield grading in existing park setting. Project Location: 410 Fairgrounds Road Castle Rock, CO Architect: The Norris Dullea Company — Josh Orth and Erin Hayne Now Norris Design (303) 892-1166 Owner: Douglas County Government — Curt Sloan (303) 470-0140 and Randy Burkhart (303) 663-6226 5. Project Name: Whitetail Park Similar Scope: Post -Tensioned Basketball Courts, and playground. Project Location: 2550 Autumn Ridge Blvd. Lafayette, CO Architect: Design Concepts — Ivy Dunlap (303) 664-5301 Owner: City of Lafayette — Bill Coleman (303) 665-5506 0 ValleyCrest Landscape Development February 1, 2006 City of Fort Collins Purchasing Division 215 North Mason Street Ft. Collins, CO 80521 To Whom it May Concern: 2322 E. 13th Street Loveland, Colorado 80537 tel: 970.278.9150 fax: 970.278.9154 www.valleycrest.com ValleyCrest Landscape Development, Inc., (VCLD) was founded in 1949 by Burton Sperber. What started as a small retail nursery grew steadily in the post World War II building boom of Los Angeles's San Fernando Valley. The firm has been in continuous operation since its beginning. During the course of this fifty-six year span, the company has never failed to complete a contract. Since its inception the company has grown to be recognized as the largest irrigation and landscape specialty contractor in the United States. What is not as well known is that VCLD is among the top 60 general engineering and site construction contractors in the country]. ValleyCrest Landscape Development's portfolio of projects includes destination resorts, waterfront development, universities, technology parks, greenbelts, street improvement projects, theme parks, major sport and performance venues, water features, natural and artificial rockwork, and golf courses. The company's growth into a national leader has been a success story built upon blending of traditional business models, sound management practices, and the most appropriate available technology, to deliver highest quality product and service, and on time performance. ValleyCrest Landscape Development, Inc. is part of a family of companies that exist under the banner of parent firm, ValleyCrest Companies, Inc. The corporate leadership at ValleyCrest Companies, Inc., has provided the managerial expertise, financial strength, and innovative vision to propel these firms to the forefront of their respective disciplines on a nation-wide basis: 1 Tulacz, Gary, The Top 400 Contractors, En¢ineerine News Record, McGraw-Hill Publishing, May 19, 2004 pg 64 ValleyCrest Landscape Development, Inc. — Landscape, Golf, and Site Construction ValleyCrest Landscape Maintenance — Long -Term Landscape Maintenance ValleyCrest Golf Course Maintenance — Golf Course Maintenance Valley Crest Tree Company — Tree Growing and Tree Relocation ValleyCrest Landscape Development has been in Colorado for the last thirty four years and at our offices in Parker for the last sixteen years. For the Spring Canyon Community Park project, ValleyCrest Landscape Development will perform a minimum of 20% of the work with its own forces. The attached document represents ValleyCrest Landscape Development's formal response to the City of Fort Collins Statement of Bidder's Qualification. Upon review, please do not hesitate to contact our office when you require additional information or clarification. Respectfully Submitted, VALLEYCREST LANDSCAPE DEVELOPMENT Chris L. Perry Assistant Branch M SECTION 00420 STATEMENT OF BIDDER'S QUALIFICATIONS Contractor Qualifications Required Documents To be a qualified Contractor, the Prime Contractor shall submit with their bid the following written documentation for the Owner's review: 1. Cover Letter. A letter on the company letterhead with the following information: a. The letter must be signed by the Owner of the Company or a Company Officer and dated; and b. A statement declaring at least seven (7) complete years of experience in the active performance of similar work (similar work is considered to include, but not limited to, the acquisition and installation of large scale park projects, athletic facilities, skate park construction, buildings of a similar nature to the proposed buildings, irrigation systems, landscaping) with its own forces and organization as opposed to the use of subcontractors. c. A statement declaring that the company will perform a minimum of 200 of the work, not including purchase of materials, with its own forces and organization, and a list of services that the Prime Contractor will provide; and 2. Company Experience. On a separate sheet, list a project history of the company's experience as a General Contractor for the seven (7) years declared in item l.b. above, including the following information: • Project name and a brief description of the work performed; and • Beginning and ending date of project; and • Location of project (city, state); and • Monetary amount of project construction budget; and • Owner of project, contact person, valid phone number with area code; and • If applicable, name of Prime Contractor (Client) that the work was performed for/phone number with area code; and • Superintendent must have worked for the Prime Contractor for minimum of one year and preferably on one of the like projects. 3. Resumes. The company shall include up-to-date resumes for the Superintendent(s) and other key personnel that will actually be doing the work which shall include at a minimum a list of similar projects that each person has been involved with, and their role, in the last 4 (four) years; and 4. References. On a separate sheet, References for a total of 5 Municipalities and/or Landscape Architects. References shall information shall include: • Project name and brief description of work performance; and • Location of project (city, state) 7/96 Section 00420 Page 1 All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. 1. Name of Bidder: ValleyCrest Landscape Development, Inc. 2. Permanent main office address: 8888 Motsenbocker Rd., Parker, CO 80134 3. When organized: 4/1/1949 (California), 1972 (Colorado) 4. If a corporation, where incorporated: Colorado 5. How many years have you been engaged in the contracting business under your present firm or trade name? 56 years 6. Contracts on hand: (Schedule these, showing the amount of each contract and the appropriate anticipated dates of completion.) See attached - Significant Projects 2005/2006. 7. General character of Work performed by your company: Landscape, Irrigation, Site Improvement 8. Have you ever failed to complete any Work awarded to you? No. If so, where and why? 9. Have your ever defaulted on a contract? No. If so, where and why? 10 Are you debarred by any government agency? If yes list agency name. 11. List the more important projects recently completed by your company, stating the approximate cost of each, and the month and year completed, location and type of construction. See attached project profiles. 12. List your major equipment available for this contract. ValleyCrest Landscape Development, Inc. is listed as one of the top 100 equipment owners in GUR Magazine. (See attached rental rate sheet for specific equipment available.) 7/96 Section 00420 Page 2 Alternate Bid Item #7 Main Entrance Bridge Culvert To include all materials complete, in place, as indicated on the Drawings, and in the Specifications including but not limited to Boulder retaining walls, Head walls, Box culvert, drain inlet and associated piping. Does not include bridge rail, badge columns, stone columns, entry sign and concrete grade beam. Lump Sum Price $ OD Ll 1D.O�� (subtract ) In Writing C5(1P ihLAn &ed fo n .,o aMc ,.sa ncA (hn>,� h xck(-ed 52ve r` - twcD &Ov Ko :s UNIT PRICES For additions and deletions to the Contract, the following unit prices shall be applicable for the specific items listed. Unit Prices shall be complete, in place including required labor, materials, permits, equipment, implements, testing, parts and supplies necessary for, and incidental to proper installation, as indicated on the Drawings, and in the Specifications. 1. The Contractor agrees that requested and/or -required changes in the scope of -work, -the - . Contract Sum shall be adjusted in accordance with the following unit prices, where the Owner elects to use this method of determining costs. 2. The Contractor is advised that the unit prices will enter into the determination of the successful bidder. Unreasonable prices may result in rejection of the entire bid proposal. 3. Unit prices for irrigation shall include pipe, fittings, valves, concrete thrust block and stabiizers, and other items shown on the Drawings, as described in the Specifications or recommended by the manufacturer as part of the installation. DEMOLITION ITEM UNIT' PRI Demo — Existing Curb L4CE $ . `)C) LF Demo — Existing Asphalt Roadway $ `J. ,55 SY Demo — Existing Asphalt Trail $ Jr , SY Demo —Asphalt Saw Cutting $ LF Protection Fence . 4' Snow Fence with `T' posts $ 01. 10 LF EARTHWORK AND UTILITIES ITEM UNIT PRICES Pot Holing $ I51. 0Rx RR Imported Fill $ . tQ I CY Earthwork - Cut and Stockpiling $/I. ('p n CY Earthwork — Fill $ 2 , M Cy Imported Structural Fill $ R bc) Cy Fly Ash Treated Sub Base $ a t-) . `A�LCY Topsoil Stripping and Stockpiling $ 1 • q0 CY Topsoil Spreading and Placement $ 1 • '70 Cy 13. Experience in construction Work similar in importance to this project: See attached project profiles 14. Background and experience of the principal members of your organization, including officers: See attached resumes. 15. Credit available: $ 58 million VCLD is a wholly owned subsidiary of VCC who has the credit line. 16. Bank reference: Scott Kaplan 310 284 2765 17. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the OWNER? Yes. 18. Are you licensed as a General CONTRACTOR? see attached If yes, in what city, county and state? Contractors License What class, license and numbers? 19. Do you anticipate subcontracting Work under this Contract? Yes. If yes, what percent of total contract? and to whom? See attached subcontractor list. 20 Are any lawsuits pending against you or your firm at this time? No. IF yes, DETAIL 21. What are the limits of your public liability? DETAIL What company? See attached letter. 22. What are your company's bonding limitations? See attarbed letter 23. The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information requested by the OWNER in verification of the recital comprising this Statement of Bidder's Qualifications. 7/96 Section 00420 Page 3 Dated at Parker, CO this 30th day of January , 20 06. VallevCre_st Landscape Development, Inc. Name of By: Jeff inners Title: Vick President, Branch Manager State of Colorado County of Dou TPff A_ HTnnars being duly sworn deposes and says that he is N7jr-e-Br-esi�en�of Va11eV('rPct L.dGp_ Developmeft#d that (name of organization) the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this loth day of January 20U. nn L A Notary Public Alicia K. Hanlen My commission expires 1/6/07 7/96 Section 00420 Page 4 CONTRACTOR'S LICENSE/PERMIT INFORMATION CONTRACTOR'S NAME OF CITY/COUNTY LICENSE NO. Aurora, City of- Lawn Sprinklers 2005-136174-OOCL Boulder, City of - ROW 0006800-28 Broomfield, City of C2006-570 Castle Rock, Town of 03-0434 Centennial, City of CEN06-5543 Commerce City, City of 103199 Douglas County A03112 Fort Collins, City of 43796 Lakewood, City of 112 Parker, Town of 2050 South Jordan, City of, Utah 4871 Utah, State of 250297-5501 H:/MSTUORM/administrative/prequal/licprmt EXPIRATION DATE 7/O1/06 5/09/06 12/31/06 8/24/06 6/30/06 12/31/05-sent for renewal 12114105 10/21/06 Until Revoked 6/15/06 12/31/05-sent note to Vicky Harris 12114105 6/30/06 7/31/07 January 4, 2006 SECTION 00430 i SCHEDULE OF SUBCONTRACTORS List all subcontractors for the work items listed below and all subcontractors performing over 10% of the contract. ITEMS y N©nQ/ SUBCONTRACTOR 7/96 Section 00430 Page 1 VALLEYCREST LANDSCAPE DEVELOPMENT SIGNIFICANT PROJECTS 2005/ 2006 Proiect Completion Owner Architect Amount Anthem May, 2006 P. C. Metro DTJ Design $9,000,000 Broomfield, CO (50% to date) Jimmy Adams Bill Reilly 303-961-0380 303-443-7533 Serenity Ridge November, 2005 S. R. Metro Norris Dullea $1,700,000 Aurora, CO (99% to date) Tony Purdue Stacy Weaks 303-209-8400 303-892-1166 Northcreek Park June, 2006 M. A. Mortenson EDAW, Inc. $1,700.000 (25% to date) Doug Raitt Jane Kopperel 303-321-4122 303-595-4522 Southlands Retail October, 2005 Alberta Dev. CLC Assoc. $1,400,000 (100% to date) Bryan MacFarland Kurt Prinslow 303-627-5000 303-770-5600 Family Funplex June, 2006 Adolphson Peterson EDAW, Inc. $970,000 (65% to date) Dick Fatout Jena McKenzie 303-363-7101 970-442-4488 Highland Walk May, 2006 Shea Homes Sage Design $1,700,000 (90% to date) Dave Vasquez Phil Sage 303-791-8180 303-470-2855 Gallery @ Reunion July, 2006 Shea Homes C/O Norris Design (0% to date) Ryan McDermed Joshua Orth $2,200,000 303-791-8180 303-892-1166 Steve Knight Professional Experience VALLEY CREST RESUME Operations Manager ➢ Operations Manager 2001-Present Responsible for supervising nursery, mechanics and field related operations as well as employee development, training and recruitment. Provides technical support to field operations to ensure quality control, contract compliance and customer satisfaction. Works with architects and owners on a wide spectrum of projects including parks, golf courses, streetscapes, shopping malls and office buildings. ➢ General Superintendent 1985-2001 Responsibilities included supervising 25+ foremen, and a workforce of 150 to 200 workers. Other responsibilities include manpower and equipment dispatch, cost controls, quality control, scheduling, project management, coordination and supervision of subcontractors and safety. ➢ Project Superintendent 1973 —1985 Held numerous positions throughout his career with Valley Crest beginning as a laborer and progressing to irrigation foreman, landscape foreman, site superintendent and concrete/bomanite foreman. Superintendent Project Experience VALLEYCREST LANDSCAPE DEVELOPMENT • Westwoods Golf Course • Springs Ranch Golf Course • Interlocken Golf Course and Streetscapes • Boulder Valley Schools • Regis Synthetic Athletic Fields • CU Folsom Field Renovations • CU Football Practice Fields • CU Synthetic Turf Pracdce Field • Invesco Field at Mile High • Aurora Sports Park • Belmar Park • Village Greens Park • Clement Park • Arapahoe County Park at Dove Valley • Wesdands Park Tim Hearlihy RESUME Project Manager PROFESSIONAL EXPERIENCE VALLEYCREST General Superintendent 1980-1995 Golf Superintendent 1997-2000 Project Manager 2000- Present Responsible for cost and budget management and analysis, creating and maintaining schedules, billing, contract management, change order creation and management, construction issues coordination, and subcontractor buyout. Mr. Hearlihy joined ValleyCrest as a General Superintendent. He was promoted to Golf Superintendent and then Project Manager. His Project and General Superintendent experience includes the following projects: PROJECT EXPERIENCE Westerly Creek Aurora Sports Park Flatirons Crossing Interlocken Golf Club Lutz Sports Complex v Westwoods Golf Course Thorncreek Golf Course n Coal Creek Golf Course Additional Professional Experience CoCal Landscape Construction, Denver, Colorado 1995-1997 (Check with Tim) Ken Swanson RESUME Project Superintendent Professional Experience VALLEYCREST LANDSCAPE DEVELOPMENT ➢ Project Superintendent 1988-Present Responsibilities include manpower and equipment dispatch, cost controls, quality control, scheduling, project management, coordination and supervision of subcontractors and safety for projects involving all phases of site development. Superintendent Proiect Experience VALLEY CREST LANDSCAPE DEVELOPMENT > Boulder Valley Schools, Boulder, Colorado 2003 > Colorado Mills, Lakewood, Colorado 2002 > Aurora Sports Park, Aurora, Colorado 2002 > City Park Golf Course Renovation, Denver, Colorado 2001 > Interlocken Golf Course, Broomfield Colorado, 2000 > Interlocken Streetscape, Broomfield, Colorado, 1999 > The Ranch Country Club, Denver, Colorado 1996 > Westwood Golf Course, Denver, Colorado 1992 > Green Valley Ranch Streetscape, Denver, Colorado 2001 > Meadows Golf Course Irrigation, Littleton, Colorado 2003 > Heritage Eagle Bend Streetscape, Aurora, Colorado 2002 > Rock. Creek, Superior, Colorado 2000 > Exempla Radiation Oncology Garden, Wheat Ridge, Colorado 2002 > Okane Park, Lakewood, Colorado 1976 Pat McCormick RESUME Project Superintendent Professional Experience VALLEYCREST LANDSCAPE DEVELOPMENT ➢ Project Superintendent 1979-Present Responsibilities include manpower and equipment dispatch, cost controls, quality control, scheduling, project management, coordination and supervision of subcontractors and safety for projects involving all phases of site development. Superintendent Project Experience VALLEYCREST LANDSCAPE DEVELOPMENT Aurora Sports Park, Aurora, Colorado 2002 Flatirons Crossings, Broomfield, Colorado 2001 Parkridge Corporate Center, Lonetree, Colorado 2000 Park Meadows, Englewood, Colorado 1997 Stonegate Filing 8, Parker, Colorado 1996 The Meadows, Castle Rock, Colorado 1990 VALLEYCREST LANDSCAPE DEVELOPMENT 5-YEAR HISTORY OF SIGNIFICANT PROJECTS Proiect Owner/ G. C. Architect Amount Interlocken VIA Intelocken Metro Dist. DTJ Design $1,000,000 Broomfield, CO Jay Johnston 303-443-7533 Lutz Sports N. Jeffco Park & Rec. Arvada Parks $1,360,000 Arvada, CO Robin Garneau Jeff Simmons 303-424-2739 720-898-7392 Flatiron Crossing Westcore Development DTJ Design $4,200,000 Broomfield, CO (No longer Owner) Todd Richards 303-443-7533 Tallyn's Reach Carma Colorado DTJ Design $3,500,000 Aurora, CO Tom Morton Scott Pessin 303-706-9451 303-443-7533 Lucent Xena Saunders Const. Studio 2 Design $ 900,000 Highlands Ranch Joe Pepper (No longer in Business) 303-699-9000 Westlands Park Greenwood Village Design Concepts $3,700,000 G. V., CO Ronda Hood Robb Layton 303-773-252 303-664-5301 Mile High Stadium Turner, Empire, Alvarado Civitas $2,300,000 Denver, CO Tom O'Keefe Eric Anderson 303-753-9600 303-571-0053 Aurora Sports Park Aurora Parks Wenk Assoc. $13,000,000 Aurora, CO Tom Barrett Bill Wenk 303-360-8545 303-623-0003 Stonegate F 14 Neulund Homes DHM Design $2,000,000 Parker, CO Phil Luna Mike Gasper 303-649-1711 303-892-5566 Colorado Mills Mills/ Stevenson DHM Design $3,800,000 Lakewood, CO Abdon Guizar Roger Burkhardt 303-232-2006 303-892-5566 Vehicle Tracking Pads Rip Rap - Type M Rip Rap - Type L Waterline Pipe - 2" PVC Waterline Pipe - 6" DIP Waterline Thrustblock Waterline Tapping Saddle Waterline Swivel Tee Waterline Bends Waterline Joint Restraint Fire Hydrant Assembly Water Meter and Meter Pit Sanitary Sewer Pipe - 8" PVC - Sanitary Sewer Pipe -6"PVC - - - Sanitary Sewer - Cleanout Sanitary Sewer - Manhole Irrigation Supply Pipe -18" PVC Irrigation Supply Pipe- 6" PVC Irrigation Supply Pipe - Blow Off Valve Irrigation Supply Pipe -Manhole Storm Sewer - 48" RCP Storm Sewer - 36" RCP Storm Sewer- 30" RCP Storm Sewer - 24" RCP Storm Sewer -18" RCP Storm Sewer -15" RCP Storm Sewer -15" Flared End Section with Trash Rack Storm Sewer -24" Flared End Section with Trash Rack Storm Sewer- 30" Flared End Section with Trash Rack Storm Sewer - 36" Flared End Section with Trash Rack Storm Sewer- 48" Flared End Section with Trash Rack Storm Sewer -4' Manhole Storm Sewer- Manhole Riser (lid) Storm Sewer - Type C Inlet Stoma Sewer -Type 13 Combination Inlet Storm Sewer -Type R Curb Inlet 6'x 4'RCB x 16 LF 6' x 1.5' RCB x 62 LF Reinforced concrete box and headwall at Horsetooth Road entry $ -+ D DO SF $ 5a 5 C)TON $ 50,50 TON $_ 11.55 LF St. M LF $ I57.5EA $ 2 5 Z ,O_EA $ 21©.00 EA $ 262,50 EA %L EA $ % I LF $..._3.`] LF $ y 212, R EA �n44(n.( RA $ 4r�.53 LF $_ 3a.55 LF $ 3, ass, CDEA $ o9. QC0 QEA $ 13G, 5DLF $ Cl I. ( LF $ 4Cy•3LF $ 5a.S0 LF $ 5 AD LF $ q(),5 LF $ ri AIA $ EA S 106, 95 EA $ I, q qI . CO EA $ 1, 937,550EA $3 q %. C EA $ SaS,CD EA $ 3 y70.Z EA $__ � 307,50 EA $ 3,-7Ic-)O-0DLS $ 14 6p rn,(o LS Westerly Creek M. A. Mortenson EDAW, Inc. $3,700,000 Stapleton, CO Kerry O'Connel Craig Coranado 303-321-4122 303-595-4522 Section 30 Sports Broomfield SportsOne Dvpt. $1,700,000 Broomfield, CO Melony Richmond Jason Sherrill 303-469-3301 303-832-2020 Southlands Ph. 1 Alberta Dvpt. CLC Assoc. $1,050,000 Aurora, CO Brian MacFarland Kurt Prinslow 303-771-4004 303-770-5600 The Hearth 122 Shea Homes Gardens (Sage) $1,850,000 Highlands Ranch Tim Mangnall Andrew Roberts 303-791-8180 303-470-2855 Reunion IA Shea Homes Norris Design $2,400,000 Ryan McDermed Joshua Orth 303-791-8180 303-892-1166 ValleyCrest Landscape Development, Inc. COLORADO All work performed as time and material work in accordance with this sheet shall be payable in full within 30 days of invoice date, without retention. 8888 Motsenbocker Road, Parker, Colorado 80134 (303) 841-8400 EQUIPMENT RENTAL - LABOR RATE SHEET Equipment Operated and Maintained - Moving Time and Delivery at Extra Cost Material used is at cost plus sales tax, 20% overhead and 10% profit. Four (4) hour minimum charge on all equipment and labor plus moving costs, unless agreed upon differently with VCLD representative prior to start of work. THIS LIST SUPERSEDES ALL PREVIOUS LISTS AND PRICES BECOME EFFECTIVE JANUARY 1, 2005 0v0s in SAFECO' SAFECO PLAZA Seattle WA 98185 January 25, 2006 To All Concerned Re: ValleyCrest Landscape Development, Inc. Dear Sir or Madam: Safeco Insurance Company of America, ("Safeco") is privileged to act as surety for ValleyCrest Landscape Development, Inc. ("VCLD") in its contracting matters. Safeco is a major, national providor of contract surety bonds, is listed in the Federal Register as a surety acceptable on Federal projects, and has an assigned single bond limit in excess of $82.6 million. Safeco enjoys a Best's Guide rating of A XV. Safeco has established a single project bond capacity of $25 million and total bonding capacity of $300 million for VCLD. The current available bonding capacity is in excess of $200 million. VCLD qualifies for a preferred bond rate of $4.00 per thousand of contract price. VCLD is a well-known, national landscape, irrigation, engineering and site construction contractor with offices in Arizona, California, Colorado, Florida, Georgia, Illinois, Massachusetts, Minnesota, Nevada, North Carolina, Texas and Virginia. It currently operates in approximately 30 states from the east to the west coasts and has an impeccable completion and on -time performance record. It has earned an excellent reputation with owners, construction managers, general contractors, subcontractors, suppliers and with its bonding company. Its sister companies are major maintenance contractors, wholesale nursery growers and movers of specimen trees. We highly recommend this firm to you. Should you desire any further input, please contact the undersigned at 213-630-3200. Sincerely, SAFECO INSURANCE COMPANY OF AMERICA C.K. Nakamura Attorney -in -Fact Douglas County Fairgrounds Regional Park Owner: Douglas County 100 Third Street Castle Rock, CO 80104 (303) 660-7430/ f (303) 660-9661 Contact: Mr. Randy Burkhardt Client / General Contractor: ECI Site Construction Management 2526 E. Hwy 402 Loveland, CO 80539 970.669.6291 970.669.6411(F) Contact: Ted Johnson Project Manager Completion Date: September '04 Total Contract Value: $ 421,796 All work Self -Performed Project Area: 18 Acres Landscape Architect Norris Dullea 710 West Colfax Denver, CO 80204 (303)892-1166/ (303) 892-1186 fax Contact: Mr. Trent McClain Architect AS WI ValleyCrest Landscape Development PROJECT PROFILE Synopsis: The Douglas County Fairgrounds Regional Park includes athletic fields, open space, nature trails, landscape plantings and shelters. ValleyCrest worked in close conjunction with ECI to successfully complete the project on schedule, allowing ample time for seed establishment while meeting the opening day milestone. Section 30 Park and Ballfields Owner: City of Broomfield 1 Descombes Drive Broomfield, CO 80020 303.464.5807 303.438.6297(F) Contact: Rhonda Jo Ackerman -Alford Project Nlanager Client / General Contractor: ECI Site Construction Management 2526 E. Hwy 402 Loveland, CO 80539 970.669.6291 970.669.641 1(F) Contact: Ted Johnson Project Manager Completion Date: October '03 Total Contract Value: $ 2,000,000 All work Self -Performed Project Area: 25 Acres Landscape Architect Sports One Development, LLC 140 E. 19th Ave., Ste 202 Denver, CO 80203 303.832.2020 303.832.1999(F) Contact: Jeff Kruger Architect #A� Up ValleyCrest Landscape Development PROJECT PROFILE: Synopsis: The Section 30 Park and Ballfields project consisted of constructing 20 acres of soccer fields, as well as the perimeter and parking lot landscaping. Construction of the soccer fields involved the installation of a computer -designed root zone mix with a subsurface drainage system, irrigation, laser grading and seeding. ValleyCrest worked in close conjunction with ECI and the City of Broomfield to successfully complete the project on schedule, allowing ample time for seed establishment while meeting the opening day milestone. CAP, ValleyCrest I III dtica})c DCVUI(1l)n1cul 11R0,IECT 11ROF11,V :,tom' r., a, -PCs. , - .1 `+ Aurora Sports Complex Owner: �..�..�� �< < City of Aurora Department of Parks `+k � � 1470 South Havana Street, Suite 502 �� ", Aurora, Colorado 80012 (303) 739-7160 / (303) 739-7143 FAX n, v, Contact: Toin Barrett, Parks Supervisor Status: Conipleted October 11, 2002owl Cost of ' Total Project: S 13, 900.182 Total, ValleyCrest Work: S 7,956,682'' ' Subcontract Trades: Dollar Value (` l:arthuwork and Excuvation S 395,000 I fhl �i>roand U[ililies S 768,000 y C olicrete Construction � 1,214,000 Sile Buildings: S 1,700,000 IsphuliPaving & Striping: S 1,200,000 E'Iec•tricul. S 660,500 Planner, / Designer: Wenk and Associates 1035 Cherokee Street Aerial view of completed shorts comple.r Denver. Colorado 80202 (303) 628-0003 l (303) 628-0004 FAX Synopsis: Contact: Paul Thomas, Graham Smith ValleyCrest completed this 215 acre regional sports complex. In terms of athletic fields, this facility has few peers, featuring twenty- two soccer practice fields, one championship soccer field, eight softball fields, and four baseball fields. Eight of those 12 ballFelds are tit. The park also features a pond and vast areas of naturalized open space as a buffer zone along both sides of Sand Creek. The facility has ample paved parking, with over 2 1/2 miles of roadway. Along with installing all the fields, and landscape and irrigation for the sports complex, ValleyCrest coordinated the construction the ten buildings on the site. These structures include the park maintenance and administration facilities, four concession stands, four restrooms, and the central irrigation and pump stations. Westlands Park Owner: City of Greenwood Village 6060 South Quebec Street Greenwood Village, Colorado 80111 (303) 773-0252 / (303) 706-1977 Fax Contact: Ms. Vicki Dudasch Status: Completed June, 2000 Cost of Total Project: $ 3,767,000.00 Total Valley Crest Work: $ 1,946,241.00 P'rinipal Subcontractors: Value of Work Earthwork: $ 50, 000.00 Concrete: $ 369,495.00 Masonry: $ 54,000.00 Asphalt Paving: $ 74,000.00 Ornamental Iron: $ 75,000.00 Playground Equipment: $ 83,931.00 Pl.ayground Equipment Ramdas: $ 40,000.00 Electrical $ 269,000.00 estroom Structure and Treehouse: $ 805,333.00 Landscape Architect: Design Concepts 2955 Valmont, Suite 310 Boulder, Colorado 80301 (303) 447-8144 / (303) 939-9874 Fax Contact: Mr. Rob Layton The park includes an interactive childrens water feature PR0JE(,'T 6 rlvv The park meets a wide range of community needs, including organized sports Passive and active recreation, including this childrens play area are included Synopsis: The extremely short construction schedule for this project required that Valley Crest commence construction during the winter months. Although a relatively mild year, snow and rain still hampered crews as they worked to complete water systems, storm drains, building foundations and other underground work. The efficiency of Valley Crest crews was further impacted by limited access to site areas and seasonal high winds. The completed park features a vast array of custom fabricated site amenities, that required early procurement to make certain that deliveries corresponded with installation milestone dates. VALLEY CREST Exhibit Silo Park Owner: City of Greenwood Village 6060 South Quebec Street Greenwood Village, Colorado 80111 (303) 468-5772 / (303) 290-0631 Fax Contact, Ms. Rhonda Hood Status: Completed June 1997 Cost of Total Project $ 690,000.00 Valley Crest Work: $ 403,400.00 Prinipal Subcontractors: Value of Work Grading: $ 44, 000.00 Asphalt Paving: $ 32,000.00 Concrete: $ 65, 000.00 Signage: $ 24, 600.00 Play Equipment: $ 76,000.00 Fencing: $ 45, 000.00 Landscape Architect: Design Concepts 2955 Valmont, Suite 310 Boulder, Colorado 80301 (303) 447-8144 / (303) 939-9874 Fax Contact: Mr. Jamili Copty PROJECT i' RG'F LL' View of outdoor amphitheater area. Synopsis: This community park combines athletic fields, open space, nature trails, and an outdoor amphitheater constructed of large, rough hewn, quarried stone elements. Valley Crest, along with performing the role of General Contractor, served to facilitate revisions to the project scope caused by mid -construction design changes required to satisfy adjacent Home Owner's Association. VALLEY CREST Exhibits Lutz Sports Complex '98 Owner: North Jeffeco Park & Recreation District 2 Inverness Drive East, Suite 101 Englewood Colorado 80112 (303) 799-6300 / (303) 414-0671 Fax Contact: Mr. Mitch Chambers Status: Completed October, 1999 Cost of Total Project $ Total Valley Crest Work: $ Prinipal Subcontractors: Asphalt Paving 5 Concrete S Modular Block Wall Electrical 5 I enang S General Contractor: Valley Crest 8888 Volsenbocker Road Parker, Colorado 80134 (303) 841-8400 / (303) 841-8445 Fax Contact: Mr. Jeff Hinners Branch Manager 1,358,300.00 980,300.00 Value of Work 62,00000 l 03, 000.00 51, 000, 00 122, 000.00 40, 000, 00 Landscape Architect: City of Arvada Planning Department Parks and Urban Design Division 8101 Ralston Road Arvada, Colorado 8002 (303) 431-3020 / (303) 431-3969 Fax Contact: Mr. Jeff Simmons View of newly constructed field over left field fence. Two little league teams compete on one or the tour new oasevan man,uuu3. Synopsis: Construction of this sports facility was hampered during mid construction by the discovery of an unforeseen underground spring. The existence of the sping required revisions to the civil engineering which impacted the project budget in a way that might reduce the funds available for the desired park amenities. Valley Crest assisted the client agency by working with the Design Team to develop realistic ''Value Engineering'' alternative materials, methods, and strategic scope reduction to build as many of the needed amenities into the project while offsetting the unforeseen additional costs. Exhibit VALLEY CREST - 01- 66. l �-d s.4, d - 444 At 5 (weele w 't(bt 5'I= td &4 I ECI BREAKDOWN SCOPE ITEMS FOR SPRING CANYON COMMUNITY PARK - FT. COLLINS 4 Demolition/ Temporary Controls Landscaping & Irrigation Scope of work Material Cost Labor & Eauipment DEMO EXISTING CURB AT COTTONWOOD GLEN (LF) DEMO EXISTING ASPHALT ROADWAY AT COTTONWOOD GLEN (SY) DEMO EXISTING ASPHALT 2000LF X 8' TRAIL (SY) ADDITIONAL MISC DEMO/ VEGETATION (LS) 12- PIPE TO DEMO (LF) 24" STORM PIPE TO REMOVE (PIECES) TREE REMOVAL/ STOCKPILING DEMO GRAVEL ROAD ALONG HOGBACK 10' WIDE (SF) DEMO AND HAULOFF FENCING (LF) DEMO TREES (EA) TREE PROTECTION FENCING 4' SNOW FENCE WITH T POSTS (LF) REMOVE CURB AND GUTTER ALONG NORTH SIDE OF ROAD (LF) PREP FOR PATH DEMO TEMPORARY PATH (SF) SITE CLEANUP/ STREET CLEANUP (DAYS) TEMPORARY FENCING FOR PEDESTRIANS -ECI CHAINLINK RICK COULTER GENERAL SUPERINTENDENT FOR COORDINATION 2 MO'S SKINNED INFIELD MIX AT BASEBALL FIELDS SUBGRADE PREP FOR INFIELDS (SF) IMPORT INFIELD MIX (TON) PLACEMENT OF MIX SUBTOTAL CRUSHER FINES TRAILS SUBGRADE CRUSHER FINES TRAILS 4" DEPTH (SF; SUBGRADE CRUSHER FINES IN DOG PARK (SF; IMPORT LIGHT BROWN OR TAN CRUSHER FINES (TON; INSTALLATION OF CRUSHER FINES AT DOGPARK (SF) PLACEMENT OF CRUSHER FINES AND FABRIC BACKUP/ INCIDENTAL GRADING OF TRAILS SUBTOTAL ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP $ 124,285.08 ECI LABOR & EQUIP ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP $ 17,242.83 1 $ 22.583.87 ECI LABOR & EQUIP ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP $ 24,126.96 $ 76,791.54 Storm Sewer — Concrete Cut Off Wall $ 4 0 :2 .5 OEA Erosion Control Fabric —NAG C350 $ (�, X SF Erosion Control Fabric —NAG 120 $ 0 . C/9 SF Erosion Control - Silt Fence $ /, / �i LF Erosion Control —Bales $ 30. CX) EA Erosion Contol — Gutter Wattle $ 1-76, m EA Erosion Control — Inlet Wattle EA Erosion Control —Ditch Wattle $ (9B5,00 EA Water Quality Pond Outlet Structure $ 7 00a Cn EA Small Area Inlet (playground, skate park) $ 3 a 3, (n EA Perforated Pipe $ :DLi .00 LF Underdrain — 8" PVC $ 09,35 LF Underdrain — Cleanout $ /p % %. 2 EA Perimeter Drain at Tennis Court - — _ . $ ... _ _ {� �p-. Q(Q.. LF Perimeter Drain at Roller Hockey $ , d LF Perimeter Drain at Buildings nna(n $ �/, ` 0 LF O HARDSCAPE Standard Grey Concrete Pavement (5" thick) $ SF Color Concrete Pavement (5" thick) — Color I $ 3 ,q 5 SF Color Concrete Pavement (5" thick) — Color 2 $ 1 .60 SF Color Concrete Pavement (5" thick) — Color 3 $ -7, q o SF Concrete Pavement (5" thick) w/ Color Hardener $ / 8.80 SF Parking Lot Concrete Pavement $ 3, 3 SF Asphaltic Concrete Paving (Horsetooth Road) I $ 93. a q SY Concrete Curb and Gutter (Horsetootb Road) $ !, 90 LF Concrete Curb and Gutter (Park Interior) $ 13.70 LF Cast -in -Place Concrete Retaining Wall $ 5, Cy Gravel Paving in Maintenance Yard $ 0. R/ SF Stair Handrail $ (RJR, oo LF ADA Curb Access Ramp $ 1 5, QC) SF Concrete Mow Strip at Fence $_ a /. On LF PARK ARCHITECTURE ITEM UNIT PRICE One -Top Pre -Engineered Structure $ / 51 C/�.Q( A Dugout Roof $ / Q. ()00, W EA 4-Top Pavilion $ (9 C/o C/(,. , 00 EA 8-Top Pavilion $ (J USO-C)(JEA I ECI BREAKDOWN SCOPE ITEMS FOR SPRING CANYON COMMUNITY PARK - FT. COLLINS I Scope of work ROCK MULCH, WEED FABRIC, MULCH AND SAND WEED FABRIC (SF) 2"-4" DIA ROCK MULCH AROUND TENNIS COURTS AND ROLLER HOCKEY 6" THICK (TON) SUBGRADE AND PLACEMENT OF ROCK IN THESE LOCATIONS 2' WIDE STRIPS (2,092 LF) (SF) SUBTOTAL TURF GRASS PAVERS SUBGRADE PREP FOR TURF GRASS PAVERS (SF) 6" ROADBASE UNDER PAVERS (TON) INSTALLATION OF ROADBASE (SF) TURF BLOCK PAVERS 20"X20" (EA) INSTALLATION OF PAVERS 1 1/2" SHARP SAND MIX AND INSTALLATION (TON) SUBTOTAL DRY -STACK WALLS (SHEETS D7, D8) AND DETAILS ON D13 &D14 PLAYGROUND DRYSTACK WALLS EXCAVATION FOR 80'LF x 4' WIDE BOULDER WALL C (CY) APPROX. (27) X x 2' x X SANDSTONE BOULDERS FIGURED AT 165LBS C.F. (TON) PLACEMENT CRUSHER FINES TOE EDGE (TON) BACKFILL (LF) SUBTOTAL PLAYGROUND BOULDERS EXCAVATION AND SUBGRADE PREP FOR BOULDERS (CY; (2) TYPE 1- 5 TN BOULDERS (TON; PLACEMENT SUBTOTAL BASEBALL DRYSTACK WALLS (D7-D8) EXCAVATION FOR 132'LF x 4' WIDE BOULDER WALL C (CY) ECI LABOR & EQUIP APPROX. (45) Tx 2' x 3' SANDSTONE BOULDERS FIGURED AT 165LBS C.F. (TON) ECI MAT'LS PLACEMENT ECI LABOR & EQUIP CRUSHER FINES TOE EDGE (TON) ECI LABOR & EQUIP Material Cost Labor & Equipment ECI MAT'LS ECI MAILS ECI LABOR & EQUIP $ 3,536.97 $ 10,546.29 ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP $ 96,801.51 $ 63,189.81 ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP $ 4,811.40 $ 5,587.48 ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP $ 1,200.00 $ 1,224.39 BACKFILL (LF) ECI LABOR & EQUIP I ECI BREAKDOWN SCOPE ITEMS FOR SPRING CANYON COMMUNITY PARK - FT. COLLINS I Scope of work EXCAVATION FOR 1421F x 4' WIDE BOULDER WALL B APPROX. (48) X x 2' x 3' & (48) 2' x 2' x 3' SANDSTONE BOULDERS FIGURED AT 165LBS C.F. I PLACEMENT CRUSHER FINES TOE EDGE (TON) BACKFILL (LF) EXCAVATION FOR 220'LF x 4' WIDE BOULDER (2) ROWS WALL B APPROX. (146) Tx 2' x 3' SANDSTONE BOULDERS FIGURED AT 165LBS C.F. I CRUSHER FINES TOE EDGE (1 BACKFILL SUBTOTAL BASEBALL FIELD BOULDERS EXCAVATION AND SUBGRADE PREP FOR BOULDERS (CY) (15) TYPE A 2 TN BOULDERS (TON) (38) TYPE B 1 1/2 TN BOULDERS (TON) (39) TYPE C 1 TN BOULDERS (TON) (32) TYPE D 1/2 TN BOULDERS (TON) (13) TYPE E 1/4 TN BOULDERS (TON) (19) TYPE 1- 5 TN BOULDERS (TON) PLACEMENT AND SETTING OF BASBALL ENTRY WAY BOULDERS (EA) PLACEMENT AND SETTING OF TYPE 15 TN BASBALL ENTRY WAY BOULDERS (EA) BACKFILL AROUND BOULDERS SUBTOTAL CREEK PAVILION (DI 1) EXCAVATION FOR 190'LF x 4' WIDE BOULDER WALL C (CY) APPROX. (64) Tx 2' x 3' SANDSTONE BOULDERS FIGURED AT 165LBS C.F. (TON) PLACEMENT CRUSHER FINES TOE EDGE (TON) BACKFILL (LF) SUBTOTAL TENNIS COURT (D29) EXCAVATION FOR 48'LF x 4' WIDE BOULDER WALL B (CY; APPROX. (16) Tx 2' x 3' & (16) 2' x 2' x 3' SANDSTONE BOULDERS FIGURED AT 165LBS C.F. (TON) PLACEMENT CRUSHER FINES TOE EDGE (TON) BACKFILL (LF) SUBTOTAL ECI LABOR ECI MAT'LS ECI LABOR ECI LABOR ECI LABOR ECI LABOR ECI MAT'LS ECI LABOR ECI LABOR ECI LABOR 40,159.80 $ ECI LABOR ECI MAT'LS ECI MAT'LS ECI MAT'LS ECI MAT'LS & EQUIP & ECI LABOR & EQUIP ECI MAILS ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP $ 9,216.00 $ 9,563.44 ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP $ 3,840.00 $ 4,538.75 I ECI BREAKDOWN SCOPE ITEMS FOR SPRING CANYON COMMUNITY PARK - FT. COLLINS I Scope of work MAIN ENTRANCE BOULDERS EXCAVATION AND SUBGRADE PREP FOR BOULDERS (CY) (28) TYPE 1- 5 TN BOULDERS (TON) (4) UNLABLED BOULDERS FIGURED AS TYPE B 1 1/2 TN BOULDERS (TON) PLACEMENT BACKFILL BOULDERS SUBTOTAL SKATE PARK BOULDERS EXCAVATION AND SUBGRADE PREP FOR BOULDERS (CY) (7) UNLABLED BOULDERS FIGURED AS TYPE B 1 1/2 TN BOULDERS (TON) PLACEMENT BACKFILL BOULDERS MARKUP ON LANDSCAPE MATERIALS CANYON WALLS Material Cost Labor & Eauiament ECI LABOR & EQUIP ECI MAT'LS ECI MAT'LS ECI LABOR & EQUIP ECI LABOR & EQUIP $ 14,160.00 $ 7,183.40 ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI LABOR & EQUIP $ 1,008.00 $ 1,670.02 ECI LABOR & EQUIP LOADING FROM GATEWAY PARK MOBILIZE LOADER FOR LOADING BOULDERS FROM GATEWAY PARK ECI LABOR & EQUIP MOBILIZE EXCAVATOR WITH A THUMB - 2 WEEKS ECI LABOR & EQUIP (30 TON BOOM TRUCK) FOR LOADING TRUCKS (DAYS) ECI LABOR & EQUIP TRUCKING FLATBEDS 1 1/2 TO ROADTRIP FULLTIME (5 LOADS/ DAY/ TRUCK) (DAYS) ECI LABOR & EQUIP SUBTOTAL $ - $ 70,914.00 DELIVERY ONSITE/ SORTING! SETTING LOADER AND OPERATOR FOR SORTING BOULDERS ECI LABOR & EQUIP EXCAVATOR WITH A THUMB - 2 WEEKS ECI LABOR & EQUIP SORTING BOULDERS ECI LABOR & EQUIP SUBTOTAL $ - $ 46,428.80 PLACEMENT EXCAVATE FOR BOULDERS - BACKHOE AND SUPPLEMENTAL TRACKHOE ABOVE (DAYS) ECI LABOR &EQUIP ECI SKIDLOADERS/ FRONT END LOADER/ TRACKHOE W/ SLING FOR SETTING (DAYS) ECI LABOR & EQUIP LABOR AND SKIDLOADERS FOR SETTING BOULDERS/ BACKFILL (DAYS) ECI LABOR & EQUIP SUBTOTAL $ - $ 131,293.60 CHAD OLESON SUPERINTENDENT FOR COORDINATION 5 MO'S I I ECI ECI BREAKDOWN SCOPE ITEMS FOR SPRING CANYON COMMUNITY PARK - FT. COLLINS Irrigation Park Architecture and Pre -Engineered Structures Scope of work IRRIGATION Material Cost Labor & Eauipment IRRIGATION SLEEVING INSTALLATION1 I ECI LABOR & EQUIP SUBTOTAL $ $ 42,315.00 IRRIGATION PUMP STATION PACKAGED UMPSTATION COMPLETE ECI MAT'LS I ECI LABOR & EQUIP OFFLOAD AND SET PUMPSTATIONI I ECI LABOR & EQUIP PIPING OUT OF PUMP HOUSE TO IRRIGATION SYSTEM ECI MAT'LS ECI LABOR & Remove Roof of Pump House ECI LABOR & Replace Roof after new pump installed ECI MAT'LS ECI LABOR & Hook up to exisitng and new park (repairs to walks and landscape) ECI LABOR & SUBTOTAL $ 119,896.00 $ 2� MARKUP ON IRRIGATION MATERIALS ECI LABOR & EQUIP I ONE -TOP PRE-ENGINEERED STRUCTURE EXCAVATION FOR FOUNDATIONS/ FOOTINGS ECI LABOR &EQUIP BACKFILL AND GRADING OF FOOTINGS ECI LABOR & EQUIP SUBTOTAL $ 1 $ 5,841.09 DUGOUT ROOFS EXCAVATION FOR FOUNDATIONS/ FOOTINGS ECI LABOR & EQUIP BACKFILL AND GRADING OF FOOTINGS ECI LABOR & EQUIP SUBTOTAL $ 1 $ 2,042.78 BUILDING PERIMETER DRAINS EXCAVATION FOR PERIMETER DRAINS MISC. FITTINGS/ ETC. INSTALL DRAINLINES (LF) BACKFILL AND COMPACT DRAINLINES SUBTOTAL ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI LABOR & EQUIP $ 1,397.50 $ 18,549.68 I ECI BREAKDOWN SCOPE ITEMS FOR SPRING CANYON COMMUNITY PARK - FT. COLLINS I Scope of work FOUR TOP PAVILLIONS EXCAVATION FOR 24" WIDE FOOTINGS (144 LF/ STRUCTURE) (LF) 4' OVEREXCAVATION UNDER FOOTINGS (CY) 4" PEA GRAVEL UNDER SLAB AND PREP (TON) CONCRETE FOOTINGS BOTH STRUCTURES (CY) BACKFILL AND GRADING OF FOOTINGS (LF) SUBTOTAL EIGHT TOP PAVILLIONS Material Cost Labor & Eauipment ECI LABOR & EQUIP ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI LABOR & EQUIP $ 399.17 $ 11,291.21 EXCAVATION FOR 24" WIDE FOOTINGS (144 LF/ STRUCTURE) (LF) ECI LABOR & EQUIP BACKFILL AND GRADING OF FOOTINGS (LF)I ECI LABOR & EQUIP SUBTOTAL $ $ 8,686.93 RESTROOMS EXCAVATION FOR FOUNDATIONS/ FOOTINGS FOR PLAYGROUND RESTROOM (LF; EXCAVATION FOR FOUNDATIONS/ FOOTINGS FOR BALLFIELD RESTROOM (LF; EXCAVATION FOR FOUNDATIONS/ FOOTINGS FOR CREEKSIDE RESTROOM (LF; OVEREXCAVATION UNDER FOOTINGS 4'0" 4' OVEREXCAVATION UNDER FOOTINGS FOR PLAYGROUND RESTROOM (CY; 4' OVEREXCAVATION UNDER FOOTINGS FOR BALLFIELD RESTROOM (CY) 4' OVEREXCAVATION UNDER FOOTINGS FOR CREEKSIDE RESTROOM (CY) ADD #3 PLAYGROUND RESTROOM 4' OF IMPORTED FILL DUE TO CLAYSTONE IN SOILS REPORT (TON) 4" GRAVEL UNDER SLAB 4" PEA GRAVEL UNDER SLAB AND PREP @ PLAYGROUND R.R. (TON) 4" PEA GRAVEL UNDER SLAB AND PREP @ BALLFIELD R.R. (TON) 4" PEA GRAVEL UNDER SLAB AND PREP @ CREEKSIDE R.R. (TON) BACKFILL AND GRADING OF ALL FOOTINGS (LF) SUBTOTAL ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI LABOR & EQUIP $ 1,588.20 $ 24,813.33 MARKUP ON MATERIALS1 1 ECI LABOR & EQUIP CHAD OLESON SUPERINTENDENT FOR COORDINATION 5 MO'S I I ECI I ECI BREAKDOWN SCOPE ITEMS FOR SPRING CANYON COMMUNITY PARK - FT. COLLINS I Scone of work Maintenance Facility/ Outdoor Storage Yard MAINTENANCE BUILDING (WITH IN 5.OF FOUNDATION) EXCAVATION FOR 24" WIDE FOOTINGS (144 LF/ STRUCTURE) (LF) 4' OVEREXCAVATION UNDER FOOTINGS (CY) 4" PEA GRAVEL UNDER SLAB AND PREP (TON) BACKFILL AND GRADING OF FOOTINGS INSTALLATION OF GATE OPENER AND CARD READER - ECI SUBTOTAL PAVEMENTS IN MAINTENANCE YARD PREP FOR DUMPSTER PADS/ FUELING PADS FUEL ISLAND BOLLARDS 4" CONCRETE FILLED (EA) INSTALLATION OF BOLLARDS SUBTOTAL GRAVEL PAYMENT Material Cost Labor & Eauioment ECI LABOR & EQUIP ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP $ 1,672.63 $ 25,460.39 ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP $ 1,210.00 $ 4,453.03 SUBGRADE FOR GRAVEL (SF) I ECI LABOR & EQUIP IMPORT 8" THICK CLASS 6 GRAVEL (TON) ECI MAT'LS PLACEMENT/ ROLLING AND COMPACTING (CY) I ECI LABOR & EQUIP SUBTOTAL $ 5,917.441 $ 8.522.40 Earthwork and Utilities SITE CLEARING (LUMP SUM) CLEARING SCRUBBRUSH FOR IRRIGATION LINE UP HOGBACKI I ECI LABOR &EQUIP WATER CONTROL/ DE -WATERING REQUIRED SUBTOTAL $ $ 5,800.00 WATER CONTROL /PUMPING FOR RIPRAP DROP STRUCTURES BY ECI ECI LABOR & EQUIP WATER CONTROL AS REQUIRED FOR DOG PARK POND WORK (LS)f ECI LABOR & EQUIP SUBTOTAL $ Is 18,743.00 I ECI BREAKDOWN SCOPE ITEMS FOR SPRING CANYON COMMUNITY PARK - FT. COLLINS I Scope of work EROSION CONTROL VEHICLE TRACKING CONTROL PADS (EA; EROSION CONTROL FABRIC NAG C350 (SF; EROSION CONTROL FABRIC NAG 120 (SF) INSTALLATION OF EROSION CONTROL FABRIC SILT FENCE (LF) GUTTER WATTLES (EA) INLET WATTLES (EA) DITCH WATTLES (EA) WATER QUALITY POND OUTLET STRUCTURE SLOPE PROTECTION (40 ACRES) (FURROW SLOPES W/ JOHN DEERE)(AC) Type M (7500 cf / 27 x 2) (ton) MISC. MATERIALS MAINTENANCE OF EROSION CONTROL ITEMS SUBTOTAL EARTHWORK/ GRADING RIP, SCARIFY AND RECOMPACT SUBGRADES FOR ROAD PAVIN RIP, SCARIFY AND RECOMPACT SUBGRADES FOR MAINTENANCE YAR GRADE LANDSCAPE 8 GRADING AROUND CANYON WALLS/ FENCIN( GRADE PLAYGROUND AREA TC GRADE SKATEPARK TO +/- .1' AFTER OVERLOT COMPI SUPPLEMENTAL BACKUP WALKS AND CURB AND Gt PREP FOR PLAZA PREP/ MISC. GRADING FOR CONCRETE FLATWORK UNDER OPEN AIR PAVIL SUBI UTILITIES Material Cost Labor & Equipment ECI MAT'LS ECI LABOR &EQUIP ECI MAT'LS ECI MAT'LS ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP $ 77,937.00 1 $ 197,109.48 3 (SF) D (SF) ERMS V ETC ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP .ETED ECI LABOR & EQUIP ITTER ECI LABOR &EQUIP LABS -IONS 'OTAL ECI LABOR & EQUIP ECI LABOR & EQUIP $ $ 168.230.75 FLOW SENSORS - CASCADE PUMP (EA) AREA INLETS IN SKATEPARK (EA) AREA INLETS IN PLAYGROUND (EA) 18" PVC STORM SEWER SKATEPARK DRAINLINE(LF) SUBTOTAL DROP STRUCTURES IN SPRING CREEK CHANNEL 36" Boulders Grouted Drop Structures (5 EA) INSTALLATION OF BOULDER DROP STRUCTURES SUBTOTAL PERFORATED PIPE/ UNDERDRAINS 18" PERFORATED HDPE PIPE (LF) 18" CLEANOUTS 8" UNDERDRAIN HDPE (LF) ECI MAT'LS ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP $ 7,530.00 $ 18.806.40 ECI MAT'LS ECI LABOR & EQUIP $ 8,895.001 $ 27,664.35 ECI MAT'LS ECI LABOR & EQUIP ECI MAILS ECI LABOR & EQUIP ECI MAILS t ECI LABOR & EQUIP I ECI BREAKDOWN SCOPE ITEMS FOR SPRING CANYON COMMUNITY PARK - FT. COLLINS I Scope of work UNDERDRAIN CLEANOUTS (EA; 12" RCP OUTLET (LF; UNDERDRAIN MANHOLES (EA) 12" FES W/ TRASH RACK SUBTOTAL ELECTRICAL/ TELECOMMUNICATIONS LIGHT POLE BASES A-5 - 18" DIAMETER (EA) LIGHT POLE BASES B-4 - 24" DIAMETER (EA) LIGHT POLE BASES BB-4A - 24" DIAMETER (EA) LIGHT POLE BASES B-4 - 24" DIAMETER (EA) LIGHT POLE BASES D-2 - 18" DIAMETER (EA) LIGHT POLE BASES D-4 - 18" DIAMETER (EA) LIGHT POLE BASES B4-R - 18" DIAMETER (EA) AUGER 18" HOLES AUGER 24" HOLES SETTING OF 87 BASES SUBTOTAL RICK COULTER GENERAL SUPERINTENDENT FOR COORDINATION 6 MO'S Matprial r:nat I nhnr R Cn„Inrwen4 ECI MAT'LS ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP $ 78,195.00 $ 193,917.57 ECI MAT'LS ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP $ 23,490.00 $ 75,806.24 ECI LABOR & EQUIP CHAD OLESON SUPERINTENDENT FOR COORDINATION 2 MO-Sl I ECI LABOR & EQUIP I ECI BREAKDOWN SCOPE ITEMS FOR SPRING CANYON COMMUNITY PARK - FT. COLLINS I Playground Scone of work PLAYGROUND SAFETY SURFACING SYNTHETIC SEAMLESS SURFACE SUBGRADE 6" GRAVEL BASE MATERIAL SYNTHETIC SEAMLESS SURFACE (SF) INSTALLATION FREIGHT SUBTOTAL ORGANIC LOOSE FILL SURFACE (FIBAR) IN -ORGANIC LOOSE FILL SURFACE (SAND) SUBGRADE PREP FIBAR (CY) INSTALLATION SUBTOTAL SUBGRADE PREP GEOTEXTILE FABRIC (SF) SAND (TON) INSTALLATION SUBTOTAL SHOTCRETE THEMING ITEMS/ GIANT/ ETC SUBGRADE PREP/ GET PADS READY/ ACCESS 4' OVEREXCAVATION UNDER SLEEPING GIANT PER ADDENDUM #3 FOUNDATIONS FOR SLEEPING GIANT SUBTOTAL PLAYGROUND WALLS/ CONCRETE FEATURES SPRAY GARDEN WALL SHEET D-15 EXCAVATION FOR WALL (LF) EXCAVATION FOR 7' RADIUS WALL (LF) WATER WALL (COMPLETE) CONCRETE PAN WITH COBBLES/ ETC (SF) INSTALL MISC. STEEL PIECES 4' PIECES (LF) Material Cost Labor & Eauioment ECI 155 LABOR & ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP $ 10,166.00 $ 7,666.92 ECI LABOR & EQUIP ECI MAT'LS ECI MAT'LS ECI LABOR & EQUIP $ 1,152.45 $ 1,677.36 ECI LABOR & EQUIP ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP $ 1,233.00 $ 12.178.00 ECI LABOR & EQUIP ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP I ECI BREAKDOWN SCOPE ITEMS FOR SPRING CANYON COMMUNITY PARK - FT. COLLINS . I Athletic Facilities Scope TRAIL HUB SEATWALL EXCAVATION FOR WALL (LF) BACKFILL AND COMPACT ALONG WALL SUBTOTAL Material Cost Labor & Eauioment ECI LABOR & EQUIP ECI LABOR & EQUIP $ 557.00 $ 7,489.99 MARKUP ON MATERIALS1 ECI LABOR & EQUIP CHAD OLESON SUPERINTENDENT FOR COORDINATION 2 MO'S PLAYER BENCHES BAT RACKS PLAYER BENCHES (EA) PLAYER BENCHES BACKLESS (EA) INSTALLATION SUBTOTAL BAT RACKS INSTALLATION SUBTOTAL I I ECI LABOR & EQUIP I ECI MAILS ECI MAT'LS ECI LABOR & EQUIP $ 3,768.00 $ 2,673.29 ECI MAT'LS ECI LABOR & EQUIP $ 2,320.00 1 $ 941.96 TENNIS COURTS W/ ASPHALT OVERLAY SUBGRADE PREP/ FINEGRADE COURT TO.05'1 ECI LABOR & EQUIP SUBTOTAL $ $ 2,980.80 TENNIS PRACTICE WALL EXCAVATION AND BACKFILL 10' PRACTICE WALL (LF) PAINT/ ETC SUBTOTAL BASKETBALL COURTS SUBGRADE PREP/ FINEGRADE COURT TO .05' 3'X5' CONCRETE PADS FOR EXTERIOR LIGHTS (EA) 12'X12' CONCRETE PERIMETER BEAM INC. PREP AND BACKFILL (LF) SUBTOTAL BASKETBALL COURT EQUIPMENT BASKETBALL COURT EQUIPMENT STANDARDS INSTALLATION (EA) SUBTOTAL ECI MAT'LS ECI LABOR & EQUIP ECI LABOR & EQUIP $ 890.00 $ 6,535.00 ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP $ 2,708.00 $ 16,297.39 ECI MAT'LS ECI LABOR & EQUIP $ 4,122.00 1 $ 3,984.90 Covered Storage Structure (including open storage bays) $ (Q (Q_� S PLAYGROUND SAFETY SURFACING ITEM UNIT PRICE. Synthetic Seamless Surface $ ci. 5a SF Organic Loose -Fill Surface (Fibar) $ clo• 0o Cy Inorganic Loose -Fill Surface (Sand) $ S L.Q •W _Cy PLAYGROUND EQUIPMENT ITEM UNIT PRICE Play Structure A $ 3 EiZ 1 acn, 60 LS Play Structure B $Jq I LQya• • Co LS Play Structure C $ 915� 326, 50 LS "Springp" . $ .._6�'dS.J EA "SuperSccop" $ 8aQ.0`J EA "Seesaw" $ 3� i014 , 25 EA "Large Swings" $ IQ. OT9 -1 n EA "Cold Weather Human Bob" $1, q 3I. 1-i EA "Music Panel -Bells Panel" $ MIi SO EA "Music Panel -Chimes Panel" $ EA "Music Panel - Drums Panel" $ (`1 Q.�{5 EA "Spinner Bowl" $ EA "Supernova" $ �% /.,9 EA "Kid Builder Arch Swings" $ (//.�� 75 EA "Freestanding Kid Spinner" $ EA "Spring Animal - Burke-a-saww" $ �� % % . (�� EA "Spring Animal - Burke Race Car" $ , 2 %. SCi EA "Spring Animal - White Bronc" $ I, 05 ( C-) EA "Spring Animal - Antique Car" $ .OS I • V EA "Tube Slide" $ 7 EA "Grand Sand and Water Play" including Water Service line $ 5�7,q. IQEA AQUATIC PLAY EQUIPMENT ITEM UNIT PRICE "Aqua Arch" $ I.W23.(Y) EA "Moppet Poppet" $ Tiz.OD EA "Water Wave" $ 1• 2,_ 3, CD EA "Bubbler" $ 15(A Cy EA "Aqua Arch" $ EA I ECI BREAKDOWN SCOPE ITEMS FOR SPRING CANYON COMMUNITY PARK - FT. COLLINS I Skatepark Scope of work Material Cost Labor & Eauipment POST TENSIONED INLINE RINK SUBGRADE PREP/ FINEGRADE COURT TO.05-1 ECI LABOR & EQUIP SUBTOTAL $ $ 4,461.96 VOLLEYBALL COURTS SUBGRADE FOR VOLLEYBALL COURTS (SF) GEOTEXTILE FABRIC 10" SAND AND INSTALLATION AS SHOWN (TON) SUBTOTAL VOLLEYBALL COURT EQUIPMENT HORSESHOE PITS VOLLEYBALL COURT EQUIPMENT INSTALLATION (EA) SUBTOTAL CONCRETE PITS (EA) HORSESHOE COURT EQUIPMENT INSTALLATION (EA) SUBTOTAL CONCRETE RETAINING WALLS AT BALLFIELDS ECI LABOR & EQUIP ECI MAILS ECI LABOR & EQUIP ECI MAT'LS ECI LABOR &EQUIP $ 10,618.16 $ 11,156.89 ECI MAT'LS ECI LABOR & EQUIP $ 1,069.00 $ 1,828,40 ECI MAT'LS ECI LABOR & EQUIP ECI MAT'LS ECI LABOR -& EQUIP $ 244.00 $ 1.750.98 EXCAVATION OF WALLS ECI LABOR & EQUIP PREP FOR FOOTINGS ECI LABOR & EQUIP BACKFILL OF AND COMPACT WALLS ECI LABOR & EQUIP SUBTOTAL $ - $ 9,430.02 MARKUP ON MATERIALS ECI LABOR & EQUIP CHAD OLESON SUPERINTENDENT FOR COORDINATION 2 SUPERVISION / COORDINATION GRADE VERIFICATION FOR GL HOFF MIKE PAETZEL SUPERVISION 4 MO'S ECI LABOR & EQUIP SURVEY AND LAYOUT FOR COPING/ EXCAVATIONS/ ETC. ECI LABOR & EQUIP PICKUP ECI LABOR & EQUIP TEMPORARY FENCING ECI LABOR & EQUIP SUBTOTAL $ - $ 57,900.00 I ECI BREAKDOWN SCOPE ITEMS FOR SPRING CANYON COMMUNITY PARK - FT. COLLINS I Scone of work EARTHWORK/ GRADING 2.5 CY LOADER (WEEKS MINI EXCAVATOR (WEEKS, WATER TRUCK (WEEKS; 36" COMPACTOR/ ROLLER (WEEKS; SHEEPSFOOT COMPACTOR/ ROLLER FOR STRUCTURAL FILL (WEEKS; PLATE COMPACTORS 2 EA (WEEKS; ECI SKIDLOADER (HOURS; IMPORT OF CLASS 6 ROADBASE AVG 6" OVER ENTIRE BOWL AREA/ SHOTCRETE (TONS; IMPORT OF CLASS 6 ROADBASE AVG 6" OVER ENTIRE TOPDECK/ FLATTOPS (TONS) OVER EXCAVATION OF BOWLS HAULOFF SPOILS GENERATED AND LOSE ONSITE OVEREXCAVATION OF TOPDECKS/ FLATWORK FINEGRADING FOR DECK FLATWORK AND BOTTOMS (GREEN AREA) SHAPING OF BOWLS THICKENED EDGE HANDGRADING SUBGRADE PREP SUBTOTAL WALL EXCAVATION Material Cost Labor & Eauinment ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP ECI LABOR & EQUIP $ 5,845.63 $ 131,089.76 WALL EXCAVATION -2' 6" MINIMUM FOR WALLS (LF)l I ECI LABOR & EQUIP BACKFILL AND COMPACT PRIOR TO POURING ADJACENT FLATWORKI I ECI LABOR & EQUIP MISC FORMING/ FINISH PRODUCTS SUBTOTAL $ $ 7,246.40 ASSISTANCE AND HAND FORMING TOP OF BOWLS FOR HOFF1 I ECI LABOR & EQUIP SUBTOTAL $ $ 4.336.00 COPING AND METALWORK PROVIDE AND INSTALL ALL 2" O.D. ROUND STEEL COPING PER PLANS AND SPECS (LF) PROVIDE AND INSTALL ALL 2" SQUARE STEEL COPING AND ANGLE IRON PER PLANS (LF) 3" ROUND SCH 40 STEEL (LF) PROVIDE AND INSTALL SKATERAILING/ HANDRAILING (PAINTED OR POWDERCOATED) (LS) SUBTOTAL ECI MAT'LS ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP $ 13,065.00 1 $ 17,948.95 I ECI BREAKDOWN SCOPE ITEMS FOR SPRING CANYON COMMUNITY PARK - FT. COLLINS I Hardscape Scope of work STANDARD GREY CONCRETE 5" THICK SUBGRADE PREPARATION (SF) BACKFILL AND COMPACT JOINT SEALANT (LF) SUBTOTAL COLORED CONCRETE PAVEMENT (COLOR 1) (YOSEMITE BROWN) SUBGRADE PREPARATION (SF) BACKFILL AND COMPACT JOINT SEALANT (LF) SUBTOTAL Material Cost Labor & Equipment ECI LABOR & EQUIP ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP $ 2,163.00 $ 71.415.05 ECI LABOR & EQUIP ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP $ 1,049.54 $ 23.439.94 COLORED CONCRETE PAVEMENT (COLOR 2) (WILLOW GREEN) SUBGRADE PREPARATION (SF)l ECI LABOR & EQUIP BACKFILL AND COMPAC 'Tj ECI LABOR & EQUIP SUBTOTAL $ - $ 1,206.13 COLORED CONCRETE PAVEMENT (COLOR 3) (TEER r4 COT T A SUBGRADE PREPARATION (SF-)l I ECI LABOR & EQUIP BACKFILL AND COMPACTI I ECI LABOR & EQUIP SUBTOTAL $ - $ 340.04 COLORED CONCRETE PAVEMENT (COLOR 4) (KAHLUA) SUBGRADE PREPARATION (SF)l I ECI LABOR & EQUIP BACKFILL AND COMPACTI I ECI LABOR & EQUIP SUBTOTAL $ - $ 430.99 GREY CONCRETE WITH SANDBLASTED FINISH (NOT ON BID FORM) SUBGRADE PREPARATION (SF)i ECI LABOR & EQUIP BACKFILL AND COMPACTI ECI LABOR & EQUIP SUBTOTAL $ - 1 $ 1,126.03 5" CONCRETE PAVEMENT WITH COLOR HARDENER SUBGRADE PREPARATION (SF) ECI LABOR & EQUIP BACKFILL AND COMPACT ECI LABOR & EQUIP SUBTOTAL $ - $ 1,126.03 PARKING LOT & ROAD CONCRETE PAVEMENT FINE GRADE AFTER SCARIFICATION ECI LABOR & EQUIP JOINT SEALANT (LF)I ECI MAT'LS I ECI LABOR & EQUIP SUBTOTALI $ 386.25 t $ 19,373.63 I ECI BREAKDOWN SCOPE ITEMS FOR SPRING CANYON COMMUNITY PARK - FT. COLLINS Scope of work HORSETOOTH ROAD IMPROVEMENTS Material Cost Labor & Eauioment PREP FOR CURB AND GUTTER (LF) ECI LABOR & EQUIP CONCRETE PAVING IN ROUNDABOUT -GREY ECI MAT'LS ECI LABOR & EQUIP SUBTOTAL $ 1,631.90 $ 4,132.87 CONCRETE CURB AND GUTTER SUBGRADE PREPARATION (SF; BACKFILL AND COMPACT JOINT SEALANT (LF) SUBTOTAL CONCRETE MOW EDGE AT FENCE SUBGRADE PREPARATION (,' BACKFILL AND COMPA ECI LABOR & EQUIP ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP $ 1,029.67 $ 14,527.45 >F) ECI LABOR & EQUIP CT ECI LABOR & EQUIP $ - $ 4,367.38 CONCRETE BLEACHERS AND STEPS SUBTOTAL SUBGRADE PREP FOR BLEACHERS AND STEPS ECI LABOR & EQUIP INSTALLATION OF RAILINGS AT BLEACHERS ECI LABOR & EQUIP INSTALLATION OF RAILINGS AT STAIR A & B ECI LABOR & EQUIP DOG PARK FEATURES SUBTOTAL $ - $ 22,372.43 DOG PARK SAND SAND AT DOG PARK (TON) ECI MAT'LS PLACEMENT OF SAND AT DOG PARK (SF) ECI LABOR &EQUIP DOCK A SUBTOTAL $ 3,509.06 $ 4,708.68 EXCAVATION FOR FOOTERS (LF; CONCRETE FOOTERS AND WALLS (CY; 6' METAL GALVANIZED GATE W/ POSTS (EA; STRUCTURAL FILL FOR INSIDE CAVITY OF DOCK (TON) BACKFILL AND COMPACT FOOTERS SUBTOTAL DOCK B EXCAVATION FOR FOOTERS (LF) CONCRETE FOOTERS AND WALLS (CY) STRUCTURAL FILL FOR INSIDE CAVITY OF DOCK BACKFILL AND COMPACT FOOTERS SUBTOTAL DOG PARK FENCE/ REMOVAL REPLACEMENT ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI LABOR & EQUIP $ 1,189.00 $ 7,048.85 ECI LABOR & EQUIP ECI MAT'LS ECI LABOR & EQUIP ECI LABOR & EQUIP $ 1,440.00 $ 7,853.32 REMOVE EXISTING DOG PARK FENCE (LF) I ECI LABOR & EQUIP SET UP TEMPORARY DOG PARK (LF) I ECI LABOR & EQUIP SUBTOTAL $ $ 12.154.9 I ECI BREAKDOWN SCOPE ITEMS FOR SPRING CANYON COMMUNITY PARK - FT. COLLINS I Scope of work Material Cost Labor & Eauipment SPRING CREEK BRIDGE & WALLS (COMPLETE) EXCAVATION FOR WINGWALLS ECI LABOR & EQUIP BACKFILL AND COMPACT BEHIND WINGWALLS ECI LABOR & EQUIP SUBTOTAL $ $ 29,223.00 ENTRY SIGNAGE -COMPLETE MAIN ENTRY SIGN CONCRETE GRADEBEAMS ECI MAT'LS ECI LABOR & EQUIP 14'0" X 6'8" X 8" THICK STONE SLAB (FF) ECI MAT'LS SANDSTONE BOULDERS (EA) ECI MAT'LS SETTING OF SLABS ECI LABOR & EQUIP NORTHWEST SIGN ECI TAKEOFF CITY CONCRETE GRADEBEAMS 97X 47 X 6" THICK STONE SLAB (FF) 6'8" X 22" X 2'0" STONE (TON) SANDSTONE BOULDERS (EA) SETTING OF SLABS SUBTOTAL WHEEL STOPS AT OVERFLOW PARKING LOTS WHEEL STOPS AT OVERFLOW PARKING LOTS (6"X4" X8' TIMBERS) ECI MAT'LS INSTALLATIOINI I ECI LABOR & EQUIP CONCRETE CURB IN LANDSCAPE AREAS SUBTOTAL [$ 1,338.95 $ 2,337.21 CONCRETE CURB IN LANDSCAPE AREAS (LF) BACKFILL AND SUBGRADE FOR THIS (LF) SUBTOTAL CHAD OLESON SUPERINTENDENT FOR COORDINATION 3 MO'S ECI MAT'LS ECI LABOR & EQUIP ECI MAT'LS ECI MAT'LS ECI MAT'LS ECI LABOR & EQUIP $ 8,151.06 $ 12,537.22 ECI MAT'LS ECI LABOR & EQUIP ECI LABOR & EQUIP $ 3,360.00 $ 8,653.56 ECI LABOR & EQUIP RICK COULTER GENERAL SUPERINTENDENT FOR COORDINATION 4 MO'S I I ECI LABOR &EQUIP MARKUP ON MATERIALS1 I ECI LABOR & EQUIP MATERIALS I COST LESS MArL I ECI BREAKDOWN SCOPE ITEMS FOR SPRING CANYON COMMUNITY PARK - FT. COLLINS I Entry Drive Bridge/ Trail Underpass Site Furnishings Scope of work ENTRY DRIVE BRIDGE / TRAIL UNDERPASS - COMPLETE EXCAVATION FOR WI BACKFILL AND COMPACT BEHIND WI PICNIC TABLES PICNIC TABLES INSTALLATION SUBTOTAL BENCH W/BACK Material Cost Labor & Epuipment (LESS ECI MAT'LS ECI LABOR &EQUIP $ 14,280.00 1 $ 7,972.80 BENCH W/ BACKI ECI MAT'LS 11 INSTALLATION ECI LABOR & EQUIP BACKLESS BENCH SUBTOTAL [$ 20,007.00 $ 9,754.03 BACKLESS BENCH INSTALLATION SUBTOTAL TRASH CANS TRASH CANS INSTALLATION SUBTOTAL BICYCLE RACK ECI MAT'LS ECI LABOR & EQUIP $ 8,514.001 $ 4,879,82 ECI MAT'LS ECI LABOR & EQUIP $ 12,780.00 1 $ 9,008.20 BICYCLE RACKI ECI MAT'LS INSTALLATION ECI LABOR &EQUIP BARBEQUE SUBTOTAL $ 6,370.00 1 $ 7,680.30 DRINKING FOUNTAIN BARBECUE INSTALLATION SUBTOTAL DRINKING FOUNTAIN INSTALLATION SUBTOTAL ECI MAT'LS ECI LABOR & EQUIP $ 2,508.00 1 $ 1,909.26 ECI MAT'LS ECI LABOR & EQUIP $ 14,205.00 $ 8,574.65 I ECI BREAKDOWN SCOPE ITEMS FOR SPRING CANYON COMMUNITY PARK - FT. COLLINS I Scone of work SOLAR PUMP SOLAR PUMP VAULT AND ASSOCIATED COMPRESSORS INCLUDED??? PIPE SUPPORT 15'X2" GALVANIZED EXCAVATE FOR VAULTS/ CONDUITS/ INSTALL SUBTOTAL 36" PIPE SECTIONS (SHOWN ON PLANS) 36" PIPE SECTIONS (SHOWN ON PLANS) INSTALLATION SUBTOTAL TRAINING CAVALETTIES (SHOWN ON PLANS) SMALL CAVALETTIES (EA) LARGE CAVALETTIES (EA) INSTALLATION SUBTOTAL 2 SWINGING BENCHES (ADDENDUM #2) (2) GAMETIME SWINGING BENCHES S12 AND D14- MODEL 28028 ECI MAT'LS INSTALLATION ECI LABOR &EQUIP EMERGENCY CALL BOXES SUBTOTAL [$ 3,492.00 $ 2,3151.75 Material Cost Labor & Equipment 160' Walk Extension to Oleander School 160' WALK EXTENSION STANDARD GREY CONCRETE 5" THICK SUBGRADE PREPARATION BACKFILL AND C( LANDSCAPE/ IRRIGATION ECI MAT'LS ECI MAT'LS ECI MAT'LS ECI LABOR & EQUIP $ 3,200.00 $ 3,445.00 ECI MAT'LS ECI LABOR & EQUIP $ 1,200.00 $ 1,273.92 ECI MAT'LS ECI MAT'LS ECI LABOR & EQUIP $ 2,350.00 $ 6,416.36 ECI I I ECI LABOR & EQUIP I I ECI BREAKDOWN SCOPE ITEMS FOR SPRING CANYON COMMUNITY PARK - FT. COLLINS I Scope of work Material Cost Labor & Equipment General Conditions/ Project Management RICK COULTER GENERAL SUPERINTENDENT ABOVE IN COST OF WORK CHAD OLESON ASSISTANT SUPERINTENDENT ABOVE IN COST OF WORK MIKE PAETZEL ASSISTANT SUPERINTENDENT FOR SKATEPARK ABOVE IN COST OF WORK TED JOHNSON PROJECT MANAGER 112 TIME FOR 18 MONTHS ECI LABOR & EQUIP SELINA'S COULTER - PROJECT ADMINISTRATOR 1/2 TIME OF 18 MONTHS ECI LABOR & EQUIP FUEL/ PICKUPS/ SUPERINTENDENT VEHICLES I ECI LABOR 9 FOl IIP ECI TRAILER _EC I SUPPLIES/ PAPER/ ETC FOR JOBSITE TRAILER $1,000.00/MOI ECI PLAN COPIES FOR SUBS, SUBMITTALS, AS -BUILT DRAWINGS ECI T'L SUBTOTAL ECI SELF PERFORMED ITEMS 1 $ 2,863EEKI I vn a wo a a `n ow 70.1 % $ 9,813,496.43 TOTAL MATERIAL COSTS IN BID 9.5% $ 1,323,105.34 TOTAL SUBCONTRACTOR AND MATERIAL COSTS $ 11,136,601.76 COST OF ECI WORK $ 2,853,648.05 PERCENTAGE OF THE COST OF THE WORK PERFORMED BY ECI 1 254% PERCENTAGE OF THE COST OF WORK AND MAT'LS USED BY ECI PROPORTIONAL TO ACTUAL COSTS 32.4%