Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 5958 EAST PROSPECT ROAD IMPROVMENTSSECTION 00510 NOTICE OF AWARD Date: March 2, 2006 TO: Don Kehn Construction, Inc. PROJECT: 5958 East Prospect Road Improvements OWNER: CITY OF FORT COLLINS (hereinafter referred to as "the OWNER") You are hereby notified that your Bid dated February 22, 2006 for the above project has been considered. You are the apparent successful Bidder and have been awarded an Agreement for 5958 East Prospect Road Improvements-Poudre River Bridge to Summit View Drive: 1. LPATH Structure which consists of superstructure and pre -cast girders sitting, on top of abutments and piers. Structure will be built to accommodate a 4-lane arterial roadway built per City of Fort Collins standards. Total quantity of class D concrete is approximately 531 CY. Structure will include bridge rails and pedestrian rails. 2. Installation of over 49,000 CY of embankment material. Over 31,000 CY consists of unclassified excavation. Material is available and located in the vicinity of the project. 3. Arterial roadway demolition and reconstruction. Pavement thickness is 12 1-" total (6 1�" asphalt concrete, 6" Aggregate Base Course). 4. Asphalt Mill (0"-3" depth) and overlay (2" depth) intersection of Summit View Drive and Prospect Road. 5. Installation of a reinforced concrete pipe storm sewer system ranging in pipe size from 18" to 36". 6. Updating of existing private sanitation sewer utility (1894 LF). 7. Relocation of 2 privately owned force mains. This work will include connections, air -vacs, blow -offs, and testing of the new lines. 8. Coordination of required utility relocations. 9. Wetlands mitigation landscaping and area of disturbance seeding/restoration. 10. Installation of new 5" thick, 10' wide concrete trail (approximately 4,600 SY). 11. Construction of a new parking lot. 12. Traffic control for work listed above. The Price of your Agreement is $3,757,538.35. Three (3) copies of each of the proposed Contract Documents (except Drawings) accompany this Notice of Award. Three (3) sets of the Drawings will be delivered separately or otherwise made available to you immediately. You must comply with the following conditions precedent within fifteen (15) days of the date of this Notice of Award, that is by March 17, 2006. 1. You must deliver to the OWNER three (3) fully executed counterparts of the Agreement including all the Contract Documents. Each of the Contract Documents must bear your signature on the cover of the page. 2. You must deliver with the executed Agreement the Contract Security (Bonds) as specified in the Instructions to Bidders, General Conditions (Article 5.1) and Supplementary Conditions. 9/12/01 Section 00510 Page 1 Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid abandoned, to annul this Notice of Award and to declare your Bid Security forfeited. Within ten (10) days after you comply with those conditions, OWNER will return to you one (1) fully -signed counterpart of the Agreement with the Contract Documents attached. By: City of Fort Collins OWNER James B. O'Neill, II, CPPO, FNIGP Director of Purchasing & Risk Management