Change Order Form
EnRlneerlug Department
PROJECT TITLE: 2005 Street Maintenance Program
PROJECT NUMBER: 320200 (Slurry Seal Project - Bid #5696)
CONTRACTOR: Intermountain SlurrySeal (PO #5503031) .
CHANGE ORDER NUMBER: 1
n 'preparin5 c ange orders s ow In o er as separate numbered paragraphs the folio -wing;
1, Reason for change. 2, Description of change.
3. Change in contract cost. 4. Change in contract time.
182. See attached sheet for detail.
3. The contract cost will decrease by $ (2,403.03)
4. There will be no change in contract time
ORIGINAL CONTRACT COST
$297,504.00
TOTAL APPROVED CHANGE ORDERS
$0.00
TOTAL PENDING CHANGE ORDERS
$0.00
TOTAL THIS CHANGE ORDER
($2,403.03)
TOTAL % OF THIS CHANGE ORDER
-0.81°%
TOTAL C.O. % Of; ORIGINAL CONTRACT
-0.81%
ADJUSTED CONTRACT COST
$295,100.97
(Assuming all change orders approved)
ACCEPTEDI
APPROVED
APPROVED
DATE: _3- - `p,
)ATE:29_�
DATE: _0
APPROVED BY: DATE:
Department Head
APPROVED BY:
Project File
DATE:
(Purchasing Agent over $30,000)
($18.70) Parking
($2,384,33) Png mering
Rnalneerine DeDurtment - 281 North College Avenue - 0,0. Box 580 - Fort Collins, CO 80522-0580 - (970) 221-6605
MAR-30-2006 THU 02:48 PM CFO ENG. FAX NO, 9702216378
P. 11
City of Port Collins F/NA1, CHANGE ORDER
2005 Asphalt Slurry Seal Pruject
lnterrncuntain Slurry Scal
Aid No. 5698 - Rellewal
Item No.
Description
Contract Cost
Actual
Quantity
+f-Quantity
4✓--Cost
105,10
Sweeping - All Streets (Day 5 gnly)
$ 9.400.00
2,00
0,00
S
105.20
Swaging - Parks (Day 5 only)
S 340.00
2,00
0.00
$
400.01
Type 11 Asphalt Slurry Seal -All Street
$ 267,860,00
22G698.23
(301,77)
S (356.09)
Locations
409.02
Type 11 Asphalt Slurry Seal - Parks
S 1,680,00
1340.67
(59.33)
$ (71,20)
614.01
`No Parking" Sign With Stand
S 11815.00
2812.00
1,312.00
S 1,640.00
614.02
Vertical Panel Without Light
S 15.00
0.00
(20.00)
S (15-00)
614,03
Type I Barricade Without Light
$ 15.00
0.00
(20.00)
$ (15,00)
614.04
Typo It Barricade WithnutLight
$ 15.00
0.00
(20.00)
5 (15.00)
614.05
'Type III Barricade Without Light
$ 437.50
183.00
8.00
$ 20.00
614.06
Size A Sign With Stand
$ 618.75
228.00
(47.00)
$ (105.75)
614.07
Size B Sign With Stand
$ 393.73
244.00
69.00
S 155.25
614.08
Size A Specialty Sign - Cost of
$ 25 M
0.00
(5.00)
$ (250.00)
Manufacturing
614.09
Size n Specialty Sign - Cost of Manufacturing
S 250.00
0.00
(5,00)
S (250.00)
614,10
Cone With Reflective Strip
$ 3,125.00
1922.00
(578.00)
$ (722S0)
614.11
Safety pence
$ 100.00
0.00
(20,00)
$ (100.00)
614.12
Light- Swady I3urn
$ 2.00
0.00
(20.00)
$ (2.00)
614,13
I.ight- plashing
S 2.00
0.00
(20.00)
S (2.00)
614 14
Advance Warning Flashing - or Sequencing
$ 125,00
0.00
(5.00)
$ (125.00)
Arrow Panel
614,15
lrnfticControl Supervisor/Daily
S 6,000.OD
11.00
(4.00)
$ (1,600,00)
614.16
Traflic Control Supervirorlliourly
$ 2,000.00
64,25
14,25
$ 570.00
614,17
Flagging
S 3,000,00
122.75
(77.25)
$ (1,158.75)
TOTA(. COST 1 (2,403.03)
Parks $ (18-70)
Enginccring $ (2,39433)
(2,403.03)