HomeMy WebLinkAboutRESPONSE - BID - 5963 TRAILWORK 2006SECTION 00300
BID FORM
PROJECT:
Place 0%Z: tL5 GO
Date fZ/53 o(r '
1. In compliance with your Invitation to Bid dated , L JSLL. 3 0 , 20 04 and
subject to all conditions thereof, the undersigned
a (Corporation, Limited Liability Company, Partnership, Joint Venture, or
Sole Proprietor) authorized to do business in the State of Colorado
hereby proposes to furnish and do everything required by the Contract
Documents to which this refers for the construction of all items listed
on the following Bid Schedule or Bid Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this
proposal is made in good faith, without collusion or connection with any
other person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the
Invitation to Bid and Instructions to Bidders, the Agreement, the
detailed Specifications, and the Drawings pertaining to the Work to be
done, all of which have been' "examined by the undersigned.
3. Accompanying this Bid is a certified or cashier's check or standard Bid
bond in the sum of p'lue_ e�aG -rvTw-4. sou Ri n
($ S % ) in accordance with the Invitation To Bid and Instructions
to Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award of the contract is delivered to him at the address given on this
Bid. The name and address of the corporate surety with which the Bidder
proposes to furnish the specified performance and payment bonds is as
follows: 3 r, v6 �o ex uy cil, aox. %/.- viz Ni�ityf TYrh Sc3or�
5. All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by
the CONTRACTOR under one of the items listed in the Bid Schedule,
irrespective of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No.
_through
7/96 Section 00300 Page 1
11. List the more important projects recently completed by your company,
stating the approximate cost of each, and the month and year completed,
location and type of construction.
see attached
12. List your major equipment available for this contract.
see attached
13. Experience in construction Work similar in importance to this
project:
see attached
14. Background and experience of the principal members of your organization,
including officers:
see attached
15. Credit available: $
16. Bank reference: Colorado State Bank. 1600 Broadway, Denver, 80202
Carleton Hamm, (303) 861-2111
17. Will you, upon request, fill out a detailed financial statement and
furnish any other information that may be required by the OWNER?
18. Are you licensed as a General CONTRACTOR? yes
If yes, in what city, county and state? Denver, Lakewood, + What
class, license and numbers? see attached
19.
Do you anticipate subcontracting
Contract? yes
If yes, what percent of total contract?
and to whom?
Work under this
20. Are any lawsuits pending against you or your firm at this time? No
IF yes, DETAIL
7/96 Section 00420 Page 2
TECHNOLOGY
CONSTRUCTORS
INCORPORATED
6. Contracts on hand
Estimated
JOB Completion
Owner Project # Project Amount Date
Regional Transportation District
35-FP-006
Colfax & Federal Transfer Facility Construction Project
$1,058,683
01/16/06
City of Fort Collins
5912
Old Town Square and Alleys Enhancement Project
$939,973
05/31/06
Regional Transportation District
35-DO-043
Wayfinding Signage for Five P-n-Rs Project
$66,762
04/22/06
11. Previous projects with similar work
CONTACT
TITLE PROJECT NUMBER START -DATE
OWNER PHONE PHONE PROJECT NAME FINAL EST_COMP_D
ADDRESS FAX EMAIL LOCATION COMPLETE AMOUNT CONSTRUCTION DESCRIPTION
City of Lakewood
480 South Allison Parkway
Lakewood, CO 80226-3127
Town of Breckenridge
150 Ski Hill Road; PO Box 168
Breckenridge, CO 80424
(303)987-7670
(303)987-7678
(970)453-3175
970-547-3132
Greenwood Village, Colorado 303-708-6135
10001 E. Costilla Avenue 303-708-6137
Greenwood Village, CO 80112-3730
City & County of Denver
201 W. Colfax, Box No. 509
Denver, CO 80202
720-865-3100
720-913-4543
Rick Baldessari
Project Manager
(303)987-7809
Robert Theobald
Civil Engineer 1
(970)453-3196
robt@townofbreckenridge.com
Rich Weyman
Project Manager
(303)708-6137
thevillage@greenwoodvillage.com
Larry Grauberger
Asst. Dir of Const-Projects
720-913-4524
larry.grauberger@ci.denver.co.us
2429 05/13/04 $168,795.57
Lakewood Link Skate Feature Development
W. Mississippi and Reed St.
11 /01 /03 $306,382.26
Breckenridge Transit Center -Phase I
N. Park Avenue & Watson -Breckenridge
2000 Capital Improvement
Program -Orchard Rd Traffic
Calming
Orchard Road
PZ22099169
8th Avenue, Federal Blvd. tc
Knox Ct. & Federal & Evans
Denver, CO
02/03/04 Skatepark with bowls, walks, ramps,
05/03/04 drainage system
09/02/03 Curb, gutter, walk,& ramps, HDPE pipe,
10/03/03 storm & sanitary sewer, sand/oil interceptor,
catch basins & inlets
08/15/01 $1,451,363
12/08/00 Construction of traffic calming medians with
$1,507,357
07/31/01 signalization. Work included concrete curb,
gutters, and walk, asphalt repaving,
associated storm water pipe and inlets, and
extensive landscaping and irrigation and
retaining wall.
11/13/01 $1,807,618
08/07/00 Complete streetscape including concrete
$2,106,481
07/03/01 curb, gutter, ramps, RCP & inlets,
landscaping and irrigation, traffic
CONTACT
TITLE PROJECT NUMBER
OWNER PHONE PHONE PROJECT NAME
ADDRESS FAX EMAIL LOCATION
Regional Transportation District
1600 Blake St.
Denver, CO 802002
Other References:
Jeff Simmons
Senior Land Architect
City of Arvada
(720)898-7391
303-299-2300 Jim Rhodes
303-299-2373 Project Manager
303-299-4104
jim.rhodes@RTD-Denver.com
Jim Barwick
Chief Construction Engineer
City and County of Denver
(720) 913-4535
START -DATE
FINAL EST_COMP_D
COMPLETE AMOUNT
CONSTRUCTION DESCRIPTION
IFB 34-DD-002 05/04/05 $604,913 09/08/04 Concrete pavement and trench drains at bus
Platte Site Improvements - $746,966 04/29/05 garage
Trench Drain and Concrete added phase
3333 Ringsby Court, Denver, CO
Robert Stewart
Senior Construction Engineer
City and County of Denver
(720)913-4533
David Flaig
Architect
City of Littleton
303-795-3766
TECHNOLOGY
U CONSTRUCTORS
INCORPORATED
12.
EQUIPMENT OWNED OR LEASED AVAILABLE FOR USE
1999 Melroe 873 Loader (Bobcat)
1999 Melroe 873 Loader (Bobcat)
1999 Melroe 873 Loader (Bobcat)
1998 Melroe 863 Loader (Bobcat)
1996 John Deere 310D Backhoe/loader
1997 Ford F700 Flatbed Dump Truck
Stanley Breaker
1999 Dodge Ram 3500 Truck 44
1999 Dodge Ram 3500 Truck
2005 Ford F250 Truck
2000 Chevrolet Tahoe
2000 Ford Excursion
2001 Chevrolet Tahoe
1998 Wacker Trench Roller
(6) Demolition & Slab Saws
Meiho Vibratory Roller
(1) Storage Containers on wheels
(2) 40 foot Van Trailers
(6) Utility Trailers
30 foot Office Trailer
(1) Meiho Compactors
(3) 1998 Mikasa Compactors
(4) 1999 Mikasa Compactors
(3) Generators
Concrete forms
5636 Kendall Court, Unit A, Arvada, CO 80002-2747, (303) 431-2961, (303) 431-0091 fax
TECHNOLOGY
CONSTRUCTORS
INCOPPOPATEED
13. Construction Experience: (also see #11)
Project name
Project
Gross
Completion
Job Location
Owner
Amount.
Date
Location
Type of construction
2549 Sheridan Sidewalks, Mississippi to Kentucky
City of Lakewood
$125,271
09/09/05
Sheridan Blvd- Mississippi
Rehab of concrete pavement, walks, curb & gutter,
to Kentucky
culverts, retaining wall
Storage Pad and Roadway Improvements
City of Englewood -Littleton/
$452,255
10/06/05
Byers, CO
Asphalt roadway, drainage, riprap, retention pond
Project
STA 0142-044 SH 14 Drainage Improvement MP 117.2
CO Dept of Transportation
$52,307
06/29/05
SH 14 at MP 117.2
Drainage -RCP and inlets, erosion control
5913 Basketball Court at City Park
Heritage Club at Greenwood Village-2005
Site Improvements
Littleton Historical Museum Walkway
SHE R600-240 R-6 Signal Project
2506 Taft Park Bridge Replacment
City of Fort Collins $38,556
American Retirement Corpo $176,059
City of Littleton $60,066
CDOT-DKS Enterprises Inc $59,904
City of Lakewood $44,478
University Physicians Median Closure University Physicians, Inc.c $59,755
Project
Parking Lot Construction at The Cherry Cherry Creek Vista Park & $103,228
Creek Vista Pool
IFB 34-DD-002 Platte Site Improvements - Trench Drain and Regional Transportation Dis $746,966
Concrete
P 08-03-6 Messina Park Improvements City of Federal Heights
2429 Lakewood Link Skate Feature Development City of Lakewood
$91,697
$168,796
09/16/05 Oak St. & Bryand Ave. -Ft. Asphalt basketball court & concrete walks
Collins
10/06/05
6450 Boston Street,
Parking lot, storm drainage, concrete walks, curbs, gutters,
Greenwood Village, CO
fencing, gates, landscaping
04/30/05
OBIA15 Gallup St -Littleton
Concrete walkway, irrigation, fencing
04/30/05
University & Belleview-
Concrete sidewalks, curb ramps, curbs, patterned median
Littleton
covers
01/21/05
2951 Simms Drive
Replace concrete deck panels and abutements on
pedestrian bridge
04/15/05
Colfax & Potomac- Aurora
Construct center median with decorative concrete,
landscaping & irrigation, remove left turn lane
05/21/05
E. Orchard Road & S. Lima
Construct center median with decorative concrete,
St.
landscaping & irrigation,remove left turn lane
05/09/05
3333 Ringsby Court,
New asphalt parking lot with concrete curb, gutter, and
Denver, CO
sidewalk and sidewalk chase and drainage installed.
05/21/04
2020 West 90th Avenue
Recreation site improvement inc. benches, pavilion,
landscaping
05/13/04
W. Mississippi and Reed St.
Skatepark with bowls, walks, ramps, drainage system
S. Windermere Street Bridge Highline City of Littleton $87,460 01/17/04 Windermere St. S. of Bridge repair and approach to bridge
Emergency Bridge Repair Project Ridgeview Dr.
Project name
Project
Gross
Completion
Job Location
Owner
Amount
Date
Location
Type of construction
2549 Sheridan Sidewalks, Mississippi to Kentucky
City of Lakewood
$125,271
09/09/05
Sheridan Blvd- Mississippi
Rehab of concrete pavement, walks, curb & gutter,
-- Breckenridge Transit Center -Phase I
Town of Breckenridge
$306,382
11/01/03
N. Park Avenue & Watson-
Curb, gutter, walk,& ramps, HDPE pipe, storm & sanitary
Breckenridge
sewer
Bega Park Site Improvements
South Suburban Parks &
$75,432
06/20/03
W Main SUS Rio Grande St
Earthwork, colored concrete, concrete design work
Recreation
GLPF 207 Dahlia Street Landscaped Median Project City of Glendale $95,331 02/01/03 1000 Dahlia Street Concrete curb, gutter, sidewalk, pavement
CE20232 Downing/Cherry Creek D-11 Bike Ramp City & County of Denver $264,199 11/21/03 Downing/Cherry Creek Bike ramps and trails, box culvert and retaining wall
Improvements
7 TECHNOLOGY
CONSTRUCTORS
INCORPORATED
14. Qualifications of Management
PRESIDENT: Richard Lee
Employment with Technology Constructors, Inc. since June 1, 1978
Degree: Bachelor of Science in Civil Engineering
The State University of New York, Buffalo
Graduated 1976.
Certifications/Training: Class B License - Supervisor for Building
Construction
City & County of Denver
Journeyman Drainlayer
City and County of Denver
Excavations and Confined Space
Erosion Control
Current responsibilities with Technology Constructors, Inc. include:
1. Overall company operations
(a) Relationship with bonding & insurance company
(b) Relationship with banker
(c) Other relationships vital to Technology Constructors, Inc.'s
operation
(d) Company policy and procedures
(e) Company budgets
2. Office operations
3. Oversee contracting
(a) Preparation of bid
(b) Preparation of subcontracts
(c) Negotiations
(d) Purchase of major material items
(e) Compilation of job cost control information
Experience prior to Technology Constructors, Inc.
In the Denver area, Richard Lee worked as an Estimator and
Project Manager for a small commercial construction company involved
with: windmill tower erection, waste water treatment plant construction,
diversion dam construction, park construction, commercial building, and
commercial remodeling. He also worked as a Design Engineer for an
engineering firm. Prior to graduation, he worked summers and part time
as an electrician's helper, sheet -metal worker, and general laborer.
5636 Kendall Court, Unit A, Arvada, CO 80002, (303) 431-2961, (303) 431-0091 fax
TECHNOLOGY
CONSTRUCTORS
INCOPPORATED
14. Qualifications of Management
VICE PRESIDENT: Mark DeMane
SECRETARY/TREASURER
Employment with Technology Constructors, Inc. since June 1, 1978
Degree: Bachelor of Science in Civil Engineering
The State University of New York, Buffalo
Graduated 1976.
Certifications/Training: Traffic Control Supervisor
Excavations and Confined Space
Current responsibilities include:
1. Overall project management
(a) Scheduling of work crews, equipment, materials, and
subcontractor
(b) Administration of job cost budgets(c) supervision of all field
personnel
(d) Supervision of all field construction activities
(e) Procurement of field construction equipment
(f) Supervise all equipment maintenance
Experience prior to Technology Constructors, Inc.
In the Denver area, Mark DeMane worked as a Project Superintendent for a
small commercial construction company involved with: windmill tower
erection, wastewater treatment plant construction, diversion dam
construction, park construction, commercial building, and commercial
remodeling. He also worked as a Design Engineer and Field Inspector for an
engineering firm. Prior to graduation, he worked summers and part-time in
various trades as: iron worker, equipment operator, and general laborer.
5636 Kendall Court, Unit A, Arvada, CO 80002, (303) 431-2961, (303) 431-0091 fax
7 TECHNOLOGY
CONSTRUCTORS
INCOf?PORATED
14. Qualification of Estimator/Project Manager
ESTIMATOR/PROJECT MANAGER: Edward R. Callejo
Employment with Technology Constructors, Inc. since April 1, 2001
Degree: Bachelors of Science Degree in Construction Management
Colorado State University
Graduated 1982
Certifications/Training: Supervisor Certification — City of Aurora
Current responsibilities with Technology Constructors, Inc. include:
1. Estimating
(a) Preparation of bid
(b) Preparation of subcontracts
2. Project Management
(a) Preparation of bid for contract changes
(b) Purchase of major material items for jobs
Experience prior to Technology Constructors, Inc.
K.E.C.I. Colorado, Inc. February 1985 — February 2000: Project
Manager/Estimator
February 2000 — March 2001: Vice President
Responsible for site work municipality contracts throughout the state of
Colorado. Took on projects as a general contractor in the areas of
intersection improvements, short span bridges, concrete box culverts and
roadway improvements. As a subcontractor, the responsibilities were to
bid and oversee traffic control, permanent signing and concrete flatwork
contracts.
El Paso Asphalt January 1984 — January 1985: Estimator
Responsible for bidding paving projects in the Colorado Springs area.
Colorado Dept. of Transportation: March 1983 — September 1984:
Engineers Aid
Preparing cost estimates for projects under $500,000.00.
5636 Kendall Court, Unit A, Arvada, CO 80002, (303) 431-2961, (303) 431-0091 fax
TECHNOLOGY
UCONSTRUCTORS
INCORPORATED
14. Qualifications of Superintendent
SUPERINTENDENT: Gerald E. Pfirsch
Employment with Technology Constructors, Inc. since April 14, 2004
CertificationsfTraining: CQC Manager, Army Corp -Safety Director for
job
15t Aide/CPR-American Red Cross
Current responsibilities include:
1. Project supervision
(a) Scheduling of work crews, equipment, materials, and
contractors for on site work
(b) Supervise job site personnel
(c) Supervision of job site construction activities
Experience prior to Technology Constructors, Inc.
Bear Star Ent. Inc. February, 1996 — April, 2004
Responsible for Project supervision, job site management, oversee
safety program, CQC Manager for all Bear Star Army Corp jobs.
Experience in: concrete work, walls and flatwork, renovation work of
government building, historical renovations.
Williams Bros. Construction 1995 —1996, Hanford Washington
Safety Director for job in Area 51, Drinking water system.
Tracy Cowdrey and Associates June, 1993 — November, 1994,
Carpenter
Bridge construction — form, place, finish, concrete.
Other experience includes project supervision building sewage pumping
stations, foundations, home and business remodeling. Worked in
construction since 1978.
5636 Kendall Court, Unit A, Arvada, CO 80002, (303) 431-2961, (303) 431-0091 fax
--02/23/06 13:08 FAX 3034310091 TECHNOLOGY CONST 14002
ADDENDUM1
5063 2008 Trail Work
REVISED BID SCHEDULE: (BASE BID)
Bid items are described in Section 01800
POUDRE TRAIL-
LEMAY AVENUE TO NIX FARM
BID
ESTIMATED
UNIT
ITEM
frEIM #
DESCRIPTION
QUANTITY
UNIT
PRICE
TOTAL
1
Mobil¢ation
1.00
LS
a - / &Oc "-
2
Tragic Control
1.00
LS
46WA
3
Demolition
32.696.00
SF
_Q
50U
4
Subgrade Prep
40,870.00
SF
0, 7°
3
5
IV Yosimite Brown colored concrete
40,870.00
SF
o?/g,. ( 6f/• -
6
Landscape Restoration
40,870.00
SF
p. ;0 ,
2-If, 5 . �=
7
Seeding
40,870.00
SF
O, f5-
Ca 130. so
POWER TRAIL:
HORSETOOTH RD TO GOLDEN MEADOWS PARK
a
Mobifization
1.00
LS
L(a n
!-16<9 —
9
Traffic Control
1.00
LS
a, 6,nc
Bab IMP
10
prune and grub
_ 1.00
—
LS
_LoQ _
/Jae , --
- —
Subgrade Prep -
—
11
subgrade preparations for trail
34,270.00
SF
3a� S61,
12
importand place class 5 abc
200.00
TON
13
Mirafi 500X Geotextile Fabric
5,400.00
SF
,5p
o� ,
7 Tl�0—
Concrete
14
1 O' Yosimite Brown colored
concrete trail
34,270.00
SF
.J. ---
15
8' Gray Concrete Sidewalk
1,120.00
SF
Jr c^
S �---
Landscaping
16
Landscape Restoration
34,270.00
SF
17
Sod
2,000.00
SF
0, A
18
Seeding
34,270.00
SF
19
Erosion Control
200.00
LF
TOTAL OF BASE BID
$ �Ci�I
Six
-/a e
` uAdissJUa
Iowa
DOLLARS
(written)
DWAt5 4,vo(
Fif{y
TECHNOLOGY
UCONSTRUCTORS
INCORPORATED
14. Qualifications of Superintendent
SUPERINTENDENT: Rudy R. Martinez
Employment with Technology Constructors, Inc. since August 29, 1989
Current responsibilities include:
Project supervision
(a) Scheduling of work crews, equipment, materials, and
contractors for on site work
(b) Supervise job site personnel
(c) Supervision of job site construction activities
Experience prior to Technology Constructors, Inc.
Rudy R. Martinez has worked in construction since 1970. Worked as a
union laborer from 1970-1974, carpenter and carpenter foreman from 1974-1986,
cement finisher from 1984-1989. He has worked in the capacity of superintendent
for TCI since 1992 on various size projects from $25,000 to $1,200,000.
5636 Kendall Court, Unit A, Arvada, CO 80002, (303) 431-2961, (303) 431-0091 fax
M9 TECHNOLOGY
CONSTRUCTORS
INCO2PORATE1D
Cm
18.
LICENSES expiration
Technology Constructors, IncType date Richard Lee Ed Callejo
Arapahoe County 07/01/06
City of Aurora 07/01/05 Supervisor 9/30/06
general bus 02/05/06
retail sellers license 02/05/06
City and County of Denver general 12/31/06 Supervisor B 6/30/08 1006536
contractor/ROW Drainlayer 7/31/08 1052983
City of Greeley contractor 03/30/06
general business 03/30/06
City of Greenwood Village contractor 06/16/06
City of Lakewood contractor 12/08/06
These are the current licenses. Note: TCI has not had any difficulty in obtaining
a license in any jurisdiction in the Denver Metro area.
5636 Kendall Court, Unit A, Arvada, Colorado 80002, (303) 431-2961, (303) 431-0091 fax
Client#: 20919
_ _ _TECHCON1 21.
ACORD- CERTIFICATE OF
D/YYYY)
LIABILITY INSURANCE o211605
12/05
,PRODUCER
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
HRH of Colorado
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
1720 S. Colorado Blvd Ste 600-N
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
O. Box 469025
ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
r —
Oenver CO 80246-9025
INSURERS AFFORDING COVERAGE NAIC #
INSURED:
INSURER A: Technology Constructors, Inc. MOUntaln States Insurance Grp 5900 +
INSURERS: Pinnacol Assurance 10780
5636 Kendall Court, Unit A INSURER C: j
Arvada, CO 80002 INSURER D:
INSURER E:
I Ht PULIUItS OF INSURANct LIS I to BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
R DD'L, l� -POLICY
EFFECTIVE POLICY EXPIRATION
iLT
LR INSRD TYPE OF INSURANCE I POLICY NUMBER ! OAT MIIVDOm'1 ATE IMMMDIYY)
f--`--It
LIMITS
A GENERAL LIABILITY CPP0103624 :01101/06 01/01/07
EACHOCCURRENCE 1S7 000000
X COMMERCIAL GENERAL LIABILITY
DAMAGE T EeEoociTEirD I si 00.000
CLAIMS MADE O OCCUR
MED EXP (Anyone person) j $1 O 0, 00
X A.I.:UND247
PERSONAL &ADV INJURY s1000000
04102
GENERAL AGGREGATE $2 OOO OOO
GENT AGGREGATE LIMIT APPLIES PER:
PRODUCTS-COMP/OPAGG $2000000
POLICY IX jRO- LOC
A
AUTOMOBILE
LIABILITY
BAP0103624
01101/06
01/01/07
IX
ANY AUTO
COMBINED SINGLE LIMIT
(Ea accident)
$1,000,000
ALL OWNED AUTOS
BODILY INJURY
$
SCHEDULED AUTOS
(Per person)
HIRED AUTOS
X
X
BeracciODILY
$
NON -OWNED AUTOS -
ent)
(Perzccideni)
PROPERTYDAMAGE
$
- --
(Per accident)
GARAGE LIABILITY
AUTO ONLY -EA ACCIDENT
$
OTHER THAN EA ACC
S
ANY AUTO
!
AUTO ONLY: AGG
S
A
EXCESSIUMBRELLA LIABILITY
UMB0103624
01/01/06
01/01/07
EACH OCCURRENCE ;
$1 OOO 000
X1 OCCUR CLAIMSMADE
AGGREGATE 151.000.000
$
$
DEDUCTIBLE
X RETENTION $ 10000
B
I WORKERS COMPENSATION AND
4051441
01/01/06
O1/O1/O7
X WC STATU- OTH-
$
EMPLOYERS' LIABILITY
E.L. EACH ACCIDENT
s500,000
ANY PROPRIETORIPARTNER/EXECUTIVE
I
OFFICER/MEMBER EXCLUDED?
If yes, descdba under
I
I
E.L. DISEASE- EA EMPLOYEEI$500000
_
T!
E.L. DISEASE- POLICY LIMIT I
$500,000
SPECIAL PROVISIONS below
OTHER
--__
DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS
Project Description: Basketball Court at City Park, Project #5913
The following are Additional Insureds as respects General Liability only
if required by written contract and coverage applies only as respects
(See Attached Descriptions)
!SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION
City of Fort Collins DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL __30* DAYSWRITTEN
215 N. Mason St., 2nd Floor !NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL
Fort Collins, CO 80522 ;IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR
REPRESENTATIVES.
AUT RIZED REPRESENTATIVE '
ACORD 25 (2001/08) 1 of 3 #M274582 HAS 0 ACORD CORPORATION 1988
21. What are the limits of your public liability? DETAIL
see attached insurance certificate
What company?
22. What are your company's bonding limitations?
$7,000,000 single, $12,000,000 aggregate
23. The undersigned
corporation to
verification of
Qualifications.
Dated at Arvada
State of Colorado
County of Jefferson
hereby authorizes and requests any person, firm or
furnish any information requested by the OWNER in
the recital comprising this Statement of Bidder's
this 23rd day of February 2006.
Richard Lee being duly sworn deposes and says that he
is President of Technology Constructors, Inc, and that
(name of organization)
the answers to the foregoing questions and all statements therein contained
are true and correct.
Subscribed
%and sworn /to/before me this 23rd day of February 2Z6_•
Notary Public
5636 Kendall Court, Unit A
Arvada, CO 80002-2747
My commission expires December 14, 2008
7/96 Section 00420 Page 3
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
performing over 15% of the contract.
SUBCONTRACTOR
7/96 Section 00430 Page 1
No Text
9. PRICES
The foregoing prices shall include all labor, materials, transportation,
shoring, removal, dewatering, overhead, profit, insurance, etc., to cover
the complete Work in place of the several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the
Bid or change quantities at his sole discretion without affecting the
Agreement or prices of any item so long as the deletion or change does
not exceed twenty-five percent (25%) of the total Agreement Price.
RESPECTFULLY SUBMITTED:
CONTRACTOR
Date
-` Title
1
License Number (If Applicable)
(Seal'- if Bid
iiiss%by corporation)
Attest:•'''�£:�-
Address �3G 1«N,t>A4, GTT Ud t r A.
Telephone
Email LGGA[ S C� C,�klEsS� kt�
7/96 Section 00300 Page 3
SECTION 00400
SUPPLEMENTS TO BID FORMS
00410 Bid Bond
00420 Statement of Bidder's Qualifications
00430 Schedule of Subcontractors
7/96 Section 00410 Page 1
r
SECTION 00410
BID BOND
KNOW ALL MEN BY THESE PRESENTS: that we, the undersigne�hnology Constructors, Inc.
as Principal, and as*Surety, are hereby held and firmly bound unto the city of
Fort Collins, Colorado, as OWNER, in the sum of $ FivP Porranr ** for the
payment of which, well and truly to be made, we hereby jointly and severally
bind ourselves, successors, and assigns.
THE CONDITION of this obligation is such that whereas the Principal has
submitted to the City of Fort Collins, Colorado the accompanying Bid and
hereby made a part hereof to enter into a Construction Agreement for the
construction of Fort Collins Project, 5963 Trail Work 2006.
v
NOW. THEREFORE,
r
(a) Xf said Bid shall be rejected, or
w (b) I€ said Bid shall be accepted and the Principal shall execute and deliver
a contract in the form of Contract attached hereto (properly completed in
e accordance with said Bid) and shall furnish a BOND for his faithful
performance of- said Contract, and for payment of all persons performing
labor or„furnishing materials in connection therewith, 4?10 shall in all
other respects perform the Agreement created by the acceptance of said
Bid, then this obligation shall be void; otherwise the same shall remain
in force and effect, it being expressly understood and agreed that the
liability of the Surety for any and all claims hereunder shall, in no
event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the
obligations of said Surety and its BOND shall be in no way impaired or
affected by any extension of the time within which the OWNER may accept such
Bid; and said Surety does hereby waive notice of any such extension.
Surety Companies executing bonds must be authorized to transact business in
the State of Colorado and be accepted by the OWNER.
* Employers Mutual Casualty Company
**of the amount bid (5.00%)
7/96 Section 00410 Page 2
IN WITNESS VEMOF, the Prineipal and the Surety have hereunto set their hands
and seals this 23 day of February , 200 L, and such of them as are
corporations have caused their Corporate seals to be hereto affixed and these
presents to be signed by their proper officers, the day and year first set
forth above.
NRI =au. SUMTY
Namt: Technology Constructors, Inc. Employers Mutual Casualty Company
Ad ess 636 Kendall Court, Unit A P.O. Box 712
ArXL da, CO 02 Des Moi s, I 03
e�
B By: '-
Title: Title: Frank C. Penn, Attorn in Pa 'it
;
ATTEST:
By
�..
(SEAL) (SEAL)
7/96 Section 00410 Page 3
No Text
1
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and
comprehensive. This statement must be notarized. If necessary, questions may
be answered on separate attached sheets. The Bidder may submit any additional
information he desires.
1. Name of Bidder: Technology Constructors, Inc.
2. Permanent main office address: 5636 Kendall Ct., Unit A, Arvada, CO 80002-2747
3. When organized:
4. If a corporation, where incorporated: Colorado
5. How many years have you been engaged in the contracting business
under your present firm or trade name? 26 _
6. Contracts on hand: (Schedule these, showing the amount of each
contract and the appropriate anticipated dates of completion.)
see attached
7. General character of Work performed by your company:
Demolition excavation concrete flatwork and misc. site improvements.
S. Have you ever failed to complete any Work awarded to you? No
If so, where and why?
9. Have your ever defaulted on a contract? No
If so, where and why?
10. Are you debarred by any government agency? No
If yes list agency name.
7/96 Section 00420 Page 1