Loading...
HomeMy WebLinkAboutCHANGE ORDER - REQUISITION - 26225MAR-17-2006 FRI 02:59 PM CFC ENG. FAX NO. 9702216378 P. 05 Change Order Form c�tyof�. a EaginecHug Department PROJECT TITLE: Mason Street Transporation Corridor PROJECT NUMBER: 30521900.6 (Bid #5932) CONTRACTOR: Mountain Constructors (PO #5506704) CHANGE ORDE)2 NUMBER: 1 n preparing change orders snow in order as separate numbered paragrap s e ounng: 1. Reason for change. 2. Description of change. 3. Change to contract cost. 4. Change in contract time. 1 &2. See. attached sheet for detail. 3. The contract cost will Increase by $ 0,141.U0 4. There will be no change In contract time. ORIGINAL CONTRACT COST $1,392,916.11 TOTAL APPROVED CHANGE ORDERS $0.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $9,141.00 TOTAL % OF THiS CHANGE ORDER 0.06% TOTAL 0.0, % OF ORIGINAL CONTRACT 0.66% ADJUSTED CONTRACT COST $1,402,056.11 (Assuming all change orders approved) ACCEPTED BY: SUBMITTED BY: Project Engineer APPROVED BY: APPROVED BY: cc: Purchasing Accounling Contraclor Project Re Project Manager (Purchasing Agent over $30,000) DATE: �- /d' O6 DATE: 3"' 1 3` OG DATE: 0! DATE: Engineering Department - 281 North College Avenue, P.O. Dox 50 • Fort Collins, CO 80522-0580 • (970) 221460S MAR-17-2006 FRI 02:59 PM CFO ENG. FAX NO, 9702216378 P. 06 .7 7.t r, .r,n'.yC14-7K.a77,.a.�"s:.,., q' Project 5893 - Mason Street/Harmony Road/Spring Creek Bike/Pedestrian Trail Mountain Constructors Adjustments were made to the design grades at sox Culvert #1 after grades were set to design and concrete forms were placed. - See attached submitia/ - - Rem Quanity Unit $1 Unit Total Superintendent-1 16 1 HR $45,00 $720.00 Laborers-3 18 HR $40.00 $720.00 JD 892D 12 HR $125.00 $1.600.00 Bobcat 325 Miniexcavator 4 HR $125.00 $500.00 3" Trash Pump 48 HR $6.00 $298,00 2" Submersible Pump 46 HR $4.00 $192.00 1 1/2" Rock 50 TON $9.65 $482,50 Time and Materials on 1/24106 and 1/25106 for MLL Subcontractor 1 LS $3,607.50 $3,607.50 Additional Concrete in Toe Walls 13 CY S87.00 $1,131.00 TOTAL $9,141.00 wQ The design grade that Box Culvert 02 was designed to was 0.68' higher than the concrete lined ditch. Mountain Constructors had already excavated all the toe walls and MLL had setup forms for this grade. After a quick call to FHU Consultant £ngineors, we decided that the box culvert grade should be set to the same grade as the channel. Mountain Constructors and MLL were directed to undo their work and re -excavate the box culvert to the lower grade. This change order pays Mountain Constructors and MLL for the adjustments to the box culvert elevation. WHIN 1351TElY Posted to Pay Estimate # 3